Schedules
(A, B, C, D&G)
January 2018
Page - 2
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Schedule - A
(See Clause 10.1)
1 THE SITE
1.1 The site of Project Highway shall include land, buildings, structures & road works as
described in Annex - I of this Schedule - A
1.2 An inventory of the Site including land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the site shall be prepared jointly by the
Authority Representative and the Concessionaire, and such inventory shall form part of the
memorandum referred to in clause 10.3.1 of the agreement.
1.3 Additional land required for toll plaza, Traffic Aid post, medical aid post and vehicle rescue
post or for construction of works specified in the Change of Scope Order issued under
clause 16.2.3 of this Agreement shall be acquired in accordance with the provisions of
Clause 10.3.6 of this Agreement. Upon acquisition, such land shall form part of the Site and
vest in Authority.
3
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Annex - I
Schedule - A
Site for Project
1. Site
The site of project highway is a section of National Highway No.150A from Existing km
309.150 to km 359.120 in the State of Karnataka and comprises the land, carriageway and
structures described herein.
2. Land
The Site of the Project Highway comprises the land described below
Existing km
S. No Average EROW, m
From To
1 309.000 310.000 36.505
2 310.000 311.000 33.213
3 311.000 312.000 31.598
4 312.000 313.000 28.502
5 313.000 314.000 31.800
6 314.000 315.000 34.302
7 315.000 316.000 32.248
8 316.000 317.000 32.610
9 317.000 318.000 38.176
10 318.000 319.000 31.830
11 319.000 320.000 34.300
12 320.000 321.000 32.161
13 321.000 322.000 27.452
14 322.000 323.000 27.912
15 323.000 324.000 28.525
16 324.000 325.000 28.030
17 325.000 326.000 27.785
18 326.000 327.000 24.064
19 327.000 328.000 22.653
20 328.000 329.000 21.376
21 329.000 330.000 21.343
22 330.000 331.000 20.776
23 331.000 332.000 20.767
24 332.000 333.000 20.900
25 333.000 334.000 21.044
26 334.000 335.000 21.383
27 335.000 336.000 22.318
28 336.000 337.000 20.828
29 337.000 338.000 20.817
30 338.000 339.000 20.769
4
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Existing km
S. No Average EROW, m
From To
31 339.000 340.000 20.770
32 340.000 341.000 20.794
33 341.000 342.000 20.769
34 342.000 343.000 24.319
35 343.000 344.000 23.223
36 344.000 345.000 22.213
37 345.000 346.000 22.228
38 346.000 347.000 27.523
39 347.000 348.000 39.400
40 348.000 349.000 38.518
41 349.000 350.000 48.747
42 350.000 351.000 35.621
43 351.000 352.000 29.622
44 352.000 353.000 36.768
45 353.000 354.000 36.744
46 354.000 355.000 28.928
47 355.000 356.000 42.779
48 356.000 357.000 24.817
49 357.000 358.000 25.205
50 358.000 359.000 23.035
51 359.000 359.120 20.723
3. Carriageway
The existing carriageway width of the project highway is of 2-lane with paved shoulders
except in built up stretches, where it is 4-Lane divided carriageway. The existing pavement
is flexible pavement except at bridge locations, carriageway details are given below.
Existing Chainage, km Carriage way width Length in
Remarks
From To (m) km
1 309.150 314.180 1+7+1=9 5.03 2-lane with Paved shoulder
4 314.180 314.560 1+7+7+1=16 0.38 4 lane divided carriageway
5 314.560 348.450 1+7+1=9 33.89 2-lane with Paved shoulder
6 348.450 348.950 1+7.5+1=9.5 0.50 2-lane with Paved shoulder
7 348.950 359.120 1+7+1=9 10.17 2-lane with Paved shoulder
Total Length in km 49.97
5
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
4 At Grade intersections
A. Major Junctions
The details of major junctions are as follows
Existing Type of Leads To
Sl. No Remarks
km Junction LHS RHS
Mulakalamuru
1 314.860 4 Legged Village road
road
2 317.870 4 Legged Rayapura Yerenahalli SH-65
3 347.170 3 Legged Nayakanhatti SH-65
(NH: National Highway, SH: State Highway, MDR: Major District Road)
B. Minor Junctions
Existing Chainage
S. No (Km) Road width Side Remarks
From To
-NIL-
6
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
6. Bypasses
7. Major Bridges
8. Minor Bridges
7
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
8
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
12. Flyover
9
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
16. Culverts
10
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Kilometer stones exist along the entire length of the project highway. The relationship
between the “Existing Chainage” and the “Design Chainage” as per field surveys is given
below.
13
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Sl.
Existing Chainage Design Chainage
No.
1 309.000 308+412
2 310.000 309+387
3 311.000 310+334
4 312.000 311+347
5 313.000 312+355
6 315.000 314+420
7 316.000 315+721
8 317.000 316+890
9 318.000 317+997
10 319.000 319+005
11 321.000 321+002
12 322.000 321+998
13 323.000 322+968
14 325.000 324+994
15 326.000 325+974
16 327.000 326+955
17 328.000 327+959
18 329.000 328+942
19 331.000 330+860
20 332.000 331+869
21 333.000 332+863
22 334.000 333+849
23 336.000 335+748
24 337.000 336+771
25 338.000 337+775
26 339.000 338+793
27 341.000 340+747
28 342.000 341+744
29 343.000 342+747
30 344.000 343+742
31 346.000 345+744
32 347.000 346+703
33 348.000 347+607
34 349.000 348+736
35 351.000 350+444
36 352.000 351+427
37 353.000 352+414
38 354.000 353+422
Disclaimer:-All the details provided in Schedule A are based on existing kilometer stones of project
highway section.
14
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
-NIL-
15
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
SCHEDULE-B
(See Clause 2.1)
Development of the Project shall include construction of the Project highway as described
in this Schedule-B and in Schedule-C.
2. Four-Laning
2.1 Four laning shall include the Construction of the Four Lane Project Highway as
described in Schedule- B and Schedule – C.
2.2 Four Laning shall be completed by the Concessionaire in conformity with the
Specifications and Standards set forth in Schedule – D.
16
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Annex – I
(Schedule – B)
1. Width of Carriageway
1.1 Four-Laning with paved shoulders shall be undertaken. The paved carriageway shall be
as specified in the Para 2.3 of this Annex-I of Schedule-B.
1.2 Except as otherwise provided in this agreement, the width of the paved carriageway
shall conform to clause 1.1 above.
2. Other Features of Four Laning
The details of existing ROW are given in Annex –I to Schedule A. Proposed ROW with re-
spect of design chaingae for the Project Highway is given below:
The Project Highway shall be constructed to four lane configuration for the Project length.
Typical cross sections required to be developed in different segments of the project
highway are given below.
17
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
19
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
20
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Note: -
1. Median width tapering shall be considered as per IRC-SP-84-2014 Clause no 2.5.4.
2. Figure 2.4 and Figure 7.8 shall be followed as per IRC-SP-84-2014
3. Intermediate Sight distance shall be followed for vertical curves
4. Any variation in lengths specified in the above table shall not constitute a Change of Scope,
save and except any variation in the length arising out of a change of scope expressly
undertaken in accordance with the provisions of Article 16.
22
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
23
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
24
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
25
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
An alignment plan and longitudinal section (Plan and Profile) of the project highway are
given at Appendix B – I in soft copy for reference only. The plan and profile of the project
road shall be developed separately by the concessionaire.
2.5 Bypass
2.6 Realignments
Service road
S.NO From To Length in m Side Total Length, m
width, m
1 312460 314420 1960 Both 7.5 3920
2 316950 317250 300 Both 7.5 600
3 330410 332000 1590 Both 7.5 3180
4 338000 338270 270 LHS 7.5 270
5 338270 339700 1430 Both 7.5 2860
6 353170 353900 730 Both 7.5 1460
7 356920 357780 860 Both 7.5 1720
Total Length, m 7140 14010
26
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Slip road
S.NO From To Length in m Side Total Length, m
width, m
1 310920 311670 750 Both 7.5 1500
2 317250 318050 800 Both 7.5 1600
3 320350 320930 580 Both 5.5 1160
4 344440 345450 1010 Both 7.5 2020
5 345450 345700 250 LHS 7.5 250
6 346400 347320 920 Both 7.5 1840
7 347550 348350 800 Both 7.5 1600
Total Length, m 5110 9970
i) Pavement design
Design of Flexible pavement shall be carried out in accordance with Section 5 of the Manual
for minimum design MSA of 51 MSA for Section I from D. Ch 308+550 to 318+450, 49 MSA
for Section II from D. Ch 318+450 to 346+110 and 52 MSA for Section III from D. Ch
346+110 to 358+500
Design of Flexible pavement shall be carried out in accordance with Section 5 of the Manual
for minimum design traffic of 10 MSA for Service roads and Slip roads.
Rigid pavement is proposed for Toll plaza locations shall be carried out in accordance with
Section 5 of the Manual for minimum design traffic of 7999 Commercial Vehicles per day.
However, minimum crust having composition of 280 mm PQC, 150mm DLC, 150 mm GSB
and 500 mm subgrade shall be provided.
ii) Type of Pavement:
Flexible Pavement shall be provided for the entire project highway including bypasses, Rea-
lignments, Slip roads and Service roads except toll plaza location. However Overlay on ex-
isting carriageway shall be as per detailed design
Rigid Pavement shall be provided for Toll Plaza location.
iii) Design Requirements shall be as specified in the Manual IRC: SP: 84:2014.
