Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ABRA
DISTRICT ENGINEERING OFFICE
CORDILLERA ADMINISTRATIVE REGION
Bangued, Abra

STATEMENT OF TIME ELAPSED AND WORK ACCOMPLISHED


As of October 13, 2017 - January 15, 2018

PROJECT ID : 17PA0100
PROJECT NAME : Maintenance, Repair and Rehabilitation of
Infrastructure Facilities, Public Buildings
PROJECT LOCATION: a.) DPWH Building (Old Planning and Design Building), Zone 7
b.) LTO Building, Zone 3
c.) DPWH - Guard House, Zone 7
d.) DPWH Old Construction Building, Zone 7
e.) DPWH Building - BOE Building, Zone 3, all at Bangued, Abra
CONTRACTOR : AMP Construction

1. ORIGINAL CONTRACT TIME (CALENDAR DAYS) 90 C.D.


2. REVISED CONTRACT TIME (CALENDAR DAYS) 120 C.D.
3. DATE EFFECTIVITY OF ORIGINAL CONTRACT October 13, 2017
4. ORIGINAL CONTRACT AMOUNT Php 5,940,279.13
5. REVISED CONTRACT AMOUNT DUE TO CHANGE/VARIATION ORDER Php 6,249,948.80
6. ORIGINAL EXPIRY DATE January 10, 2018
7. APPROVED TIME EXTENSION DUE TO SHUTDOWN DAYS DUE TO
SUSPENSION ORDER FROM DPWH n/a
8. APPROVED TIME EXTENSION DUE TO VARIATION ORDER 30 C.D.
9. TOTAL TIME EXTENSION & SUSPENSION ORDER C.D.
10. TOTAL CALENDAR DAYS ELAPSED TO DATE 95 C.D.
11. REVISED EXPIRY DATE DUE TO EXTENSION/SUSPENSION February 9, 2018
12. PERCENTAGE OF TIME ELAPSED 79.17%
13. PERCENTAGE OF WORK ACCOMPLISHED 89.91%
14. SCHEDULE PERCENTAGE OF WORK TO BE ACCOMPLISHED 89.70%
15. PROJECT SLIPPAGE (13 - 14) +0.21%

Certified by:

ARLON DON G. BARBERO


Project Engineer I
Approved By:

EDGARDO K. LIM
District Engineer
CONTRACTOR'S STATEMENT OF WORK ACCOMPLISHED
As of October 13, 2017 - January 15, 2018
PROJECT NAME: Maintenance, Repair and Rehabilitation of Infrastructure Facilities, Public Buildings
PROJECT LOCATION:
a.) DPWH Building (Old Planning and Design Building), Zone 7
b.) LTO Building, Zone 3
c.) DPWH - Guard House, Zone 7
d.) DPWH Old Construction Building, Zone 7
e.) DPWH Building - BOE Building, Zone 3, all at Bangued, Abra
PROJECT I.D :

Total Qty. Total Qty.


Total Total Qty.
UNIT PRICE Total Contract Approved in Approved Balance of Cost of Cost of this
ITEM DESCRIPTION UNIT Contract to this Cost to Date Cost Balance
PESOS Cost Previous in this Quantity Previous Billing Billing
Quantity Date
billing billing

a.) DPWH Building (Old Planning & Design Building)

B.5 Project Billboard / Signboard l.s. 1.00 4,969.59 4,969.59 - 1.00 1.00 - - 4,969.59 4,969.59 -

B.7 Occupational Safety and Health Program month 2.17 30,880.03 66,906.73 - 2.17 2.17 - - 66,906.73 66,906.73 -

Removal of Existing Structures


101(1) l.s 1.00 70,605.31 70,605.31 1.00 - 1.00 - 70,605.31 - 70,605.31 -
(Ceiling,Roof,Walls,Windows)

403 (4) Structural Steel, furnished, and fabricated - Purlins kgs. 1,885.00 64.67 121,896.43 1,434.40 450.60 1,885.00 - 92,757.12 29,139.31 121,896.43 -

Structural Steel, furnished, fabricated, and erected -


403 (5) kgs. 1,750.63 154.67 270,770.22 253.00 1,497.63 1,750.63 - 39,131.47 231,638.75 270,770.22 -
Truss

404 (1) a Reinforcing Steel kgs. 197.61 55.42 10,952.74 197.61 - 197.61 - 10,952.74 - 10,952.74 -

803 (1) a Structure Excavation (Common Soil) cu.m. 2.00 46.01 92.01 2.00 - 2.00 - 92.01 - 92.01 -

900(1) a2 Structural Concrete (Footing ) cu.m. 0.64 3,681.83 2,356.37 0.64 - 0.64 - 2,356.37 - 2,356.37 -

900(1) a4 Structural Concrete (Columns) cu.m. 1.00 5,533.73 5,533.73 1.00 - 1.00 - 5,533.73 - 5,533.73 -

900 ( 1 ) b6 Structural Concrete (Beams) cu.m. 0.72 13,962.07 10,052.69 0.72 - 0.72 - 10,052.69 - 10,052.69 -

903(2) Forms and Falseworks sq.m. 26.06 1,118.15 29,139.10 26.06 - 26.06 - 29,139.10 - 29,139.10 -

