Sei sulla pagina 1di 4

45000

RIGHT OF WAY
9500 26000 9500

2000 2000 VARIES 2000 1500 7000 5000 7000 1500 2000 VARIES 2000 2000
DRAIN PROPOSED CARRIAGEWAY PROPOSED CARRIAGEWAY DRAIN

KERB SHYNESS

KERB SHYNESS
SPACE FOR

SPACE FOR
SHOULDER

SHOULDER

SHOULDER

SHOULDER
500 4000 500
SERVICES

SERVICES
EARTHEN

EARTHEN
PAVED

PAVED
MEDIAN

Sr. No. From To Length(m)


1 215+000 217+060 2060
CL
2 220+000 222+400 2400 PROPOSED ROAD
3 223+100 232+100 9000 SELECTED EARTH FILL
4 246+800 248+960 2160 SELECTED EARTH FILL SELECTED EARTH FILL
5 249+500 257+070 7570 3% 3%
Total Length of Type - 1 23120 2.5% 2.5%
3% 3%
ROW

ROW
2 2
1 1

(MIN.)

(MIN.)
1000

1000
BC 40mm BC 40mm
HFL DBM 100mm DBM 100mm HFL
WMM 250mm WMM 250mm
GSB 200mm GSB 200mm
SUBGRADE 500mm CBR 8% (min.) 5000 - 7000 SUBGRADE 500mm CBR 8% (min.)
WEEP HOLES EXISTING CARRIAGEWAY WEEP HOLES

100 THK. PCC M-15 100 THK. PCC M-15


TYPICAL CROSS SECTION (TYPE - 1)
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)
4-LANE DIVIDED HIGHWAY WITH RAISED MEDIAN
45000
RIGHT OF WAY
9500 26000 9500

2000 2000 VARIES 2000 1500 7000 5000 7000 1500 2000 VARIES 2000 2000
DRAIN PROPOSED CARRIAGEWAY PROPOSED CARRIAGEWAY DRAIN
SPACE FOR

SPACE FOR
SHOULDER

SHOULDER

SHOULDER

SHOULDER
500 4000 500
SERVICES

SERVICES
EARTHEN

EARTHEN
PAVED

PAVED
MEDIAN

KERB SHYNESS

KERB SHYNESS
CL
PROPOSED ROAD
SELECTED EARTH FILL
SELECTED EARTH FILL SELECTED EARTH FILL
3% 3%
2.5% 2.5%
ROW

ROW
3% 3%
2 2
1 1
(MIN.)

(MIN.)
1000

1000
HFL HFL

BC 40mm BC 40mm
DBM 100mm DBM 100mm
WMM 250mm WMM 250mm
GSB 200mm GSB 200mm
SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)
Sr. No. From To Length(m)
1
2
232+100 233+700
234+400 239+250
1600
4850
TYPICAL CROSS SECTION (TYPE - 2)
3 240+800 242+090 1290
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)
Total Length of Type - 2 7740 4-LANE DIVIDED HIGHWAY WITH RAISED MEDIAN (NEW CONSTRUCTION-BYPASS LOCATION)

SCALE
Consulting Engineering Services (I) Pvt. Ltd. NATIONAL HIGHWAYS AUTHORITY OF INDIA 47110520/RH/TCS-01
Plot No. 184, Platinum Tower, CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF 4 LANING OF R0
Udyog Vihar, Phase I, TYPICAL CROSS SECTION
MIRZACHAUKI TO FARAKKA FROM KM. 190.000 TO KM. 283.000 OF
Gurgaon 122016, (Haryana), India
NH-80 IN THE STATE OF JHARKHAND
45000
RIGHT OF WAY

1750 1500 7500 1000 500 2000 7000 500 1500 500 7000 2000 500 1000 7500 1500 1750
SERVICE ROAD PROPOSED CARRIAGEWAY MEDIAN PROPOSED CARRIAGEWAY SERVICE ROAD
CUM DRAIN

CUM DRAIN
CRASH BARRIER

CRASH BARRIER
SPACE FOR

SPACE FOR
SHOULDER

SHOULDER
FOOTPATH

FOOTPATH
SERVICES

SERVICES
KERB SHYNESS

KERB SHYNESS
FOOTPATH

FOOTPATH
PAVED

PAVED
CL of Proposed Road
ROW

ROW
SLOT IN FOOTPATH SELECTED EARTH FILL SELECTED EARTH FILL SLOT IN FOOTPATH
200mm x 200mm OF SELECTED EARTH FILL 200mm x 200mm OF
@ 10m INTERVAL . @ 10m INTERVAL .
EXISTING PAVEMENT
SLOPE 3% 3% SLOPE
SLOPE 2.5% 2.5% SLOPE
2.5% 2.5%

HFL HFL

BC 40mm BC 40mm BC 40mm BC 40mm


DBM 60mm DBM 100mm DBM 100mm DBM 60mm
WMM 250mm WMM 250mm 5000 - 7000 WMM 250mm WMM 250mm
GSB 200mm GSB 200mm EXISTING CARRIAGEWAY GSB 200mm GSB 200mm
SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)

