Scalable PLC AC500

Summary AC500
First Project
Basic module
© ABB Group – Version 3.1 (2011-04)
 Technical Guides
From Project Draft up to Online Test
Content

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 2
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 3
First Project
Start a New Project

Required: The hardware and ABB Configurator are


completely installed and ready for operation

1. Start ABB Configurator

2. Select the CPU

3. Rename project

4. Location for save

© ABB Group
March 11, 2013 | Slide 4
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 5
First Project
Defining the PLC Configuration (1)

1. Right-Click “I/O-Bus”

2. “Add Device“

3. Select the appropriate


device

© ABB Group
March 11, 2013 | Slide 6
First Project
Defining the PLC Configuration (2)

1. Configure the device parameters

2. Enter the symbolic names

© ABB Group
March 11, 2013 | Slide 7
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 8
First Project
Start CoDeSys

 Start CoDeSys direct in ABB Configurator

1. Double-Click “AC500_1”

© ABB Group
March 11, 2013 | Slide 9
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 10
First Project
Declare Variables and Create a Program

Control Builder demonstration performed


by the trainer in FDB or preferred editor

© ABB Group
March 11, 2013 | Slide 11
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 12
First Project
Compile and Save

1. Select “Project” from the top menu, then “Build”


2. Ensure the project has been compiled without errors

At this point the program syntax is verified. All


required libraries are loaded.

3. Click on the “Save” icon

4. Close CoDeSys
5. Click on the “Save” icon

© ABB Group
March 11, 2013 | Slide 13
First Project
Compile and Save

 Save Project ABB Configurator

1. Click on the “Save” icon

 Save Project As

2. Or “Save As”

© ABB Group
March 11, 2013 | Slide 14
First Project
Compile and Save

 Save Project archive

Add “.lib or .bmp …”

© ABB Group
March 11, 2013 | Slide 15
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 16
First Project
Communication via COM1/2, Ethernet and FBP possible

FBP Ethernet
Online access Online access
RS232
TCP/IP
by using UDP/IP
cable UTF21-FBP
MODBUS

Will be further
considered
COM1 COM2
Online access Online access
RS232 RS232
MODBUS
MODBUS ASCII
ASCII
SysLibCom
CS31 fieldbus
Multi-Protocol
SysLibCom
Multi-Protocol

© ABB Group
March 11, 2013 | Slide 17
First Project
Communication Setup Serial (1)

1. Select “Online“, “Communication Parameters“

2. Choose Serial (RS232) option

Port - COM1 or the correct port the USB


converter is set to
Baud rate – 19200 (hardware default)
Parity - No
Stop Bit – 1 (default)
Motorola byte order – Yes

© ABB Group
March 11, 2013 | Slide 18
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 19
First Project
Login and Creation of Boot Project

Required: The PLC has to be connected to the PC via selected communication port
1. Select “Online“, “Login“

Message window pops up when SYSTEM


changes were made.

Selecting YES will load the entire program.


PLC goes to STOP mode.

2. Save the program in Flash EPROM by


selecting “Create boot project”.

© ABB Group
March 11, 2013 | Slide 20
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 21
First Project
Project Start

1. Select “Online“ and “Run“


or press “RUN“ key on
CPU keyboard

2. Message “RUNNING” in the


status line placed in the right
down corner of the screen
indicates the program processing

© ABB Group
March 11, 2013 | Slide 22
From Project Draft up to Online Test
Coming up

 Start a new project, select target controller type


 Define the PLC configuration and variables
according to hardware
 Select a program editor
 Declare the variables and create the control
project software
 Compile and save the project
 Setup the communication port
 Login, download and create a boot project
 Start the project
 Test the functionality

© ABB Group
March 11, 2013 | Slide 23
First Project
Program Test

Program test

When using PLC


Devoid of PLC


Test with real inputs
Simulation mode
and outputs

Demonstration performed by the trainer

© ABB Group
March 11, 2013 | Slide 24
Cross-References to Documentation (2)

1. ABB Configurator online Help \ 1.1.2 Overview of


Commands of ABB Configurator

2. CoDeSys Help\Target System\


AC500 / S500-FBP\
Introduction\
Getting Started\
Getting started AC500

© ABB Group
March 11, 2013 | Slide 25
© ABB Group
March 11, 2013 | Slide 26