1003(1) c2 Ceiling (6.0mm Wood Frame Marine Plywood) sq.m. 154.92 558.65 86,546.38 - 100.00 100.00 54.92 - 55,865.21 55,865.21 30,681.17

1003(3) Cabinets sq.m. 43.98 807.56 35,516.47 - - - 43.98 - - - 35,516.47

1003(4) Cabinets piece 1.00 26,280.57 26,280.57 - - - 1.00 - - - 26,280.57

1005 (1) Residential Casement sq.m. 19.38 3,894.34 75,472.34 - 12.00 12.00 7.38 - 46,732.10 46,732.10 28,740.24

1010(1)b Doors (Wood Panel) sq.m. 10.50 2,752.24 28,898.55 - - - 10.50 - - - 28,898.55

Prepainted Metal Sheets-Rib Type (Below 0.427


1014(1) b2 sq.m 210.00 670.56 140,817.91 - 210.00 210.00 - - 140,817.91 140,817.91 -
mm),Long Span

1013(2)a Fabricated Metal Roofing Accessory -Ridge Roll ln.m. 13.00 298.50 3,880.50 - 13.00 13.00 - - 3,880.50 3,880.50 -

1013(2) b Fabricated Metal Roofing Accessory -Flashings ln.m. 18.20 330.81 6,020.67 - 18.20 18.20 - - 6,020.67 6,020.67 -

1013(2)c Fabricated Metal Roofing Accessory - Gutters ln.m. 25.20 305.55 7,699.75 - 25.20 25.20 - - 7,699.75 7,699.75 -

1018(1) Glazed Tiles and Trims sq.m. 86.80 1,445.27 125,449.58 - 86.80 86.80 - - 125,449.58 125,449.58 -
1027(1) Cement Plaster Finish sq.m. 83.33 199.15 16,595.51 - 83.33 83.33 - - 16,595.51 16,595.51 -

1032(1)a Painting Works - Masonry/Concrete sq.m. 291.23 123.10 35,849.98 - 291.23 291.23 - - 35,849.98 35,849.98 -

1032(1)b Painting Works - Wood sq.m. 164.88 184.38 30,400.02 - 164.88 164.88 - - 30,400.02 30,400.02 -

1046(2) a CHB Non Load Bearing Wall - 100mm sq.m. 35.00 580.36 20,312.61 - 35.00 35.00 - - 20,312.61 20,312.61 -

1100(14) Octagonal Junction Box PVC pcs. 8.00 94.59 756.69 - 8.00 8.00 - - 756.69 756.69 -

1100(15) Utility Boxes PVC pcs. 19.00 125.51 2,384.60 - 19.00 19.00 - - 2,384.60 2,384.60 -

1100(22) Grounding Rod Copperweld length 1.00 825.01 825.01 - 1.00 1.00 - - 825.01 825.01 -

1101(1)b2 Electrical Wire - 2.0mm² TWG/THHN mtr. 115.88 95.22 11,034.55 - 115.88 115.88 - - 11,034.55 11,034.55 -

1101(1)b4 Electrical Wire - 3.5mm² TWG/THHN mtr. 190.00 38.81 7,373.64 - 190.00 190.00 - - 7,373.64 7,373.64 -

1101(1)b8 Electrical Wire - 8.0mm² TWG/THHN roll 35.00 65.97 2,308.92 - 35.00 35.00 - - 2,308.92 2,308.92 -

1101(7)a1 Single Pole Wall Switch on one Switch Plate set 3.00 397.06 1,191.19 - 3.00 3.00 - - 1,191.19 1,191.19 -

1101(7)a2 Duplex(2 Single Pole Wall Switch on one Switch Plate) set 5.00 481.57 2,407.85 - 5.00 5.00 - - 2,407.85 2,407.85 -

1101(8)a2 Duplex Convenience Receptacles/Outlets set 12.00 502.06 6,024.71 - 12.00 12.00 - - 6,024.71 6,024.71 -

Panelboard Circuit Breaker Type - Main Distribution Panel


1102(1)a1 set 1.00 17,841.61 17,841.61 - 1.00 1.00 - - 17,841.61 17,841.61 -
(MDP)
Flourescent Lighting Fixture with/ HPF-NCPF Ballast
1103(2)a33 sets 11.00 1,334.58 14,680.36 - 11.00 11.00 - - 14,680.36 14,680.36 -
(Boxtype Surface Mounted)
Led Bulb w/ Medium Base, Keyless Type, porcelain
1103(7)a5 sets 9.00 608.90 5,480.07 - 9.00 9.00 - - 5,480.07 5,480.07 -
Receptacle/Outlet

1200 (4)a2 Package Type Airconditioning Unit set 1.00 42,156.94 42,156.94 - - - 1.00 - - - 42,156.94

1,347,481.90 - 260,620.54 894,587.42 1,155,207.96 192,273.94

b.) LTO Building - - -

B.5 Project Billboard / Signboard l.s. 1.00 4,441.41 4,441.41 - 1.00 1.00 - - 4,441.41 4,441.41 -

B.7 Occupational Safety and Health Program month 2.17 3,651.14 7,910.80 - 2.17 2.17 - - 7,910.80 7,910.80 -

