Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Technology
Excelsior Class EBRV
138,000 m3
2
LNG STS Transfer
Double Banked at Anchor
3
LNG STS Configurations
LNG
Gas
LNG
Gas
LNG
Gas
4
LNG Lightering
5
Double-Banked at Bahia Blanca
6
Bahía Blanca GasPort
(Argentina)
7
LNG STS Transfer
Risk Management
LNG
means
9
LNG STS Transfer
Initial Engineering & Feasibility
• By BUREAU VERITAS
Target: assess measurable operational criteria to avoid sloshing
damage in LNG-C due to any level of partial filling during LNG
transfer
Conclusion: LNG-C maximum roll angle 2° ; keep heading +/-30°
into direction of significant waves
Hs < 2.0 m
• BY GTT
Target: determine the maximum LNG transfer flow rate
compatible with the treatment capacity of the increased Boil-Off
Gas (BOG)
Conclusion: Up to 6,000 m3/h with 60 mbar cargo tank pressure
difference between LNG-RV and LNG-C
• HAZID / HAZOP : Original STS design
Lloyds Register / BMT
10
LNG STS Transfer
Risk Based Assessments
11
LNG STS Transfer
Manifold Configuration
3 liquid lines
6 hoses
Blank flange
1 vapour line
2 hoses
Feeder ship
LNGRV
Spool pieces
Saddles
Flexible hoses
Dry-Break ERC
Water curtain & bath
12
LNG STS Transfer
Gear General Arrangement
13
LNG STS Transfer
Equipment Class Approvals
14
LNG STS Transfer
Cargo Transfer Hose
15
LNG STS Transfer
Cargo Transfer Hose
• 57 Layers of Polyethylene
• Film and Fabric
• Inner / Outer Stainless
Mandrel
• Electrically Continuous
• Failure Mode
• Leak before fail
• 400,000 Cryogenic Cycles
• Comprehensive testing by
TNO
• Flow tests at Nikisso w/ up
to 1500 m3/hr
16
LNG STS Transfer
Cargo Transfer Hose
• Composite Hose
• 8” Diameter
• 15 m Length
• 0.65 m Min. Bend Radius
• 300 Liter Volume per Hose
• DNV Type Approved
• Fit for Purpose
• Light and Flexible
17
LNG STS Transfer
Cargo Hose Storage
18
LNG STS Transfer
Cryogenic Hose Impact Test
• 224 kg x 1.5 m
•3 bar LN2
•No Leakage
19
LNG STS Transfer
Sudden Impact!
20
LNG STS Transfer
Cryogenic Hose Impact Test
21
LNG STS Transfer
Cryogenic Hose Crush Test
23
LNG STS Transfer
Cryogenic Hose Pressure Test
24
LNG STS Transfer
Cryogenic Hose Integrity
• 400,000 Cycles
• 2 Meter Stroke
• Certified by TNO
26
LNG STS Transfer
Hose Support Saddle
28
LNG STS Transfer
Reducing Wye Spool Pieces
• 16 “ x 12” x 8” (2)
• Standard ANSI 150# Flanges
• BV Class Approved
• Handled by Crane Horizontally
29
LNG STS Transfer
Specific Controls and Safety
30
LNG STS Transfer
Water Curtains & Bath
31
LNG STS Transfer
Emergency Release Couplings
32
LNG STS Transfer
‘Dry-Break’ Emergency Release Coupling
33
LNG STS Transfer
Emergency Release Coupling
• BV Class Approved
• Function Tested w/ 1”
‘Hard’ Ice
• Liquid Nitrogen @ 10
bar
34
LNG STS Transfer
ERC Actuated
35
LNG STS Transfer
Hose Brake System
36
LNG STS Transfer
Equipment, Controls and Safety
37
LNG STS Transfer
Fender Arrangement
38
LNG STS Transfer
Approach Maneuver
39
LNG STS Transfer
Coming Alongside
40
LNG STS TRANSFER
Mooring Operation
41
LNG STS Transfer
Cargo Hoses Rigged
42
LNG STS Transfer
Gear Placement
43
LNG STS Transfer
Hose Connection
44
LNG STS Transfer
Line Cooldown
45
LNG STS Transfer
Projected Time Line
• Rigging Fenders 1 hr
• Approach Maneuver 1 hr
• Mooring 2 hrs
• Pre-Transfer Meeting / Gauging 1 hr
• Connect Hoses 2 hrs
• Line Cooldown 1-½ hr
• ESD / ERC Tests ½ hr
• Cargo Transfer (130,000 m3 @ 5000 m3/hr) 26 hrs
• Hose Drain / Purge / Disconnect 4 hrs
• Unmooring / Vessel Separation 1 hr
• Fender Recovery 1 hr
Total Projected Time 41 hrs
46
1st Commercial STS Transfer
Scapa Flow – 8-9 February 2007
47
LNG STS Transfer
Site Specific Assessments
• Simulator training with Scapa Flow Pilots and EBRV senior staff at South
Shields Technical College (UK)
• Ballast Water Management issues regarding environmental preservation
• Waterway management risk assesment with Orkney Harbor Authority,
Scotish National Heritage and BMT-Isis
• Simulator training with Bahia Blanca Pilots and EBRV senior staff at SiPort
• Risk assessment of non-standard conditions prior to STS operation
Primarily for weather considerations and forecasted conditions
48
LNG STS Transfer
Full Rate Cargo Transfer (5,950 m3/hr)
49
LNG STS Transfer
Routine Inspections
50
LNG STS Transfer
Drain & Purge Hoses
51
LNG STS Transfer
CTMS
EXCALIBUR EXCELSIOR
52
LNG STS Transfer
Statistics
53
LNG STS Transfer
54