27
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
are given below, the cross roads shall be regarded and strengthen to have a crust as same
of main carriageway for a length shown in the Ministry’s typed designs for intersections
along-with provision of adequate cross drainage structure on the cross roads.
10 T Mannekote
345.850 345+600
11 346.490 346+235 T village
12 350.110 349+550 Y Thaluka Village
13 351.320 350+760 + Village Devarahalli
14 358.100 357+530 Y Labanehatti
Note:
Location of median opening shall follow as specified clause 2.11 in schedule B
Type of Junction to be improved as per manual and MOST type design for intersection on National
Highways, 1992
2.10 Grade Separated Junctions
Grade Separated junctions shall be provided at the intersection of main carriageway are
given below
Existing km Design Type of
Sl.No LHS RHS Location Remarks
Chainage Junction
1 311.970 311+300 T Katanaikanahalli Katanaikanahalli LVUP
2 314.860 314+210 Y Molakalmuru Molakalmuru Flyover
3 317.870 317+760 + Rayapura Yerrenahalli Rayapura Flyover,
SH 65
4 320.530 320+530 + Nerlahalli Tumkuralahalli VOP
5 331.010 330+870 Y Surammanahalli Bommagondenkere Flyover
6 339.030 338+820 + Village Hirehalli Village Hirehalli LVUP
7 345.170 344+900 + Byadareddyhalli village Byadareddyhalli LVUP
8 Realignment 346+710 T Nayakanahatti Flyover
9 Realignment 347+965 T Thaluka Thaluka LVUP
10 354.145 353+565 T Varavoo Village Chikamanahalli LVUP
28
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Note:
1. Junction improvement shall be carried out as per IRC Manual under grade separators with
proper entry/exit to cross roads and slip/service roads.
2. Location and span are indicative. Exact location may be decided in consultation with IE. Any
Change in span arrangement shall not be treated as change of scope.
3. Any additional Barrel length required as per site condition shall not be treated as change in
scope of work.
2.11 Median Opening
Median Openings shall be provided as per manual. The locations of median opening are as
follows:
S. No Existing Chaiange Design Chaiange
1 322.565 322+550
2 324.950 324+890
3 326.930 326+890
4 329.690 329+600
5 333.000 332+870
6 Realignment 334+970
7 337.030 336+800
8 341.260 341+000
9 343.260 343+000
10 351.320 350+760
11 356.600 356+000
Note: Not to be limited to the above specified locations and it shall be finalized in
consultation with Independent Engineer / Project Director, NHAI.
2.12 Lateral and vertical clearances at underpasses
Lateral and vertical clearances for VUP / Flyover and provision of guardrails /crash barriers
shall be as per paragraph 2.10 of the Manual. The vertical clearance for LVUP shall be 4.0m
as per NHAI Circular no-11014/11/2016-HR-I dated 12-06-2017(Policy Matter -
10.1.16/2017). The width of the opening at the underpasses/ flyovers shall be as follows:
Minimum
Existing Design Span / Proposed
Sl. Vertical
Chainage Chainage Opening Deck Width Remarks
No. Clearance
(Km) (Km) (m) (m)
(m)
14.50+M
1 311.970 311+300 1x12.00 4.00 LVUP
+14.50
14.50+M Flyover
2 314.860 314+210 1x35.00 5.50
+14.50
14.50+M
3 317.870 317+760 1x25.00 5.50 Flyover
+14.50
29
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Minimum
Existing Design Span / Proposed
Sl. Vertical
Chainage Chainage Opening Deck Width Remarks
No. Clearance
(Km) (Km) (m) (m)
(m)
14.50+M
4 331.010 330+870 1x25.00 5.50 Flyover
+14.50
14.50+M
5 339.030 338+820 1x12.00 4.00 LVUP
+14.50
14.50+M
6 345.170 344+900 1x12.00 4.00 LVUP
+14.50
14.50+M
7 - 346+710 1x25.00 5.50 Flyover
+14.50
8 - 347+965 1x12.00 4.00 14.50+M+14.50 LVUP
9 354.145 353+565 1x12.00 4.00 14.50+M+14.50 LVUP
10 357.885 357+300 1x12.00 4.00 14.50+M+14.50 LVUP
* M=Median width shall be followed as per Clause 2.3
10 nos of cattle crossings of size 7.0 X 3.0 m box structure shall be constructed without
affecting the plan & Profile. The location of These Cattle crossings shall be finalised in
consultation with IE/NHAI.