403 (4) Structural Steel, furnished, and fabricated - Purlins kgs. 1,485.96 68.71 102,105.77 200.00 350.00 550.00 935.96 13,742.77 24,049.85 37,792.62 64,313.15

Structural Steel, furnished, fabricated, and erected -


403 (5) kgs. 1,655.92 78.12 129,363.11 360.00 500.00 860.00 795.92 28,123.73 39,060.73 67,184.46 62,178.65
Truss

404 (1) a Reinforcing Steel kgs. 442.39 61.23 27,088.76 442.39 - 442.39 - 27,088.76 - 27,088.76 -

Removal of Actual Structures/Obstruction ( Ceiling and


801(1) l.s. 1.00 43,483.38 43,483.38 1.00 - 1.00 - 43,483.38 - 43,483.38 -
Roof Framing)

903(2) Forms and Falseworks l.s 1.00 26,301.17 26,301.17 1.00 - 1.00 - 26,301.17 - 26,301.17 -

1003(1) c2 Ceiling sq.m. 326.35 932.46 304,309.02 - 326.35 326.35 - - 304,309.02 304,309.02 -

1005 (1)a Residential Casement sq.m. 14.04 2,690.51 37,774.75 14.04 - 14.04 - 37,774.75 - 37,774.75 -

1007 (1)b Aluminum Glass Doors sq.m. 9.48 7,189.83 68,159.59 9.48 - 9.48 - 68,159.59 - 68,159.59 -
1014(1)b2 Prepainted Metal Sheets sq.m 362.52 590.93 214,223.24 - 130.00 130.00 232.52 - 76,820.65 76,820.65 137,402.59

1013(2)a Fabricated Metal Roofing Accessory -Ridge Roll ln.m. 15.80 287.29 4,539.11 - 15.80 15.80 - - 4,539.11 4,539.11 -

1013(2) b Fabricated Metal Roofing Accessory -Flashings ln.m. 36.80 281.94 10,375.42 - 36.80 36.80 - - 10,375.42 10,375.42 -

1013(2)c Fabricated Metal Roofing Accessory - Gutters ln.m. 31.60 269.64 8,520.52 - 31.60 31.60 - - 8,520.52 8,520.52 -

1027(1) Cement Plaster Finish sq.m. 90.32 269.64 24,353.58 - 90.32 90.32 - - 24,353.58 24,353.58 -

1032(1)a Painting Works - Masonry and Fiber Cement Painting sq.m. 215.53 272.74 58,784.09 - 215.53 215.53 - - 58,784.09 58,784.09 -

1032(1)c Painting Works - Wood Paint sq.m. 203.28 393.37 79,965.11 - 203.28 203.28 - - 79,965.11 79,965.11 -

1043(2) a CHB Non Load Bearing Wall - 100mm sq.m. 45.16 461.77 20,853.53 - 45.16 45.16 - - 20,853.53 20,853.53 -

1100(14) Octagonal Junction Box PVC pcs. 13.00 125.78 1,635.14 - 13.00 13.00 - - 1,635.14 1,635.14 -

1100(15) Utility Boxes PVC pcs. 17.00 130.09 2,211.46 - 17.00 17.00 - - 2,211.46 2,211.46 -

1101(1)b2 Electrical Wire - 2.0mm² TWG/THHN mtr. 350.00 37.17 13,008.71 - 350.00 350.00 - - 13,008.71 13,008.71 -

1101(1)b4 Electrical Wire - 3.5mm² TWG/THHN mtr. 100.00 42.08 4,207.90 - 100.00 100.00 - - 4,207.90 4,207.90 -

1101(7)a1 Single Pole Wall Switch on one Switch Plate set 9.00 435.66 3,920.91 - 9.00 9.00 - - 3,920.91 3,920.91 -

1101(7)a2 Duplex(2 Single Pole Wall Switch on one Switch Plate) set 4.00 464.20 1,856.81 - 4.00 4.00 - - 1,856.81 1,856.81 -

1101(8)a2 Duplex Convenience Receptacles/Outlets set 3.00 444.17 1,332.51 - 3.00 3.00 - - 1,332.51 1,332.51 -

Panelboard Circuit Breaker Type - Main Distribution Panel


1102(1)a1 set 1.00 3,889.08 3,889.08 - 1.00 1.00 - - 3,889.08 3,889.08 -
(MDP)
Flourescent Lighting Fixture with/ HPF-NCPF Ballast
1103(2)a33 sets 9.00 1,334.58 12,011.20 - 9.00 9.00 - - 12,011.20 12,011.20 -
(Boxtype Surface Mounted)
Led Bulb w/ Medium Base, Keyless Type, porcelain
1103(7)a5 sets 9.00 608.90 5,480.07 - 9.00 9.00 - - 5,480.07 5,480.07 -
Receptacle/Outlet

1,222,106.15 244,674.15 713,537.61 958,211.76 263,894.39

c.) DPWH - Guard House -

B.5 Project Billboard / Signboard l.s. 1.00 4,441.41 4,441.41 - 1.00 1.00 - - 4,441.41 4,441.41 -

B.7 Occupational Safety and Health Program month 1.60 6,996.83 11,194.93 - 1.60 1.60 - - 11,194.93 11,194.93 -

