NBL ARCHITECTS SDN BHD

Lot 8669, 1st & 2nd Floor, Koperkasa Commercial Centre


Jalan Simpang Tiga, 93300 Kuching
Tel. : [082] 236 126
PROPOSED 18-STOREY & 2 BASEMENTS, COMMERCIAL, CARPARK & OFFICE BUILDING (BAITUL MAKMUR II)
ON LOTS 4563, 4564, 4565, 4566 & PART OF LOT 4580, BLOCK 18, SALAK LAND DISTRICT, BUKIT SIOL,
PETRA JAYA, KUCHING.
NON-CONFORMING REPORT(NCR)
NCR Reference No. : NBL/MASJA/NCR/0045 Date : 29-11-2016

Description of Works : Incomplete casting and cold joint


Location : L11/Slab and beam/ D2-F2/ 8a-9a

Description of Non-Conformance / Problems & Cause :

Documentation Material Machinery Others(workmanship)

We regret to inform that we found the following concreting works was aborted before the concreting work complete. The structural
affected for Level 11, Slab and beam grid B2-G2/9a-11a.
I. Cold joint slab & Beam D2-F2/ 8a-9a
II. Improper joint preparation (soft and unsound concrete)
III. Casting without inspection
Kindly submit your proposal and remedial works ASAP.
Issued by : Received by :

…………………………………… ……………………………………… ……………………………………


Consultant’s Representative Consultant’s Representative Contractor’s Representative

Name : Alson Chin Yian Chon Name : Leong Wei Onn Name :
Designation : R.E Designation : R.A Designation :
Date & Time : 24-Nov-16 Date & Time : 24-Nov-16 Date & Time :

Corrective Action (By Contractor) :

Accept Rework Repair Reject

Root Cause:

Corrective Action:

Preventive Action:

Proposed by : Agreed by :

………………………………… ………………………………
Contractor’s Representative Consultant’s Representative
Name : Name :
Designation : Designation :
Date & Time : Date & Time :

Close-out

Joint Inspection RFI No: Date:

Approved/Reject

……………………………………… ………………………………… Comments(if any):


Contractor Representative Consultant’s Representative

Name: Name :
Designation: Designation :
Date & Time: Date & Time:

CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho
Not proper construction joint

Soft and unsound concrete

CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho
Cast without inspection

CC:
NBL Architects Sdn Bhd Attn: Ar. Liew Nam Boon/Mr. Leong
Jurutera TCS Sdn Bhd Attn: Ir. Christopher Adrian/Pn. Aida Asrina
FCH Quantity Surveyors (S) Sdn Bhd Attn: Sr. Orbet Ho

Potrebbero piacerti anche