Jakarta Mass Rapid Transit Project CP101&CP102 Inspection and Test Plan
Approval:
Description of Activity: Details the inspection and test plan for construction of WMS No: TWJO-MST-0011 ITP NO: TWJO-ITP-GEN-0009 revA
rigid pavement for detour at lebak bulus.
1 Documentation
Work Method
Before Civil Engineer/
Established Work Method Statement covering
1.2 commencement of OCS clause 3.1 Construction NA P NA I
Statement aspects include in
Excavation activity Manager
OCS clause 3.1
2 Material Testing
Concrete strength
Once before QC Engineer Compressive
Establishing the concrete trial mix TWJO-ITP-GEN- shall be equal to or
2.1 commencement of with QC strength R P I
for detour 0002 more than the design
concreting Manager reports
strength
Description of Activity: Details the inspection and test plan for construction of WMS No: TWJO-MST-0011 ITP NO: TWJO-ITP-GEN-0009 revA
rigid pavement for detour at lebak bulus.
4 Execution
Prior to
Demolition of above and As per Method As per Method
4.1 commencement of Civil Engineer NA P NA I
underground structures statement for detour statement for detour
Excavation activity
Surface irregularities
(soil, rubble, bushes)
to be removed and
Prior to soil As per Method Civil Engineer
4.2 Clearing and excavation clean.Underground NA P NA NA
compaction statement for detour or his delegate
structures, if any
(foundtions, tanks) to
be demolished
Description of Activity: Details the inspection and test plan for construction of WMS No: TWJO-MST-0011 ITP NO: TWJO-ITP-GEN-0009 revA
rigid pavement for detour at lebak bulus.
Prior to concreting;
One test/ 40 to 50
mtrs for straight
Permisible tolerances Civil Engineer
Checking thickness and width of section Survey
4.4 NA For thickness ± 5 mm with QC P NA I
Base Course or One test/ 20 to 25 Records
For width - 50 mm Engineer
mtrs for sections of
horizontal or vertical
curves
5 Rigid Paving
Prior to Vol 5 Outline TWJO-ITP-
5.1 Formwork material checking commencement of Construction Specs NA Civil Engineer GEN-0003- P NA I
concreting clause 5.10 CHK-001
Prior to Vol 5 Outline TWJO-ITP-
5.2 Formwork preperation checking commencement of Construction Specs NA Civil Engineer GEN-0003- P NA I
concreting clause 5.10 CHK-001
TWJO-ITP-GEN-0009 revA Page 5 / 7
INSPECTION AND TEST PLAN FOR TEMPORARY DETOUR AT LEBAK BULUS
Description of Activity: Details the inspection and test plan for construction of WMS No: TWJO-MST-0011 ITP NO: TWJO-ITP-GEN-0009 revA
rigid pavement for detour at lebak bulus.
Thickness of
Vol 5 Outline uncompacted layer ≤ TWJO-ITP-
Checking for thickness of concrete
5.3 For every casting Construction Specs 0.45 m Civil Engineer GEN-0003- P NA I
and height of concrete pour
clause 5.15.1 Height of placing ≤ 1.5 CHK-001
m
Vol 5 Outline TWJO-ITP-
Checking of Curing and Concrete
5.4 After every casting Construction Specs NA Civil Engineer GEN-0003- P NA I
Protection
clause 5.15.1 CHK-001
Construction of temperory
6
drainage & pedestrian
levels to be checked
Checking for drainage base level Civil Engineer Survey
6.1 Prior to concreting NA against the design P NA I
& pedestrian with Surveyor records
level
Description of Activity: Details the inspection and test plan for construction of WMS No: TWJO-MST-0011 ITP NO: TWJO-ITP-GEN-0009 revA
rigid pavement for detour at lebak bulus.
Legends P: Perform R: Review I: For Information only H: Hold point W: Witness point NA: Not Applicable
Prepared by: Approved by:
Name: Name:
Signature: Signature:
All approved ITPs and related records shall be stored on TWJO server under Quality Assurance folder with a hard copy in office file.