401 (1)b Metal Railing ln.m. 6.55 1,524.64 9,986.38 - 6.55 6.55 - - 9,986.38 9,986.38 -

403 (4) Structural Steel, furnished, and fabricated - Purlins kgs. 1,889.72 66.03 124,771.71 1,889.72 - 1,889.72 - 124,771.71 - 124,771.71 -

Structural Steel, furnished, fabricated, and erected -


403 (5) kgs. 1,467.78 77.03 113,067.64 1,467.78 - 1,467.78 - 113,067.64 - 113,067.64 -
Truss

404 (1) a Reinforcing Steel kgs. 2,970.20 55.59 165,106.21 2,681.68 288.52 2,970.20 - 149,066.94 16,039.27 165,106.21 -

Removal of Actual Structures/Obstruction (Walls,Windows


101(1) l.s. 1.00 30,791.97 30,791.97 1.00 - 1.00 - 30,791.97 - 30,791.97 -
& Roof Framing)

103 (1) a Structure Excavation cu.m. 15.57 142.07 2,211.69 15.57 - 15.57 - 2,211.69 - 2,211.69 -

804(1)b Embankment from Common Borrow by Equipment cu.m. 38.00 492.60 18,718.80 - 38.00 38.00 - - 18,718.80 18,718.80 -
Reinforced Concrete (Column Footing, Wall Footing, Slab,
900(1) cu.m. 19.80 4,634.38 91,760.79 14.60 5.20 19.80 - 67,662.00 24,098.79 91,760.79 -
Column, Beam)

903(1) Forms and Falseworks l.s 1.00 74,687.33 74,687.33 1.00 - 1.00 - 74,687.33 - 74,687.33 -

1001 (1) a Pipe - 50mm diameter PVC ln.m. 1.00 709.78 709.78 - 1.00 1.00 - - 709.78 709.78 -

1001 (1) a2 Pipe - 75mm diameter PVC ln.m. 2.00 764.52 1,529.03 - 2.00 2.00 - - 1,529.03 1,529.03 -

1001 (2) a1 Fittings- 50mm diameter PVC 45deg. Elbow pcs. 1.00 305.78 305.78 - 1.00 1.00 - - 305.78 305.78 -

1001 (2) a2 Fittings- 75mm diameter PVC 45deg. Elbow pcs. 4.00 142.01 568.04 - 4.00 4.00 - - 568.04 568.04 -

1001 (2) b2 Fittings- 75mm diameter PVC 90deg. Elbow pcs. 1.00 342.70 342.70 - 1.00 1.00 - - 342.70 342.70 -

1001 (2) c2 Fittings- 75mm diameter PVC Cleanout with Plug pcs. 3.00 108.29 324.87 - 3.00 3.00 - - 324.87 324.87 -

1001 (2) g2 Fittings- 75mm dia. PVC Sanitary Wye pcs. 3.00 106.48 319.44 - 3.00 3.00 - - 319.44 319.44 -

Fittings- 75mm dia. X 50mm dia. PVC Reducer - Sanitary


1001 (2) k1 pcs. 3.00 233.69 701.08 - 3.00 3.00 - - 701.08 701.08 -
Tee

1001 (8) Two Chamber Septic Vault ls 1.00 23,896.91 23,896.91 1.00 - 1.00 - 23,896.91 - 23,896.91 -

1002 (1) e1 Fittings- 50mm diameter P-Trap pcs. 2.00 556.70 1,113.40 - 2.00 2.00 - - 1,113.40 1,113.40 -

1002(2)a1 Galvanizes Iron Pipes (13mm dia.) pcs. 3.00 419.96 1,259.88 - 3.00 3.00 - - 1,259.88 1,259.88 -

1002(2)a2 Galvanizes Iron Pipes (25mm dia.) pcs. 1.00 1,408.62 1,408.62 - 1.00 1.00 - - 1,408.62 1,408.62 -

Fittings - Galvanized Iron (13mm dia elbow 1/4 bend; 90


1002(2)b2 pcs. 6.00 194.87 1,169.22 - 6.00 6.00 - - 1,169.22 1,169.22 -
deg. )

1002(2)c1 Fittings - Galvanized Iron (13mm dia tee equal ) pcs. 7.00 135.75 950.24 - 7.00 7.00 - - 950.24 950.24 -

1002(2)e1 Fittings - Galvanized Iron (13mm dia socket/coupling) pcs. 6.00 124.93 749.60 - 6.00 6.00 - - 749.60 749.60 -

Fittings - Galvanized Iron (25mm dia. x 13mm reducer


1002(2)f2 pcs. 1.00 233.74 233.74 - 1.00 1.00 - - 233.74 233.74 -
coupling)

1002(5)a1 Water Closet, Elongated, Complete set 1.00 9,415.58 9,415.58 - 1.00 1.00 - - 9,415.58 9,415.58 -

1002(5)q Faucet pcs. 3.00 703.22 2,109.65 - 3.00 3.00 - - 2,109.65 2,109.65 -

1002(5)r Hose Bibb pcs. 1.00 703.22 703.22 - 1.00 1.00 - - 703.22 703.22 -

1002(5)h3 Floor Drain pcs. 1.00 603.05 603.05 - 1.00 1.00 - - 603.05 603.05 -

1002 5) c1 Kitchen Sink Complete set 1.00 7,351.93 7,351.93 - 1.00 1.00 - - 7,351.93 7,351.93 -

