Sei sulla pagina 1di 5

FACULTY SCIENCES AND TECHNOLOGY

ASSIGNMENT SUBMISSION AND ASSESSMENT

________________________________________________________________________

EMQM5103

PROJECT QUALITY MANAGEMENT

MAY 2016 ASSIGNMENT (USTY)

_______________________________________________________________________

INSTRUCTIONS TO STUDENTS

1. This assignment contains question that is set in English.

2. Answer in English only.

3. Your assignment should be typed using 12 point Times New Roman font and 1.5 line spacing.

4. You must submit your hardcopy assignment to your Facilitator and ON-LINE LINE via the MyVLE. Refer to
the portal for instructions on the procedures to submit your assignment on- on-line. You are advised to
keep a copy of your submitted assignment and proof of the submission for personal reference. Your
assignment must be submitted on (-----------------------------) (SUBMISSION DATE).
DATE)

5. Your assignment should be prepared individually. You should not copy another person’s assignment.
You should also not plagiarise another person’s work as your own.

EVALUATION

This assignment accounts for 60% of the total marks for the course.
1
OBJECTIVE:

The objective of this assignment is to provide students the opportunity to apply project quality
management in a real world project environment.

INSTRUCTIONS:

You are required to develop a report on two assessed tasks to achieve the assessment
criteria which are set out in the marking rubric. It is acceptable to use the opinions and
judgments of project professionals to support your work.

QUESTION

The ISO 9000 series of standards addresses quality management system that includes ISO
9000, ISO 9001 and ISO 9004. ISO 9001 is a specification standard may be listed as ISO
9001:2008 to indicate the 2008 edition. Many international customers favour supplier that are
certified by a Third Party Quality Auditor.

Pursuant to this statement, as a Project Quality Manager, you are instructed by your company
to prepare for a Third Party Quality Audit for ISO 9001:2008 Certification.

TASK

The assignment consists of TWO (2) interrelated tasks which are to be adhered strictly. The
required tasks and marks are based on the rubric.

TASK 1

Prepare a report and elaborate in detail the steps that you will undertake to prepare the
company for this audit.

TASK 2

Discuss the problems that you will anticipate in preparing the audit and how you will overcome
these problems.
2
REPORT FORMAT

Introduction, literature survey, steps and plans for the audit, problems analysis and solutions,
summary and references.

REFERENCES

You can refer to any references (books, module, internet, journal and others). Remember to cite
the source of references in your report.

Notes:

ADDITIONAL GUIDELINES / ASSIGNMENT FORMAT (ACCORDING TO FACULTY’S


SPECIFICATIONS):

• Your assignment should be typed on A4 paper using 12-point Times New Roman and
1.5 spacing.
• Your assignment should NOT exceed 3000 words, not including appendix and
reference.
• Your must provide references. References should use the American Psychological
Association (APA) format.
• References should include the latest journal/book publication (year 2009 and onwards).
• You are to submit a softcopy of your assignment via email. You must receive
acknowledgement email from your facilitator to confirm submission.
• Plagiarism is not acceptable. If you are not sure what is meant by plagiarism, refer to the
various websites, which discuss this matter, e.g. owl.english.purdue.edu/handouts.
• Plagiarised assignments will receive a ‘Fail’ mark.

3
PROJECT QUALITY MANAGEMENT RUBRICS

MAY 2016 (USTY)

Your assignment should be between 2500-4000 words and will be assessed based on the following aspects:

Low Fair Above average Excellent Maximum


Marks
Assessment Criteria Marks
1 2 3 4
Weight

1 Introduction 1 Vague and brief Adequately clear but Clear and somewhat Clear and 4
description of the brief description of the detailed description detailed
quality audit. quality audit. of the quality audit. description of the
quality audit with
relevant
supports.

2 Literature Review 3 Not available Poor review of relevant Fair review of articles Good review of 12
articles explaining the explaining the articles
importance of quality importance of quality explaining the
audit in projects. audit in projects. importance of
Minimum of 6 articles Minimum of 6 articles quality audit in
reviewed to support reviewed to support projects.
your discussion. your discussion. Minimum of 6
articles reviewed
to support your
discussion.

4
3 Discussion on the steps for 5 Inadequate Shallow discussion on Fair discussion on Sound discussion 20
the audit discussion on the the steps for audit the steps for audit on the steps for
steps for audit preparation and only preparation and audit preparation
preparation. based on personal view based on good and based on
and lack of evidence. evidence. clearly supported
evidence and
very practical to
be implemented
at the workplace.

4 Problem analysis and 4 Inadequate Shallow analysis of Fair analysis of Sound analysis of 16
solution discussion and problems and proposed problems and problems and
analysis. Solution solution with insufficient proposed solution proposed solution
is not appropriate evidence. based on good with clearly
to the context of evidence. supported
the quality audit. evidence.

5 Conclusion 1 Poor conclusion Basic conclusion with Good conclusion Excellent 4


that does not some degree of with moderate degree conclusion with
conclude the understanding of the of understanding of good degree of
assignment clearly assignment the assignment understanding of
the assignment

6 Using the APA style of 1 No citations & Only bibliography is Some citations were All citations and 4
citation and referencing referencing present. No citations in not reflected in the referencing
text. Only a few bibliography, some adheres to the
bibliographies adhered adhered to the APA APA style
to the APA style style

Total points 60

Potrebbero piacerti anche