Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
ODN should be updated in the tax relevant transactions. For example in case of DZ document
type it should be updated when we are receiving advance (F-29). But in our case it is updating in
the normal payment also (F-28)
Thanks
Rahul
Reply
Jul 13, 2017
Ashish Mohapatra
Thanks Brinda for the blog. Please refer the following statements of your blog
"For MM- ODN is only required for UNREGISTERED Vendors with RCM conditions.
BKPF-XBLNR will get updated with the value that you will enter manually in
reference field.
BKPF-XBLNR_ALT will get updated with ODN
For FI - The generated Official Document Number will be updated against BKPF-XBLNR."
Since some of the entries relevant for RCM will be processed through MM and some through FI,
it will create confusion since in BSEG table ODN will be in different fields for different
documents, even for the same vendor.
Reply
Jul 23, 2017
Ashish Mohapatra
Hello Brinda,
Since the table-field BKPF-XBLNR_ALT is not visible in FB03 transaction, how do user
(without authorization for SE16/SE16N or similar t-codes) confirm that the field has been
populated by ODN.
Reply
Jul 26, 2017
Achuthan Nair
Hi Brinda,
After implementing above SNOTE of ODN, ODN is getting generated for all the MIRO
transaction. it doesn't check either vendor is registered / RCM conditions are there or not.
Regards,
Mihir Patel
Reply
Jul 26, 2017
Ashish Mohapatra
Reply
Jul 26, 2017
Achuthan Nair
HI Ashish,
I checked the vendor classification in vendor master data and it's blank. Further, I also run the
transaction FB60, it's still generating ODN number.
There is no RCM conditions during posting document using MIRO & FB60
Regards,
Mihir Patel
Reply
Jul 26, 2017
Ashish Mohapatra
The ODN generation has no links to RCM condition types. It is generated only when
If any of this three condition is satisfied ODN will be generated irrespective of the transaction
(MIRO or FB60).
Reply
Jul 26, 2017
Achuthan Nair
HI Ashish,
you are right, but problem is still there. I think FM is not validating vendor classification
properly
Regards,
Mihir Patel
Reply
Jul 26, 2017
Brinda R
Hi,
The issue could be because you have set the flag to "X" for all scenarios in BADI. CALL BADI
lv_exit->change_odn_checks
Regards,
Brinda
Reply
Jul 27, 2017
Vivien Meier
Hi ,
We have one Problem when trying to create the object J_1IG_ODN as per note 2487589,
Attachment "Number-Range-Object.pdf"
In the Transaction SNRO we should enter the Package J1I_GST_LO. We have the Problem
because the entry field in the Transaction is not shown as
described in the attachment document. So we can not enter the package. When we enter all the
other required data and try to go to another Tab or save, we got error message saying the object
does not exisit and should be created via SNRO (which we are just doing). We checked that
required entries (Package, Domain etc.) have been creted. Also all the Tasks related to the other
two attachments of the note have been performed. We had the idea that it might be the
authorisation, but su53 was fineWe had the idea that it might be the authorisation, but su53 was
fine.
Has anyone any Idea what is wrong here? .How have You processed this step?
Vivien
Reply
Jul 31, 2017
Ashvin Masih
Hi Brinda,
But as mentioned earlier in case of DZ document type it should be updated when we are
receiving advance F-29.
Any solutions??
Regards,
Ashvin.
Reply
Aug 10, 2017
Brinda R
Hi Ashvin,
If the document type is configured in J_1IG_T003_I table then system will try to generate ODN.
If you do not want ODN to be generated for a particular tcode then copy the document type and
create a new one for which there is no entry maintained in J_1IG_T003_I table. <<<<OR>>>>
Regards,
Brinda
Vijay Prabhu
NCR portion to load while entry of Inventory - OK, at the time of physical receipt of the material
at our premises.
CR portion - IGST, how to put into system while physical receipt of material at our premises.
this is not available? - Not OK
Before GST - we were using J1IG (trading) & J1IEX (manufacturing) to take CR portion credit
at the time of physical receipt of material at our premises. Material can come partial. i.e. Receipt
of 100 Ton at Custom may be received by us in partial consignment on different dates. for, e.g.
Material at dock on 29th of the month so we have to clear custom amount but credit can be taken
at the time of receipt in next month - may be on 2nd we receive 50 ton and remaining 50 ton on
3rd.
vijay g prabhu
+91 9909997748
vijay.prabhu@aiaengineering.com
Reply
Jul 28, 2017