1003(1) a2 Ceiling (4.5mm Fiber Cement Board) sq.m. 80.00 1,128.13 90,250.37 80.00 - 80.00 - 90,250.37 - 90,250.37 -

1008 (1)a Residential Casement sq.m. 11.05 2,766.33 30,567.90 11.05 - 11.05 - 30,567.90 - 30,567.90 -

1010(2)b Wooden Doors - Flush sq.m. 11.34 5,714.64 64,803.99 - 11.34 11.34 - - 64,803.99 64,803.99 -

1014(1)b2 Metal Roofing - Prepainted Long Span sq.m 121.06 621.82 75,275.71 121.06 - 121.06 - 75,275.71 - 75,275.71 -

1013(2)a Fabricated Metal Roofing Accessory -Ridge Roll ln.m. 9.40 295.37 2,776.45 9.40 - 9.40 - 2,776.45 - 2,776.45 -

1013(2) b Fabricated Metal Roofing Accessory -Flashings ln.m. 36.56 273.09 9,983.99 - 36.56 36.56 - - 9,983.99 9,983.99 -
1013(2)c Fabricated Metal Roofing Accessory - Gutters ln.m. 21.30 404.36 8,612.92 - 21.30 21.30 - - 8,612.92 8,612.92 -

1013(3) Roof Ventilators each 0.48 7,434.15 3,568.39 - 0.48 0.48 - - 3,568.39 3,568.39 -

1018(1) Glazed Tiles and Trims sq.m. 2.12 1,438.41 3,049.44 - 2.12 2.12 - - 3,049.44 3,049.44 -

1027(1) Cement Plaster Finish sq.m. 354.01 294.64 104,304.87 354.01 - 354.01 - 104,304.87 - 104,304.87 -

1032(1)a1 Painting Works - Masonry and Fiber Cement Painting sq.m. 388.01 122.20 47,413.37 - 388.01 388.01 - - 47,413.37 47,413.37 -

1032(1)a2 Painting Works - Wood Paint sq.m. 114.00 182.86 20,846.54 80.00 34.00 114.00 - 14,629.15 6,217.39 20,846.54 -

1043(2) a CHB Non Load Bearing Wall - 100mm sq.m. 124.70 474.96 59,229.58 58.15 66.55 124.70 - 27,618.84 31,610.74 59,229.58 -

1100(11) a2 Octagonal Junction Box PVC pcs. 6.00 85.02 510.11 - 6.00 6.00 - - 510.11 510.11 -

1100(11)b2 Utility Boxes PVC pcs. 16.00 117.39 1,878.31 - 16.00 16.00 - - 1,878.31 1,878.31 -

1100(14) a Grounding Rod Copperweld length 2.00 667.13 1,334.26 - 2.00 2.00 - - 1,334.26 1,334.26 -

1101(1)b2 Electrical Wire - 2.0mm² TWG/THHN mtr. 40.00 48.11 1,924.38 - 40.00 40.00 - - 1,924.38 1,924.38 -

1101(1)b4 Electrical Wire - 3.5mm² TWG/THHN mtr. 76.00 47.86 3,637.42 - 76.00 76.00 - - 3,637.42 3,637.42 -

1101(7)a1 Single Pole Wall Switch on one Switch Plate set 2.00 512.85 1,025.69 - 2.00 2.00 - - 1,025.69 1,025.69 -

1101(7)a2 Duplex(2 Single Pole Wall Switch on one Switch Plate) set 4.00 464.20 1,856.81 - 4.00 4.00 - - 1,856.81 1,856.81 -

1101(8)a2 Duplex Convenience Receptacles/Outlets set 10.00 490.48 4,904.81 - 10.00 10.00 - - 4,904.81 4,904.81 -

Panelboard Circuit Breaker Type - Main Distribution Panel


1102(1)a1 set 1.00 4,203.05 4,203.05 - 1.00 1.00 - - 4,203.05 4,203.05 -
(MDP)
Flourescent Lighting Fixture with/ HPF-NCPF Ballast
1103(2)a33 sets 5.00 1,441.19 7,205.93 - 5.00 5.00 - - 7,205.93 7,205.93 -
(Boxtype Surface Mounted)
Led Bulb w/ Medium Base, Keyless Type, porcelain
1103(7)a5 sets 8.00 715.51 5,724.04 - 8.00 8.00 - - 5,724.04 5,724.04 -
Receptacle/Outlet

1,257,392.95 - 931,579.48 325,813.47 1,257,392.95 -

d.) DPWH Old Construction Building -

B.5 Project Billboard / Signboard l.s. 1.00 4,441.41 4,441.41 - 1.00 1.00 - - 4,441.41 4,441.41 -

B.7 Occupational Safety and Health Program month 2.17 7,877.77 17,068.51 - 2.17 2.17 - - 17,068.51 17,068.51 -

401 (1) a Metal Railing ln.m. 14.00 1,990.36 27,865.03 - 5.00 5.00 9.00 - 9,951.80 9,951.80 17,913.23

