Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
1
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 916 1 917 M/H 9,108
Deputy Site Manager M/D 150 1 151 M/H 1,448
Construction Manager M/D 296 1 297 M/H 2,905
Deputy Construction Manager M/D 186 1 187 M/H 1,808
2
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 168 1 169 M/H 1,625
2 HSSE
HSSE M/D 9,673 11 9,684 M/H 21,077
HSSE Administration M/D 1,191 1 1,192 M/H 2,562
3 Quality Control
Field. QC Manager M/D 231 2 233 M/H 2,209
QC Coordinator-2 M/D 309 2 311 M/H 2,974
QC Engineer M/D 1,028 6 1,034 M/H 9,532
QC Admin M/D 141 2 143 M/H 1,315
Welding Tracking M/D 16 1 17 M/H 153
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 370 1 371 M/H 3,405
Electrical Superintendent M/D 348 1 349 M/H 3,251
ME Supervisor Temfac M/D 340 1 341 M/H 3,210
Civil Supervisor Temfac M/D 675 2 677 M/H 6,349
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 258 1 259 M/H 2,482
3
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 231 1 232 M/H 2,243
4.2 Civil
General Civil Superintendent M/D 266 1 267 M/H 2,578
Project Engineer M/D 198 4 202 M/H 1,913
Civil Engineer M/D 457 1 458 M/H 4,114
Civil Engineer M/D 390 1 391 M/H 3,562
Field Engineer M/D 190 1 191 M/H 1,842
Civil Construction M/D 297 1 298 M/H 2,850
Batching Plant Coordinator M/D 238 1 239 M/H 2,303
Surveyor M/D 490 1 491 M/H 4,470
Helper Surveyor M/D 461 1 462 M/H 4,142
Steel Structure Engineer M/D 169 1 170 M/H 1,635
4.3 Building
Building Superintendent M/D 450 1 451 M/H 4,071
Building Supervisor M/D 574 3 577 M/H 5,584
Surveyor M/D 368 4 372 M/H 2,050
Helper Surveyor M/D 341 2 343 M/H 3,308
4.4 Piping
4
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 225 1 226 M/H 2,186
Asst. Piping Superintendent M/D 207 1 208 M/H 2,015
Piping Engineer M/D 161 2 163 M/H 1,567
Technical Suport M/D 3 1 4 M/H 27
Supervisor M/D 259 3 262 M/H 2,449
CMS Operator M/D 68 1 69 M/H 640
Clerk M/D 166 1 167 M/H 1,620
4.5 Process
Process Superintendent M/D 233 1 234 M/H 2,257
Clerk M/D 3 1 4 M/H 27
4.6 Mechanical & Tank
Mechanical Superintendent M/D 75 1 76 M/H 698
4.6.1 Tank
Tank Field Engineer M/D 168 1 169 M/H 1,628
Tank Supervisor M/D 74 1 75 M/H 688
4.6.2 Static Mechanical
Static Field Engineer M/D 74 2 76 M/H 688
Preservation Technician M/D 138 - 138 M/H 1,310
5
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 71 1 72 M/H 661
4.6.4 Rotary
Field Engineer M/D 3 1 4 M/H 27
Supervisor M/D 3 1 4 M/H 27
4.6.5 Combation
Field Engineer M/D 3 1 4 M/H 27
4.7 General Contruction
General Superintendent M/D 240 1 241 M/H 2,348
Jr.Mechanical Engineer M/D 74 1 75 M/H 653
Mechanical Supervisor M/D 66 1 67 M/H 624
4.8 Electrical
Elecctrical Superintendent M/D 9 1 10 M/H 86
Field Engineer M/D 9 1 10 M/H 86
Lead Supervisor M/D 9 1 10 M/H 86
Engineer M/D 9 1 10 M/H 86
Supervisor M/D 27 3 30 M/H 258
Clerk M/D 9 1 10 M/H 86
6
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 9 1 10 M/H 86
Supervisor M/D 9 1 10 M/H 86
5 Preservation
Preservation Coordinator M/D 9 1 10 M/H 86
Preservation Eng M/D 9 1 10 M/H 86
Preservation Junior Eng M/D 36 4 40 M/H 344
6 Control
Project Control Manager M/D 197 1 198 M/H 1,919
Project Control M/D 235 1 236 M/H 2,142
Document Control M/D 263 1 264 M/H 2,547
Schedule Engineer M/D 198 4 202 M/H 1,919
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 397 5 402 M/H 3,807
Cost Control M/D 286 2 288 M/H 2,751
Subcontracting M/D 560 4 564 M/H 5,395
Material Control M/D 637 4 641 M/H 6,155
7 Administration
7
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 210 1 211 M/H 2,036
Administration M/D 2,210 18 2,228 M/H 21,106
Business Coordinator M/D 739 2 741 M/H 6,790
Project Support M/D 431 2 433 M/H 4,182
Finance M/D 233 1 234 M/H 2,257
Puchasing M/D 335 2 337 M/H 3,255
8 Public Relation
Public Affair M/D 1,107 3 1,110 M/H 10,216
Government Permit M/D 459 1 460 M/H 4,121
9 IT
IT Engineer M/D 864 4 868 M/H 8,254
10 Others
Security M/D 6,384 33 6,417 M/H 61,281
Rigging & Lifting / Operator M/D 2,759 12 2,771 M/H 26,863
Operator Genset M/D 486 2 488 M/H 4,714
Office Boy/Girl M/D 1,286 6 1,292 M/H 12,476
Paramedic M/D 2,660 12 2,672 M/H 25,782
Driver M/D 4,382 26 4,408 M/H 42,417
8
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 277 4 281 M/H 2,799
Rigger M/D 360 5 365 M/H 3,370
Skill M/D 1,113 8 1,121 M/H 10,390
Warehouse M/D 298 17 315 M/H 2,894
Total 53,646 281 53,927 431,433
9
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
10
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 792 3 795 M/H 7,576
2 Lab M/D 458 1 459 M/H 4,451
3 Driver Truck Mixer M/D 942 5 947 M/H 9,170
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,630 3 1,633 M/H 14,023
Sub Total 3,942 12 3,954 36,147
11
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
12
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
13
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
14
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
15
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
16
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
17
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
18
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
DIRECT MANPOWER
20
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
21
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
22
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
23
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
24
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
25
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
26
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
27
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
28
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
29
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
30
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
31
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
32
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
33
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
34
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
35
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 74 1 75 737
36
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
37
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
38
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 405 3 408 M/H 4,050
39
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
40
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
41
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
42
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
43
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
44
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
45
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
46
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
47
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
48
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
49
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
50
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
51
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
52
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
M/H
53
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
54
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
55
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
56
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
57
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
58
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
59
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
60
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
61
DAILY REPORT
P
JGC ENC
62
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
10 9,118
10 1,458
10 2,915
10 1,818
63
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,635
110 21,187
10 2,572
20 2,229
20 2,994
60 9,592
20 1,335
10 163
10 3,415
10 3,261
10 3,220
20 6,369
- 158
10 2,492
64
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,253
10 2,588
40 1,953
10 4,124
10 3,572
10 1,852
10 2,860
10 2,313
10 4,480
10 4,152
10 1,645
10 4,081
30 5,614
40 2,090
20 3,328
65
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,196
10 2,025
20 1,587
10 37
30 2,479
10 650
10 1,630
10 2,267
10 37
10 708
10 1,638
10 698
-
20 708
- 1,310
66
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 671
10 37
10 37
10 37
10 2,358
10 663
10 634
10 96
10 96
10 96
10 96
30 288
10 96
67
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 96
10 96
10 96
10 96
40 384
10 1,929
10 2,152
10 2,557
40 1,959
980
50 3,857
20 2,771
40 5,435
40 6,195
68
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,046
180 21,286
20 6,810
20 4,202
10 2,267
20 3,275
30 10,246
10 4,131
40 8,294
330 61,611
120 26,983
20 4,734
60 12,536
120 25,902
260 42,677
69
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 2,839
50 3,420
80 10,470
170 3,064
2,810 434,243
- 88,084
& C - IKM)
- 153,750
70
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
71
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,606
10 4,461
50 9,220
- 928
30 14,053
120 36,267
210 63,356
72
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 14,616
70 16,046
10 3,240
73
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 6,649
90 14,137
40 8,641
74
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
450 3,680
190 34,577
1,630 284,801
75
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
76
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
2,250 415,414
- 610 1 Workshop
77
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,446
78
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,185
70 6,718
79
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,630
100 12,789
20 2,768
- 80
960 98,502
1,270 151,055
80
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,288
10 3,206
10 1,390
81
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
220 14,650
- 8,890
1,230 129,510 -
82
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
83
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Total concrete = 7 m³
1,240 132,716
ON - GTA)
- 1,132 PIPERACK
- 1,072 - B2PR01
- 1,192 - B2PR02
84
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,440 - D3PR01
40 1,876
20 2,134 A3ST01
- 934 A4ST01
85
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,678
- 390
- 1,188
10 799
130 36,320
40 5,250
190 16,220
90 15,543
80 8,120
110 15,804
86
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
90 3,017
180 27,742
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 3.1
87
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 0.0
A3ST01 1.0
Total 4.1
910 128,016
88
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 3,708
89
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 3,797
20 20,245
90
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
10 6,627
930 190,671
91
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,240 254,755
STATIC EQUIPMENT
92
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- - ROTARY EQUIPMENT
93
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 424 Pre-Alignment
Pre-Alignment
94
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Chipping on foundation
1,260 32,346
95
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 867
10 1,337 2 CONDENSATE A
40 3,548
10 787 3 CONDENSATE B
10 617
96
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,207
- -
10 517
10 597
10 1,297
10 747
20 2,834
20 1,984
20 1,284
20 1,804
40 3,488
97
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 667
370 33,246
30 2,348
10 2,215
40 2,628
160 17,498
20 1,394
110 12,332
170 13,139
30 2,732
570 54,286
98
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
940 87,532
10 1,540
99
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,290 Total 0
10 1,540
20 2,630 1 CS 0
30 4,080 2 LTCS 0
10 1,540 4 DUPLEX SS 0
100
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,170 Total 0
10 980
20 1,130
10 610
20 2,000
520 58,930
C Other Progress
1 Borrow Sand 0
70 4,930 2 Coating 0
101
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 1,980 5 Lettering/Marking 0
60 5,620 Total 0
50 3,940
20 1,700
20 2,610
40 2,990
10 850
10 640
370 32,730
860 74,620
102
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,380 133,550
10 1,367 1 HDPE 0
- 1,194 Total 40
10 1,435
103
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 1,960 Total 4
10 1,118
20 1,777 1 CS (Ton) 0
10 892 Total 0
104
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 858
- 720
40 2,919
105
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
130 8,009
60 3,728
50 3,734
40 2,904
40 2,664
40 3,117
40 3,034
10 1,283
10 1,187
460 33,299
1,110 83,812
106
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
107
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,024
10 1,174
10 846
10 808
10 778
20 1,116
10 472
200 17,612
10 748
10 640
20 528
108
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 2,010
130 1,638
90 3,094
10 826
10 826
40 2,128
10 680
10 748
400 13,866
600 31,478
109
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
2 Install Tray at SS m 2
40 1,280
110
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 3,238
LDING - TTP)
10 1,055
10 1,055
10 518
111
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,025
- 1,045
10 508
- 478
10 2,013
10 915
10 755
10 77
130 13,644
20 1,780
20 2,110
112
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
100 8,390
70 4,023
210 16,303
340 29,947
NG - TNDT)
- 60 1 Stand By
10 720
10 740
10 740
113
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,260
30 1,420
10 1,490
10 700
20 980
70 4,590
100 6,850
114
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Fuel Supply
10 2,041
10 1,856
20 3,897
10 2,012
20 3,855
30 5,863
60 11,729
115
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
80 15,626
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
BPP) - NO WORK
- 21,007.0
116
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,652
NO WORK
- 1,288.5
- 2,378
10 1,630
- -
10 1,630
117
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
10 1,630
10 1,630
40 6,520
10 1,630
10 1,630
10 1,630
20 3,260
20 3,260
30 4,890
10 1,630
118
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
140 22,540
90 14,490
50 8,050
30 4,890
30 4,830
20 3,260
470 75,990
510 82,510
16,310 2,576,778
OTHER
119
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WEATHE
Condition From To
HEAVY
RAIN
120
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
121
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
HIGHLIG
122
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
123
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
124
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
125
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
126
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
127
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
128
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
129
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
130
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
131
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
132
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- FWBS 2000 2
A Utility Area 3
133
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Neutralization Pit 4
B Process Area 7
- Lean Concrete 9
10
13
C Offsite Area 14
134
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
16
19
- FWBS 1000
1 Lhokseumawe Road
135
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
136
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
137
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total Concrete = 0 m³
1 Area A-400 1
138
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- BAckfill In A4SN04 F4 6
2 Area B-500
139
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Area B-600
: 1 m3
4 Area B-700
140
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 0 m³
141
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- 3
142
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
143
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
144
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
PIPERACK 1
- B2PR01 2
- B2PR02 4
145
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- D3PR01 7
10
11
EQUIPMENT SUPPORT 12
- A3ST01 13
Adjusting Plumbness
- A4ST01
146
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
147
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
148
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
149
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Aplication epoxy 2
- Installation raisefloor 9
- Check Plafond 11
12
13
3 Mechanical WE WS & WH 14
150
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Not Activity 15
16
4 Chemical Storage 17
19
20
5 Waste Storage 21
22
23
6 GEG Building
151
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
152
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
153
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Install of Equipment
Install of Equipment
Leveling of Equipment
Grouting on foundation
Grouting on foundation
ROTARY EQUIPMENT
154
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Cont. Pre-Alignment
Cont. Pre-Alignment
- 36-PAX-332 A/B
Install of Pump
Padding on Foundation
Finishing on foundation
Finishing on foundation
PACKAGE EQUIPMENT
155
