OWNER:
DATE: 6/28/2017
REVISION HISTORY:
Num Issuer
(1) SDI
(2) ENG
(3) SDI
(4) ENG
DOCUMENT COMMENTS:
REV A (2)
SPECIFICATIONS
Hoja 1 Los materiales de los containers, pre-formed
panels or pre-manufactured) deben tener un
del pdf tiempo de vida (de diseño) de al menos de 30
años, conforme a las especificaciones técnicas.
Note: According to the SA 3.4.2 of the Contract "The Owner’s review of design documents and any submittals from the Sup
complying with this Agreement; (b) any errors or omissions in any submittals; (c) confirming and correlating all quantities, de
construction techniques; and (e) ensuring the quality of the equipment in accordance with the Requirements"
Description
Communication code
INT-E-SDI-ENG-198
INT-E-ENG-SDI-354
INT-E-SDI-ENG-418
INT-E-ENG-SDI-592
Contractor's Answer
(3)
Hemos completado la primera versión del documento de proyecto
básico a la ingeniería de ejecución. En el presente documento, se
define un índice con los contenidosde memorias y planos relativos al
control+Administrative Building que completaremos ASAP con los del
MV Building
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
OK SE IMPLEMENTARA
e Owner’s review of design documents and any submittals from the Supplier shall not relieve the Supplier from the responsibility for: (a)
missions in any submittals; (c) confirming and correlating all quantities, details and dimensions; (d) selecting fabrication processes and
y of the equipment in accordance with the Requirements"
arios, A : Aprobado
PROJECT:
INTIPAMPA
SDI
9975-ENG-00.16-DWG-
BUILDINGS_RevisionSheet
Status Purpose
AC PR
Date Replied by
4/3/2017 ENG
4/6/2017
6/23/2017 ENG
6/28/2017
Status:
Open/
Owner's Repply Closed/ To
be Update
(4)
Closed
Closed
Closed
Closed
Open
Closed
Closed
Codificado Closed
Closed
Open
Closed
Open
Closed
(4)
Open
Compatibilizar los bancos de ductos
(exteriores) que se dirigen a las
To be
edificaciones con las canalizaciones de
update
cables interiores
Open
Open
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
To be
update
pplier shall not relieve the Supplier from the responsibility for: (a)
etails and dimensions; (d) selecting fabrication processes and