403 (4) Structural Steel, furnished, and fabricated - Purlins kg 1,357.14 83.12 112,806.25 750.00 607.14 1,357.14 - 62,340.24 50,466.01 112,806.25 -

Structural Steel, furnished, fabricated, and erected -


403 (5) kg 1,799.92 120.99 217,766.47 980.00 819.92 1,799.92 - 118,567.01 99,199.46 217,766.47 -
Truss

404 (1) a Reinforcing Steel kg 1,547.81 56.30 87,139.06 1,547.81 - 1,547.81 - 87,139.06 - 87,139.06 -

Removal of Actual Structures/Obstruction (Walls,Windows


801(1) l.s. 1.00 40,294.75 40,294.75 1.00 - 1.00 - 40,294.75 - 40,294.75 -
& Roof Framing)

803 (1) a Structure Excavation cu.m. 6.96 612.36 4,262.00 6.96 - 6.96 - 4,262.00 - 4,262.00 -

Reinforced Concrete (Column Footing, Wall Footing, Slab,


900(1) cu.m. 5.64 4,843.06 27,333.02 5.64 0.00 5.64 - 27,314.86 18.16 27,333.02 -
Column, Beam)
903(1) Forms and Falseworks l.s 1.00 23,996.74 23,996.74 1.00 - 1.00 - 23,996.74 - 23,996.74 -

1001 (1) a1 Pipe - 50mm dia. PVC Pipe ln.m. 30.00 197.76 5,932.81 - 30.00 30.00 - - 5,932.81 5,932.81 -

1001 (1) a3 Pipe - 100mm dia. PVC Pipe ln.m. 21.00 346.35 7,273.40 - 21.00 21.00 - - 7,273.40 7,273.40 -

1001 (2) a1 Fittings- 50mm dia. PVC 45deg. Elbow pc 4.00 120.37 481.47 - 4.00 4.00 - - 481.47 481.47 -

1001 (2) a3 Fittings- 100mm dia. PVC 45deg. Elbow pc 9.00 163.01 1,467.09 - 9.00 9.00 - - 1,467.09 1,467.09 -

1001 (2) b1 Fittings- 50mm dia. PVC 90deg. Elbow pc 12.00 106.03 1,272.30 - 12.00 12.00 - - 1,272.30 1,272.30 -

1001 (2) b3 Fittings- 100mm dia. PVC 90deg. Elbow pc 2.00 258.88 517.75 - 2.00 2.00 - - 517.75 517.75 -

1001 (2) c1 Fittings- 50mm dia. PVC Cleanout with Plug pc 1.00 305.78 305.78 - 1.00 1.00 - - 305.78 305.78 -

1001 (2) c3 Fittings- 100mm dia. PVC Cleanout with Plug pc 4.00 168.75 674.98 - 4.00 4.00 - - 674.98 674.98 -

1001 (2) e1 Fittings- 50mm dia. PVC P-Trap pc 2.00 556.70 1,113.40 - 2.00 2.00 - - 1,113.40 1,113.40 -

1001 (2) f1 Fittings- 50mm dia. X 50mm dia. PVC Sanitary Tee pc 7.00 114.25 799.75 - 7.00 7.00 - - 799.75 799.75 -

1001 (2) g1 Fittings- 50mm dia. PVC Sanitary Wye pc 1.00 382.16 382.16 - 1.00 1.00 - - 382.16 382.16 -

1001 (2) g3 Fittings- 100mm dia. PVC Sanitary Wye pc 3.00 274.43 823.30 - 3.00 3.00 - - 823.30 823.30 -

Fittings- 100mm dia. X 50mm dia. PVC Reducer-Sanitary


1001 (2) l2 pc 3.00 241.33 724.00 - 3.00 3.00 - - 724.00 724.00 -
Wye
Fittings- 100mm dia. X 50mm dia. PVC Reducer-Sanitary
1001 (2) k2 pc 2.00 295.80 591.59 - 2.00 2.00 - - 591.59 591.59 -
Tee

1002 (2) a1 13 mm dia. G.I. Pipe ln.m. 23.00 131.10 3,015.28 - 23.00 23.00 - - 3,015.28 3,015.28 -

1002 (2) a2 25 mm dia. G.I. Pipe ln.m. 2.50 202.26 505.66 - 2.50 2.50 - - 505.66 505.66 -

1002(2)b1 Fittings - 13mm dia. G.I. 90deg. Elbow pc 11.00 167.84 1,846.25 - 11.00 11.00 - - 1,846.25 1,846.25 -

1002(2)c1 Fittings - 13mm dia. G.I. tee equal pc 11.00 146.20 1,608.18 - 11.00 11.00 - - 1,608.18 1,608.18 -

1002(2)e1 Fittings - 13 mm dia. G.I. socket/coupling pc 1.00 251.56 251.56 - 1.00 1.00 - - 251.56 251.56 -

1002(2) f2 Fittings - 25mm dia. X 13 mm dia. G.I. Reducer pc 5.00 151.19 755.97 - 5.00 5.00 - - 755.97 755.97 -

1002(5) a1 Water Closet set 2.00 9,415.58 18,831.16 - 2.00 2.00 - - 18,831.16 18,831.16 -

1002(5) c1 Stainless Kitchen Sink Complete set 1.00 8,338.23 8,338.23 - 1.00 1.00 - - 8,338.23 8,338.23 -

