LONGJIAN ROAD & BRIDGE CO., LTD.

Paira Bridge (Lebukhali Bridge) Construction Project

Checklist for Reinforcement Cage for 2500mm Pile for Main Bridge

RFI Ref.: Cage No.:


Pier No.: Date:
Pile No.: Cage Length:

SL. Inspection Comments


Description Remarks
No. Yes No
1 RFI has received with all approved drawings

Pile Reinforcement
Fabrication & placing of reinforcement in the case as per drawing
2
(Nos of main bars, spirals/Hoops/Seismic Hooks etc.)
3 Laps/ Splice length/ Couplers provided as per drawing
4 Covers/ Spacers/ Chairs are adequately provided as per drawing
5 Check the couplers thread for AP1 and AP2 bars provided

Base Grouting and Ultrasonic Ingtegrity Test Arrangement

Base grouting arrangement have provided as per drawing (check nos


6 of GI pipes with joining nuts, position of holes on steel tube under
rubber sleeves at the bottom of pipes on each U loop)

Whether Ultrasonic integrity test arragement have confirmed with


7
base grouting or not?

O-cell Load Test arrangement


8 Check O-cell assembly with hudraulic hose pipes as per drawings
9 Check GI pipes with joining nuts for Telltale Rods
10 Check the position strain gauges in pile reinforcement cage

Contractor's Representative Consultant's Representative

Signature:

Name: Junior Engineer Bridge Engineer


Designation: ICT-KUNWHA-NARCO-EPC JV. ICT-KUNWHA-NARCO-EPC JV.

O-Cell Testing Agency

Signature:
Name:
Designation:
LONGJIAN ROAD & BRIDGE CO., LTD.
Paira Bridge (Lebukhali Bridge) Construction Project

Checklist for Reinforcement Cage for 2500mm Pile for Main Bridge

RFI Ref.: Cage No.:


Pier No.: Date:
Pile No.: Cage Length:

SL.
Description of Item Detail of arrangement Unit Quantity Detail Measurement Remarks
No.

AP1 Nos 39 12m


AP2 Nos 39 10.40m
Ties (20mm Dia) Nos 91
Steel Plate (Spacer), Single Nos 3 10mm thick, 140mm width
1 Reinforcement
Steel Plate (Spacer), Double Nos 1 Plate thickness 10mm, U-shape
Supporting Plate Nos 4 Plate size= 335 X 150 X 50
Base Plate Nos 4 Plate size= 550 X 210 X 20
Pipe Catching U-shape Hook Nos 24 12mm dia bar
40mm dia bar, althrough inside
Base Grouting Pipe Nos 6 main bar
2 Base Grouting
25mm dia bar, althrough inside
Base Grouting Pipe Nos 6 main bar
Pipe to top of reinforcement
Vent Pipe (GI) Nos 2 cage, dia 12mm
Pipe to top of reinforcement
Compression Pipe (GI) Nos 4 cage, dia 12mm

3 O-cell Arrangement Hydraulic Hose Pipe Reinforcement Cage top to


Nos 8 bottom

Strain Guage Nos N/A


250V- 6mm, all strainer and
Electric Wire Nos
transducer connected

Contractor's Representative Consultant's Representative

Signature:

Name: Junior Engineer Bridge Engineer


Designation: -KUNWHA-NARCO-EPC JV. ICT-KUNWHA-NARCO-EPC JV.

O-Cell Testing Agency

Signature:

Name:
Designation: