Sei sulla pagina 1di 1

We have chosen some considerations that the project must achieve to be our design and we will test it

to be sure that we achieved all of the design requirements. These design requirements are chosen by
which are :

Cost:

Be sure that prototype doesn’t exceed the budget (600 LE).

Portability:

we aim to make our prototype small in size to be moved, replaced or fixed easily

Efficiency:

The prototype has to save a lot of water and money and to be sure that it will does its work efficiently
we would compare its cost with other projects costs and it should reduce the amount of water used up
to 15% compared to ordinary irrigation system

Safety:

any project should be in a high level safety such as probabilities that our prototype may hurt the farmer
or damage the crops in case of collapsing

Resistance to weather conditions:

all of us live in different environments with different weather conditions so we care in our project to be
suitable for working in any weather conditions without affected by any surrounding environment

Ecofriendly:

be sure that the prototype does not pollute the environment and hasn’t any effects on the living
organisms

Potrebbero piacerti anche