NFI-WE2-0003 11-Aug-17 INSTRUMENT WE2 GROUNDING TO BE COMPLETED A 18-Aug-17 CLOSED 15-Aug-17 PRANA

NFI-WE2-0003 11-Aug-17 INSTRUMENT WE2 PERFORATE TRAY NOT YET INSTALLED A 18-Aug-17 CLOSED 15-Aug-17 PRANA
NFI-WE2-0003 11-Aug-17 INSTRUMENT WE2 MARK UP DRAWING TO BE AFC B 18-Aug-17 CLOSED 15-Aug-17 PRANA
NFI-WE2-0004 15-Aug-17 INSTRUMENT WE2 SHALL PROVIDE COPY OF CALIBRATION CERTIFICATE FOR INSPECTION TOOL B 19-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0004 15-Aug-17 INSTRUMENT WE2 CABLE MARKER , CABLE CLAMP, MICA COVER, PANEL BOTTOM PLATE , VISUAL INSPECTION NOT YET B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
DONE. MCR

NFI-WE2-0004 15-Aug-17 INSTRUMENT WE2 NON SAT RELATED TO BE MARKED WITH RED TAPE AT CIRCUIT BREAKER B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 HARDWARE DOCUMENTATION TO BE PROVIDED INSIDE EACH PANEL B 21-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 GROUNDING BUSBAR SHALL BE AS PER THICKNESS MENTIOED IN ARRANGEMENT DWG A 21-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 BOTTOM PLATE OF PANEL. TO BE PROPERLY INSTALLED. B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 PANEL REAR OR FRONT. TO BE UPDATED ON LAYOUT DRAWING. B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 BOLT, NUT, COVER. TO INSTALL WITH SIZE AS PER DWG, C/W WASHER & COVER. B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 HOLE ON RAISED FLOOR FOR SPARE. TO BE COVERED WHERE NOT USED. B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 CABINET SP CERTIFICATE TO BE PROVIDED. B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO CONNECT LOOSE WIRES (SYSTEM CABLE GROUNDING) FOR MARSHALLING PANELS B 21-Aug-17 CLOSED 21-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO CLEAR FOREIGN OBJECTY INSIDE MARSHALLING PANELS B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO INSTALL PUC DUCT AFTER CABLING ACTIVITIES AT MARSHALLING PANELS B 7-Sep-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 SAFETY RELAY SR-01 SR-08 SHALL BE INSTALLED FOR MARSHALLING PANELS SMR 005 A 21-Aug-17 CLOSED 20-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 PE CABLE SHALL USE GREEN/YELLOW COLOR AT MARSHALLING PANELS B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 LIVE PART TERMINAL BLOCK 230 VAC TO PROVIDE "DANGER" LABEL AT MCR-PMR-005 B 21-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 RING WIRE / LOOP CABINET TO BE DONE AT MARSHALLING PANEL B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO PROPERLY CONNECT POWER CABLE FOR INTERPANEL BARRIER FOR MCR-PMR-006/ MCR-PMR-002 A 21-Aug-17 CLOSED 21-Aug-17 PRANA

NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 NET A FOC CABINET. TO INSTALL COMMUNICATION CABLES I.E, F.O, CAT-6 B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO COMPLETE ACCESSORIES, CLAMP, WIRE/CABLE MARKER, SEGREGATE AT MARSHALLING PANEL B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO CLEAN DIRTY PANEL SURFACE AT MARSHALLING PANEL B 27-Aug-17 OPEN 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 BLA-1-SD-00-001 PAGE 44 TO BE REVISED FOR SUPPORT UPDATE FOR MARSHALLING PANEL B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 GROMET A DUCT SEEL TO BE PROPERTY INSTALLED B 26-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 SHALL BE INSTALLED FOR AUXILIARY PANEL GROUNDING CABLE A 19-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 SHALL BE INSTALLED FOR MCR-FWS-001 POWER CABLE A 19-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 TO PUT GROMET INPLACE AND HOLE SEALED W/ DUCT SEAL B 26-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 POWER CABLE INSTALLATION B 26-Aug-17 CLOSED 27-Sep-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 GROUNDING CABLE SHELL BE INSTALLED FOR MCR-SCADA-001 GROUNDING CABLE A 19-Aug-17 CLOSED 19-Aug-17 PRANA
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 SOME GAPS BETWEEN CONSOLES ARE TOO WIDE, GAPS TO BE CLOSED B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 ADJUSTMENT OF OWS MONITOR POSITION. OWS MONITOR TO BE RESPOSITIONED TO ALLOW B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
OPERATOR TO VIEW TV VIEW TV SCREEN FROM SITTING POSITION. MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 POWER AND NETWORK CABLES INSIDE CONSOLE SHALL BE TIDY AND GIVEN MARKER B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 GROUNDING INSIDE CONSOLE, ACTUAL INSTALLED DIFFERENT WITH GA DRAWING, VENDOR TO B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
JUSTIFY THIS IS APPROPRIATED AND REVISE GA DRAWING. MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 FOREIGN OBJECT INSIDE & DUST AROUND CONSOLE B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 CONSOLE ETHERNET CONNECTOR SHALL BE PROPERLY INSTALLED AND MARKED B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 LOOSE GREEN CABLE TO BE TERMINATED OR ISOLATED FOR EAC-001/002 B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 ENG/SCADA-001/002 B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0005 15-Aug-17 INSTRUMENT WE2 CPU BRACKET B 30-Nov-17 OPEN PRANA Waiting cable termination completed in
MCR
NFI-WE2-0007 26-Aug-17 INSTRUMENT WE2 1. PENDING CABLE MARKER 2. PENDING CABLE CAMP 30-Nov-17 OPEN PRANA
B
NFI-WE2-0011 27-Aug-17 INSTRUMENT WE2 DYNABOLT WITH DIFFERENT LENGTH ON SUPPORT B 23-Oct-17 OPEN PRANA
NFI-WE2-0011 27-Aug-17 INSTRUMENT WE2 CORRODED SUPPORT STRUCTURE, TO PERFORM NECESSARY TOUCHUP. B 23-Oct-17 OPEN PRANA
NFI-WE2-0011 27-Aug-17 INSTRUMENT WE2 UNSTANDARD NAME PLATE. TO PROVIDE STANDAR NAMEPLATE ACCORDING TO TYPICAL B 23-Oct-17 OPEN PRANA
INSTALLATION DRAWING WHICH IS TRAFFOLYTE USING U-BOLT.
NFI-WE2-0011 27-Aug-17 INSTRUMENT WE2 INCOMPLETE VENT HOLE & WEEP HOLE ON STANCHION B 23-Oct-17 OPEN PRANA
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 TO ENSURE JB RECEIVED COMPLY WITH DESIGN SPECIFICATIONS B 23-Oct-17 OPEN PRANA
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 CHECK EX & IP CERTIFICATE B 23-Oct-17 OPEN PRANA
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 LOOSE INSULATED SCREEN BAR TO BE TIGHTENED. B 23-Oct-17 OPEN PRANA
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 FLOATING EARTHING CABLES INSIDE/OUTSIDE JB. TO TIE UP OR CLAMP EARTHING CABLES SO NOT B 23-Oct-17 OPEN PRANA
LOOSE OR FLOATING
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 PEELED/CORRODED STEEL SUPPORT CHANNEL B 23-Oct-17 OPEN PRANA
NFI-WE2-0008 26-Aug-17 INSTRUMENT WE2 SHARP EDGES ON TEFLON GALVANIC INSULATOR. TO SMOOTHEN/ROUND THE SHARP EDGES. B 23-Oct-17 OPEN PRANA