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
156
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Tangki Condensate A 1
2 Condensate B Tank
3 Condensate C Tank 4
157
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Instalation Accessories
8 EG Make-Up Tank
- Instalation Accessories
158
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
159
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
Total 118 6
160
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
161
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
6 Spring Support 0
Total 0
C Other Progress
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
162
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 Lettering/Marking 0
Total 0
163
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
Total 16 6
164
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Stainless Steel 0 11
Total 14 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
4 DUPLEX SS (Ton) 0 19
Total 0 22
165
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
166
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
167
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
2 Setting panel 2
10
10
168
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
11
12
13
14
15
15
15
16
17
18
19
20
169
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
170
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
171
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
(Supporting Manpower)
172
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
173
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
174
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 5
10
11
12
13
14
175
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Fuel Supply 1
176
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
177
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
178
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
179
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
180
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WEATHER
Remark
181
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
182
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
HIGHLIGHT
183
184
EQUIPMENT
Equipment & Tools Unit QTY
185
EQUIPMENT
Equipment & Tools Unit QTY
186
EQUIPMENT
Equipment & Tools Unit QTY
187
EQUIPMENT
Equipment & Tools Unit QTY
188
EQUIPMENT
Equipment & Tools Unit QTY
189
EQUIPMENT
Equipment & Tools Unit QTY
190
EQUIPMENT
Equipment & Tools Unit QTY
191
EQUIPMENT
Equipment & Tools Unit QTY
192
EQUIPMENT
Equipment & Tools Unit QTY
193
EQUIPMENT
Equipment & Tools Unit QTY
Theodolite Unit 3
Waterpass Unit 3
194
EQUIPMENT
Equipment & Tools Unit QTY
Excavator Unit 5
Dumptruck Unit 6
Bulldozer Unit 1
Genset Unit 4
Grader Unit 1
195
EQUIPMENT
Equipment & Tools Unit QTY
Crane Unit 1
196
EQUIPMENT
Equipment & Tools Unit QTY
197
EQUIPMENT
Equipment & Tools Unit QTY
198
EQUIPMENT
Equipment & Tools Unit QTY
199
EQUIPMENT
Equipment & Tools Unit QTY
200
EQUIPMENT
Equipment & Tools Unit QTY
201
EQUIPMENT
Equipment & Tools Unit QTY
202
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
203
EQUIPMENT
Equipment & Tools Unit QTY
204
EQUIPMENT
Equipment & Tools Unit QTY
205
EQUIPMENT
Equipment & Tools Unit QTY
206
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
207
EQUIPMENT
Equipment & Tools Unit QTY
208
EQUIPMENT
Equipment & Tools Unit QTY
209
EQUIPMENT
Equipment & Tools Unit QTY
210
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
211
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
212
EQUIPMENT
Equipment & Tools Unit QTY
213
EQUIPMENT
Equipment & Tools Unit QTY
214
EQUIPMENT
Equipment & Tools Unit QTY
215
EQUIPMENT
Equipment & Tools Unit QTY
216
EQUIPMENT
Equipment & Tools Unit QTY
217
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
Miller Unit 2
218
EQUIPMENT
Equipment & Tools Unit QTY
Generator
a. 18 KVA Unit 1
219
EQUIPMENT
Equipment & Tools Unit QTY
220
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
221
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle Unit 2
222
EQUIPMENT
Equipment & Tools Unit QTY
223
EQUIPMENT
Equipment & Tools Unit QTY
224
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
225
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
Forklif Unit 1
226
EQUIPMENT
Equipment & Tools Unit QTY
227
EQUIPMENT
Equipment & Tools Unit QTY
228
EQUIPMENT
Equipment & Tools Unit QTY
229
EQUIPMENT
Equipment & Tools Unit QTY
230
EQUIPMENT
Equipment & Tools Unit QTY
231
EQUIPMENT
Equipment & Tools Unit QTY
232
EQUIPMENT
Equipment & Tools Unit QTY
233
EQUIPMENT
Equipment & Tools Unit QTY
234
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
Barricade Roll 1
235
EQUIPMENT
Equipment & Tools Unit QTY
Megaphone Unit 1
MC Cleaner Can 1
MC Penetrant Can 1
MC Developer Can 1
236
EQUIPMENT
Equipment & Tools Unit QTY
Dispenser Unit 1
237
EQUIPMENT
Equipment & Tools Unit QTY
238
EQUIPMENT
Equipment & Tools Unit QTY
239
EQUIPMENT
Equipment & Tools Unit QTY
240
EQUIPMENT
Equipment & Tools Unit QTY
241
EQUIPMENT
Equipment & Tools Unit QTY
242
EQUIPMENT
Equipment & Tools Unit QTY
243
EQUIPMENT
Equipment & Tools Unit QTY
244
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
249
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 917 1 918 M/H 9,118
Deputy Site Manager M/D 151 1 152 M/H 1,458
Construction Manager M/D 297 1 298 M/H 2,915
Deputy Construction Manager M/D 187 1 188 M/H 1,818
250
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 169 1 170 M/H 1,635
2 HSSE
HSSE M/D 9,684 11 9,695 M/H 21,187
HSSE Administration M/D 1,192 1 1,193 M/H 2,572
3 Quality Control
Field. QC Manager M/D 233 2 235 M/H 2,229
QC Coordinator-2 M/D 311 2 313 M/H 2,994
QC Engineer M/D 1,034 6 1,040 M/H 9,592
QC Admin M/D 143 2 145 M/H 1,335
Welding Tracking M/D 17 1 18 M/H 163
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 371 1 372 M/H 3,415
Electrical Superintendent M/D 349 1 350 M/H 3,261
ME Supervisor Temfac M/D 341 1 342 M/H 3,220
Civil Supervisor Temfac M/D 677 2 679 M/H 6,369
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 259 1 260 M/H 2,492
251
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 232 1 233 M/H 2,253
4.2 Civil
General Civil Superintendent M/D 267 1 268 M/H 2,588
Project Engineer M/D 202 4 206 M/H 1,953
Civil Engineer M/D 458 1 459 M/H 4,124
Civil Engineer M/D 391 1 392 M/H 3,572
Field Engineer M/D 191 1 192 M/H 1,852
Civil Construction M/D 298 1 299 M/H 2,860
Batching Plant Coordinator M/D 239 1 240 M/H 2,313
Surveyor M/D 491 1 492 M/H 4,480
Helper Surveyor M/D 462 1 463 M/H 4,152
Steel Structure Engineer M/D 170 1 171 M/H 1,645
4.3 Building
Building Superintendent M/D 451 1 452 M/H 4,081
Building Supervisor M/D 577 3 580 M/H 5,614
Surveyor M/D 372 4 376 M/H 2,090
Helper Surveyor M/D 343 2 345 M/H 3,328
4.4 Piping
252
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 226 1 227 M/H 2,196
Asst. Piping Superintendent M/D 208 1 209 M/H 2,025
Piping Engineer M/D 163 2 165 M/H 1,587
Technical Suport M/D 4 1 5 M/H 37
Supervisor M/D 262 3 265 M/H 2,479
CMS Operator M/D 69 1 70 M/H 650
Clerk M/D 167 1 168 M/H 1,630
4.5 Process
Process Superintendent M/D 234 1 235 M/H 2,267
Clerk M/D 4 1 5 M/H 37
4.6 Mechanical & Tank
Mechanical Superintendent M/D 76 1 77 M/H 708
4.6.1 Tank
Tank Field Engineer M/D 169 1 170 M/H 1,638
Tank Supervisor M/D 75 1 76 M/H 698
4.6.2 Static Mechanical
Static Field Engineer M/D 76 2 78 M/H 708
Preservation Technician M/D 138 - 138 M/H 1,310
253
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 72 1 73 M/H 671
4.6.4 Rotary
Field Engineer M/D 4 1 5 M/H 37
Supervisor M/D 4 1 5 M/H 37
4.6.5 Combation
Field Engineer M/D 4 1 5 M/H 37
4.7 General Contruction
General Superintendent M/D 241 1 242 M/H 2,358
Jr.Mechanical Engineer M/D 75 1 76 M/H 663
Mechanical Supervisor M/D 67 1 68 M/H 634
4.8 Electrical
Elecctrical Superintendent M/D 10 1 11 M/H 96
Field Engineer M/D 10 1 11 M/H 96
Lead Supervisor M/D 10 1 11 M/H 96
Engineer M/D 10 1 11 M/H 96
Supervisor M/D 30 3 33 M/H 288
Clerk M/D 10 1 11 M/H 96
254
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 10 1 11 M/H 96
Supervisor M/D 10 1 11 M/H 96
5 Preservation
Preservation Coordinator M/D 10 1 11 M/H 96
Preservation Eng M/D 10 1 11 M/H 96
Preservation Junior Eng M/D 40 4 44 M/H 384
6 Control
Project Control Manager M/D 198 1 199 M/H 1,929
Project Control M/D 236 1 237 M/H 2,152
Document Control M/D 264 1 265 M/H 2,557
Schedule Engineer M/D 202 4 206 M/H 1,959
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 402 5 407 M/H 3,857
Cost Control M/D 288 2 290 M/H 2,771
Subcontracting M/D 564 4 568 M/H 5,435
Material Control M/D 641 4 645 M/H 6,195
7 Administration
255
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 211 1 212 M/H 2,046
Administration M/D 2,228 18 2,246 M/H 21,286
Business Coordinator M/D 741 2 743 M/H 6,810
Project Support M/D 433 2 435 M/H 4,202
Finance M/D 234 1 235 M/H 2,267
Puchasing M/D 337 2 339 M/H 3,275
8 Public Relation
Public Affair M/D 1,110 3 1,113 M/H 10,246
Government Permit M/D 460 1 461 M/H 4,131
9 IT
IT Engineer M/D 868 4 872 M/H 8,294
10 Others
Security M/D 6,417 33 6,450 M/H 61,611
Rigging & Lifting / Operator M/D 2,771 12 2,783 M/H 26,983
Operator Genset M/D 488 2 490 M/H 4,734
Office Boy/Girl M/D 1,292 6 1,298 M/H 12,536
Paramedic M/D 2,672 12 2,684 M/H 25,902
Driver M/D 4,408 26 4,434 M/H 42,677
256
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 281 4 285 M/H 2,839
Rigger M/D 365 5 370 M/H 3,420
Skill M/D 1,121 8 1,129 M/H 10,470
Warehouse M/D 315 17 332 M/H 3,064
Total 53,927 281 54,208 434,243
257
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
258
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 795 3 798 M/H 7,606
2 Lab M/D 459 1 460 M/H 4,461
3 Driver Truck Mixer M/D 947 5 952 M/H 9,220
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,633 3 1,636 M/H 14,053
Sub Total 3,954 12 3,966 36,267
259
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
260
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
261
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
262
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
263
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
264
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
265
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
266
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
267
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
DIRECT MANPOWER
268
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
269
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
270
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
271
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
272
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
273
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
274
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
275
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
276
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
277
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
278
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
279
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
280
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
281
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
282
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
283
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 75 1 76 747
284
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
285
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
286
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 408 3 411 M/H 4,080
287
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
288
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
289
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
290
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
291
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
292
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
293
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
294
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
295
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
296
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
297
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
298
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
299
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
300
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
M/H
301
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
302
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
303
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
304
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
305
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
306
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
307
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
308
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
309
DAILY REPORT
P
JGC ENC
310
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
10 9,128
10 1,468
10 2,925
10 1,828
311
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,645
110 21,297
10 2,582
20 2,249
20 3,014
60 9,652
20 1,355
10 173
10 3,425
10 3,271
10 3,230
20 6,389
- 158
10 2,502
312
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,263
10 2,598
40 1,993
10 4,134
10 3,582
10 1,862
10 2,870
10 2,323
10 4,490
10 4,162
10 1,655
10 4,091
30 5,644
40 2,130
20 3,348
313
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,206
10 2,035
20 1,607
10 47
30 2,509
10 660
10 1,640
10 2,277
10 47
10 718
10 1,648
10 708
-
20 728
- 1,310
314
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 681
10 47
10 47
10 47
10 2,368
10 673
10 644
10 106
10 106
10 106
10 106
30 318
10 106
315
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 106
10 106
10 106
10 106
40 424
10 1,939
10 2,162
10 2,567
40 1,999
980
50 3,907
20 2,791
40 5,475
40 6,235
316
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,056
180 21,466
20 6,830
20 4,222
10 2,277
20 3,295
30 10,276
10 4,141
40 8,334
330 61,941
120 27,103
20 4,754
60 12,596
120 26,022
260 42,937
317
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 2,879
50 3,470
80 10,550
170 3,234
2,810 437,053
- 88,084
& C - IKM)
- 153,750
318
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
319
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,636
10 4,471
50 9,270
- 928
30 14,083
120 36,387
220 63,576
320
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 14,686
70 16,116
10 2,276
321
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 550
10 2,359
40 11,701
- 5,271
70 66,758
322
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
100 93,561
200 3,880
70 12,593
290 60,252
150 34,727
920 285,721
323
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
324
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,540 416,954
325
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,456
- 1,047
326
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
50 7,236
20 6,184
- 1,235
290 52,843
30 4,469
70 6,788
100 9,565
120 11,008
327
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
100 5,621
- -
- 1,630
100 12,889
20 2,788
- 80
880 99,382
1,170 152,225
328
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,288
10 3,216 -
10 1,400
329
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
220 14,870
- 8,890
1,230 130,740 -
330
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
331
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,240 133,956
ON - GTA)
- 1,132 PIPERACK
- 1,072 - B2PR01
- 1,192 - B2PR02
332
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,052 - D3PR01
- 2,008
40 1,916 A3ST01
- 404 - Beam :4
- 1,994 - Handrail : 13
- 3,123 A4ST01
333
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,678
- 390
- 1,188
10 809
130 36,450
40 5,290
190 16,410
90 15,633
80 8,200
110 15,914
334
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
90 3,107
180 27,922
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 0.5
335
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 5.0
A3ST01 1.3
Total 6.8
910 128,926
336
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
50 6,020
90 10,830
30 9,982
20 3,728
337
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 3,797
338
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
10 6,637
339
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,420 256,175
STATIC EQUIPMENT
340
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- - ROTARY EQUIPMENT
341
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Padding on Foundation
342
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,260 33,606
343
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 877
10 857
10 627
344
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,347
- -
10 1,307
20 2,854
20 2,004
20 1,304
20 1,824
40 3,528
345
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 677
370 33,616
30 2,378
10 2,225
40 2,668
160 17,658
20 1,414
110 12,442
170 13,309
30 2,762
570 54,856
346
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
940 88,472
10 1,550
347
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,300 Total 0
10 1,550
20 2,650 1 CS 0
30 4,110 2 LTCS 0
10 1,550 4 DUPLEX SS 0
348
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,200 Total 0
10 990
20 1,150
10 620
20 2,020
520 59,450
C Other Progress
1 Borrow Sand 0
70 5,000 2 Coating 0
349
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,000 5 Lettering/Marking 0
60 5,680 Total 0
50 3,990
20 1,720
20 2,630
40 3,030
10 860
10 650
370 33,100
860 75,480
350
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,380 134,930
10 1,377 1 HDPE 0
- 1,194 Total 52
10 1,445
351
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 1,980 Total 24
10 1,128
20 1,797 1 CS (Ton) 0
10 902 Total 0
352
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 868
- 720
40 2,959
353
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
130 8,139
60 3,788
50 3,784
40 2,944
40 2,704
40 3,157
40 3,074
10 1,293
10 1,197
460 33,759
1,080 84,892
354
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
355
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,184
10 856
10 818
10 788
20 1,136
10 482
200 17,812
10 758
10 650
20 548
356
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 2,070
130 1,768
90 3,184
10 836
10 836
40 2,168
10 690
10 758
400 14,266
600 32,078
357
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
10 90
30 1,230
40 1,320
358
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 3,298
LDING - TTP)
10 1,065
10 1,065
10 528
359
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,035
- 1,045
10 518
10 488
10 2,023
10 925
10 765
10 87
140 13,784
20 1,800
20 2,130
360
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
100 8,490
70 4,093
210 16,513
350 30,297
NG - TNDT)
- 60 1 Stand By
10 730
10 750
10 750
361
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,290
30 1,450
10 1,500
10 710
20 1,000
70 4,660
100 6,950
362
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Fuel Supply
10 2,051
10 1,866
20 3,917
10 2,022
20 3,875
30 5,893
60 11,789
363
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
80 15,706
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
BPP) - NO WORK
- 21,007.0
364
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,652
NO WORK
- 1,288.5
- 2,378
10 1,640
- -
10 1,640
365
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
10 1,640
10 1,640
40 6,560
10 1,640
10 1,640
10 1,640
20 3,280
20 3,280
30 4,920
10 1,640
366
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
140 22,680
90 14,580
50 8,100
30 4,920
30 4,860
20 3,280
470 76,460
510 83,020
15,670 2,592,448
OTHER
367
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WEATHE
Condition From To
HEAVY
RAIN
368
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
369
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
HIGHLIG
370
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
371
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
372
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
373
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
374
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
375
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
376
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
377
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
378
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
379
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
380
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- FWBS 2000 2
A Utility Area 3
381
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Neutralization Pit 4
B Offsite Area 7
10
- FWBS 1000 11
14
382
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
16
19
20
17.5 m³
383
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
384
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
385
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total Concrete = 0 m³
4 Area A-400 1
386
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 Area B-500
387
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
6 Area B-600
7 Area B-700
388
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 0 m³
389
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- 3
390
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
391
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
392
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 7 m³
PIPERACK 1
- B2PR01 2
Install Handrail 4
- B2PR02 5
393
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- D3PR01 7
Grouting on foundation 8
EQUIPMENT SUPPORT 10
- A3ST01 11
Adjusting Plumbness 13
- A4ST01
394
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
395
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
396
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
397
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
398
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
3 Chemical Storage
4 Waste Storage
399
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 GEG Building
6 Shelter Building
400
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
401
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- 31-MBD-102
Finishing foundation
Finishing foundation
Install Platform
Preparation of intallation
ROTARY EQUIPMENT
402
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Joint Inspection
Joint Inspection
- 36-PAX-332 A/B
Centering of pump
Padding on Foundation
PACKAGE EQUIPMENT
403
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Padding on foundation
Padding on foundation
404
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Tangki Condensate A 1
2 Condensate B Tank
3 Condensate C Tank 4
405
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Instalation Accessories
8 EG Make-Up Tank
- Instalation Accessories
406
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
407
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
Total 152 6
408
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
409
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
6 Spring Support 0
Total 0
C Other Progress
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
410
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 Lettering/Marking 0
Total 0
411
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
Total 16 6
412
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Stainless Steel 0 11
Total 14 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
4 DUPLEX SS (Ton) 0 19
Total 0 22
413
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
414
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
415
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
2 Setting panel 2
10
10
416
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
11
12
13
14
15
15
15
16
17
18
19
20
417
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
418
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
419
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
(Supporting Manpower)
420
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
421
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
422
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 5
10
11
12
13
14
423
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Fuel Supply 1
424
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
425
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
426
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
427
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
428
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WEATHER
Remark
429
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
430
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
HIGHLIGHT
431
432
EQUIPMENT
Equipment & Tools Unit QTY
433
EQUIPMENT
Equipment & Tools Unit QTY
434
EQUIPMENT
Equipment & Tools Unit QTY
435
EQUIPMENT
Equipment & Tools Unit QTY
436
EQUIPMENT
Equipment & Tools Unit QTY
437
EQUIPMENT
Equipment & Tools Unit QTY
438
EQUIPMENT
Equipment & Tools Unit QTY
439
EQUIPMENT
Equipment & Tools Unit QTY
440
EQUIPMENT
Equipment & Tools Unit QTY
441
EQUIPMENT
Equipment & Tools Unit QTY
Theodolite Unit 3
Waterpass Unit 3
442
EQUIPMENT
Equipment & Tools Unit QTY
Excavator Unit 5
Dumptruck Unit 6
Bulldozer Unit 1
Genset Unit 4
Grader Unit 1
443
EQUIPMENT
Equipment & Tools Unit QTY
Crane Unit 1
444
EQUIPMENT
Equipment & Tools Unit QTY
445
EQUIPMENT
Equipment & Tools Unit QTY
446
EQUIPMENT
Equipment & Tools Unit QTY
447
EQUIPMENT
Equipment & Tools Unit QTY
448
EQUIPMENT
Equipment & Tools Unit QTY
449
EQUIPMENT
Equipment & Tools Unit QTY
450
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
451
EQUIPMENT
Equipment & Tools Unit QTY
452
EQUIPMENT
Equipment & Tools Unit QTY
453
EQUIPMENT
Equipment & Tools Unit QTY
454
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
455
EQUIPMENT
Equipment & Tools Unit QTY
456
EQUIPMENT
Equipment & Tools Unit QTY
457
EQUIPMENT
Equipment & Tools Unit QTY
458
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
459
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
460
EQUIPMENT
Equipment & Tools Unit QTY
461
EQUIPMENT
Equipment & Tools Unit QTY
462
EQUIPMENT
Equipment & Tools Unit QTY
463
EQUIPMENT
Equipment & Tools Unit QTY
464
EQUIPMENT
Equipment & Tools Unit QTY
465
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
Miller Unit 2
466
EQUIPMENT
Equipment & Tools Unit QTY
Generator
a. 18 KVA Unit 1
467
EQUIPMENT
Equipment & Tools Unit QTY
468
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
469
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle Unit 2
470
EQUIPMENT
Equipment & Tools Unit QTY
471
EQUIPMENT
Equipment & Tools Unit QTY
472
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
473
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
Forklif Unit 1
474
EQUIPMENT
Equipment & Tools Unit QTY
475
EQUIPMENT
Equipment & Tools Unit QTY
476
EQUIPMENT
Equipment & Tools Unit QTY
477
EQUIPMENT
Equipment & Tools Unit QTY
478
EQUIPMENT
Equipment & Tools Unit QTY
479
EQUIPMENT
Equipment & Tools Unit QTY
480
EQUIPMENT
Equipment & Tools Unit QTY
481
EQUIPMENT
Equipment & Tools Unit QTY
482
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
Barricade Roll 1
483
EQUIPMENT
Equipment & Tools Unit QTY
Megaphone Unit 1
MC Cleaner Can 1
MC Penetrant Can 1
MC Developer Can 1
484
EQUIPMENT
Equipment & Tools Unit QTY
Dispenser Unit 1
485
EQUIPMENT
Equipment & Tools Unit QTY
486
EQUIPMENT
Equipment & Tools Unit QTY
487
EQUIPMENT
Equipment & Tools Unit QTY
488
EQUIPMENT
Equipment & Tools Unit QTY
489
EQUIPMENT
Equipment & Tools Unit QTY
490
EQUIPMENT
Equipment & Tools Unit QTY
491
EQUIPMENT
Equipment & Tools Unit QTY
492
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
497
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 918 1 919 M/H 9,128
Deputy Site Manager M/D 152 1 153 M/H 1,468
Construction Manager M/D 298 1 299 M/H 2,925
Deputy Construction Manager M/D 188 1 189 M/H 1,828
498
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 170 1 171 M/H 1,645
2 HSSE
HSSE M/D 9,695 11 9,706 M/H 21,297
HSSE Administration M/D 1,193 1 1,194 M/H 2,582
3 Quality Control
Field. QC Manager M/D 235 2 237 M/H 2,249
QC Coordinator-2 M/D 313 2 315 M/H 3,014
QC Engineer M/D 1,040 6 1,046 M/H 9,652
QC Admin M/D 145 2 147 M/H 1,355
Welding Tracking M/D 18 1 19 M/H 173
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 372 1 373 M/H 3,425
Electrical Superintendent M/D 350 1 351 M/H 3,271
ME Supervisor Temfac M/D 342 1 343 M/H 3,230
Civil Supervisor Temfac M/D 679 2 681 M/H 6,389
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 260 1 261 M/H 2,502
499
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 233 1 234 M/H 2,263
4.2 Civil
General Civil Superintendent M/D 268 1 269 M/H 2,598
Project Engineer M/D 206 4 210 M/H 1,993
Civil Engineer M/D 459 1 460 M/H 4,134
Civil Engineer M/D 392 1 393 M/H 3,582
Field Engineer M/D 192 1 193 M/H 1,862
Civil Construction M/D 299 1 300 M/H 2,870
Batching Plant Coordinator M/D 240 1 241 M/H 2,323
Surveyor M/D 492 1 493 M/H 4,490
Helper Surveyor M/D 463 1 464 M/H 4,162
Steel Structure Engineer M/D 171 1 172 M/H 1,655
4.3 Building
Building Superintendent M/D 452 1 453 M/H 4,091
Building Supervisor M/D 580 3 583 M/H 5,644
Surveyor M/D 376 4 380 M/H 2,130
Helper Surveyor M/D 345 2 347 M/H 3,348
4.4 Piping
500
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 227 1 228 M/H 2,206
Asst. Piping Superintendent M/D 209 1 210 M/H 2,035
Piping Engineer M/D 165 2 167 M/H 1,607
Technical Suport M/D 5 1 6 M/H 47
Supervisor M/D 265 3 268 M/H 2,509
CMS Operator M/D 70 1 71 M/H 660
Clerk M/D 168 1 169 M/H 1,640
4.5 Process
Process Superintendent M/D 235 1 236 M/H 2,277
Clerk M/D 5 1 6 M/H 47
4.6 Mechanical & Tank
Mechanical Superintendent M/D 77 1 78 M/H 718
4.6.1 Tank
Tank Field Engineer M/D 170 1 171 M/H 1,648
Tank Supervisor M/D 76 1 77 M/H 708
4.6.2 Static Mechanical
Static Field Engineer M/D 78 2 80 M/H 728
Preservation Technician M/D 138 - 138 M/H 1,310
501
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 73 1 74 M/H 681
4.6.4 Rotary
Field Engineer M/D 5 1 6 M/H 47
Supervisor M/D 5 1 6 M/H 47
4.6.5 Combation
Field Engineer M/D 5 1 6 M/H 47
4.7 General Contruction
General Superintendent M/D 242 1 243 M/H 2,368
Jr.Mechanical Engineer M/D 76 1 77 M/H 673
Mechanical Supervisor M/D 68 1 69 M/H 644
4.8 Electrical
Elecctrical Superintendent M/D 11 1 12 M/H 106
Field Engineer M/D 11 1 12 M/H 106
Lead Supervisor M/D 11 1 12 M/H 106
Engineer M/D 11 1 12 M/H 106
Supervisor M/D 33 3 36 M/H 318
Clerk M/D 11 1 12 M/H 106
502
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 11 1 12 M/H 106
Supervisor M/D 11 1 12 M/H 106
5 Preservation
Preservation Coordinator M/D 11 1 12 M/H 106
Preservation Eng M/D 11 1 12 M/H 106
Preservation Junior Eng M/D 44 4 48 M/H 424
6 Control
Project Control Manager M/D 199 1 200 M/H 1,939
Project Control M/D 237 1 238 M/H 2,162
Document Control M/D 265 1 266 M/H 2,567
Schedule Engineer M/D 206 4 210 M/H 1,999
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 407 5 412 M/H 3,907
Cost Control M/D 290 2 292 M/H 2,791
Subcontracting M/D 568 4 572 M/H 5,475
Material Control M/D 645 4 649 M/H 6,235
7 Administration
503
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 212 1 213 M/H 2,056
Administration M/D 2,246 18 2,264 M/H 21,466
Business Coordinator M/D 743 2 745 M/H 6,830
Project Support M/D 435 2 437 M/H 4,222
Finance M/D 235 1 236 M/H 2,277
Puchasing M/D 339 2 341 M/H 3,295
8 Public Relation
Public Affair M/D 1,113 3 1,116 M/H 10,276
Government Permit M/D 461 1 462 M/H 4,141
9 IT
IT Engineer M/D 872 4 876 M/H 8,334
10 Others
Security M/D 6,450 33 6,483 M/H 61,941
Rigging & Lifting / Operator M/D 2,783 12 2,795 M/H 27,103
Operator Genset M/D 490 2 492 M/H 4,754
Office Boy/Girl M/D 1,298 6 1,304 M/H 12,596
Paramedic M/D 2,684 12 2,696 M/H 26,022
Driver M/D 4,434 26 4,460 M/H 42,937
504
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 285 4 289 M/H 2,879
Rigger M/D 370 5 375 M/H 3,470
Skill M/D 1,129 8 1,137 M/H 10,550
Warehouse M/D 332 17 349 M/H 3,234
Total 54,208 281 54,489 437,053
505
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
506
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 798 3 801 M/H 7,636
2 Lab M/D 460 1 461 M/H 4,471
3 Driver Truck Mixer M/D 952 5 957 M/H 9,270
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,636 3 1,639 M/H 14,083
Sub Total 3,966 12 3,978 36,387
507
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
508
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
509
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
510
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
511
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
512
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
513
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
514
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
515
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
DIRECT MANPOWER
516
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
517
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
518
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
519
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
520
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
521
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
522
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
523
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
524
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
525
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
526
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
527
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
528
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
529
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
530
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
531
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 76 1 77 757
532
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
533
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
534
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 411 3 414 M/H 4,110
535
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
536
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
537
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
538
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
539
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
540
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
541
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
542
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
543
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
544
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
545
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
546
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
547
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
548
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
M/H
549
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
550
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
551
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
552
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
553
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
554
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
555
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
556
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
557
DAILY REPORT
P
JGC ENC
558
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
8 9,136
8 1,476
8 2,933
8 1,836
559
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 1,653
-
88 21,385
8 2,590
-
16 2,265
16 3,030
48 9,700
16 1,371
8 181
-
-
8 3,433
8 3,279
8 3,238
16 6,405
- 158
8 2,510
560
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,271
-
8 2,606
32 2,025
8 4,142
8 3,590
8 1,870
8 2,878
8 2,331
8 4,498
8 4,170
8 1,663
-
8 4,099
24 5,668
32 2,162
16 3,364
-
561
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,214
8 2,043
16 1,623
8 55
24 2,533
8 668
8 1,648
-
8 2,285
8 55
-
8 726
-
8 1,656
8 716
-
16 744
- 1,310
562
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
8 689
-
8 55
8 55
-
8 55
-
8 2,376
8 681
8 652
-
8 114
8 114
8 114
8 114
24 342
8 114
563
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
8 114
8 114
-
8 114
8 114
32 456
-
8 1,947
8 2,170
8 2,575
32 2,031
- 980
40 3,947
16 2,807
32 5,507
32 6,267
-
564
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,064
144 21,610
16 6,846
16 4,238
8 2,285
16 3,311
-
24 10,300
8 4,149
-
32 8,366
-
264 62,205
96 27,199
16 4,770
48 12,644
96 26,118
208 43,145
565
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
32 2,911
40 3,510
64 10,614
136 3,370
2,248 439,301
- 88,084
& C - IKM)
- 153,750
566
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
567
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,666
10 4,481
50 9,320
- 928
30 14,113
120 36,507
220 63,796
568
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 14,756
10 2,041 No Activity
10 2,340
10 1,360
10 4,279
30 5,654
10 2,286
10 3,260
10 2,113
569
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 560
30 6,709
40 8,780
10 2,369
90 14,317
50 9,833
40 11,741
620 131,853
- 5,271
10 8,691
20 66,778
570
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 93,621
- 3,880
70 12,663
90 60,342
60 34,787
310 286,031
571
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
572
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Total Concrete = 43 m³
930 417,884
573
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,466
20 4,056
574
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 4,317
- 1,235
300 53,143
30 4,499
70 6,858
110 9,675
140 11,148
575
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
90 5,711
- -
- 1,630
100 12,989
20 2,808
- 80
900 100,282
1,200 153,425
576
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,288
10 3,226 -
10 1,410
577
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
220 15,090
- 8,890
1,230 131,970
578
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
579
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,240 135,196
ON - GTA)
- 1,132 PIPERACK
- 1,072 - B2PR01
- 1,192 V. Brace : 3
580
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,052 - B2PR02
- 2,008 - D3PR01
40 1,956
20 2,174 A3ST01
40 3,850 V. Brace : 12
- 934 A4ST01
581
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 390 Girder :7
- 1,188
10 819
130 36,580
40 5,330
190 16,600
90 15,723
80 8,280
110 16,024
582
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
90 3,197
180 28,102
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 1.1
583
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 4.0
A3ST01 1.4
Total 6.5
910 129,836
584
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
50 6,070
90 10,920
30 10,012
20 3,748
585
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 3,797
586
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
10 6,647
587
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,410 257,585
STATIC EQUIPMENT
588
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
589
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 1,202
Centering of Pump
140 5,064
590
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,260 34,866
591
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 887
10 867
10 1,207
592
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 1,611
10 537
10 767
20 1,324
593
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 687
370 33,986
30 2,408
10 2,235
40 2,708
160 17,818
20 1,434
110 12,552
170 13,479
30 2,792
570 55,426
594
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
940 89,412
10 1,560
595
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,310 Total 0
10 1,560
20 2,670 1 CS 0
30 4,140 2 LTCS 0
10 1,560 4 DUPLEX SS 0
596
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,230 Total 0
10 1,000
20 1,170
10 630
20 2,040
520 59,970
C Other Progress
1 Borrow Sand 0
70 5,070 2 Coating 0
597
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,020 5 Lettering/Marking 0
60 5,740 Total 0
50 4,040
20 1,740
20 2,650
40 3,070
10 870
10 660
370 33,470
860 76,340
598
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,380 136,310
10 1,387 1 HDPE 0
- 1,194 Total 34
10 1,455
599
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,000 Total 3
10 1,138
20 1,817 1 CS (Ton) 0
10 912 Total 0
600
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 878
- 720
40 2,999
601
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
170 8,309
60 3,848
60 3,844
40 2,984
40 2,744
40 3,197
40 3,114
10 1,303
10 1,207
510 34,269
1,140 86,032
602
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
10 758
30 2,594
10 582
10 1,296
10 552
603
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,044
10 1,194
10 866
10 828
10 798
20 1,156
10 492
200 18,012
10 768
10 660
20 568
604
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 2,130
130 1,898
90 3,274
10 846
10 846
40 2,208
10 700
10 768
400 14,666
600 32,678
605
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
Unit Today
10 100
30 1,260
40 1,360
606
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 3,358
LDING - TTP)
10 1,075
10 1,055
10 538
607
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,045
- 1,045
10 528
10 498
10 2,033
10 935
10 775
10 97
10 10
150 13,934
20 1,820
608
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,150
100 8,590
70 4,163
210 16,723
360 30,657
NG - TNDT)
- 60 1 Stand By
10 740
10 760
609
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 760
30 2,320
30 1,480
10 1,510
10 720
20 1,020
70 4,730
610
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
100 7,050
Fuel Supply
10 2,061
10 1,876
20 3,937
10 2,032
20 3,895
30 5,923
60 11,849
611
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
80 15,786
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
BPP) - NO WORK
- 21,007.0
612
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,652
NO WORK
- 1,288.5
- 2,378
10 1,650
- -
613
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,650
- -
10 1,650
10 1,650
40 6,600
10 1,650
10 1,650
10 1,650
20 3,300
20 3,300
30 4,950
614
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,650
140 22,820
90 14,670
50 8,150
30 4,950
30 4,890
20 3,300
470 76,930
510 83,530
14,588 2,607,036
615
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
OTHER
WEATHE
Condition From To
HEAVY
RAIN
616
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
617
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
HIGHLIG
618
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
619
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
620
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
621
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
622
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
623
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
624
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
625
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
626
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
627
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
628
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- FWBS 2000 2
A Utility Area 3
629
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Neutralization Pit 4
B Offsite Area 7
- Concrete Wall 9
43 m³ 10
- FWBS 1000 11
No Activity 12
13
14
15
16
630
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
16
17
18
19
20
631
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
632
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
633
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total Concrete = 0 m³
1 Area A-400 1
634
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
2 Area B-500
635
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Treatment Package F8 , F9 AB
4 Area B-700
636
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 0 m³
637
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
638
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
639
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
640
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 1 m³
PIPERACK 1
- B2PR01 2
641
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- B2PR02 6
- D3BG01 9
11
EQUIPMENT SUPPORT 12
- A3ST01 13
- A4ST01
642
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
643
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
644
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
645
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
646
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
3 Chemical Storage
4 Waste Storage
647
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 GEG Building
6 Shelter Building
648
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
649
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Finishing of Platform
Install of Equipment
Install of Equipment
Install of Equipment
Leveling of equipment
Welding Washer
650
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
ROTARY EQUIPMENT
- 36-PAX-332 A/B
Padding on Foundation
PACKAGE EQUIPMENT
651
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
652
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Condensate A Tank 1
2 Condensate B Tank
3 Condensate C Tank 5
653
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Instalation Accessories
8 EG Make-Up Tank
- Instalation Accessories
654
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
655
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
Total 152 6
656
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
657
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
6 Spring Support 0
Total 0
C Other Progress
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
658
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
5 Lettering/Marking 0
Total 0
659
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
Total 16 6
660
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Stainless Steel 0 11
Total 14 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
4 DUPLEX SS (Ton) 0 19
Total 0 22
661
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
662
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
663
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
2 Setting panel 2
10
10
664
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
11
12
13
14
15
15
15
16
17
18
19
20
665
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
666
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
667
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
2 Utility Area
at B2PR01
668
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
669
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
670
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 5
10
11
12
13
14
671
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Fuel Supply 1
672
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
673
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
674
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
675
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
676
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
WEATHER
Remark
677
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
678
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
HIGHLIGHT
679
680
EQUIPMENT
Equipment & Tools Unit QTY
681
EQUIPMENT
Equipment & Tools Unit QTY
682
EQUIPMENT
Equipment & Tools Unit QTY
683
EQUIPMENT
Equipment & Tools Unit QTY
684
EQUIPMENT
Equipment & Tools Unit QTY
685
EQUIPMENT
Equipment & Tools Unit QTY
686
EQUIPMENT
Equipment & Tools Unit QTY
687
EQUIPMENT
Equipment & Tools Unit QTY
688
EQUIPMENT
Equipment & Tools Unit QTY
689
EQUIPMENT
Equipment & Tools Unit QTY
Theodolite Unit 3
Waterpass Unit 3
690
EQUIPMENT
Equipment & Tools Unit QTY
Excavator Unit 5
Dumptruck Unit 6
Bulldozer Unit 1
Genset Unit 4
Grader Unit 1
691
EQUIPMENT
Equipment & Tools Unit QTY
Crane Unit 1
692
EQUIPMENT
Equipment & Tools Unit QTY
693
EQUIPMENT
Equipment & Tools Unit QTY
694
EQUIPMENT
Equipment & Tools Unit QTY
695
EQUIPMENT
Equipment & Tools Unit QTY
696
EQUIPMENT
Equipment & Tools Unit QTY
697
EQUIPMENT
Equipment & Tools Unit QTY
698
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
699
EQUIPMENT
Equipment & Tools Unit QTY
700
EQUIPMENT
Equipment & Tools Unit QTY
701
EQUIPMENT
Equipment & Tools Unit QTY
702
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
703
EQUIPMENT
Equipment & Tools Unit QTY
704
EQUIPMENT
Equipment & Tools Unit QTY
705
EQUIPMENT
Equipment & Tools Unit QTY
706
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
707
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
708
EQUIPMENT
Equipment & Tools Unit QTY
709
EQUIPMENT
Equipment & Tools Unit QTY
710
EQUIPMENT
Equipment & Tools Unit QTY
711
EQUIPMENT
Equipment & Tools Unit QTY
712
EQUIPMENT
Equipment & Tools Unit QTY
713
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
Miller Unit 2
714
EQUIPMENT
Equipment & Tools Unit QTY
Generator
a. 18 KVA Unit 1
715
EQUIPMENT
Equipment & Tools Unit QTY
716
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
717
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle Unit 2
718
EQUIPMENT
Equipment & Tools Unit QTY
719
EQUIPMENT
Equipment & Tools Unit QTY
720
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
721
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
Forklif Unit 1
722
EQUIPMENT
Equipment & Tools Unit QTY
723
EQUIPMENT
Equipment & Tools Unit QTY
724
EQUIPMENT
Equipment & Tools Unit QTY
725
EQUIPMENT
Equipment & Tools Unit QTY
726
EQUIPMENT
Equipment & Tools Unit QTY
727
EQUIPMENT
Equipment & Tools Unit QTY
728
EQUIPMENT
Equipment & Tools Unit QTY
729
EQUIPMENT
Equipment & Tools Unit QTY
730
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
731
EQUIPMENT
Equipment & Tools Unit QTY
Barricade Roll 1
Megaphone Unit 1
MC Cleaner Can 1
MC Penetrant Can 1
MC Developer Can 1
732
EQUIPMENT
Equipment & Tools Unit QTY
Dispenser Unit 1
733
EQUIPMENT
Equipment & Tools Unit QTY
734
EQUIPMENT
Equipment & Tools Unit QTY
735
EQUIPMENT
Equipment & Tools Unit QTY
736
EQUIPMENT
Equipment & Tools Unit QTY
737
EQUIPMENT
Equipment & Tools Unit QTY
738
EQUIPMENT
Equipment & Tools Unit QTY
739
EQUIPMENT
Equipment & Tools Unit QTY
740
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
745
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 919 1 920 M/H 9,136
Deputy Site Manager M/D 153 1 154 M/H 1,476
Construction Manager M/D 299 1 300 M/H 2,933
Deputy Construction Manager M/D 189 1 190 M/H 1,836
746
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 171 1 172 M/H 1,653
2 HSSE
HSSE M/D 9,706 11 9,717 M/H 21,385
HSSE Administration M/D 1,194 1 1,195 M/H 2,590
3 Quality Control
Field. QC Manager M/D 237 2 239 M/H 2,265
QC Coordinator-2 M/D 315 2 317 M/H 3,030
QC Engineer M/D 1,046 6 1,052 M/H 9,700
QC Admin M/D 147 2 149 M/H 1,371
Welding Tracking M/D 19 1 20 M/H 181
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 373 1 374 M/H 3,433
Electrical Superintendent M/D 351 1 352 M/H 3,279
ME Supervisor Temfac M/D 343 1 344 M/H 3,238
Civil Supervisor Temfac M/D 681 2 683 M/H 6,405
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 261 1 262 M/H 2,510
747
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 234 1 235 M/H 2,271
4.2 Civil
General Civil Superintendent M/D 269 1 270 M/H 2,606
Project Engineer M/D 210 4 214 M/H 2,025
Civil Engineer M/D 460 1 461 M/H 4,142
Civil Engineer M/D 393 1 394 M/H 3,590
Field Engineer M/D 193 1 194 M/H 1,870
Civil Construction M/D 300 1 301 M/H 2,878
Batching Plant Coordinator M/D 241 1 242 M/H 2,331
Surveyor M/D 493 1 494 M/H 4,498
Helper Surveyor M/D 464 1 465 M/H 4,170
Steel Structure Engineer M/D 172 1 173 M/H 1,663
4.3 Building
Building Superintendent M/D 453 1 454 M/H 4,099
Building Supervisor M/D 583 3 586 M/H 5,668
Surveyor M/D 380 4 384 M/H 2,162
Helper Surveyor M/D 347 2 349 M/H 3,364
4.4 Piping
748
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 228 1 229 M/H 2,214
Asst. Piping Superintendent M/D 210 1 211 M/H 2,043
Piping Engineer M/D 167 2 169 M/H 1,623
Technical Suport M/D 6 1 7 M/H 55
Supervisor M/D 268 3 271 M/H 2,533
CMS Operator M/D 71 1 72 M/H 668
Clerk M/D 169 1 170 M/H 1,648
4.5 Process
Process Superintendent M/D 236 1 237 M/H 2,285
Clerk M/D 6 1 7 M/H 55
4.6 Mechanical & Tank
Mechanical Superintendent M/D 78 1 79 M/H 726
4.6.1 Tank
Tank Field Engineer M/D 171 1 172 M/H 1,656
Tank Supervisor M/D 77 1 78 M/H 716
4.6.2 Static Mechanical
Static Field Engineer M/D 80 2 82 M/H 744
Preservation Technician M/D 138 - 138 M/H 1,310
749
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 74 1 75 M/H 689
4.6.4 Rotary
Field Engineer M/D 6 1 7 M/H 55
Supervisor M/D 6 1 7 M/H 55
4.6.5 Combation
Field Engineer M/D 6 1 7 M/H 55
4.7 General Contruction
General Superintendent M/D 243 1 244 M/H 2,376
Jr.Mechanical Engineer M/D 77 1 78 M/H 681
Mechanical Supervisor M/D 69 1 70 M/H 652
4.8 Electrical
Elecctrical Superintendent M/D 12 1 13 M/H 114
Field Engineer M/D 12 1 13 M/H 114
Lead Supervisor M/D 12 1 13 M/H 114
Engineer M/D 12 1 13 M/H 114
Supervisor M/D 36 3 39 M/H 342
Clerk M/D 12 1 13 M/H 114
750
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 12 1 13 M/H 114
Supervisor M/D 12 1 13 M/H 114
5 Preservation
Preservation Coordinator M/D 12 1 13 M/H 114
Preservation Eng M/D 12 1 13 M/H 114
Preservation Junior Eng M/D 48 4 52 M/H 456
6 Control
Project Control Manager M/D 200 1 201 M/H 1,947
Project Control M/D 238 1 239 M/H 2,170
Document Control M/D 266 1 267 M/H 2,575
Schedule Engineer M/D 210 4 214 M/H 2,031
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 412 5 417 M/H 3,947
Cost Control M/D 292 2 294 M/H 2,807
Subcontracting M/D 572 4 576 M/H 5,507
Material Control M/D 649 4 653 M/H 6,267
7 Administration
751
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 213 1 214 M/H 2,064
Administration M/D 2,264 18 2,282 M/H 21,610
Business Coordinator M/D 745 2 747 M/H 6,846
Project Support M/D 437 2 439 M/H 4,238
Finance M/D 236 1 237 M/H 2,285
Puchasing M/D 341 2 343 M/H 3,311
8 Public Relation
Public Affair M/D 1,116 3 1,119 M/H 10,300
Government Permit M/D 462 1 463 M/H 4,149
9 IT
IT Engineer M/D 876 4 880 M/H 8,366
10 Others
Security M/D 6,483 33 6,516 M/H 62,205
Rigging & Lifting / Operator M/D 2,795 12 2,807 M/H 27,199
Operator Genset M/D 492 2 494 M/H 4,770
Office Boy/Girl M/D 1,304 6 1,310 M/H 12,644
Paramedic M/D 2,696 12 2,708 M/H 26,118
Driver M/D 4,460 26 4,486 M/H 43,145
752
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 289 4 293 M/H 2,911
Rigger M/D 375 5 380 M/H 3,510
Skill M/D 1,137 8 1,145 M/H 10,614
Warehouse M/D 349 17 366 M/H 3,370
Total 54,489 281 54,770 439,301
753
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
754
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 801 3 804 M/H 7,666
2 Lab M/D 461 1 462 M/H 4,481
3 Driver Truck Mixer M/D 957 5 962 M/H 9,320
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,639 3 1,642 M/H 14,113
Sub Total 3,978 12 3,990 36,507
755
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
756
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
757
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
758
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
759
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
760
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
761
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
762
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
763
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
764
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
765
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
766
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
767
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
768
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
769
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
770
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
771
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
772
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
773
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
774
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 77 1 78 767
775
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
776
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
777
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
778
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 414 3 417 M/H 4,140
779
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
780
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
781
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
782
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
783
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
784
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
785
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
786
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
787
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
788
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
789
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
790
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
791
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
DIRECT MANPOWER
792
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
M/H
DIRECT MANPOWER
793
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
794
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
795
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
796
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
797
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
798
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
799
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
800
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
801
DAILY REPORT
P
JGC ENC
802
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
9 9,145
9 1,485
9 2,942
9 1,845
803
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 1,662
-
99 21,484
9 2,599
-
18 2,283
18 3,048
54 9,754
18 1,389
9 190
-
-
9 3,442
9 3,288
9 3,247
18 6,423
- 158
9 2,519
804
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,280
-
9 2,615
36 2,061
9 4,151
9 3,599
9 1,879
9 2,887
9 2,340
9 4,507
9 4,179
9 1,672
-
9 4,108
27 5,695
36 2,198
18 3,382
-
805
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,223
9 2,052
18 1,641
9 64
27 2,560
9 677
9 1,657
-
9 2,294
9 64
-
9 735
-
9 1,665
9 725
-
18 762
- 1,310
806
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
9 698
-
9 64
9 64
-
9 64
-
9 2,385
9 690
9 661
-
9 123
9 123
9 123
9 123
27 369
9 123
807
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
9 123
9 123
-
9 123
9 123
36 492
-
9 1,956
9 2,179
9 2,584
36 2,067
- 980
45 3,992
18 2,825
36 5,543
36 6,303
-
808
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 2,073
162 21,772
18 6,864
18 4,256
9 2,294
18 3,329
-
27 10,327
9 4,158
-
36 8,402
-
297 62,502
108 27,307
18 4,788
54 12,698
108 26,226
234 43,379
809
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
36 2,947
45 3,555
72 10,686
153 3,523
2,529 441,830
- 88,084
& C - IKM)
- 153,750
810
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
811
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,696
10 4,491
50 9,370
- 928
30 14,143
120 36,627
220 64,016
812
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 610 1 Workshop
10 1,476
813
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 786
20 6,224
814
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 4,529
70 6,928
110 9,785
100 11,248
90 5,801
- -
- 1,630
100 13,089
20 2,828
- 80
810 101,092
815
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,110 154,535
- 1,288
10 3,236
816
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,420
320 15,410
10 8,900
817
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
818
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,450 136,646
ON - GTA)
- 1,132 PIPERACK
819
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,072 - B2PR01
- 1,192 V. Brace : 3
- 1,052 - B2PR02
- 2,008 - D3PR01
40 1,996
20 2,194 A3ST01
820
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 3,890 V. Brace : 12
- 934 A4ST01
- 390 Girder :7
- 1,188
10 829
130 36,710
40 5,370
821
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
190 16,790
90 15,813
80 8,360
110 16,134
90 3,287
180 28,282
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
822
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 1.1
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 4.0
A3ST01 1.4
Total 6.5
823
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
910 130,746
30 10,042
20 3,768
824
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,205
- 1,912
825
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
50 4,240 - Concreting LC
270 19,170
826
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,030 193,871 -
827
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,360 258,945
STATIC EQUIPMENT
828
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 1,232
829
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
830
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,260 36,126
10 897
40 3,668
831
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 647
- -
10 1,327
832
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,044
20 1,344
20 1,864
40 3,608
10 697
370 34,356
30 2,438
10 2,245
40 2,748
160 17,978
20 1,454
833
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
110 12,662
170 13,649
30 2,822
570 55,996
940 90,352
834
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,570
10 1,320 Total 0
10 1,570
835
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,690 1 CS 0
30 4,170 2 LTCS 0
10 1,570 4 DUPLEX SS 0
30 2,260 Total 0
10 1,010
20 1,190
10 640
20 2,060
520 60,490
C Other Progress
836
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1 Borrow Sand 0
70 5,140 2 Coating 0
20 2,040 5 Lettering/Marking 0
60 5,800 Total 0
50 4,090
20 1,760
20 2,670
40 3,110
10 880
10 670
837
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
370 33,840
860 77,200
1,380 137,690
10 1,397 1 HDPE 0
838
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,194 Total 50
10 1,465
20 2,020 Total 32
10 1,148
20 1,837 1 CS (Ton) 0
839
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 922 Total 0
10 888
840
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 720
40 3,039
170 8,479
60 3,908
60 3,904
40 3,024
40 2,784
40 3,237
30 3,144
10 1,313
10 1,217
841
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
500 34,769
1,110 87,142
Unit Today
842
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,624
10 592
10 1,306
10 562
10 1,054
10 1,204
10 876
10 838
10 808
20 1,176
10 502
200 18,212
843
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 778
10 670
20 588
60 2,190
130 2,028
90 3,364
10 856
10 856
40 2,248
10 710
10 778
400 15,066
844
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
600 33,278
Unit Today
30 1,290
845
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 1,400
60 3,418
LDING - TTP)
9 1,084 at B2PR01
846
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
9 1,064
9 1,084
9 1,084
9 547
9 1,054
- 1,045
9 537
9 507
9 2,042
9 944
9 784
9 106
9 19
847
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
135 14,069
18 1,838
18 2,168
90 8,680
63 4,226
189 16,912
324 30,981
NG - TNDT)
848
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 60 1 Stand By
10 750
10 770
10 770
30 2,350
30 1,510
10 1,520
10 730
20 1,040
849
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 4,800
100 7,150
Fuel Supply
10 2,071
10 1,886
20 3,957
850
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,042
20 3,915
30 5,953
60 11,909
80 15,866
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
851
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
BPP) - NO WORK
- 21,007.0
- 2,652
NO WORK
- 1,288.5
- 2,378
852
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,660
- -
10 1,660
- -
10 1,660
10 1,660
40 6,640
10 1,660
10 1,660
853
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,660
20 3,320
20 3,320
30 4,980
10 1,660
140 22,960
90 14,760
50 8,200
30 4,980
30 4,920
20 3,320
470 77,400
854
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
510 84,040
13,943 2,620,979
OTHER
WEATHE
Condition From To
HEAVY
RAIN
855
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
856
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
857
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
HIGHLIG
858
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
859
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
860
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
861
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
862
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
863
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
864
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
865
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
866
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
867
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
868
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
869
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Area A-400 1
870
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
eatment Package F8 , F9 AB
871
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 0 m³
872
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Fwk. and Embedded Install for Pedestal F2, F12 (SLP 8,9,10,11) 2
873
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
874
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
875
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 9 m³
PIPERACK 1
876
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- B2PR01 2
- B2PR02 6
- D3BG01 9
11
EQUIPMENT SUPPORT 12
- A3ST01 13
877
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- A4ST01
878
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
879
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
880
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
881
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
23
882
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Chemical Storage
4 Waste Storage
5 GEG Building
6 Shelter Building
883
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
884
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
Leveling of equipment
Install of Equipment
Install of Equipment
885
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Leveling of equipment
Welding Washer
ROTARY EQUIPMENT
- 36-PAX-332 A/B
Leveling of Pump
PACKAGE EQUIPMENT
886
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
887
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Condensate A Tank 1
2 Condensate B Tank
888
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Condensate C Tank 5
- Instalation Accessories
889
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
8 EG Make-Up Tank
- Instalation Accessories
890
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
891
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 152 6
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
892
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
6 Spring Support 0
Total 0
C Other Progress
893
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
5 Lettering/Marking 0
Total 0
894
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
895
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 16 6
3 Stainless Steel 0 11
Total 14 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
896
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
4 DUPLEX SS (Ton) 0 19
Total 0 22
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
897
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
898
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
2 Setting panel 2
899
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
10
11
12
13
14
15
15
15
16
17
900
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
18
19
20
901
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
902
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Utility Area
at B2PR01
903
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
904
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
905
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
- Radiography Inspection 5
10
11
12
906
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
13
14
Fuel Supply 1
907
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
908
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
909
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
910
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
911
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
WEATHER
Remark
912
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
913
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
914
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
HIGHLIGHT
915
916
EQUIPMENT
Equipment & Tools Unit QTY
917
EQUIPMENT
Equipment & Tools Unit QTY
918
EQUIPMENT
Equipment & Tools Unit QTY
919
EQUIPMENT
Equipment & Tools Unit QTY
920
EQUIPMENT
Equipment & Tools Unit QTY
921
EQUIPMENT
Equipment & Tools Unit QTY
922
EQUIPMENT
Equipment & Tools Unit QTY
923
EQUIPMENT
Equipment & Tools Unit QTY
924
EQUIPMENT
Equipment & Tools Unit QTY
925
EQUIPMENT
Equipment & Tools Unit QTY
926
EQUIPMENT
Equipment & Tools Unit QTY
927
EQUIPMENT
Equipment & Tools Unit QTY
928
EQUIPMENT
Equipment & Tools Unit QTY
929
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
930
EQUIPMENT
Equipment & Tools Unit QTY
931
EQUIPMENT
Equipment & Tools Unit QTY
932
EQUIPMENT
Equipment & Tools Unit QTY
933
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
934
EQUIPMENT
Equipment & Tools Unit QTY
935
EQUIPMENT
Equipment & Tools Unit QTY
936
EQUIPMENT
Equipment & Tools Unit QTY
937
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
938
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
939
EQUIPMENT
Equipment & Tools Unit QTY
940
EQUIPMENT
Equipment & Tools Unit QTY
941
EQUIPMENT
Equipment & Tools Unit QTY
942
EQUIPMENT
Equipment & Tools Unit QTY
943
EQUIPMENT
Equipment & Tools Unit QTY
944
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
945
EQUIPMENT
Equipment & Tools Unit QTY
Miller Unit 2
Generator
a. 18 KVA Unit 1
946
EQUIPMENT
Equipment & Tools Unit QTY
947
EQUIPMENT
Equipment & Tools Unit QTY
948
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
Vehicle Unit 2
949
EQUIPMENT
Equipment & Tools Unit QTY
950
EQUIPMENT
Equipment & Tools Unit QTY
951
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
952
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
953
EQUIPMENT
Equipment & Tools Unit QTY
Forklif Unit 1
954
EQUIPMENT
Equipment & Tools Unit QTY
955
EQUIPMENT
Equipment & Tools Unit QTY
956
EQUIPMENT
Equipment & Tools Unit QTY
957
EQUIPMENT
Equipment & Tools Unit QTY
958
EQUIPMENT
Equipment & Tools Unit QTY
959
EQUIPMENT
Equipment & Tools Unit QTY
960
EQUIPMENT
Equipment & Tools Unit QTY
961
EQUIPMENT
Equipment & Tools Unit QTY
962
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
Barricade Roll 1
Megaphone Unit 1
MC Cleaner Can 1
963
EQUIPMENT
Equipment & Tools Unit QTY
MC Penetrant Can 1
MC Developer Can 1
Dispenser Unit 1
964
EQUIPMENT
Equipment & Tools Unit QTY
965
EQUIPMENT
Equipment & Tools Unit QTY
966
EQUIPMENT
Equipment & Tools Unit QTY
967
EQUIPMENT
Equipment & Tools Unit QTY
968
EQUIPMENT
Equipment & Tools Unit QTY
969
EQUIPMENT
Equipment & Tools Unit QTY
970
EQUIPMENT
Equipment & Tools Unit QTY
971
EQUIPMENT
Equipment & Tools Unit QTY
972
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
973
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 920 1 921 M/H 9,145
Deputy Site Manager M/D 154 - 154 M/H 1,485
Construction Manager M/D 300 - 300 M/H 2,942
Deputy Construction Manager M/D 190 1 191 M/H 1,845
974
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 172 1 173 M/H 1,662
2 HSSE
HSSE M/D 9,717 7 9,724 M/H 21,484
HSSE Administration M/D 1,195 1 1,196 M/H 2,599
3 Quality Control
Field. QC Manager M/D 239 2 241 M/H 2,283
QC Coordinator-2 M/D 317 2 319 M/H 3,048
QC Engineer M/D 1,052 9 1,061 M/H 9,754
QC Admin M/D 149 - 149 M/H 1,389
Welding Tracking M/D 20 1 21 M/H 190
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 374 1 375 M/H 3,442
Electrical Superintendent M/D 352 1 353 M/H 3,288
ME Supervisor Temfac M/D 344 1 345 M/H 3,247
Civil Supervisor Temfac M/D 683 1 684 M/H 6,423
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 262 1 263 M/H 2,519
975
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 235 1 236 M/H 2,280
4.2 Civil
General Civil Superintendent M/D 270 1 271 M/H 2,615
Project Engineer M/D 214 2 216 M/H 2,061
Civil Engineer M/D 461 1 462 M/H 4,151
Civil Engineer M/D 394 1 395 M/H 3,599
Field Engineer M/D 194 1 195 M/H 1,879
Civil Construction M/D 301 1 302 M/H 2,887
Batching Plant Coordinator M/D 242 1 243 M/H 2,340
Surveyor M/D 494 1 495 M/H 4,507
Helper Surveyor M/D 465 1 466 M/H 4,179
Steel Structure Engineer M/D 173 1 174 M/H 1,672
4.3 Building
Building Superintendent M/D 454 1 455 M/H 4,108
Building Supervisor M/D 586 3 589 M/H 5,695
Surveyor M/D 384 4 388 M/H 2,198
Helper Surveyor M/D 349 2 351 M/H 3,382
4.4 Piping
976
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 229 - 229 M/H 2,223
Asst. Piping Superintendent M/D 211 1 212 M/H 2,052
Piping Engineer M/D 169 2 171 M/H 1,641
Technical Suport M/D 7 1 8 M/H 64
Supervisor M/D 271 3 274 M/H 2,560
CMS Operator M/D 72 1 73 M/H 677
Clerk M/D 170 1 171 M/H 1,657
4.5 Process
Process Superintendent M/D 237 1 238 M/H 2,294
Clerk M/D 7 1 8 M/H 64
4.6 Mechanical & Tank
Mechanical Superintendent M/D 79 1 80 M/H 735
4.6.1 Tank
Tank Field Engineer M/D 172 1 173 M/H 1,665
Tank Supervisor M/D 78 1 79 M/H 725
4.6.2 Static Mechanical
Static Field Engineer M/D 82 2 84 M/H 762
Preservation Technician M/D 138 - 138 M/H 1,310
977
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 75 1 76 M/H 698
4.6.4 Rotary
Field Engineer M/D 7 1 8 M/H 64
Supervisor M/D 7 1 8 M/H 64
4.6.5 Combation
Field Engineer M/D 7 1 8 M/H 64
4.7 General Contruction
General Superintendent M/D 244 1 245 M/H 2,385
Jr.Mechanical Engineer M/D 78 1 79 M/H 690
Mechanical Supervisor M/D 70 1 71 M/H 661
4.8 Electrical
Elecctrical Superintendent M/D 13 1 14 M/H 123
Field Engineer M/D 13 1 14 M/H 123
Lead Supervisor M/D 13 1 14 M/H 123
Engineer M/D 13 1 14 M/H 123
Supervisor M/D 39 3 42 M/H 369
Clerk M/D 13 1 14 M/H 123
978
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 13 1 14 M/H 123
Supervisor M/D 13 1 14 M/H 123
5 Preservation
Preservation Coordinator M/D 13 1 14 M/H 123
Preservation Eng M/D 13 1 14 M/H 123
Preservation Junior Eng M/D 52 4 56 M/H 492
6 Control
Project Control Manager M/D 201 1 202 M/H 1,956
Project Control M/D 239 - 239 M/H 2,179
Document Control M/D 267 - 267 M/H 2,584
Schedule Engineer M/D 214 - 214 M/H 2,067
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 417 - 417 M/H 3,992
Cost Control M/D 294 - 294 M/H 2,825
Subcontracting M/D 576 1 577 M/H 5,543
Material Control M/D 653 4 657 M/H 6,303
7 Administration
979
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 214 1 215 M/H 2,073
Administration M/D 2,282 4 2,286 M/H 21,772
Business Coordinator M/D 747 1 748 M/H 6,864
Project Support M/D 439 2 441 M/H 4,256
Finance M/D 237 1 238 M/H 2,294
Puchasing M/D 343 2 345 M/H 3,329
8 Public Relation
Public Affair M/D 1,119 - 1,119 M/H 10,327
Government Permit M/D 463 - 463 M/H 4,158
9 IT
IT Engineer M/D 880 2 882 M/H 8,402
10 Others
Security M/D 6,516 33 6,549 M/H 62,502
Rigging & Lifting / Operator M/D 2,807 12 2,819 M/H 27,307
Operator Genset M/D 494 2 496 M/H 4,788
Office Boy/Girl M/D 1,310 6 1,316 M/H 12,698
Paramedic M/D 2,708 12 2,720 M/H 26,226
Driver M/D 4,486 26 4,512 M/H 43,379
980
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 293 4 297 M/H 2,947
Rigger M/D 380 5 385 M/H 3,555
Skill M/D 1,145 4 1,149 M/H 10,686
Warehouse M/D 366 10 376 M/H 3,523
Total 54,770 224 54,994 441,830
981
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
982
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 804 3 807 M/H 7,696
2 Lab M/D 462 1 463 M/H 4,491
3 Driver Truck Mixer M/D 962 5 967 M/H 9,370
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,642 3 1,645 M/H 14,143
Sub Total 3,990 12 4,002 36,627
983
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
984
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
985
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
986
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
987
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
988
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
989
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
990
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
991
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
992
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
993
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
994
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
995
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
996
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
997
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
998
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
999
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1000
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1001
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1002
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 78 1 79 777
1003
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1004
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1005
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1006
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 417 3 420 M/H 4,170
1007
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1008
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1009
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1010
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1011
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1012
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1013
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1014
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1015
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1016
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1017
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1018
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1019
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
DIRECT MANPOWER
1020
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
M/H
DIRECT MANPOWER
1021
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1022
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1023
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1024
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1025
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
1026
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
1027
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
1028
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
1029
DAILY REPORT
P
JGC ENC
1030
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
7 9,152
- 1,485
- 2,942
7 1,852
1031
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 1,669
-
49 21,533
7 2,606
-
14 2,297
14 3,062
63 9,817
- 1,389
7 197
-
-
7 3,449
7 3,295
7 3,254
7 6,430
- 158
7 2,526
1032
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 2,287
-
7 2,622
14 2,075
7 4,158
7 3,606
7 1,886
7 2,894
7 2,347
7 4,514
7 4,186
7 1,679
-
7 4,115
21 5,716
28 2,226
14 3,396
-
1033
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,223
7 2,059
14 1,655
7 71
21 2,581
7 684
7 1,664
-
7 2,301
7 71
-
7 742
-
7 1,672
7 732
-
14 776
- 1,310
1034
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
7 705
-
7 71
7 71
-
7 71
-
7 2,392
7 697
7 668
-
7 130
7 130
7 130
7 130
21 390
7 130
1035
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
7 130
7 130
-
7 130
7 130
28 520
-
7 1,963
- 2,179
- 2,584
- 2,067
- 980
- 3,992
- 2,825
7 5,550
28 6,331
-
1036
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 2,080
28 21,800
7 6,871
14 4,270
7 2,301
14 3,343
-
- 10,327
- 4,158
-
14 8,416
-
231 62,733
84 27,391
14 4,802
42 12,740
84 26,310
182 43,561
1037
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
28 2,975
35 3,590
28 10,714
70 3,593
1,568 443,398
- 88,084
& C - IKM)
- 153,750
1038
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
1039
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,726
10 4,501
50 9,420
- 928
30 14,173
120 36,747
220 64,236
1040
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 2,229
48 8,378
1041
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 6,232
1042
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
24 4,553
40 6,968
88 9,873
64 11,312
72 5,873
- -
24 1,654
72 13,161
8 2,836
- 80
608 101,700
1043
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
792 155,327
- 1,288
10 3,246
1044
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,430
320 15,730
10 8,910
1,440 134,850
1045
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1046
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,450 138,096
ON - GTA)
- 1,132 No Activity
1047
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,072
- 1,122
- 1,142
- 1,192
- 1,122
- 1,052
- 1,440
- 2,008
- 3,316
- 1,996
- 1,484
- 2,194
- 404
1048
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,994
- 3,123
- 3,890
- 934
- 2,008
- 1,678
- 390
- 1,188
- 829
- 36,710
- 5,370
1049
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 16,790
- 15,813
- 8,360
- 16,134
- 3,287
- 28,282
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
1050
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 0.0
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 0.0
A3ST01 0.0
Total 0.0
1051
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 130,746
30 10,072
20 3,788
1052
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
330 65,404 - Polling cable Lamp ind office room and laboratory (5)
- 1,205
- 1,912
1053
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 13,900
70 20,425
- -
10 6,667
50 4,290
230 19,400
1054
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1055
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,320 260,265
- 444 No Activity
- 454
- 454
- 454
- 454
- 454
- 454
- 444
- 708
1056
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,355
- 444
- 454
- -
- 1,232
- 454
- 444
- 2,270
- -
- 454
- 12,427
1057
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,593
- 5,204
- 2,449
- 1,140
- 8,623
- 3,370
- 1,320
- 23,699
1058
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 36,126
10 907
40 3,708
1059
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 657
30 1,671
10 637
20 2,914
1060
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,064
20 1,364
20 1,884
40 3,648
10 707
370 34,726
30 2,468
10 2,255
40 2,788
160 18,138
20 1,474
1061
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
150 12,812
170 13,819
30 2,852
610 56,606
980 91,332
1062
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,220 Total 71
10 1,580
10 1,330 Total 0
10 1,580
1063
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,710 1 CS 0
30 4,200 2 LTCS 0
10 1,580 4 DUPLEX SS 0
30 2,290 Total 0
10 1,020
20 1,210
10 650
20 2,080
520 61,010
C Other Progress
1064
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1 Borrow Sand 0
70 5,210 2 Coating 0
20 2,060 5 Lettering/Marking 0
60 5,860 Total 0
50 4,140
20 1,780
20 2,690
40 3,150
10 890
10 680
1065
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
370 34,210
860 78,060
1,380 139,070
8 1,405 1 HDPE 0
1066
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,194 Total 18
- 1,465
- 2,020 Total 30
- 1,148
- 1,837 1 CS (Ton) 0
1067
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
8 930 Total 0
8 896
1068
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 720
32 3,071
128 8,607
40 3,948
32 3,936
32 3,056
32 2,816
32 3,269
- 3,144
- 1,313
- 1,217
1069
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
328 35,097
640 87,782
Unit Today
1070
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,654
10 602
10 1,316
10 572
10 1,064
10 1,214
10 886
10 848
10 818
20 1,196
10 512
200 18,412
1071
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 788
10 680
20 608
60 2,250
130 2,158
90 3,454
10 866
10 866
40 2,288
10 720
10 788
400 15,466
1072
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
600 33,878
Unit Today
20 130
40 1,330
1073
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 1,460
80 3,498
LDING - TTP)
7 1,091 at B2PR01
1074
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
7 1,071
7 1,061
- 1,045
7 544
7 514
7 2,049
7 951
7 791
7 113
7 26
1075
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
105 14,174
14 1,852
14 2,182
70 8,750
49 4,275
147 17,059
252 31,233
NG - TNDT)
1076
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 60 1 A110 Piperack
10 780
30 2,380
30 1,540
10 1,530
10 740
20 1,060
1077
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 4,870
100 7,250
Fuel Supply
10 2,081
10 1,896
20 3,977
1078
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,052
20 3,935
30 5,983
60 11,969
80 15,946
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
1079
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
BPP) - NO WORK
- 21,007.0
- 2,652
NO WORK
- 1,288.5
- 2,378
1080
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,670
- -
10 1,670
- -
10 1,670
10 1,670
40 6,680
10 1,670
10 1,670
1081
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,670
20 3,340
20 3,340
30 5,010
10 1,670
140 23,100
90 14,850
50 8,250
30 5,010
30 4,950
20 3,340
470 77,870
1082
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
510 84,550
9,972 2,630,951
OTHER
WEATHE
Condition From To
HEAVY
RAIN
1083
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
1084
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
1085
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
HIGHLIG
1086
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
1087
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
1088
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
1089
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1090
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1091
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1092
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1093
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1094
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1095
