Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Introduction
WonJin Heavy Industries Co,.Ltd. was established in 1990 to provide domestic and
international clients with basic design and manufacturing of chemical equipment,
pressure vessels, and storage tanks for chemical and industrial plants.
WonJin Heavy Industries' advanced technology and expertise have earned high
marks in the industry, especially regarding methanol chemical plants. We are
positioned to deliver professional, in-depth services in engineering and constructing
formalin, chemical, and industrial plants.
KOPIA
Applications
Usage
�Phenol Resin and Adhesives / Urea and Melamine Adhesives
�Urea Resign / Melamine Resin / Hexamethy Lenetetramine
�Pentaerythritol / Paraformaldehyde
�Medicines and Agricultural Chemicals
�TMP / TME / NPG
�Polyacetal Resin (POM)
�MDI / Hemiformal
�Others
This reacted gas is immediately quenched in the waste heat boiler integrated with
the reactor. At the same time, the waste heat boiler recovers reaction heat to
generate stem, which is effectively used as heat sources for the methanol
evaporator and other heaters, and as stem supply for the mixer.
The reaction gas is introduced into the absorber where produced formaldehyde and
residual methanol are absorbed by recycling formalin at the lower section of the
absorber.
The vent gas from the absorber, containing about 20% of hydrogen, can be used as
boiler fuel to generate steam and prevent air pollution.
The product yield of the reaction is more than 91% (wt) and this process requires
small utilities and the cost of catalyst is very low.
WON JIN
Standard Proposal For Formalin Plant
KOPIA
Proposed Standard Plant
Production Capacity
�4,000 M3/Day
Working Condition : 12 Hours/day
Construction Schedule
About eighteen (18) months after receipt of the down payment, the plant will be completed.
However, this proposed schedule may be extended or shortened according to on-
site construction circumstances.
WON JIN
Standard Proposal For Formalin Plant
Operation Manpower
Classification No of Persons
�Plant Manager 1
�Engineer 1
�Production Operator 3
�General Worker 5
�Total (based on Korean) 10Per Shift
KOPIA
Technology Transfer with Training Program
The Company will provide the Owner with the latest technology and operational exper
tise for the effective management of the Plant in addition to the training of the Owner's
engineers and skilled workers at the Plant site and or in Korea, when required.
Plant Layout
Experience Record
Description Unit Consumption
�150 T/D Formalin Plant UJin Chemical 1986
�60 T/D Formalin Reactor Samyang Chemical 1994
�150 T/D High Content Haein Enterprise 1996
Formaldehyde Plant
�150 T/D Formalin Plant Haein Enterprise 1997
�150 T/D Formalin reactor Samyang Chemical 1998
WON JIN
Standard Proposal For
Formalin Plant