.2.13 Lateral and vertical clearances at overpasses
Lateral and vertical clearances at over passes (VOP) shall be as per paragraph 2.11 of the
Manual. The width of the opening at the over passes shall be as follows:
Minimum
Existing Design
Sl. Span / Opening Vertical
Chainage Chainage Remarks
No. (m) Clearance
(Km) (Km)
(m)
1 320.530 320+530 2 x 21.00 5.50
Design Chainage
Width of
S. No. (Km) Span (m) Location
Carriageway (m)
From To
-NIL-
The culverts requiring reconstruction / widening / new construction are given below:
30
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Span Arrangement
Existing Design Type of
Sl. Type of Existing Cul- (m)
Chainage Chainage Cross sec-
No. vert Existing Proposed
(km) (km) tion
Span Span
-NIL-
Note:
The overall width of the above culverts shall be equal to Roadway width of approaches. In
other words, the above culverts shall also be provided in median gap and also in gap
between main carriageway & service road, in case there is any service road.
All the existing culverts which are not to be reconstructed or widened shall be retained.
Location and span are indicative. Exact location may be decided in consultation with IE.
Any Change in span arrangement shall not be treated as change of scope.
32
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Note:
The overall width of the above culverts shall be equal to Roadway width of approaches. In
other words, the above culverts shall also be provided in median gap and also in gap
between main carriageway & service road, in case there is any service road.
Location and span are indicative. Exact location may be decided in consultation with IE. Any
Change in span arrangement shall not be treated as change of scope.
Note: -
The overall width of the above culverts shall be equal to Roadway width of approaches. In
other words, the above culverts shall also be provided in median gap and also in gap
between main carriageway & service road, in case there is any service road.
Location and span are indicative. Exact location may be decided in consultation with IE. Any
Change in span arrangement shall not be treated as change of scope.
Chainages mentioned are indicative and will be finalized by IE/IC to anywhere within the
project reach.
Any additional Barrel length required as per site condition shall not be treated as change in
scope of work.
34
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Proposed
Sl. Existing Design Type of No. Of Span
Location
No km chainage Junction Culverts Arrangement
(m)
4 320.530 320+530 - 4-Legged 2 1x2.00x1.50
5 331.010 330+870 Bommagondenkere 3-Legged 1 1x2.00x1.50
6 339.030 338+820 Hirehalli 4-Legged 2 1x2.00x1.50
7 345.160 344+900 Byadareddyhalli 4-Legged 2 1x2.00x1.50
8 347.165 346+850 - 3-Legged 1 1x2.00x1.50
9 Re-aligment 347+965 Thaluka 3-Legged 1 1x2.00x1.50
10 354.145 353+565 Chikamanahalli 3-Legged 1 1x2.00x1.50
11 357.69 357+300 Budanahatti Village 3-Legged 1 1x2.00x1.50
Note:
Chainages mentioned are indicative and will be finalized by IE/IC to any where within the
project reach.
Any additional Barrel length required as per site condition shall not be treated as change in
scope of work.
Location and their sizes are indicative. The same shall be finalized in consultation with IE.
35
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
A. Rehabilitation & Repair of Existing Major Bridges and Construction of new Major Bridges:
The following existing major bridges, proposed to be retained and utilized as a bridge for main carriageway on one side, shall be
repaired /strengthened as per the details given below. New two lane and three lane major bridges proposed on both side/required
side of existing bridge as per Cl.7.3 (iv) of manual and shall be constructed as per the details given below:
Note: - Location and span are indicative. Exact location may be decided in consultation with IE. Any Change in span arrangement shall not be
treated as change of scope.
B. Rehabilitation & Repair of Existing Minor Bridges and Construction of New Minor Bridges:
The following existing minor bridge, proposed to be retained and utilized as a bridge for main carriageway on one side, shall be
repaired /strengthened as per the details given below. New minor bridge for main carriageway on other side shall be constructed as
per the details given below:
Chainage (Km) Existing Structure Details Proposed New Bridge
Nature of Extent
Span Proposed Width (m)
Type of of Repairs /
SL Span Carriage- Ar-
Cross- Proposal Strengthening to
No Existing Design Arrange- way Width range- Main Car- Service/
ing be carried out for
ment (m) (m) ment riageway Slip Road
existing bridge
(m)
-NIL-
Note: - Location and span are indicative. Exact location may be decided in consultation with IE. Any Change in span arrangement shall not be
treated as change of scope.
C. Widening, Rehabilitation & Repair of Existing Minor Bridges and Construction of new Minor Bridges: The following existing narrow
36
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
minor bridges, proposed to be widened and utilized as a bridge for main carriageway on one side, shall be repaired /strengthened as
per the details given below. New minor bridge for main carriageway on other side shall be constructed as per the details given below.