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
1096
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1097
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Area A-400 1
10
2 Area B-300 11
1098
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Area B-500
4 Area B-600
5 Area B-700
1099
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Backfill in Pipe Sleeper
Total concrete = 0 m³
1100
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1101
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1102
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1103
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
PIPERACK 1
1104
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- B2PR01 2
- B2PR02 6
- D3BG01 9
11
EQUIPMENT SUPPORT 12
- A3ST01 13
1105
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- A4ST01
1106
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1107
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1108
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Installation scaffolding 3
- Installation lamp 5
- Installation Panel 6
- Installation skirting 8
10
1109
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
21
22
3 Chemical Storage 23
1110
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
4 Waste Storage
5 GEG Building
6 Shelter Building
1111
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1112
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
Leveling of equipment
Install of Equipment
Install of Equipment
1113
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Leveling of equipment
Welding Washer
ROTARY EQUIPMENT
- 36-PAX-332 A/B
Leveling of Pump
PACKAGE EQUIPMENT
1114
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1115
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Condensate A Tank 1
2 Condensate B Tank
1116
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Condensate C Tank 5
- Instalation Accessories
1117
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
8 EG Make-Up Tank
- Instalation Accessories
1118
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
1119
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 152 6
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
1120
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
6 Spring Support 0
Total 0
C Other Progress
1121
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
5 Lettering/Marking 0
Total 0
1122
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
1123
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 16 6
3 Stainless Steel 18 11
Total 30 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
1124
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
4 DUPLEX SS (Ton) 0 19
Total 0 22
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
1125
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1126
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
2 Setting panel 2
1127
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
10
11
12
13
14
15
15
15
16
17
1128
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
18
19
20
1129
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1130
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Utility Area
at B2PR01
1131
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
2 Sulfur Pit
(Site Instruction)
1132
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1133
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
- Radiography Inspection 5
10
11
12
1134
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
13
14
Fuel Supply 1
1135
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1136
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1137
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
1138
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1139
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
WEATHER
Remark
1140
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1141
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
1142
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
HIGHLIGHT
1143
1144
EQUIPMENT
Equipment & Tools Unit QTY
1145
EQUIPMENT
Equipment & Tools Unit QTY
1146
EQUIPMENT
Equipment & Tools Unit QTY
1147
EQUIPMENT
Equipment & Tools Unit QTY
1148
EQUIPMENT
Equipment & Tools Unit QTY
1149
EQUIPMENT
Equipment & Tools Unit QTY
1150
EQUIPMENT
Equipment & Tools Unit QTY
1151
EQUIPMENT
Equipment & Tools Unit QTY
1152
EQUIPMENT
Equipment & Tools Unit QTY
1153
EQUIPMENT
Equipment & Tools Unit QTY
1154
EQUIPMENT
Equipment & Tools Unit QTY
1155
EQUIPMENT
Equipment & Tools Unit QTY
1156
EQUIPMENT
Equipment & Tools Unit QTY
1157
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
1158
EQUIPMENT
Equipment & Tools Unit QTY
1159
EQUIPMENT
Equipment & Tools Unit QTY
1160
EQUIPMENT
Equipment & Tools Unit QTY
1161
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
1162
EQUIPMENT
Equipment & Tools Unit QTY
1163
EQUIPMENT
Equipment & Tools Unit QTY
1164
EQUIPMENT
Equipment & Tools Unit QTY
1165
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
1166
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
1167
EQUIPMENT
Equipment & Tools Unit QTY
1168
EQUIPMENT
Equipment & Tools Unit QTY
1169
EQUIPMENT
Equipment & Tools Unit QTY
1170
EQUIPMENT
Equipment & Tools Unit QTY
1171
EQUIPMENT
Equipment & Tools Unit QTY
1172
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
1173
EQUIPMENT
Equipment & Tools Unit QTY
Miller Unit 2
Generator
a. 18 KVA Unit 1
1174
EQUIPMENT
Equipment & Tools Unit QTY
1175
EQUIPMENT
Equipment & Tools Unit QTY
1176
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
Vehicle Unit 2
1177
EQUIPMENT
Equipment & Tools Unit QTY
1178
EQUIPMENT
Equipment & Tools Unit QTY
1179
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
1180
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
1181
EQUIPMENT
Equipment & Tools Unit QTY
Forklif Unit 1
1182
EQUIPMENT
Equipment & Tools Unit QTY
1183
EQUIPMENT
Equipment & Tools Unit QTY
1184
EQUIPMENT
Equipment & Tools Unit QTY
1185
EQUIPMENT
Equipment & Tools Unit QTY
1186
EQUIPMENT
Equipment & Tools Unit QTY
1187
EQUIPMENT
Equipment & Tools Unit QTY
1188
EQUIPMENT
Equipment & Tools Unit QTY
1189
EQUIPMENT
Equipment & Tools Unit QTY
1190
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
Barricade Roll 1
Megaphone Unit 1
MC Cleaner Can 1
1191
EQUIPMENT
Equipment & Tools Unit QTY
MC Penetrant Can 1
MC Developer Can 1
Dispenser Unit 1
1192
EQUIPMENT
Equipment & Tools Unit QTY
1193
EQUIPMENT
Equipment & Tools Unit QTY
1194
EQUIPMENT
Equipment & Tools Unit QTY
1195
EQUIPMENT
Equipment & Tools Unit QTY
1196
EQUIPMENT
Equipment & Tools Unit QTY
1197
EQUIPMENT
Equipment & Tools Unit QTY
1198
EQUIPMENT
Equipment & Tools Unit QTY
1199
EQUIPMENT
Equipment & Tools Unit QTY
1200
Project Name : BLOCK A SITE DEVELOPMENT PROJECT
Location : CPP, DESA BLANG NISAM, KEC. INDRA MAKMUR, KAB. ACEH TIMUR
Client : MEDCO E&P MALAKKA
Main-Contractor : JGC ENCONA CONSORTIUM
Subcontractor & : 1. PT. BANGUN NUSA PERSADA (BNP) : TEMPORARY FACILITY SE
Scope Of Work 2. PT. INDOTECH KARYA MANDIRI (IKM) : TEMPORARY FACILITY SE
3. PT. NAD JAYA (NAD) : TEMPORARY FACILITY SE
4. PT. PELITA NUSA PERKASA (PNP) : BATCHING PLANT
5. PT. PUALAM BANGUN CIPTA (PBC) : FWBS 2000 (CONCRETE S
6. PT. JEC-DIRECT HIRED : FWS 2300 (FOUNDATION
7. PT. JEC- DELTA : FWS 2300 (FOUNDATION
8. PT. GUNA TEGUH ABADI (GTA) : STEEL STRUCTURE EREC
9. PT. BANGUN NUSA PERSADA (BNP) : MAIN BULDING
10. PT. GUNA TEGUH ABADI (GTA) : MECAHANICAL WORK
11. PT. BARATA INDONESIA : FIELD ERECTED TANK
12. PT. ISMA TIUR : PIPING FIELD INSTALLAT
13. PT. SWADAYA GRAHA : PIPING FIELD INSTALLAT
14. PT. WIJAYA ENGINDO NUSA (WEN) : ELECTRICAL
1201
15. PT. WIJAYA ENGINDO NUSA (WEN) : INSTRUMEN
16. PT. TERAS TEKNIK PERDANA (TTP) : INSULATION / SCAFFOLD
17. PT. THAI NDT INDONESIA(TNDT) : NON-DESTRUCTIVE TEST
18. PT. MI ENERGI (MIE) : FUEL SUPPLY
19. PT. BAASITHU BOGA SERVICES (BBS) : RECEPTIONIST AND ROO
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1 JEC
1 Management
Deputy Project Manager M/D 289 - 289 M/H 2,845
Site Manager M/D 921 1 922 M/H 9,152
Deputy Site Manager M/D 154 1 155 M/H 1,485
Construction Manager M/D 300 1 301 M/H 2,942
Deputy Construction Manager M/D 191 1 192 M/H 1,852
1202
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Bussiness Manager M/D 173 1 174 M/H 1,669
2 HSSE
HSSE M/D 9,724 11 9,735 M/H 21,533
HSSE Administration M/D 1,196 1 1,197 M/H 2,606
3 Quality Control
Field. QC Manager M/D 241 2 243 M/H 2,297
QC Coordinator-2 M/D 319 2 321 M/H 3,062
QC Engineer M/D 1,061 9 1,070 M/H 9,817
QC Admin M/D 149 2 151 M/H 1,389
Welding Tracking M/D 21 1 22 M/H 197
4 Construction
4.1 Temporary Facility
Coordinator Temfac M/D 375 1 376 M/H 3,449
Electrical Superintendent M/D 353 1 354 M/H 3,295
ME Supervisor Temfac M/D 345 1 346 M/H 3,254
Civil Supervisor Temfac M/D 684 2 686 M/H 6,430
Civil Engineer Temfac M/D 19 - 19 M/H 158
Engineer Temfac M/D 263 1 264 M/H 2,526
1203
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Electrical Engineer M/D 236 1 237 M/H 2,287
4.2 Civil
General Civil Superintendent M/D 271 1 272 M/H 2,622
Project Engineer M/D 216 4 220 M/H 2,075
Civil Engineer M/D 462 1 463 M/H 4,158
Civil Engineer M/D 395 1 396 M/H 3,606
Field Engineer M/D 195 1 196 M/H 1,886
Civil Construction M/D 302 1 303 M/H 2,894
Batching Plant Coordinator M/D 243 1 244 M/H 2,347
Surveyor M/D 495 1 496 M/H 4,514
Helper Surveyor M/D 466 1 467 M/H 4,186
Steel Structure Engineer M/D 174 1 175 M/H 1,679
4.3 Building
Building Superintendent M/D 455 1 456 M/H 4,115
Building Supervisor M/D 589 3 592 M/H 5,716
Surveyor M/D 388 4 392 M/H 2,226
Helper Surveyor M/D 351 2 353 M/H 3,396
4.4 Piping
1204
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Piping Superintendent M/D 229 1 230 M/H 2,223
Asst. Piping Superintendent M/D 212 1 213 M/H 2,059
Piping Engineer M/D 171 2 173 M/H 1,655
Technical Suport M/D 8 1 9 M/H 71
Supervisor M/D 274 3 277 M/H 2,581
CMS Operator M/D 73 1 74 M/H 684
Clerk M/D 171 1 172 M/H 1,664
4.5 Process
Process Superintendent M/D 238 1 239 M/H 2,301
Clerk M/D 8 1 9 M/H 71
4.6 Mechanical & Tank
Mechanical Superintendent M/D 80 1 81 M/H 742
4.6.1 Tank
Tank Field Engineer M/D 173 1 174 M/H 1,672
Tank Supervisor M/D 79 1 80 M/H 732
4.6.2 Static Mechanical
Static Field Engineer M/D 84 2 86 M/H 776
Preservation Technician M/D 138 - 138 M/H 1,310
1205
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.6.3 Package Mechanical
Package Field Engineer M/D 76 1 77 M/H 705
4.6.4 Rotary
Field Engineer M/D 8 1 9 M/H 71
Supervisor M/D 8 1 9 M/H 71
4.6.5 Combation
Field Engineer M/D 8 1 9 M/H 71
4.7 General Contruction
General Superintendent M/D 245 1 246 M/H 2,392
Jr.Mechanical Engineer M/D 79 1 80 M/H 697
Mechanical Supervisor M/D 71 1 72 M/H 668
4.8 Electrical
Elecctrical Superintendent M/D 14 1 15 M/H 130
Field Engineer M/D 14 1 15 M/H 130
Lead Supervisor M/D 14 1 15 M/H 130
Engineer M/D 14 1 15 M/H 130
Supervisor M/D 42 3 45 M/H 390
Clerk M/D 14 1 15 M/H 130
1206
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
4.9 Instrument
Lead Supervisor M/D 14 1 15 M/H 130
Supervisor M/D 14 1 15 M/H 130
5 Preservation
Preservation Coordinator M/D 14 1 15 M/H 130
Preservation Eng M/D 14 1 15 M/H 130
Preservation Junior Eng M/D 56 4 60 M/H 520
6 Control
Project Control Manager M/D 202 1 203 M/H 1,963
Project Control M/D 239 1 240 M/H 2,179
Document Control M/D 267 1 268 M/H 2,584
Schedule Engineer M/D 214 4 218 M/H 2,067
Associate Engineer M/D 98 - 98 M/H 980
DHT & Tomas M/D 417 5 422 M/H 3,992
Cost Control M/D 294 2 296 M/H 2,825
Subcontracting M/D 577 4 581 M/H 5,550
Material Control M/D 657 4 661 M/H 6,331
7 Administration
1207
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Administration Manager M/D 215 1 216 M/H 2,080
Administration M/D 2,286 18 2,304 M/H 21,800
Business Coordinator M/D 748 2 750 M/H 6,871
Project Support M/D 441 2 443 M/H 4,270
Finance M/D 238 1 239 M/H 2,301
Puchasing M/D 345 2 347 M/H 3,343
8 Public Relation
Public Affair M/D 1,119 3 1,122 M/H 10,327
Government Permit M/D 463 1 464 M/H 4,158
9 IT
IT Engineer M/D 882 4 886 M/H 8,416
10 Others
Security M/D 6,549 33 6,582 M/H 62,733
Rigging & Lifting / Operator M/D 2,819 12 2,831 M/H 27,391
Operator Genset M/D 496 2 498 M/H 4,802
Office Boy/Girl M/D 1,316 6 1,322 M/H 12,740
Paramedic M/D 2,720 12 2,732 M/H 26,310
Driver M/D 4,512 26 4,538 M/H 43,561
1208
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
Dump Truck Driver M/D 297 4 301 M/H 2,975
Rigger M/D 385 5 390 M/H 3,590
Skill M/D 1,149 8 1,157 M/H 10,714
Warehouse M/D 376 17 393 M/H 3,593
Total 54,994 284 55,278 443,398
1209
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1210
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1 Operator M/D 807 3 810 M/H 7,726
2 Lab M/D 463 1 464 M/H 4,501
3 Driver Truck Mixer M/D 967 5 972 M/H 9,420
4 Foreman M/D 120 - 120 M/H 928
5 Helper M/D 1,645 2 1,647 M/H 14,173
Sub Total 4,002 11 4,013 36,747
1211
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
1212
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1213
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1214
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
- - - M/H -
1215
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1216
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1217
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1218
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1219
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1220
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1221
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1222
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1223
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1224
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1225
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1226
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1227
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1228
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1229
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1230
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
19 Admin 79 1 80 787
1231
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1232
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1233
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1234
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
18 Supervisor CS, LTCS & Nace M/D 420 3 423 M/H 4,200
1235
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1236
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1237
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1238
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1239
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1240
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1241
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1242
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1243
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1244
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1245
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1246
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1247
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
INDIRECT MANPOWER
DIRECT MANPOWER
1248
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
M/H
DIRECT MANPOWER
1249
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1250
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1251
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
DIRECT MANPOWER
1252
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
1253
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
JEC PERSONNEL
No NAME POSITION REMARKS
Management
1 Achmad Kosasih Deputy Project Manager
2 Dhasa Putra Site Manager
3 Mamoru Morohashi Deputy Site Manager
4 Hendri Bustan Construction Manager
5 Toh Ee Hon Deputy Construction Manager
6 Adhi Sumarhadi Business Manager
HSSE
1 Abdul Majid HSSE Manager
1254
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
2 Syafik Affandi HSSE Coordinator
3 Golkariadi HSSE Coordinator
4 Mansur Rusdiana HSSE Training Coordinator
5 Farid Masjhudi HSSE Officer
6 Dewi hardiyanti HSSE Admin
7 Bagoes Prakoso HSSE Coordinator
8 Zoelafdi Zarkasih HSSE Coordinator
Quality Control
1 Dadit Prasetyanta QC Manager
2 Wisnu Wardhana QC Coordinator-2 (CVL, BLD, TANK, EQP, INST, ELEC, PAINT, INSU, CERTIFICATION
3 Khairudin QC Engineer
4 Ariza Sitanggang QC Engineer
Control
1 Syamsul Anam Project Control Manager
3 Mahathir Associate Engineer
4 Andrianto Nugroho Document Control
5 Adi Arien Nardiyanto Schedule Engineer
6 Khairul Hamka DHT
1255
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
7 M. Fakhrur Rozi Cost Control
8 Afdal Subcontracting
9 Hilman Syarif Subcontracting
10 Sakdun Abdul Latief Material Control
11 Lukita Anuraga Material Control
12 Romy Yoshendra Warehouse
IT
1 Zulfikar Said IT Engineer
2 Andi Asdiar IT Engineer
3 Muhammad Safik IT Engineer
Administration
1 Warham ZB Administration Manager
2 Istia Mentari Administration
3 Maulina Administration
4 Takdir Ja'far Administration
5 Zahrul Amri Administration
6 Sulaiman Camp. Manager
7 Ibnu Yahya PJ Support
1256
PERSONNEL
Manpower Manhours
No. Description
Unit Prev. Today Accum Unit Prev.
