We regret to inform that we found the following concreting works was aborted before the concreting work complete. The structural
affected for Level 11, Slab and beam grid B2-G2/9a-11a.
I. Cold joint slab & Beam D2-F2/ 8a-9a
II. Improper joint preparation (soft and unsound concrete)
III. Casting without inspection
Kindly submit your proposal and remedial works ASAP.
Issued by : Received by :
Name : Alson Chin Yian Chon Name : Leong Wei Onn Name :
Designation : R.E Designation : R.A Designation :
Date & Time : 24-Nov-16 Date & Time : 24-Nov-16 Date & Time :
Root Cause:
Corrective Action:
Preventive Action:
Proposed by : Agreed by :
………………………………… ………………………………
Contractor’s Representative Consultant’s Representative
Name : Name :
Designation : Designation :
Date & Time : Date & Time :
Close-out
Approved/Reject
Name: Name :
Designation: Designation :
Date & Time: Date & Time:
CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho
Not proper construction joint
CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho
Cast without inspection
CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho