Sei sulla pagina 1di 8

SEQ. NO. ...........................................

JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Fabrication of members for frames; weldable structural


steel to BS 4360 Grade 43

Phrase 4 Columns DRAWING REF:

Phrase 5 straight on plan UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS:

Line Length Width Weight kg/m Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ NO. ............................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Fabrication of members for frames; weldable structural


steel to BS 4360 Grade 43

Phrase 4 Beams DRAWING REF:

Phrase 5 straight on plan UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS:

Line Length Width Weight kg/m Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Fabrication of members for frames; weldable structural


steel to BS 4360 Grade 43

Phrase 4 Bracings, purlins and cladding rails DRAWING REF:

Phrase 5 generally UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS:

Line Length Width Weight kg/m Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. .................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS E : EARTHWORKS

Fabrication of members for frames; weldable structural


Phrase 3 steel to BS 4360 Grade 43

Anchorages and holding down bolt assemblies; comprising


Phrase 4 * x * x * mm thick base plate; * nrs. `Expamet' tubes DRAWING REF:
* mm diameter x * m long; M20 heavy duty bolts with
plates * x * x * mm thick

Phrase 5 base detail for structural steel columns UNIT: NR


MSD QTY: 0 NR
BILLED QTY: 0 NR
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - - - 0
2 - - -
3 - - -
4 - - -
5 - - -
6 - - -
7 - - -
8 - - -
9 - - -
10 - - -
11 - - -
12 - - -
13 - - -
14 - - -
15 - - -
16 - - -
17 - - -
18 - - -
19 - - -
20 - - -
21 - - -
22 - - -
23 - - -
24 - - -
25 - - -
26 - - -
27 - - -
28 - - -
29 - - -
30 - - -
31 - - -
32 - - -
33 - - -
34 - - -
TOTAL QTY 0
SEQ. NO. ..............................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Erection of members for frames

Phrase 4 Permanent erection DRAWING REF:

Phrase 5 structural frame; * UNIT: KG


MSD QTY: 0.00 KG
BILLED QTY: 0.00 T
DIMENSIONS:

Line Length Width Weight kg/m Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ..................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Off Site surface treatment

Phrase 4 Blast cleaning DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ............................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS M


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS M : STRUCTURAL METALWORK

Phrase 3 Off Site surface treatment

Phrase 4 Painting; two coats approved shop-applied primer DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00
SEQ. NO. ....................................
JOB NO: P8B PAGE NO:

PROJECT: Brunei-Muara-Tutong Water Supply Scheme TAKER-OFF:


Stage 6 Phase 2
CHECKED:

BILL WORK SECTION: CLASS V


NO:
ELEMENT:

DESCRIPTION: ADDITIONAL REMARKS:


Phrase 1

Phrase 2 CLASS V : PAINTING

Phrase 3 Approved alkyd gloss paint; in three coats

Phrase 4 Metal sections; surface shop primed DRAWING REF:

Phrase 5 generally UNIT: M2


MSD QTY: 0.00 M2
BILLED QTY: 0 M2
DIMENSIONS:

Line Length Width Height/Depth Timesing Quantity Annotation Query Ref.

1 - 0.00
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
TOTAL QTY 0.00

Potrebbero piacerti anche