1002(5) h1 50 mm dia. Stainless Floor Drain pc 2.00 479.77 959.53 - 2.00 2.00 - - 959.53 959.53 -

1002(5) o Shower Complete set 2.00 3,158.17 6,316.34 - 2.00 2.00 - - 6,316.34 6,316.34 -

1002 (5) s1 Water Meter pc 1.00 2,283.58 2,283.58 - 1.00 1.00 - - 2,283.58 2,283.58 -

1003(1) a1 Ceiling (4.5mm Fiber Cement Board) sq.m. 123.00 603.38 74,215.77 - 123.00 123.00 - - 74,215.77 74,215.77 -

1008 (1) b Residential Casement sq.m. 25.00 2,775.04 69,375.96 20.00 5.00 25.00 - 55,500.77 13,875.19 69,375.96 -

1010(2) a Wooden Doors - Flush sq.m. 7.56 2,608.43 19,719.70 - 7.56 7.56 - - 19,719.70 19,719.70 -
1013(2)a Fabricated Metal Roofing Accessory -Ridge Roll ln.m. 12.00 333.14 3,997.64 - 12.00 12.00 - - 3,997.64 3,997.64 -

1013(2) b Fabricated Metal Roofing Accessory -Flashings ln.m. 36.40 273.35 9,949.77 - 36.40 36.40 - - 9,949.77 9,949.77 -

1013(2) c Fabricated Metal Roofing Accessory - Gutters ln.m. 29.50 268.57 7,922.88 - 29.50 29.50 - - 7,922.88 7,922.88 -

1013(3) Roof Ventilators set 4.00 2,740.86 10,963.45 - 4.00 4.00 - - 10,963.45 10,963.45 -

1014(1) b2 Metal Roofing-Prepainted Long Span sq.m 188.50 617.82 116,458.20 - 188.50 188.50 - - 116,458.20 116,458.20 -

1018(1) Glazed Tiles and Trims sq.m 14.66 2,359.29 34,583.48 - - - 14.66 - - - 34,583.48

1018(2) Unglazed Tiles sq.m 5.00 2,686.51 13,432.55 - - - 5.00 - - - 13,432.55

1027(1) Cement Plaster Finish sq.m. 300.00 314.77 94,430.25 300.00 - 300.00 - 94,430.25 - 94,430.25 -

1043(2) a PVC Doors and Frames set 2.00 2,426.23 4,852.45 - 2.00 2.00 - - 4,852.45 4,852.45 -

1046(2) b CHB Non Load Bearing Wall - 100mm sq.m. 154.50 524.35 81,011.80 154.50 - 154.50 - 81,011.80 - 81,011.80 -

1201 (6) b1 Gate Valve pc 1.00 653.98 653.98 - 1.00 1.00 - - 653.98 653.98 -

1100(11) a2 PVC Octagonal Junction Boxes pc 11.00 132.68 1,459.45 - 11.00 11.00 - - 1,459.45 1,459.45 -

1100(11) b2 PVC Utility Boxes pc 30.00 127.67 3,830.05 - 30.00 30.00 - - 3,830.05 3,830.05 -

1101(1) b5 Electrical Wire - 2.0mm² TWG/THHN mtr. 100.00 89.31 8,930.65 - 100.00 100.00 - - 8,930.65 8,930.65 -

1101(1) b6 Electrical Wire - 3.5mm² TWG/THHN mtr. 100.00 44.50 4,449.67 - 100.00 100.00 - - 4,449.67 4,449.67 -

1101(7)a1 Single Pole Wall Switch on one Switch Plate set 5.00 443.38 2,216.88 - 5.00 5.00 - - 2,216.88 2,216.88 -

1101(7)a2 Duplex(2 Single Pole Wall Switch on one Switch Plate) set 3.00 551.04 1,653.11 - 3.00 3.00 - - 1,653.11 1,653.11 -

1101(8)a2 Duplex Convenience Receptacles/Outlets set 21.00 493.79 10,369.57 - 21.00 21.00 - - 10,369.57 10,369.57 -

Panelboard Circuit Breaker Type - Main Distribution Panel


1102(1)a1 set 1.00 19,237.74 19,237.74 - 1.00 1.00 - - 19,237.74 19,237.74 -
(MDP)
Flourescent Lighting Fixture with/ HPF-NCPF Ballast
1103(2)a33 set 5.00 1,441.19 7,205.93 - 5.00 5.00 - - 7,205.93 7,205.93 -
(Boxtype Surface Mounted)
Led Bulb w/ Medium Base, Keyless Type, porcelain
1103(7)a5 set 7.00 715.51 5,008.54 - 7.00 7.00 - - 5,008.54 5,008.54 -
Receptacle/Outlet

1,235,974.23 - 594,857.48 575,187.49 1,170,044.97 65,929.26

e.) DPWH Building - BOE Building - - -

B.5 Project Billboard / Signboard l.s. 1.00 4,441.41 4,441.41 - 1.00 1.00 - - 4,441.41 4,441.41 -

B.7 Occupational Safety and Health Program month 2.16 5,495.05 11,869.31 - 2.16 2.16 - - 11,869.31 11,869.31 -