Sr. No. From To Length(m)


1 218+200 218+700 500
2 219+330 220+000 670
3 242+770 243+150 380
4 257+070 257+718 648
Total Length of Type - 3 2198
TYPICAL CROSS SECTION (TYPE - 3)
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)
4-LANE DIVIDED HIGHWAY BUILTUP AREA WITH BOTH SIDE SERVICE ROADS AND RAISED MEDIAN

SCALE
Consulting Engineering Services (I) Pvt. Ltd. NATIONAL HIGHWAYS AUTHORITY OF INDIA 47110520/RH/TCS-02
Plot No. 184, Platinum Tower, CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF 4 LANING OF R0
Udyog Vihar, Phase I, TYPICAL CROSS SECTION
MIRZACHAUKI TO FARAKKA FROM KM. 190.000 TO KM. 283.000 OF
Gurgaon 122016, (Haryana), India
NH-80 IN THE STATE OF JHARKHAND
45000
RIGHT OF WAY

1750 1500 7500 1000 500 2000 7000 500 1500 500 7000 1500 2000 VARIES 2000 2000
SERVICE ROAD PROPOSED CARRIAGEWAY MEDIAN PROPOSED CARRIAGEWAY DRAIN
CUM DRAIN

CRASH BARRIER
SPACE FOR

SPACE FOR
SHOULDER

SHOULDER

SHOULDER
FOOTPATH
SERVICES

SERVICES
KERB SHYNESS

KERB SHYNESS

EARTHEN
FOOTPATH

PAVED

PAVED
CL of Proposed Road
SLOT IN FOOTPATH SELECTED EARTH FILL
200mm x 200mm OF
ROW

SELECTED EARTH FILL


@ 10m INTERVAL .

ROW
SELECTED EARTH FILL
EXISTING PAVEMENT
SLOPE 3% 3%
SLOPE 2.5% 2.5%
2.5% 3%
2
1

HFL HFL

BC 40mm BC 40mm BC 40mm


DBM 60mm DBM 100mm DBM 100mm
Sr. No. From To Length(m) WMM 250mm WMM 250mm 5000 - 7000 WMM 250mm
1 243+150 246+800 3650 GSB 200mm
GSB 200mm EXISTING CARRIAGEWAY GSB 200mm
Total Length of Type - 4 3650
SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)
TYPICAL CROSS SECTION (TYPE - 4)
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)
4-LANE DIVIDED HIGHWAYBUILTUP AREA WITH LEFT SIDE SERVICE ROADS AND WITH RAISED MEDIAN

45000
RIGHT OF WAY

2000 2000 VARIES 2000 1500 7000 500 1500 500 7000 2000 500 1000 7500 1500 1750
DRAIN PROPOSED CARRIAGEWAY MEDIAN PROPOSED CARRIAGEWAY SERVICE ROAD

CUM DRAIN
CRASH BARRIER
SPACE FOR

SPACE FOR
SHOULDER

SHOULDER

SHOULDER

FOOTPATH
SERVICES

SERVICES
KERB SHYNESS

KERB SHYNESS
EARTHEN

FOOTPATH
PAVED

PAVED
C
L of Proposed Road
SELECTED EARTH FILL SLOT IN FOOTPATH
200mm x 200mm OF

ROW
SELECTED EARTH FILL
@ 10m INTERVAL .
ROW

SELECTED EARTH FILL


EXISTING PAVEMENT
3% 3% SLOPE
2.5% 2.5% SLOPE
3% 2.5%
2
1

HFL HFL
BC 40mm BC 40mm BC 40mm
DBM 100mm DBM 100mm DBM 60mm
WMM 250mm 5000 - 7000 WMM 250mm WMM 250mm
Length(m) GSB 200mm EXISTING CARRIAGEWAY GSB 200mm GSB 200mm
Sr. No. From To
1 222+400 223+100 700 SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)
Total Length of Type - 5 700
TYPICAL CROSS SECTION (TYPE - 5)
(OPEN COUNTRY PLAIN/ROLLING TERRAIN)
4-LANE DIVIDED HIGHWAY BUILTUP AREA WITH RIGHT SIDE SERVICE ROADS AND WITH RAISED MEDIAN

SCALE
Consulting Engineering Services (I) Pvt. Ltd. NATIONAL HIGHWAYS AUTHORITY OF INDIA 47110520/RH/TCS-03
Plot No. 184, Platinum Tower, CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF 4 LANING OF R0
Udyog Vihar, Phase I, TYPICAL CROSS SECTION
MIRZACHAUKI TO FARAKKA FROM KM. 190.000 TO KM. 283.000 OF
Gurgaon 122016, (Haryana), India
NH-80 IN THE STATE OF JHARKHAND
62150
RIGHT OF WAY
30500
14500 14500
625 1000 2000 10500 1000 VARIES 1000 10500 2000 1000 625

