SEI ARUSHI PVT. LTD. SUNEDISON SOLAR POWER INDIA PVT. LTD.
PROJECT :
30MW / 36MWp SOLAR PV POWER PLANT AT KADIRI, ANDHRA PRADESH
SUPPLIER / CONTRACTOR:L & T CONSTRUCTION
Solar Projects
JOB No. O15111-WS-S
TOTAL NO. OF PAGES 5 TITLE :
NAME SIGN DATE
DSGN SRK SRK 15.10.2015
CHKD VR VR 15.10.2015
VENTILATION CALCULATION - CONTROL ROOM
APPD TRAMS TRAMS 15.10.2015
CODE REV.
DOC. No. O 1 5 1 1 1 - W S - S - D C - V F - 0 0 0 1
IS A
Sheet 01A of 04
Specific volume of air @ DBT & WBT ( Sa ) = 0.91 m³ / kg of dry air [ From psychrometric chart]
Heat dissipation from list of equipment : [ Inputs from AC,DC & Scada Electrical ]
NOTE : Heat load of inverter is not considered, only air requirement specified by the inverter manufacturer is considered for
sizing/selection of supply air fan.
L&T Construction
Water & Renewable Energy
Solar Projects
30MW / 36MWp SOLAR PV POWER PLANT AT KADIRI, DOC.NO : DATE
PROJECT:
ANDHRA PRADESH O15111-WS-S 15.10.2015
DESIGNED CHECKED APPROVED
TITLE: CONTROL ROOM - HT PANEL ROOM
SRK VR TRAMS
Total thermal heat addition into the room from the eletrical [ Inputs from the electrical DC / AC
= 5.767 kW
equipment ( with out inverter ), q team ]
Since, Heat dissipated from the electrical equipment = Heat gain by the supplied air into the room
[m : Mass of air ;
So, Heat gain is given by, q = m x Cp x ⍙t kW Cp: Specific heat of fluid ;
⍙t : Rise in temperature]
= 6300 m³ / hr [ Approx. ]
Total rate of air flow as per air changes = (13.415 * 8.64 * 3.7 ) x ( 15 )
= 6433 m³ / hr
Since, the amount of air flow calculated as per air changes in the room is higher than the equipment heat load requirement - Air flow requirement
based on air changes in the room shall be considered for ventilation design.
L&T Construction
Water & Renewable Energy
Solar Projects
30MW / 36MWp SOLAR PV POWER PLANT AT KADIRI, DOC.NO : DATE
PROJECT:
ANDHRA PRADESH O15111-WS-S 15.10.2015
DESIGNED CHECKED APPROVED
TITLE: CONTROL ROOM - HT PANEL ROOM
SRK VR TRAMS
Maximum allowable velocity of air flow through the Air filter = 2.5 m / sec
Velocity of air flow through the Air-Filter ( V ) = 2.2 m / sec [ Design consideration ]
Total rate of air flow as per air changes = (14.1 x 3.375 x 3.7 ) x ( 15 )
= 2641 m³ / hr
= 9600 m³ / hr
Number of air supply / exhaust fans will be estimated & sized as per the vendor catalogue for tube axial fans & propeller fans.
Flow rate of each supply air fan ( Q ) = 5000 m³ / hr [ From product catalogue ]
Maximum allowable velocity of air flow through the Air filter = 2.5 m / sec
L&T Construction
Water & Renewable Energy
Solar Projects
30MW / 36MWp SOLAR PV POWER PLANT AT KADIRI, DOC.NO : DATE
PROJECT:
ANDHRA PRADESH O15111-WS-S 15.10.2015
DESIGNED CHECKED APPROVED
TITLE: CONTROL ROOM - INVERTER ROOM
SRK VR TRAMS
Velocity of air flow through the Air-Filter ( V ) = 2.2 m / sec [ Design consideration ]