8 Donny Winner PJ Support
9 Imam Syaifillah Finance
10 Wicahya Indra Agustian Puchasing
11 Dwi Chandra Pranata Local Purchasing
Batching Plant, Piling Work, Civil Work, Process, Piping, Tank
1 Yamaguchi General Civil Superintendent
1257
DAILY REPORT
P
JGC ENC
1258
TRUMEN
ULATION / SCAFFOLDING
-DESTRUCTIVE TESTING
L SUPPLY
EPTIONIST AND ROOM BOY/ROOM MAID
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 2,845
10 9,162
10 1,495
10 2,952
10 1,862
1259
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,679
-
110 21,643
10 2,616
-
20 2,317
20 3,082
90 9,907
20 1,409
10 207
-
-
10 3,459
10 3,305
10 3,264
20 6,450
- 158
10 2,536
1260
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,297
-
10 2,632
40 2,115
10 4,168
10 3,616
10 1,896
10 2,904
10 2,357
10 4,524
10 4,196
10 1,689
-
10 4,125
30 5,746
40 2,266
20 3,416
-
1261
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,233
10 2,069
20 1,675
10 81
30 2,611
10 694
10 1,674
-
10 2,311
10 81
-
10 752
-
10 1,682
10 742
-
20 796
- 1,310
1262
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
10 715
-
10 81
10 81
-
10 81
-
10 2,402
10 707
10 678
-
10 140
10 140
10 140
10 140
30 420
10 140
1263
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
-
10 140
10 140
-
10 140
10 140
40 560
-
10 1,973
10 2,189
10 2,594
40 2,107
- 980
50 4,042
20 2,845
40 5,590
40 6,371
-
1264
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,090
180 21,980
20 6,891
20 4,290
10 2,311
20 3,363
-
30 10,357
10 4,168
-
40 8,456
-
330 63,063
120 27,511
20 4,822
60 12,800
120 26,430
260 43,821
1265
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
40 3,015
50 3,640
80 10,794
170 3,763
2,840 446,238
- 88,084
& C - IKM)
- 153,750
1266
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 185,652
1267
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 7,756
10 4,511
50 9,470
- 928
20 14,193
110 36,857
220 64,456
1268
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,494
10 1,989
1269
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 634
5Area B-700
1270
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
110 9,983
80 11,392
90 5,963
- -
30 1,684
150 13,311
10 2,846
- 80
850 102,550
1271
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,140 156,467
- 1,288
10 3,256
1272
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,440
320 16,050
10 8,920
1,440 136,290
1273
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1274
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,450 139,546
ON - GTA)
- 1,132 PIPERACK
1275
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,072 - B2PR01
- 1,142 Handrail : 11
- 1,052
- 1,440 - B2PR02
20 3,336
- 1,484 A3ST01
1276
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,994 Stair :6
- 3,123
40 3,930 A4ST01
- 390
- 1,188
10 839
130 36,840
40 5,410
1277
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
190 16,980
90 15,903
80 8,440
110 16,244
90 3,377
180 28,462
A1PR01A 0.0
A1PR01B 0.0
A1PR02A 0.0
A1PR02B 0.0
A1PR03A 0.0
A1PR03B 0.0
1278
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
A2PR01 0.0
D1PR01 0.0
A6PR01 0.0
B2PR01 0.2
B2PR02 0.0
D3PR02 0.0
D3PR01 0.0
D3BG01 0.0
A6ST01 0.0
A4ST01 0.0
A3ST01 1.4
Total 1.6
1279
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
910 131,656
90 11,190
30 10,102
1280
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 1,205
- 1,912
1281
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 13,900
70 20,495
- -
10 6,677
50 4,340
230 19,630
1282
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1283
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,510 261,775
1284
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- -
- - Finishing Foundation
PACKAGE EQUIPMENT
1285
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1286
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1,260 37,386
10 1,387
1287
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,237
10 1,387
- -
10 1,347
1288
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 1,384
10 717
370 35,096
30 2,498
10 2,265
40 2,828
160 18,298
20 1,494
1289
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
170 12,982
170 13,989
30 2,882
630 57,236
1,000 92,332
1290
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,590
10 1,340 Total 0
10 1,590
1291
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
20 2,730 1 CS 0
30 4,230 2 LTCS 0
10 1,590 4 DUPLEX SS 0
30 2,320 Total 0
10 1,030
20 1,230
10 660
20 2,100
520 61,530
C Other Progress
1292
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
1 Borrow Sand 0
70 5,280 2 Coating 0
20 2,080 5 Lettering/Marking 0
60 5,920 Total 0
50 4,190
20 1,800
20 2,710
40 3,190
10 900
10 690
1293
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
370 34,580
860 78,920
1,380 140,450
10 1,415 1 HDPE 0
1294
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,475
20 2,040 Total 14
10 1,158
10 1,847 1 CS (Ton) 0
1295
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 940 Total 0
10 906
1296
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 720
40 3,111
180 8,787
60 4,008
60 3,996
30 3,086
30 2,846
40 3,309
30 3,174
10 1,323
10 1,227
1297
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
490 35,587
1,110 88,892
Unit Today
1298
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
30 2,684
10 612
10 1,326
10 582
10 1,074
10 1,224
10 896
10 858
10 828
20 1,216
10 522
200 18,612
1299
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 798
10 690
30 638
60 2,310
130 2,288
90 3,544
10 876
10 876
40 2,328
10 730
10 798
410 15,876
1300
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
610 34,488
Unit Today
20 150
40 1,370
1301
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
60 1,520
80 3,578
LDING - TTP)
10 1,101 at B2PR01
1302
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,081
10 1,071
- 1,045
10 554
10 524
10 2,059
10 961
10 801
10 123
10 36
1303
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
150 14,324
20 1,872
20 2,202
100 8,850
70 4,345
210 17,269
360 31,593
NG - TNDT)
1304
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
- 60 Stand By
10 770
10 790
10 790
30 2,410
30 1,570
10 1,540
10 750
20 1,080
1305
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
70 4,940
100 7,350
Fuel Supply
10 2,091
10 1,906
20 3,997
1306
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 2,062
20 3,955
30 6,013
60 12,029
80 16,026
GEULUMPANG - MEULIGO)
- 1,957
K - THI) - NO WORK
- 33,568
1307
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
BPP) - NO WORK
- 21,007.0
- 2,652
NO WORK
- 1,288.5
- 2,378
1308
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,680
- -
10 1,680
- -
10 1,680
10 1,680
40 6,720
10 1,680
10 1,680
1309
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
10 1,680
20 3,360
20 3,360
30 5,040
10 1,680
140 23,240
90 14,940
50 8,300
30 5,040
30 4,980
20 3,360
470 78,340
1310
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
510 85,060
14,560 2,645,511
OTHER
WEATHE
Condition From To
HEAVY
RAIN
1311
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
INSU, CERTIFICATION)
1312
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
WORKING H
Normal Work 07.00 18.00
Over Time >18.00 Finish
1313
ACTIVI
Manhours Remarks Activity Today
Today Accum No Description
HIGHLIG
1314
Prepared By, Acknowledged by,
JGC ENCONA CONSORTIUM PT. MEDCO E&P MALAKKA
1315
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
2
3
4
5
6
1316
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
7
8
1317
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1318
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1319
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1320
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1321
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1322
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1323
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1
1 Ready Mix Concrete Production 2
2 Ready Mix Concrete Production (Batching Plant II) 3
4
5
1324
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1325
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Area A-400 1
10
2 Area B-300 11
1326
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Area B-500
reatment Package F9 AB
4 Area B-600
5 Area B-700
1327
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Backfill in Pipe Sleeper
Total concrete = 0 m³
1328
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1329
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1330
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1331
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total concrete = 0 m³
PIPERACK 1
1332
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- B2PR01 2
- B2PR02 6
- D3BG01 10
12
EQUIPMENT SUPPORT 13
- A3ST01
1333
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- A4ST01
1334
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1335
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1336
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Installation scaffolding 3
- Installation lamp 5
- Installation Panel 6
- Installation skirting 8
10
1337
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
21
22
3 Chemical Storage 23
1338
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
4 Waste Storage
5 GEG Building
6 Shelter Building
1339
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1340
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
STATIC EQUIPMENT
Install of Equipment
Install of Equipment
Install of Equipment
1341
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
ROTARY EQUIPMENT
- 36-PAX-332 A/B
- 39-PZZ-333 A/B
Check Foundation
- 39-PZZ-332 A/B
Check Foundation
PACKAGE EQUIPMENT
1342
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Padding on foundation
1343
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Condensate A Tank 1
2 Condensate B Tank
1344
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
3 Condensate C Tank 5
- Instalation Accessories
1345
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
8 EG Make-Up Tank
- Instalation Accessories
1346
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
Underground (16475.4) 2
1 Pipe HDPE 62 3
1347
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 152 6
5 ALLOY 825 0 13
Total 0 14
15
B Support Progress
1348
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 CS 0
2 LTCS 0
3 Stainless Steel 0
4 DUPLEX SS 0
6 Spring Support 0
Total 0
C Other Progress
1349
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Borrow Sand 0
2 Coating 0
4 Finish Painting 0
5 Lettering/Marking 0
Total 0
1350
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
A Welding Progress 1
1 HDPE 0 3
1351
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Total 16 6
3 Stainless Steel 18 11
Total 30 13
14
1 CS (Ton) 0 16
2 LTCS (Ton) 0 17
1352
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
4 DUPLEX SS (Ton) 0 19
Total 0 22
23
C Other Progress 24
2 Coating ( M2) 0
5 Lettering/Marking (pnt) 0
Total 0
1353
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1354
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Glandbox fabrication 1
1355
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
10
10
11
12
13
14
15
15
15
16
17
1356
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
18
19
20
1357
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1358
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1 Utility Area
at B2PR01
1359
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
2 Sulfur Pit
(Site Instruction)
1360
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1361
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
- Radiography Inspection 2
- Radiography Inspection 5
10
11
12
1362
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
13
14
Fuel Supply 1
1363
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1364
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1365
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
Ready
1366
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1367
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
OTHERS
WEATHER
Remark
1368
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
1369
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
WORKING HOUR
1370
ACTIVITY EQUIP
ay Activity Next Day
No
ion No Description
HIGHLIGHT
1371
1372
EQUIPMENT
Equipment & Tools Unit QTY
1373
EQUIPMENT
Equipment & Tools Unit QTY
1374
EQUIPMENT
Equipment & Tools Unit QTY
1375
EQUIPMENT
Equipment & Tools Unit QTY
1376
EQUIPMENT
Equipment & Tools Unit QTY
1377
EQUIPMENT
Equipment & Tools Unit QTY
1378
EQUIPMENT
Equipment & Tools Unit QTY
1379
EQUIPMENT
Equipment & Tools Unit QTY
1380
EQUIPMENT
Equipment & Tools Unit QTY
1381
EQUIPMENT
Equipment & Tools Unit QTY
1382
EQUIPMENT
Equipment & Tools Unit QTY
1383
EQUIPMENT
Equipment & Tools Unit QTY
1384
EQUIPMENT
Equipment & Tools Unit QTY
1385
EQUIPMENT
Equipment & Tools Unit QTY
Excavator unit 1
Fibrator unit 1
Mixer DT 03 unit 1
1386
EQUIPMENT
Equipment & Tools Unit QTY
1387
EQUIPMENT
Equipment & Tools Unit QTY
1388
EQUIPMENT
Equipment & Tools Unit QTY
1389
EQUIPMENT
Equipment & Tools Unit QTY
Scaffolding M 17020
Skylift Unit 3
1390
EQUIPMENT
Equipment & Tools Unit QTY
1391
EQUIPMENT
Equipment & Tools Unit QTY
1392
EQUIPMENT
Equipment & Tools Unit QTY
1393
EQUIPMENT
Equipment & Tools Unit QTY
Tripod Unit 2
Hammer 5 kg Unit 1
Excavator Unit 2
Genset unit 1
1394
EQUIPMENT
Equipment & Tools Unit QTY
Vehicle unit 1
Stamper unit 1
Bucket unit 1
Crane unit 1
1395
EQUIPMENT
Equipment & Tools Unit QTY
1396
EQUIPMENT
Equipment & Tools Unit QTY
1397
EQUIPMENT
Equipment & Tools Unit QTY
1398
EQUIPMENT
Equipment & Tools Unit QTY
1399
EQUIPMENT
Equipment & Tools Unit QTY
1400
EQUIPMENT
Equipment & Tools Unit QTY
Oven Unit 2
Grinda
a. 4" Unit 13
b. 6" Unit 8
c. 7" Unit 3
Drayer Unit 24
Trapo Unit 26
1401
EQUIPMENT
Equipment & Tools Unit QTY
Miller Unit 2
Generator
a. 18 KVA Unit 1
1402
EQUIPMENT
Equipment & Tools Unit QTY
1403
EQUIPMENT
Equipment & Tools Unit QTY
1404
EQUIPMENT
Equipment & Tools Unit QTY
Handryer Unit 5
Vehicle Unit 2
1405
EQUIPMENT
Equipment & Tools Unit QTY
1406
EQUIPMENT
Equipment & Tools Unit QTY
1407
EQUIPMENT
Equipment & Tools Unit QTY
Pick-up Unit 4
Vehicle Unit 2
Generator 6 A Unit 0
1408
EQUIPMENT
Equipment & Tools Unit QTY
Trailer Unit 2
1409
EQUIPMENT
Equipment & Tools Unit QTY
Forklif Unit 1
1410
EQUIPMENT
Equipment & Tools Unit QTY
1411
EQUIPMENT
Equipment & Tools Unit QTY
1412
EQUIPMENT
Equipment & Tools Unit QTY
1413
EQUIPMENT
Equipment & Tools Unit QTY
1414
EQUIPMENT
Equipment & Tools Unit QTY
1415
EQUIPMENT
Equipment & Tools Unit QTY
1416
EQUIPMENT
Equipment & Tools Unit QTY
1417
EQUIPMENT
Equipment & Tools Unit QTY
1418
EQUIPMENT
Equipment & Tools Unit QTY
Collimator Unit 1
Barricade Roll 1
Megaphone Unit 1
MC Cleaner Can 1
1419
EQUIPMENT
Equipment & Tools Unit QTY
MC Penetrant Can 1
MC Developer Can 1
Dispenser Unit 1
1420
EQUIPMENT
Equipment & Tools Unit QTY
1421
EQUIPMENT
Equipment & Tools Unit QTY
1422
EQUIPMENT
Equipment & Tools Unit QTY
1423
EQUIPMENT
Equipment & Tools Unit QTY
1424
EQUIPMENT
Equipment & Tools Unit QTY
1425
EQUIPMENT
Equipment & Tools Unit QTY
1426
EQUIPMENT
Equipment & Tools Unit QTY
1427
EQUIPMENT
Equipment & Tools Unit QTY
1428
No. Activities
1 Civil
2 Steel Structure
4 Building
5 Mechanical
6 TANK
7 PIPING
8 PIPING
9 Electrical
Total
10 Instrument
No Description
6
11 QC (NDT)
Total
12 Precomm & Comm
13 Interface
Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sche
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities in G
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (10 August 2017)
OUNDATION WORK)
N BUILDING - BNP)
TRICAL - WEN)
UMENT - WEN)
ACTUAL WORK
1450
No. Activities Due date Target Tod
1451
No. Activities Due date Target Tod
Total
6 Install JB Ea 3
1452
No. Activities Due date Target Tod
11 QC (NDT)
1453
No. Activities Due date Target Tod
Total
1454
No. Activities Due date Target Tod
13 Interface
1455
ACTIVITY
Target Today ( August 2017) Remarks
1456
ACTIVITY
Target Today ( August 2017) Remarks
PT. ISMA TIUR (PIPING FIELD INSTALLATION AND PAINTING WORK UTILITY AREA
PT. SWADAYA GRAHA (PIPING FIELD INSTALLATION AND PAINTING WORK PROC
1457
ACTIVITY
Target Today ( August 2017) Remarks
1914
1458
ACTIVITY
Target Today ( August 2017) Remarks
1459
ACTIVITY
Target Today ( August 2017) Remarks
1460
ACTIVITY
Target Today ( August 2017) Remarks
1461
ACTIVITY
Remarks Activity Next Day ( August 2017)
1462
ACTIVITY
Remarks Activity Next Day ( August 2017)
1463
ACTIVITY
Remarks Activity Next Day ( August 2017)
ACTUAL WORK
Description
Remark
1464
ACTIVITY
Remarks Activity Next Day ( August 2017)
1465
ACTIVITY
Remarks Activity Next Day ( August 2017)
1466
ACTIVITY
Remarks Activity Next Day ( August 2017)
1467
No. Activities
1 Civil
2 Steel Structure
4 Building
5 Mechanical
6 TANK
7 PIPING
8 PIPING
9 Electrical
Total
10 Instrument
No Description
11 QC (NDT)
Total
Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sc
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities i
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (12 August 2017)
Ea 24
Pnt 20 20
Cabinet Marshalling m 50 50
hod and detail Schedule
erate activities in GEG building
ACTIVITY
7) Remarks
0 : FOUNDATION WORK)
ECTRICAL - WEN)
STRUMENT - WEN)
ACTUAL WORK
Ea 24
Pnt 20 20
m 50 50
Activity Next Day (13 August 2017)
REA - ISTI)
1 Civil
2 Steel Structure
4 Building
5 Mechanical
6 TANK
7 PIPING
8 PIPING
9 Electrical
Total
10 Instrument
No Description
6
11 QC (NDT)
Total
12 Precomm & Comm
13 Interface
Highlight :
- Steel Structure on GEG - Need to provide Method and detail Sche
- Activities on MCR building target finish 6 of August
- Additional Heavy equipment from BNP to accelerate activities in G
- Start Piping A/g in area B600 (Sleeper)
Due date Target Today (13 August 2017)
MCR m
Cabine
hod and detail Schedule
erate activities in GEG building
ACTIVITY
Remarks
OUNDATION WORK)
N BUILDING - BNP)
TRICAL - WEN)
UMENT - WEN)
ACTUAL WORK