Also, service road bridge on both sides shall be constructed as per the details given below:
Chainage (km) Existing Structure Details Proposed widening & New Bridge Nature of Ex-
tent of Re-
Proposed Width (m)
Sl. Carriage- pairs /
Type of Span Ar- Span Ar-
No way Width/ Proposal Strengthening
Existing Design Crossing range- range-
. Deck Width Widening to be carried
ment (m) ment (m) New Bridge
(m) bridge to out for exist-
ing bridge
LHS - MCW-
Widening; RHS
1 336.216 335+942 - 2x12.00 12.00 2x12.00 16.00 16.00
MCW- New
Construction
LHS - MCW- Cleaning,
Widening; RHS painting, re-
2 337.547 337+309 - 2x6.00 12.00 1x12.00 16.00 16.00
MCW- New placement of
Construction railing with
LHS - MCW- crash barrier,
Widening; RHS replacement
3 344.320 344+055 - 2x6.00 12.00 1x12.00 16.00 16.00
MCW- New of expansion
Construction joint & wear-
LHS - MCW- ing coat,
Widening; RHS epoxy appli-
4 351.640 351+075 - 2x6.00 12.00 2x6.00 16.00 16.00
MCW- New cation etc.
Construction
LHS - MCW-
5 359.030 358+418 - 2x8.00 12.00 Widening; RHS 2x8.00 16.00 16.00
MCW- New
37
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
Chainage (km) Existing Structure Details Proposed widening & New Bridge Nature of Ex-
tent of Re-
Proposed Width (m)
Sl. Carriage- pairs /
Type of Span Ar- Span Ar-
No way Width/ Proposal Strengthening
Existing Design Crossing range- range-
. Deck Width Widening to be carried
ment (m) ment (m) New Bridge
(m) bridge to out for exist-
ing bridge
Construction
38
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
39
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
LHS-SR-New
14.50+
Construction;MCW-
5 314.620 313+973 - 3x8.00 M+14. 2x11.00
Reconstruction;RHS
50
SR-New Construction
LHS-SR-New
14.50+
Construction;MCW-
6 317.733 317+610 Nala 4x6.00 M+14. 2x11.00
Reconstruction;RHS
50
SR-New Construction
LHS-MCW-
16.00 +
Reconstruction; RHS-
7 319.055 319+045 - 1x15.00 M+ -
MCW-New
16.00
Construction
LHS-MCW-
16.00 +
Reconstruction; RHS-
8 321.310* 321+306 - 2x5.00 M+ -
MCW-New
16.00
Construction
LHS SR- New
14.50+
Construction; MCW-
9 330.854 330+763 - 2x16.00 M+14. 2x11.00
Reconstruction;RHS
50
SR- New Construction
LHS - MCW-
16.00 +
Reconstruction; RHS
10 340.060 339+845 - 1x20.00 M+ -
MCW- New
16.00
Construction
LHS MCW-New 16.00 +
11 340.820 340+618 - Construction; RHS 4x4.00 M+ -
MCW-Reconstruction 16.00
LHS MCW-
16.00 +
Reconstruction; RHS
12 346.105 345+849 - 2x5.00 M+ -
MCW-New
16.00
Construction
LHS MCW-
16.00 +
Reconstruction; RHS
13 350.820 350+312 - 2x6.00 M+ -
MCW-New
16.00
Construction
40
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
(ii) Location and span are indicative. Exact location may be decided in consultation
with IE. Any Change in span arrangement shall not be treated as change of scope.
G. New minor bridges:
New minor bridges at the following locations on the Project Highway shall be
constructed.
2.16 Interchange
42
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
2.18 Utilities
As per Ministry of Environment and Forests Notification, New Delhi dated 14.01.1997
(as amended on 13.01.1998, 05.01.1999 & 6.11.2000), the construction of Rain wa-
ter, harvesting structure is mandatory in and around Water Crisis area, notified by
the Central Ground Water Board. The provision of rain water harvesting to be exe-
cuted as per requirement of IRC SP: 42-2014 and IRC SP: 50 - 2013
The length of Structures and bridges specified hereinabove shall be treated as an ap-
proximate assessment. The actual lengths as required on the basis of detailed inves-
tigations shall be determined by the Concessionaire in accordance with the Specifica-
tions and Standards. Any variations in the lengths specified in this Schedule-B shall
not constitute a Change of Scope, save and except any variations in the length arising
out of a Change of Scope expressly undertaken in accordance with the provisions
ofArticle16.
3. Project Facilities
The Project Highway shall be constructed in conformity with the Specifications and
Standards specified in Annex – I of Schedule – D.
43
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
SCHEDULE – C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The concessionaire shall construct the project facilities in accordance with the
provisions of this agreement. Such Project facilities shall include:
(a) Toll Plazas;
(l) Others
Project Facilities forming part of Four-Laning and to be completed on or before the Project
Completion Date have been described in Annex-I of this Schedule-C.
