KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 25. Concreting
Klang, Selangor. Date: Date:

25. Concreting
HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager
Physical
- Fall of person from height Site Manager
- Working at least two workers per team.
- Fall of object from height -Serious injury / fatality 2 5 10 - To provide appropriate PPE. Site Agent
- Failure of formwork
Site Engineer
structure / support
Site Supervisor
SHO / SSS
- Concrete bucket shall have nozzle to reduce splash of
concrete chemical to concreter. EO
Body contact with concrete - MSDS / CSDS of concrete shall be submitted and Scaffolder
1 Concreting works -Skin allergic 2 3 6
chemical briefed to all person involved.
- Standby clean water &washing facilities. Work Leader
- To provide appropriate PPE. Machinery opr/
Driver
- Usage of rope to control vibrator nozzle. Signalman
Noise & vibration -Minor injury 2 3 6 - To provide appropriate PPE.
Banksman
Rigger
- To maintain good housekeeping and proper storage of
Physical waste materials. Welder
-Serious injury / fatality 2 5 10
Trip & Falls - Provide safe access and egress.
Workers
- To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)