Design & Construct New Orbital Highway And Truck Route(P023)

Project ID : IA/12-13/C/060/ST
Contractor: Joannou & Paraskevaides(Overseas) Ltd/ J&P-Avax.S.A,-JV
Consultant: AECOM Middle East
Bill Of Quantities- JUNCTION 17
Old Design New Design
ITEM DESCRIPTION Variance Remarks
AMOUNT AMOUNT

STRUCTURES- JUNCTION 17 MB1


SUMMARY
A. EARTH WORKS (1,283,709.77) Err:509 Err:509
B. CONCRETE (6,814,195.81) Err:509 Err:509
C. REINFORECEMENT (11,997,968.03) Err:509 Err:509
D. FORMWORK (1,370,195.95) Err:509 Err:509
E. WATERPROOFING (858,757.86) Err:509 Err:509
F. PILING WORKS - Err:509 Err:509

Total QAR. (22,324,827.42) Err:509 Err:509


Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
SEISMIC - Junction-17
ITEM
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
SEISMIC - Junction-17
DESCRIPTION

SUMMMARY

Bill no - 01 - EARTHWORKS

Bill no - 01 Additions

Bill no - 01 Omissions

Bill no - 02 - CONCRETE WORKS

Bill no - 02 Additions

Bill no - 02 Omissions

Bill no - 03 - REINFORECEMENT WORKS

Bill no - 03 Additions

Bill no - 03 Omissions

Bill no - 04 - FORMWORKS

Bill no - 04 Additions

Bill no - 04 Omissions

Bill no - 05- WATERPROOFING

Bill no - 05 Additions

Bill no - 05 Omissions

Bill no - 06- BORED CAST IN PLACE CONCRETE PILES

Bill no - 06 Additions

Bill no - 06 Omissions
Total to Collection QAR.
AMOUNT

Err:509

(1,283,710)

Err:509

(6,814,196)

Err:509

(11,997,968)

Err:509

(1,370,196)

Err:509

(858,758)

Err:509

(354,663)
Err:509
BILL OF QUANTITY FOR MATERAL OF 11 KV SWITCHGEAR RING MAIN UNIT (RMU)

New Orbital Highway and trucj Route (P023)

Schedule
ITEM DESCRIPTION UNIT RATE QTY.
Ref.

11 KV SWITCHGEAR RING MAIN UNIT (RMU) FOR


OUTDOOR SS.26622

11KV, 520A, SWITCHGEAR RING MAIN UNIT FOR


OUTDOOR SUB-STATIOJN 26622 WITH SPARE PART nr 1 (TRM) + 1(RS)
LIST AS FOLLOWING:

Phase Comparator Test Unit Pcs 01

Torx Screw Driver Pcs 01

Cable Test Adapter Set 01

SF6 Gas leak detector Pcs 01

Tripping Solenoid 24V DC Pcs 01

Motor for TPS Pcs 01

CB On/Off Switch Pcs 01

Indication Lamp (Blue) Pcs 01

EFI with Sensor Pcs 01

IKI30 relay with current Sensor Pcs 01


TOTAL SUM COLLECTION QAR
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 01

STRUCTURES- JUNCTION 17 - OMISSIONS

A EARTHWORKS E 211 m3 449.52 2.8

Excavation for foundations;


B Depth: n.e. 0.25 m E 331 m3 674.28 34.65
C Depth 0.25 m to 0.50 m E 332 m3 1,123.80 34.65
D Depth 0.50 m to 1.00 m E 333 m3 2,247.60 34.65
E Depth 1.00 m to 2.00 m E 334 m3 4,495.19 62.38
Depth 2m to 5m E 335 m3 4,105.22 108.04

Excavation ancillaries
Preparation of excavated surface
F Material other than topsoil. Rock or artificial hard E 522 m2 4,495.19 1.89
material

Fillina to Structures
G Selected excavated material other than topsoil or E614 m3 4,878.65 65.71
rock

Filling ancillaries
Preparation of filled surfaces
H E722 m2 3,968.26 1.89
With material other than topsoil, rock or artificial
hard mat.

Disposal of excavated materials within 10 km radius

I Material other than topsoil. Rock or artificial hard E 532 m3 8,216.95 9.95
material
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 02

STRUCTURES- JUNCTION 17 - OMISSIONS

CONCRETE WORKS

Blinding concrete
A Grade; C30;Cement to BS 12 or BS 146; 20mm F 263 m3 475.34 502.14
Concrete For Foundations/Walls/Columns

B Grade; C40;Cement to BS 12 or BS 146; 20mm F283 m3 11,581.27 510.09

PLACING OF MASS CONCRETE


C Mass concrete for Blinding thickness n.e. 150mm F 511 m3 475.34 45.29

PLACING OF REINFORCED CONCRETE


D Reinforced concrete for Bases, footings, pipe caps F624 m3 7,689.90 50.59
and ground slabs; thickness exceeding 500mm

E Reinforced concrete for walls thickness thickness F 644 m3 1,930.61 62.61


exceedina 500mm

F Reinforced concrete for columns and piers cross F655 m3 1,960.76 69.66
sectional area exceeding 1 m2
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 03

