LIQUID PENETRANT Request No. :
Procedure No. :
EXAMINATION REPORT Page : of
Project: Client:
Acceptance criteria:
Category: Working Area:
MATERIAL INFORMATION
Material: Drawing No.: Welding process:
Line No.:
Welding joint status After PWHT After hydro-test As-forged After welding
TECHNIQUE INFORMATION
Penetrant Type: Light intensity :
PT Material P/N Brand Batch No. Dwell time Temperature
Penetrant
Remover
Developer
EVALUATION
Joint Identification Interpretation Judgment
Date of
Welder Length (mm) Location Length Remarks
No. Joint No. Type Accept Reject Inspection
No. (mm) (mm)
Sketch/Drawing:
Date:
Date:
Name:
Evaluated by:
Signature:
Signature:
PT level II
FORM: PT/RE/01