44
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
Annex – I
Schedule-C
Project Facilities
1. Project Facilities:
The Concessionaire shall construct the Project Facilities described in this Annex-I to form
part of the Four – Lane Project. The Project Facilities shall include:
(a) Toll Plazas;
(l) Others
45
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
Above mentioned toll lanes are indicative. Concessionaire shall assess actual
requirement of toll lanes as per actual site condition and manual. These toll lanes
shall be finalized in consultation with Independent Engineer/ Project Director, NHAI.
The additional toll lanes shall not be treated as change of scope. Typical drawing at
Toll plaza shall be followed as per Annex-II of Schedule C
(ii) Solar panels shall be erected over the Toll Plaza Canopy to generate the green
energy. Same shall be utilized for toll plaza lighting with LED lights and other energy
requirement within toll plaza area. In addition to solar panels conventional lighting
shall be provided by Concessionaire.
(iii) All Toll Lanes to be equipped with ETC equipments.
(iv) Weigh in Motion (WIM) devices shall be provided in toll lanes at Toll Plaza
Location. In addition to WIM, Static weigh Bridge (SWBs) shall be provided on each
direction as per manual.
(v) Point of sale (POS) with card swapping machines shall be provided.
(vi) A separate toilet facilities under Swachch Bharat shall be provided near toll plaza
location along with parking facility for road users. One toilet block on each direction
(LHS & RHS) shall be provided. These Toilets facilities must be constructed with
international standards layout which is provided by NHAI and 24 hours functional
including operation and maintenance.
Road side furniture shall be provided in accordance with the Manual of Specifications
and Standards as referred in Schedule D.
i. Traffic Signs: Traffic Signs include roadside signs, overhead signs and kerb
mounted signs etc. along the entire Project Highway. The detailed signage plan
indicating places, direction, distances and other features marked on the change
plan shall be prepared and same shall be finalised in consultation with Inde-
pendent Engineer/Project Director, NHAI as per site requirement.
ii. Overhead signs: Excluding overhead signs and other signs at Toll Plaza location
which are to be provided as per Manual of Specifications and Standards as re-
ferred in Schedule D, the location of these facilities shall be finalized in consulta-
46
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
iii. Pavement Markings: Pavement Markings shall cover road marking for the en-
tire Project Highway as per manual.
iv. LED Traffic Beacons: These shall be provided on the entire Project Highway
near pedestrian crossings, public gathering places (Educational Institutions,
Hospitals, Worshipping Places, etc.),cross roads, & median openings.
v. Crash Barrier: W-Metal Beam Crash Barrier shall be provided at built up loca-
tion, High Embankment &, Bridge approaches and curve locations where radius
is less than 450m. The locations for these provisions shall be as per Section 9.7
of manual and finalised in consultation with Independent Engineer/Project Di-
rector, NHAI.
vi. Cat’s Eye / Road Studs: Road Studs shall be provided at Horizontal Curve below
700m, median opening, intersections, Cross roads & Built-up areas (Excluding
Toll Plaza location) and shall confirm to the specifications mentioned in Sched-
ule D.
vii. Delineators: shall be provided as per IRC 79-1981 and requirements & specifi-
cations as per schedule D.
viii. Hectometre/Kilometre stones: shall be provided for the entire Project Highway
as per the manual.
47
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
ix. Boundary Stones: Shall be provided at the boundary on both sides of Right of
Way as per Clause 9.8 of IRC SP: 84-2014
(i) At Toll Plazas, Rest area, Truck lay bye, Bus bays and shelter as given in this
schedule–C, Interchange, Grade separators including Slip roads, built up
sections, ROB, Major Bridge, and at Grade Junctions at locations given in
schedule –B.
(ii) Solar lighting shall be considered near junctions, interchanges and at toll plaza
locations. Solar Panels also to be established at any other preferred locations
along with Conventional lighting.
Not to be limited to the above specified locations and it shall be finalized in
consultation with Independent Engineer / Project Director, NHAI.
(d) Pedestrian Facilities:
Pedestrian Facilities shall be provided in accordance with the Manual of
Specifications and Standards as referred in Schedule D.
(e) Rest Areas (Wayside Amenities):
Wayside Amenities shall be provided at locations as given below:
Toilet block on each Truck Lay bye shall be provided as per drawing at Annexure II of
Schedule C. These toilets facilities must be constructed with 24 hours functional including
48
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
maintenance.
Locations for Bus Bays and Bus shelters are indicated in the table given below. However, the
same shall be finalized as per suitability of location and site requirement in consultation with
Independent Engineer / Project Director, NHAI.
