PMGSY - II (BATCH - II) 2017 - 2018

Road From Thiruchuli - Kamuthi Road to Muthaneri - Kurunthankulam Road via Naduvapacheri, Regunathamadai, Kulalikulam upto Union Limit Km. 0/0-
2/750

Traffic Category : T4 Surface Details : BT wornout

BLOCK :NARIKUDI DISTRICT : VIRUDHUNAGAR

Proposed Pavement
Pavement Balance Total
Existing Crust
Reach Type of Soil CBR Value thick thickness Thickness
thickness in "mm"
required required Stabilized Proposed
GSB "III" WBM Gr. II WBM Gr.
Base III

Km 0/0 - 0/275 Sandy Clay 4% 375 170 BT wornout 205 0 100 75 75 250

Km 0/275 - 1/0 Sandy Clay 4% 375 150 BT wornout 225 100 100 0 0 200

Km 1/0-2/0 Sandy Clay 4% 375 160 BT wornout 215 100 100 0 0 200

Km 2/0-2/750 Sandy Clay 4% 375 160 BT wornout 215 100 100 0 0 200
PMGSY - II (BATCH - II) 2017- 2018

Name of Work :Upgrading the Road from Vadakkunatham to Ranisethupuram Road to upto Union Limit Km.0/0-3/0

Traffic Category : T4 Surface Details : BT wornout

BLOCK :THIRUCHULI DISTRICT : VIRUDHUNAGAR

Proposed Pavement
CBR Pavement Existing Crust Balance Total
Reach Type of Soil Value thick thickness in thickness Thickness
required "mm" required Terrazyme Terrazyme Recycled - WBM Gr. II WBM Gr. Proposed
Bottom Top GSB "III" III

BT
Km 0/0 - 0/300 Sandy Clay 5% 300 140 160 0 0 100 75 75 250
wornout

BT
Km 0/3-1/0 Sandy Clay 5% 300 140 160 75 100 0 0 75 250
wornout

BT
Km 1/0-2/0 Sandy Clay 5% 300 130 170 75 100 0 0 75 250
wornout

BT
Km 2/0-3/0 Sandy Clay 5% 300 130 170 75 100 0 0 75 250
wornout