Demolition & Dismantling Works (Non-Heritage Block)

Bracing of Heritage Block (Peripheral Wall)


Al Shafi Enterprises Commencement Date: December 15, 2017
Daily Construction Report
Site Info:
Site Name Silk Bank Tower
Owner JCL Reporting Date DATE: 16-12-2017

Subcontractor No. Contractor Al-Shafi Enterprises


Daily Job Report # 2 Day of Week Saturday

WeatherSS
Weather type (Sunny/Cloudy/Rainy) Time Temperature C
Sunny 1200PM Max. 28`

Site Visitor
Name Organization Time In Time Out
Mr. Abu Sady Silk Bank
Engr. Javaid Qasim Arcop
Syed Arif Shah ASPL
M. Saqib Rana ASPL
Jamil Shafi ASE
Muhammad Naeem ASE
Muhammad Ovais ASE
Faisal Nadeem ASE
Owais Raza ASE

ASE Site Staff:


Designation No. Work Hours Designation No. Work Hours
Project Manager 01

Project Engineer 01
Site Supervisor 01
Guard 02

Total 05
Demolition & Dismantling Works (Non-Heritage Block)
Bracing of Heritage Block (Peripheral Wall)
Al Shafi Enterprises Commencement Date: December 15, 2017

Daily Construction Report

Description of Works:
Current Week Targets:
Target Work Done Total Labor Details
Activity Job Today Achieved

Skilled Labor Unskilled Labor Total Manpower

Back Log Activities


Back Log:
Activity Target Work Done Total Achieved Labor Details
Quantum Today

-
-
-
-
-