STRUCTURES- JUNCTION 17 - OMISSIONS

REINFORCEMENT

Deformed high yield steel bars to BS 4449, type 2


grade 60 including cutting, bending & fixing using
tie wires as detailed on Drawings and Specifications

G 525 - G
A Various diameter: (10mm & above) t 2,700.75 4,442.46
527
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 04

STRUCTURES- JUNCTION 17 - OMISSIONS

FORMWORKS

A Plane vertical Width exceedina 1.22m G245 m² 8,454.93 96.16

Curved to one radius in one elanej as seecified and


detailed on drawings
B Width exceeding 1.22m G255 m² 4,502.02 123.76
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 05

STRUCTURES- JUNCTION 17 - OMISSIONS

WATERPROOFING SYSTEM

4mm thick mat type waterproofing membrane

A For bottom and sides of raft foundation G6/231G m² 9,274.84 52.86

B For sides of walls G6/231H m² 587.81 61.56

PROTECTIVE COATING FOR CONCRETE


C Protective coating for exposed smooth concrete G6/230D-E m² 8,649.25 38.42
according to project specification
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref

Bill no - 06

STRUCTURES- JUNCTION 17 - OMISSIONS

BORED CAST IN PLACE CONCRETE PILES

Bored cast in place; piles; concrete grade C20:


Cement to
BS 12 or BS 146; 20mm aggregate; Diameter 900mm
to

A Number of piles P 151 nr 424.00 836.47


Total to Collection QAR.
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(1,258.65)

(23,363.75)
(38,939.58)
(77,879.17)
(280,409.95)
(443,528.08)

(8,495.91)

(320,575.99)

(7,500.01)

(81,758.68)
(1,283,709.77)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(238,684.72)

(5,907,489.22)

(21,527.92)

(389,032.04)

(120,875.64)

(136,586.27)
(6,814,195.81)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(11,997,968.03)
(11,997,968.03)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(813,025.78)

(557,170.17)
(1,370,195.95)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(490,267.88)

(36,185.71)

(332,304.27)
(858,757.86)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway

AMOUNT

(354,663.28)
(354,663.28)
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Seismic Design Junction-17
Junction 17 Measurements Summary
OLD DESIGN NEW DESIGN
S.No Description Unit Defference
QTY QTY

A Earth works
1 Excavation for foundation
Top Soil upto 0.10 m 449.52 533.62 84.10
Depth: n.e. 0.25 m m3 674.28 800.43 126.15
Depth 0.25 m to 0.50 m m3 1,123.80 1,334.04 210.25
Depth 0.50 m to 1.00 m m3 2,247.60 2,668.09 420.49
Depth 1.00 m to 2.00 m m3 4,495.19 5,336.17 840.98
Depth 2m to 5m 4,105.22 5,916.61 1,811.39

3 Preparation of excavated surface m2 4,495.19 5,230.05 734.86


Fillina to Structures
Selected excavated material other than
4 topsoil or rock m3 4,878.65 6,893.04 2,014.39

Preparation of filled surfaces


With material other than topsoil, rock or
artificial hard mat. m3 3,968.26 4,503.82 535.56

Disposal of excavated materials within 10


km radius m3 8,216.95 9,623.34 1,406.39

B Concrete

1 Blinding concrete m3 475.34 555.83 80.50


Concrete for foundation
2 Abutment m3 1,196.40 2,926.50 1,730.10
3 Piers m3 6,493.50 7,647.25 1,153.75
7,689.90 10,573.75
Concrete for walls/columns
4 Abutment m3 1,930.61 2,875.63 945.02
5 Piers m3 1,960.76 5,808.58 3,847.82
3,891.37 8,684.21
11,581.27 19,257.96
Reinforcement
Reinforcement For Abutment Foundations
t 299.10 731.63 432.53
Reinforcement For Abutment Walls t 386.12 575.13 189.00
Reinforcement For Pier Foundations t 1,623.38 1,911.81 288.44
Reinforcement For Piers Column t 392.15 1,161.72 769.56
2,700.75 4,380.28
C Formwork
Formwork for foundation
1 Abutment m2 622.56 1,140.40 517.84
2 Piers m2 3,924.00 4,161.50 237.50

D Formwork for walls/columns/ap.slab


1 Abutment m2 3,908.37 4,707.69 799.32
2 Piers m2 4,502.02 5,808.58 1,306.56

E WaterProofing
System type for abutment
Below ground
1 Foundation m2 5,814.66 14,511.79 8,697.13
2 Walls m2 427.60 805.52 377.92
Above ground
3 Spray type for abutment Wall m2 3,960.06 4,684.62 724.56

System type for piers


Below ground
4 Foundation m2 3,460.18 10,852.49 7,392.31
5 Column m2 160.21 1,310.06 1,149.85
Above ground
6 Spray type for Pier Column m2 4,689.19 6,495.64 1,806.45

BORED CAST IN PLACE CONCRETE PILES


Number of piles nr 424.00 460.00 36.00
Orbital Highway

Remarks