Report No.

:
LIQUID PENETRANT Request No. :
Procedure No. :
EXAMINATION REPORT Page : of
Project: Client:

Acceptance criteria:
Category: Working Area:

MATERIAL INFORMATION
Material: Drawing No.: Welding process:
Line No.:

Surface Cleaning Grinding Machining Brushing Others

Welding joint status After PWHT After hydro-test As-forged After welding

TECHNIQUE INFORMATION
Penetrant Type: Light intensity :
PT Material P/N Brand Batch No. Dwell time Temperature
Penetrant
Remover
Developer
EVALUATION
Joint Identification Interpretation Judgment
Date of
Welder Length (mm) Location Length Remarks
No. Joint No. Type Accept Reject Inspection
No. (mm) (mm)

Sketch/Drawing:

ABBREVIATION: ACC-Acceptable REJ-Reject LOP-Lack of Penetrant


P-Porosity S-Slag Inclusion LOF-Lack Of Fusion
C-Crack UC-Undercut RW-To Cut Or Reweld

TTAsia Co., Ltd Review by: NDE Level III

Date:
Date:
Name:
Evaluated by:
Signature:
Signature:

PT level II

FORM: PT/RE/01