CRASH BARRIER

CRASH BARRIER

CRASH BARRIER

CRASH BARRIER
PROPOSED CARRIAGEWAY PROPOSED CARRIAGEWAY

MEDIAN
SHOULDER

SHOULDER
PAVED

PAVED
CL of Proposed Road

FORMATION FORMATION
LEVEL LEVEL
2.5% 2.5%

BC 40mm BC 40mm
ROW

ROW
DBM 100mm DBM 100mm
WMM 250mm WMM 250mm
GSB 200mm GSB 200mm
15200 SUBGRADE 500mm CBR 8% (min.) 31750 SUBGRADE 500mm CBR 8% (min.) 15200
1500 2000 . 1500 7500 750 750 7500 1500 . 2000 1500

FOOTPATH
FOOTPATH
SERVICES

SERVICES
VARIES FOOTPATH SERVICE ROAD SERVICE ROAD FOOTPATH VARIES
DRAIN

DRAIN
SPACE

SPACE
SLOT IN FOOTPATH SLOT IN FOOTPATH
FOR

FOR
200mm x 200mm OF 200mm x 200mm OF
SLOPE @ 10m INTERVAL . @ 10m INTERVAL . SLOPE
2.5% 2.5%
2 2
1 1

300mm WIDE & 200mm DEPTH


BC 40mm BC 40mm
CHUTE DRAIN (BRICK/CONCRETE) DBM 60mm DBM 60mm
WMM 250mm WMM 250mm 300mm WIDE & 200mm DEPTH

Sr. No. From To Length(m)


GSB 200mm
SUBGRADE 500mm CBR 8% (min.)
TYPICAL CROSS SECTION (TYPE - 06) GSB 200mm CHUTE DRAIN (BRICK/CONCRETE)
SUBGRADE 500mm CBR 8% (min.)
1 233+700 234+400 700
2
3
242+090 242+770
248+890 249+500
680
610
VEHICULAR UNDERPASS WITH APPROACH THROUGH R.E.WALL
Total Length of Type - 6 1990
6-LANE DIVIDED HIGHWAY WITH SERVICE ROADS AND WITH RAISED MEDIAN

65150
RIGHT OF WAY
33500
16000 16000
625500 1500 1000 12000 1000 VARIES 1000 12000 1000 1500 500 625

CRASH BARRIER

CRASH BARRIER
CRASH BARRIER

CRASH BARRIER
PROPOSED CARRIAGEWAY PROPOSED CARRIAGEWAY

MEDIAN
FOOTPATH

FOOTPATH
RAILING

RAILING
CL of Proposed Road
FORMATION FORMATION
LEVEL LEVEL
2.5% 2.5%

BC 40mm BC 40mm
DBM 100mm DBM 100mm
WMM 250mm WMM 250mm

ROW
15200 GSB 200mm 34750 GSB 200mm 15200
SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)
1500 2000 . 1500 7500 750 750 7500 1500 . 2000 1500

FOOTPATH
FOOTPATH
SERVICES

SERVICES
DRAIN VARIES FOOTPATH SERVICE ROAD SERVICE ROAD FOOTPATH VARIES DRAIN
DRAIN
SPACE

SPACE
SLOT IN FOOTPATH SLOT IN FOOTPATH
FOR

FOR
200mm x 200mm OF 200mm x 200mm OF
SLOPE @ 10m INTERVAL . @ 10m INTERVAL . SLOPE
2.5% 2.5%
2 2
1 1

300mm WIDE & 200mm DEPTH


BC 40mm BC 40mm
CHUTE DRAIN (BRICK/CONCRETE) DBM 60mm DBM 60mm
WMM 250mm WMM 250mm 300mm WIDE & 200mm DEPTH
GSB 200mm TYPICAL CROSS SECTION (TYPE - 07) GSB 200mm CHUTE DRAIN (BRICK/CONCRETE)
SUBGRADE 500mm CBR 8% (min.) SUBGRADE 500mm CBR 8% (min.)
ROB APPROACH THROUGH R.E.WALL
Sr. No. From
1
To
217+060 218+200
Length(m)
1140
6-LANE DIVIDED HIGHWAY WITH SERVICE ROADS AND WITH RAISED MEDIAN
2 218+700 219+330 630
3 239+250 240+800 1550
Total Length of Type - 7 3320

SCALE
Consulting Engineering Services (I) Pvt. Ltd. NATIONAL HIGHWAYS AUTHORITY OF INDIA 47110520/RH/TCS-04
Plot No. 184, Platinum Tower, CONSULTANCY SERVICES FOR FEASIBILITY STUDY OF 4 LANING OF R0
Udyog Vihar, Phase I, TYPICAL CROSS SECTION
MIRZACHAUKI TO FARAKKA FROM KM. 190.000 TO KM. 283.000 OF
Gurgaon 122016, (Haryana), India
NH-80 IN THE STATE OF JHARKHAND