403 (4) Structural Steel, furnished, and fabricated - Purlins kgs. 1,710.68 75.93 129,884.11 1,000.00 710.68 1,710.68 - 75,925.23 53,958.88 129,884.11 -

Structural Steel, furnished, fabricated, and erected -


403 (5) kgs. 2,123.09 112.59 239,046.34 1,600.00 523.09 2,123.09 - 180,149.40 58,896.94 239,046.34 -
Truss

404 (1) a Reinforcing Steel kgs. 217.55 61.18 13,309.65 217.55 - 217.55 - 13,309.65 - 13,309.65 -

Removal of Actual Structures/Obstruction (Walls,Windows


801(1) l.s. 1.00 30,221.06 30,221.06 1.00 - 1.00 - 30,221.06 - 30,221.06 -
& Roof Framing)
Reinforced Concrete (Column Footing, Wall Footing, Slab,
900(1) cu.m. 1.59 4,857.52 7,723.46 1.59 - 1.59 - 7,723.46 - 7,723.46 -
Column, Beam)

903(2) Forms and Falseworks l.s 1.00 24,620.57 24,620.57 1.00 - 1.00 - 24,620.57 - 24,620.57 -

1003(1) a1 Ceiling (4.5mm Fiber Cement Board) sq.m. 196.00 721.97 141,505.64 - 196.00 196.00 - - 141,505.64 141,505.64 -

1003(3)d2 Carpentry and Joinery Works (Wall) sq.m 40.50 1,198.13 48,524.37 - 40.50 40.50 - - 48,524.37 48,524.37 -

1008(1)a Aluminum Glass Window sq.m. 34.50 4,876.88 168,252.22 - 34.50 34.50 - - 168,252.22 168,252.22 -

1010(1)b Wooden Doors - Flush sq.m. 5.73 2,569.97 14,725.93 - 5.73 5.73 - - 14,725.93 14,725.93 -

1013(1) Metal Roofing - Prepainted Long Span sq.m 217.43 621.79 135,195.22 - 217.43 217.43 - - 135,195.22 135,195.22 -

1013(2)a Fabricated Metal Roofing Accessory -Ridge Roll ln.m. 22.95 491.23 11,273.68 - 22.95 22.95 - - 11,273.68 11,273.68 -

1027(1) Cement Plaster Finish sq.m. 40.00 314.55 12,581.92 40.00 - 40.00 - 12,581.92 - 12,581.92 -

1032(1)a1 Painting Works - Masonry and Fiber Cement Painting sq.m. 445.89 243.07 108,382.15 - - - 445.89 - - - 108,382.15

1032(1)c Painting Works - Wood Paint sq.m. 229.00 222.57 50,969.22 - 229.00 229.00 - - 50,969.22 50,969.22 -

1100(14) Octagonal Junction Box PVC pcs. 5.00 87.93 439.66 - 5.00 5.00 - - 439.66 439.66 -

1100(15) Utility Boxes PVC pcs. 13.00 124.51 1,618.59 - 13.00 13.00 - - 1,618.59 1,618.59 -

1101(1)b2 Electrical Wire - 2.0mm² TWG/THHN mtr. 250.00 27.47 6,866.75 - 250.00 250.00 - - 6,866.75 6,866.75 -

1101(7)a1 Single Pole Wall Switch on one Switch Plate set 1.00 512.84 512.84 - 1.00 1.00 - - 512.84 512.84 -

1101(7)a2 Duplex(2 Single Pole Wall Switch on one Switch Plate) set 4.00 464.20 1,856.81 - 4.00 4.00 - - 1,856.81 1,856.81 -

1101(8)a2 Duplex Convenience Receptacles/Outlets set 8.00 473.11 3,784.91 - 8.00 8.00 - - 3,784.91 3,784.91 -

Panelboard Circuit Breaker Type - Main Distribution Panel


1102(1)a1 set 1.00 2,849.72 2,849.72 - 1.00 1.00 - - 2,849.72 2,849.72 -
(MDP)
Flourescent Lighting Fixture with/ HPF-NCPF Ballast
1103(2)a33 sets 8.00 1,441.19 11,529.49 - 8.00 8.00 - - 11,529.49 11,529.49 -
(Boxtype Surface Mounted)
Led Bulb w/ Medium Base, Keyless Type, porcelain
1103(7)a5 sets 7.00 715.51 5,008.54 - 7.00 7.00 - - 5,008.54 5,008.54 -
Receptacle/Outlet

1,186,993.57 344,531.29 734,080.13 1,078,611.42 108,382.15

6,249,948.80 Total 2,376,262.94 3,243,206.12 5,619,469.06 630,479.74


I HEREBY CERTIFY that tall work items were duly verified I HEREBY CERTIFY that materials used in the
by the undersigned and have been acomplished in connection project have been tested and have all requirements. (Copies
with the approved plans, spacification and programs of work. of test reports hereto attached).

APOLINAR M. PACHECO ARLON DON G. BARBERO ERNESTO P. BAYOAN


AMP CONSTRUCTION Project Engineer I Chief, Quality Assurance Section
OWNER

Recommending approval: APPROVED:

EDWIN T. BRINGAS EDGARDO K. LIM


OIC - Assistant District Engineer District Engineer