Design Chainage
Sl. No Existing Chainage Side Remarks
km
1 310.940 310+280 LHS Bus Bay with Shelter
2 311.210 310+550 RHS Bus Bay with Shelter
3 311.850 311+200 LHS Bus shelter
4 311.945 311+300 RHS Bus shelter
5 313.340 312+700 LHS Bus shelter
6 313.440 312+800 RHS Bus shelter
7 314.110 313+550 LHS Bus shelter
8 314.310 313+750 RHS Bus shelter
9 314.860 314+300 LHS Bus shelter
10 314.660 314+100 RHS Bus shelter
11 317.645 317+650 Bus shelter
12 317.845 317+850 Bus shelter
13 320.440 320+450 LHS Bus shelter
14 320.640 320+650 RHS Bus shelter
15 331.130 331+000 LHS Bus shelter
16 331.230 331+100 RHS Bus shelter
17 332.375 332+250 Bus Bay with Shelter
18 332.475 332+350 Bus Bay with Shelter
19 338.900 338+700 LHS Bus shelter
20 339.100 338+900 RHS Bus shelter
21 344.990 344+750 LHS Bus Bay with Shelter
22 345.300 345+050 RHS Bus Bay with Shelter
23 Realignment 346+750 LHS Bus shelter
24 347.480 347+100 RHS Bus shelter
25 Realignment 348+100 LHS Bus Bay with Shelter
26 Realignment 348+200 RHS Bus Bay with Shelter
27 350.350 349+800 LHS Bus Bay with Shelter
28 350.450 349+900 RHS Bus Bay with Shelter
29 351.300 350+750 LHS Bus Bay with Shelter
30 351.450 350+900 RHS Bus Bay with Shelter
31 354.070 353+500 LHS Bus shelter
32 354.170 353+600 RHS Bus shelter
49
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
Design Chainage
Sl. No Existing Chainage Side Remarks
km
33 357.770 357+200 RHS Bus shelter
34 357.970 357+400 LHS Bus shelter
Traffic aid post shall be constructed at the toll plaza in consultation with the
Independent Engineer/Project Director, NHAI, not exceeding 25 (twenty five) square
meter of plinth area, 2nos of patrolling vehicles to carry out the obligations.
Specification and requirements shall be strictly as per concession agreement and
schedule “D”
Medical aid post shall be constructed at the toll plaza in consultation with the
Independent Engineer/Project Director, NHAI. 2nos of ambulance(s) services, the
response time is not more than 20min of call. Specification and requirements shall be
strictly as per concession agreement and schedule “D”
Vehicle Rescue post shall be constructed at the toll plaza in consultation with the
Independent Engineer/Project Director, NHAI. 2nos of crane services to tow away the
disabled vehicles and Specification and requirements shall be strictly as per
concession agreement and schedule “D”
50
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of
NH-150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of
Karnataka
(l) Others
(1) Cattle Underpass: 10 no of Cattle underpasses are proposed, the exact Location shall be fixed in
consultation with IE.
51
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
Annex-II
(Schedule-C)
Standard Drawing for Toilet
Page - 52
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
Note: Above mentioned typical drawing is for reference, Concessionaire shall finalize the detailed drawing as per manual in consultation with
Independent Engineer/ Project Director, NHAI
Page - 53
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
Note: Above mentioned typical drawing is for reference, Concessionaire shall finalize the detailed drawing as per manual in consultation with
Independent Engineer/ Project Director, NHAI
Typical Drawing for Rest Area
Page - 54
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-150 A, on Hybrid Annuity Mode under
Bharatmala Pariyojna in the State of Karnataka
Note: Above mentioned typical drawing is for reference, Concessionaire shall finalize the detailed drawing as per manual in consultation with
Independent Engineer/ Project Director, NHAI
Page - 55
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
SCHEDULE – D
(See Clause 2.1)
The Concessionaire shall comply with the Specifications and Standards set forth in Annex-I of this
Schedule-D for construction of the Project.
Page - 56
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Annex – I
(Schedule – D)
Specifications and Standards for Four-Laning
Four – Laning of the Project shall conform to the Manual of Specifications and Standards for Four –
Laning of Highways through Public Private Partnership published by the IRC (IRC: SP: 84 -2014,
Referred as 4 laning manual) and NHAI circular shall be followed NHAI letter No.11014/11/2016-
HR-I Dated 12-06-2017 (Policy Matter - 10.1.16/2017)
Notwithstanding anything to the contrary contained in the aforesaid Manual, the following
Specifications and Standards shall apply to the construction of the Project Highway, and for
purposes of this agreement, the aforesaid manual shall be deemed to be amended to the extent
set forth below:
Page - 57
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Annexure-I of Schedule G
Format for Contract Price Weightages for Highway Projects with Flexible Pavements