NFI-WE2-0010 27-Aug-17 INSTRUMENT WE2 UNINSTALLED LIGHTNING ARRESTER FOR CABLE B 25-Nov-17 OPEN PRANA Waiting material from Vendor
(Yokogawa)
NFI-WE2-0010 27-Aug-17 INSTRUMENT WE2 UNSTANDARD CABLE MARKER. TO PROVIDE STAINLESS STEEL CABLE MARKER AS SPECIFIED ON B 23-Oct-17 OPEN PRANA
TYPICAL INSTALLATION DRAWING.
NFI-WE2-0014 5-Sep-17 INSTRUMENT WE2 PLAT WASHER FOR BOLT HOLD DOWN CLAMP MUST BE INSTALL B 14-Oct-17 OPEN DALTON
NFI-WE2-0014 5-Sep-17 INSTRUMENT WE2 BOLT FOR JOINT CLAMP SHOULD BE INSTALL PROPERLY B 14-Oct-17 OPEN DALTON
NFI-WE2-0018 18-Sep-17 INSTRUMENT WE2 CABLE B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0018 18-Sep-17 INSTRUMENT WE2 MICA COVER A BOTTOM PLATE B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0018 18-Sep-17 INSTRUMENT WE2 FOREIGN MATERIAL B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0018 18-Sep-17 INSTRUMENT WE2 CABLE MARKER B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0016 12-Sep-17 INSTRUMENT WE2 BOTTOM PLATE COVER NOT ISTALL YET B 25-Nov-17 OPEN MAIMUN S Waiting cable termination completed in
SS
NFI-WE2-0016 12-Sep-17 INSTRUMENT WE2 DRAWING PANEL NOT ATTACHED AT POCKET PANEL B 25-Nov-17 OPEN MAIMUN S Waiting cable termination completed in
SS
NFI-WE2-0016 12-Sep-17 INSTRUMENT WE2 ALL GROUNDING NOT INSTALL PROPERLY B 25-Nov-17 OPEN MAIMUN S Waiting cable termination completed in
SS
NFI-WE2-0019 20-Sep-17 INSTRUMENT WE2 NEOPRENE SEAL SHALL BE INSTALLED ON CELL BOLT-NUT CONNECTION BETWEEN JB AND STEEL B 23-Oct-17 OPEN MAIMUN S
CHANNEL
NFI-WE2-0019 20-Sep-17 INSTRUMENT WE2 SHARP EDGE ON ALL CUT NEOPRENE SEAL SHALL BE REMOVED B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0019 20-Sep-17 INSTRUMENT WE2 EARTH CABLE SHALL BE TIED SIRULY TO THE STEEL CHANNEL B 23-Oct-17 OPEN MAIMUN S
NFI-WE2-0002 18-Jul-17 INSTRUMENT WE2 BONDING JUMPER SHOULD BE INSTALL EACH JOINT CABLE TRAY/LADDER SHALL BE BONDED TO EACH B 14-Oct-17 OPEN PRANA TO BE CANCELLED COMMENT
LOOP EVERY 30 M CONTRACTOR TO VERITY WITH SPEC, ACTUAL AUPPORT INSTALLED EVERY 6
METERS, CHECK REQUIPMENT ACCESSORIES N/Y COMPLETED

NFI-WE2-0020 21-Sep-17 INSTRUMENT WE2 REVISE CABLE ROUTEBON DWG NO. BLA-1-L0-40.702 & BLA-1-LO-40-602 AS PER ACTUAL CABLE B 23-Oct-17 OPEN MAIMUN S FS to be raised. PIC Pak Kurniawan
ROUTE