Sei sulla pagina 1di 3

GMR Hyderabad International Airport Limited

Price schedule for Design, procure, Construction, installation, testing, commissioning and handing over of Two new fuel storage tanks and associated
S.no Description Amount (Rs)
1 Cost Centre -1 : Preliminaries and General -
2 Cost Centre - 2 Foundation and Civil Works for Fuel Tanks -
3 Cost Centre 3 - New Tanks -
4 Cost Centre 4- Electrical works -
5 Cost Centre 5 - Fuel Pumps , fuel piping and foams systems -
Cost Centre 6- Offloading Bays & Green Belt Area - Works for 3 Offloading Bays including Shed/ -
6
Platforms/ Fall Arrestors including painting.
7 Cost Centre 7 - Up gradation of existing infrastructure -
8 Cost Centre 8- Replacement of valves for existing tanks -
9 Cost Centre 9- Final integration, testing, commissioning and approvals. -
GRAND TOTAL (1 to 9) -
Add Taxes (Out put tax)
IGST -

Total -
Note
The Prices shall include all taxes, duties, cess, import duties (if imported equipment used), labour welfare cess, octory, seigniorage/royalty charges and
1
any and all other statutory fee and charges applicable for the works. Except the out put GST payable against the invoice raised by the Contractor.
2 The bidder shall consider passing the input tax credit to the Employer/Client/GHIAL in the unit price quoted.
3 Above schedule shall be on Lumpsum, basis and the bidder shall provide a detailed BOQ for each cost centre along with the proposal. Currency of
4 Payment shall be made on achievement of milestones as provided in the RFP (Schedules)
5 Currency of Contract shall be in INR
GMR Hyderabad International Airport Limited
Price schedule for Design, procure, Construction, installation, testing, commissioning and handing over of Two new fuel storage
S.no Description Unit Qty Rate Amount (Rs)
1 Cost Centre -1 : Preliminaries and General
1.1 Design Services LS 1 -
1.2 Project Management LS 1 -
Quality assurance Plan, Quality Control, 1
1.3 environment management plan, statutory LS
compliance, progress reporting etc. -
1
1.4 Dismantling, relocation and other temporary works LS -
1.5 Fire Barrication and general Barrication works LS 1 -
1.6 Comply with the requirements for safety LS 1 -
Sub Total-1 -
Cost Centre - 2 Foundation and Civil Works for
2
Fuel Tanks
2.1 Site Preparation works -
2.2 Earth work in excavation in all type of soil Cum 2761 -
2.3 Plain Cement concrete works Cum 7 -
RCC for Foundation and substructures Concrete 32.6
2.4 Cum
works for new tanks -
2.5 Reinforcement Steel for all RCC Works MT 24 -
Dyke Flooring, Waterproofing and other Finishes / 1
2.6 misc. works. LS -
2.7 Sand Bedding Cum 903 -
1
2.8 Modification of Dyke Walls and Fire Walls before LS
and after Construction of New Fuel Storage Tanks. -
2.9 Foundation Drainage System LS 1 -
Sub Total -2 -
3 Cost Centre 3 - New Tanks
Fabrication and installation of Tank structure 2
3.1 Nos
including all associated works complete -
3.2 Tank internal and external painting Nos 2 -
Tank Roof structure and cover incl painting all 2
3.3 complete Nos -
Earthing & Cathodic Protection for Tank all 2
3.4 complete LS -
3.5 Tank Valves including all accessories Nos 36 -
Motorised Valves Nos 12 -
Non-Motorised Valves Nos 24 -
3.6 Tank marking, signage etc. LS 2 -
3.7 Instrumentation & Associated Works for tanks LS 2 -
3.8 Other Misc. works for tanks LS 2 -
Sub Total -3 -
4 Cost Centre 4- Electrical works
Electrical work including cables, controls, earth 1
4.1 LS
protection, lighting all complete -
Lighting System and Lightning Arrestor System, 1
4.2 LS
and Aviation lights . -
Sub Total - 4 -
Cost Centre 5 - Fuel Pumps , fuel piping and
5
foams systems
1000
5.1 Supply installation of Fuel Piping system including Rmt
pumps , valves, controls, and all associated works -
Supply, delivery, installation, testing, 1
5.2 commissioning & handing over of foam systems for LS
additional tanks -
5.3 Earthing & Cathodic Protection for Piping LS 1 -
Modifications/Alterations & Integration with existing 1
5.4 systems LS -
Sub Total - 5 -
Cost Centre 6- Offloading Bays & Green Belt
Area - Works for 3 Offloading Bays including
6
Shed/ Platforms/ Fall Arrestors including
painting.
750
Construction of pavement for the additional bays
6.1 (Including earth work excavation, backfilling all sqm
complete as per design parameters)
-
Extension of shed or roof/platforms/fall arrestors 150
6.2 sqm
for additional bays -
6.3 Pavement Marking LS 1 -
6.4 Drainage system LS 1 -
6.5 Painting to structure LS 1 -
All necessary IT & Communication, Electrical, 1
6.6 Instrumentation & Associated Works at offloading LS
bays & offloading pump house -
Sub Total - 6 -
Cost Centre 7 - Up gradation of existing
7
infrastructure
Up gradation of Firefighting, Fire Detection 1
7.1 LS
System, Fire Alarm Systems. -
SCADA Automation & Control System Up 1
7.2 gradation ( H/W & S/W) & Integration of New LS
storage facility with Existing facility. -
7.3 Any other systems as required LS 1 -
Sub Total - 7 -
Cost Centre 8- Replacement of valves for
8
existing tanks
Replacement of existing Manual Body Valves to 9
8.1 Motorized Valves & Modification of Existing Dyke Nos
Outlet Valves. -
Modifications, Instrumentation and associated 1
8.2
works LS -
Sub Total - 8 -
Cost Centre 9- Final integration, testing,
9
commissioning and approvals.
Perform final integrated test for tanks including 1
9.1 LS
calibration, hydro testing, soaking all complete -
9.2 Final commissioning, training and handover LS 1 -
1
9.3 Obtain all requisite approvals such as PESO, Fire LS
and others for commencement of operations. -
Sub Total - 9 -
GRAND TOTAL (1 to 9) -
Add Taxes (Out put tax)
IGST 18% -

Total -
Note
The Prices shall include all taxes, duties, cess, import duties (if imported equipment used), labour
welfare cess, octory, seigniorage/royalty charges and any and all other statutory fee and charges
1
applicable for the works. Except the out put GST payable against the invoice raised by the
Contractor.
2 The bidder shall consider passing the input tax credit to the Employer in the unit price quoted.
3 Above schedule shall be on Lumpsum, basis and the bidder shall provide a detailed BOQ for each cost centre along wit
4 Payment shall be made on achievement of milestones as provided in the RFP (Annexure)
5 Currency of Contract shall be in INR.

Potrebbero piacerti anche