Contract Price Weightages
1 The Contract Price for this Agreement is Rs.
2 Proportions of the Contract Price for different stages of Construction of the Project Highway
shall be as specified below:
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
Road works A- 4 Lane New/Re construction/realignment/bypass
including
(1) Earthwork up to top of
culverts, minor Km 35.090 5.68%
the sub-grade
bridges,
(2) Granular work (sub-
underpasses,
base, base)
overpasses,
approaches to (a) GSB Km 35.090 5.50%
ROB/RUB/ (b) WMM Km 35.090 5.15%
Major Bridges/ (3) Bituminous work
Structures (but (a) DBM Km 35.090 7.49%
excluding (b) BC Km 35.090 3.42%
service roads) (4) Rigid Pavement
(a) DLC Km 0.00 0.00
(b) PQC Km 0.00 0.00
B- 4 Lane Widening and strengthening of existing road
(1) Earthwork up to top of
Km 5.820 0.50%
the sub-grade
(2) Granular work (sub-
base, base)
(a) GSB Km 5.820 0.59%
(b) WMM Km 5.820 0.54%
(3) Bituminous work
(a) DBM Km 5.820 1.12%
(b) BC Km 5.820 0.52%
(4) Rigid Pavement
(a) DLC Km 0.00 0.00
(b) PQC Km 0.00 0.00
Page - 58
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
(5) Widening and repair of
No. 32 0.11%
culverts
(6) Widening and repair of
No. 5 0.01%
minor bridges
C- 6 Lane New
realignment/bypass
Page - 59
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
Page - 60
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
(a) ROB
(1) Foundation No. 0.00 0.00
(2) Sub-structure No. 0.00 0.00
(3) Super-structure
(including crash barriers No. 0.00 0.00
etc. complete)
(b) RUB
(1) Foundation No. 0.00 0.00
(2) Sub-structure No. 0.00 0.00
(3) Super-structure
(including crash barriers No. 0.00 0.00
etc. complete)
C- New Major Bridges
(1) Foundation No. 0.00 0.00
(2) Sub-structure No. 0.00 0.00
(3) Super-structure
(including crash barriers No. 0.00 0.00
etc. complete)
D- New rail-road bridges
(a) ROB
(1) Foundation No. 0.00 0.00
(2) Sub-structure No. 0.00 0.00
(b) RUB
(1) Foundation No. 0.00 0.00
(2) Sub-structure No. 0.00 0.00
(3) Super-structure
(including crash barriers No. 0.00 0.00
etc. complete)
Structures (1) Foundation No. 0.00 0.00
(elevated (2) Sub-structure No. 0.00 0.00
Page - 61
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
sections, (3) Super-structure
reinforced (including crash barriers No. 0.00 0.00
earth) etc. complete)
(4) Reinforced Earth Wall
with Friction Slab (includes
Approaches of ROB, Sqm 1,20,486 14.42%
Underpasses, Overpasses,
Flyover etc.
Other Works (i) Service roads/ Slip
Km 23.980 5.37%
Roads /Ramp (Both Sides)
(ii) Toll Plaza No. 1 1.81%
(iii-a) Road side drains
Km 15.364 2.55%
(Lined Drain)
(iii-b) Road side drains
Km 84.324 0.05%
(Unlined Drain)
(iv) Road signs, markings,
km stones, safety devices,
(a)Road signs,
Km 50.050 0.75%
markings, km stones,
(v) Project facilities
(a) Bus bays No. 12 0.12%
(b) Truck lay-byes No. 4 0.18%
(c) Rest areas No. 2 0.99%
(d) Bus Shelter No. 34 0.30%
(vi) Road side plantation,
median plantation and Km 50.050 0.17%
Transplantation
(vii) Protection works
(a) Mild Steel Railing Km 13.860 0.54%
Page - 62
Four Laning from km 308.550 to km 358.500, Byrapura to Challakere section of NH-
150 A, on Hybrid Annuity Mode under Bharatmala Pariyojna in the State of Karnataka
Weightage
in
Stage for measurement of percentage
Item Unit Qty.
Physical Progress to the
Contract
Price
1 2 3 4 5
(a) Electrical Works Lump sum 0.79%
(b) Other Works Lump sum 3.06%
(ix) Junctions island Lump sum
0.62%
improvement
(x) Site clearance and Lump sum
dismantling of existing 0.35%
structures
(xi) O&M Centre Lump sum 0.16%
Total 100.00%
* The above list is illustrative and may require modification as per the scope of the work.
** Measurement of Progress
For example, if the total length of bituminous work to be done is 100 km, the physical progress of
bituminous work shall be determined as follows:
Physical progress of bituminous work
=Weightage for bituminous work x (L'/L)
L = Total length of
bituminous work in km
L' = Executed length of
bituminous work in km
Similarly, the physical progress for other stages shall be worked out and addition of all will give the
total progress achieved.
Page - 63