Sei sulla pagina 1di 3

PROJECT: SMG-1 Platfoforms and Water Well Rehabilitation

CLIENT: MAZARINE ENERGY TUNISIA BV


CONTRACTOR: ESTS (SAHRAOUI COMPANY)

COMPANY: MAZARINE ENEGY BV TUNISIA CONTRACTOR: ESTS


STATUS DATE: 28/03/2018 REPORT DATE: 28/03/2018

CONTRACT No: MTU-DRL-CON-011-2018 PREPARED BY: SADDEM HADFI

START / FINISH TIME: from 8.00am to 18.00 Pm LOCATION: MA ZA RI NE SITE SMG 1

WEATHER: GOOD WEATHER TEMPERATURE: 27°C

HSSE:

HSSE KPI To Date Month to date Project start to date

Total Number of employees 6 6 6


Working hours 10 20 20
Total Safe Work hours 60 120 120
Lost Work Days 0 0 0
Restricted Work Case 0 0 0
Restricted Work Days 0 0 0
Medical Treatment Case 0 0 0
First Aid Case 0 0 0
Incident 0 0 0
Near Miss 0 0 0
Hazards/Finding 0 0 0
Total of HSSE Training Hours 0 0
0

Total driven distance (in Km) 6 14 14

WORK DESCRIPTION& PROGRESS of the Day

MAIN camp cleanup

Remove the sand from the Main camp

PAGE 1 OF 3
PROJECT: GHRIB FIELD ACCESS ROAD MAINTENANCE
CLIENT: MAZARINE ENERGY TUNISIA BV
CONTRACTOR: ESTS (SAHRAOUI COMPANY)

MANPOWER

S/N Company Trade/Qualification Discipline No Working hours

1 ESTS HSSE Engineer HSSE Management 1 10

2 ESTS Construction Manager Construction Management 1 10

3 ESTS Project Director Construction Management 1 10

4 ESTS Banks Man civil 0 0

5 ESTS Truck Driver Transport 0 0

6 ESTS Wheel-Loader driver Construction 1 10

7 ESTS Backhoe-driver construction 1 10

8 ESTS Compactor driver Construction 0 0

9 ESTS Grader driver construction 0 0

10 ESTS crawler excavator driver Construction 1 10

TOTAL 10 60

PAGE 2 OF 3
PROJECT: GHRIB FIELD ACCESS ROAD MAINTENANCE
CLIENT: MAZARINE ENERGY TUNISIA BV
CONTRACTOR: ESTS (SAHRAOUI COMPANY)

MAJOR EQUIPMENT
Working Working
S/N Type No S/N Type No
hours hours
1 Truck 8/4 0 0 6 crawler excavator 1 10
2 Grader 0 0 7 Backhoe 1 10
3 Compactor 0 0 8

4 Wheel-loader 1 10 9

5 Water tank truck 0 0

PAGE 3 OF 3