Version Date: 1/20/2014

SCADA - EMS Initial values SCADA will upadate these values every minute for EMS

Description from to Value type original source EMS Energy Management System

Inverter 1 ON/OFF SCADA EMS ON/OFF inverter


Inverter 1 - active power - actual SCADA EMS KW value inverter
Inverter 1 - reactive power - actual SCADA EMS KVAR value inverter
Inverter 1 - max power - limit SCADA EMS KW value inverter
Battery 1- State of charge SCADA EMS SOC % Battery to check
Inverter 2 ON/OFF SCADA EMS ON/OFF inverter
Inverter 2 - active power - actual SCADA EMS KW value inverter
Inverter 2 - reactive power - actual SCADA EMS KVAR value inverter
Inverter 2 - active power - limit SCADA EMS KW value inverter
Battery 2- State of charge SCADA EMS SOC % Battery
12.5 KV Circuit breaker - ON/OFF SCADA EMS ON/OFF Circuit breaker
PV inverter 1 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 1 - KW SCADA EMS ON/OFF PV SCADA
PV inverter 2 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 2 - KW SCADA EMS ON/OFF PV SCADA
PV inverter 3 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 3 - KW SCADA EMS ON/OFF PV SCADA
PV inverter 4 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 4 - KW SCADA EMS ON/OFF PV SCADA
PV inverter 5 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 5 - KW SCADA EMS ON/OFF PV SCADA
PV inverter 6 - ON/OFF SCADA EMS ON/OFF PV SCADA
PV inverter 6 - KW SCADA EMS ON/OFF PV SCADA
Total demand - KW SCADA EMS KW value PV SCADA
Desired Power factor at PCC SCADA EMS PF value PV SCADA optional
Total electric load SCADA EMS KVAR value
Building 1- active power SCADA EMS KW value building KW meter future
Building 1- main CB ON/OFF SCADA EMS ON/OFF Circuit breaker future
Building 2- active power SCADA EMS KW value building KW meter future
Building 2- main CB ON/OFF SCADA EMS ON/OFF Circuit breaker future
Building 3- active power SCADA EMS KW value building KW meter future
Building 3- main CB ON/OFF SCADA EMS ON/OFF Circuit breaker future
Building 4- active power SCADA EMS KW value building KW meter
Building 4 - main CB ON/OFF SCADA EMS ON/OFF Circuit breaker
EMS - SCADA (Instructions) EMS will update these values and SCADA will read every minute
Description from to Value type original source
Day Ahead Scheduling (DHS) Setpoints
Inverter 1 for battery 1- active power - set point EMS SCADA KW value EMS
Inverter 1 for battery 1- reactive power - set point EMS SCADA KVAR value EMS
Inverter 2 for battery 2 - active power - set point EMS SCADA KW value EMS
Inverter 2 for battery 2 - reactive power - set point EMS SCADA KVAR value EMS
PV inverter 1 - reactive power set point EMS SCADA KW value EMS
PV inverter 1 - active power set point EMS SCADA KVAR value EMS
PV inverter 2 - reactive power set point EMS SCADA KW value EMS
PV inverter 2 - active power set point EMS SCADA KVAR value EMS
PV inverter 3 - reactive power set point EMS SCADA KW value EMS
PV inverter 3 - active power set point EMS SCADA KVAR value EMS
PV inverter 4 - reactive power set point EMS SCADA KW value EMS
PV inverter 4 - active power set point EMS SCADA KVAR value EMS
PV inverter 5 - reactive power set point EMS SCADA KW value EMS
PV inverter 5 - active power set point EMS SCADA KVAR value EMS
PV inverter 6 - reactive power set point EMS SCADA KW value EMS
PV inverter 6 - active power set point EMS SCADA KVAR value EMS

Rolling Forecasts (RF) Setpoints


Inverter 1 for battery 1- active power - set point EMS SCADA KW value EMS
Inverter 1 for battery 1- reactive power - set point EMS SCADA KVAR value EMS
Inverter 2 for battery 2 - active power - set point EMS SCADA KW value EMS
Inverter 2 for battery 2 - reactive power - set point EMS SCADA KVAR value EMS
PV inverter 1 - reactive power set point EMS SCADA KW value EMS
PV inverter 1 - active power set point EMS SCADA KVAR value EMS
PV inverter 2 - reactive power set point EMS SCADA KW value EMS
PV inverter 2 - active power set point EMS SCADA KVAR value EMS
PV inverter 3 - reactive power set point EMS SCADA KW value EMS
PV inverter 3 - active power set point EMS SCADA KVAR value EMS
PV inverter 4 - reactive power set point EMS SCADA KW value EMS
PV inverter 4 - active power set point EMS SCADA KVAR value EMS
PV inverter 5 - reactive power set point EMS SCADA KW value EMS
PV inverter 5 - active power set point EMS SCADA KVAR value EMS
PV inverter 6 - reactive power set point EMS SCADA KW value EMS
PV inverter 6 - active power set point EMS SCADA KVAR value EMS

PV on/off status
PV inverter 1 - ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
PV inverter 2 - ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
PV inverter 3 - ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
PV inverter 4 - ON/OFF EMS SCADA ON/OFF EMS
PV inverter 5 - ON/OFF EMS SCADA ON/OFF EMS
PV inverter 6 - ON/OFF EMS SCADA ON/OFF EMS
Building 1- main CB ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
Building 2- main CB ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
Building 3- main CB ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?
Building 4 - main CB ON/OFF EMS SCADA ON/OFF EMS ON needed- safety?

Weather forecasts will be downloaded from the internet directly


Comment:
We will also need historic electricity data and weather data for at least a year to be able to build the load forecaster for DER-CAM

We assume that we always set a constant power factor