lo, improved memor and mucle tone while eliminating irritale owl, gatric reflux and
attention deficit. The proce folk tart out tagging equipment a follow:

Pump are impl tagged P-1, P-2, P-3 (make ene right?)
Agitator are tagged AG-1, AG-2, AG-3, etc. Dude - thi i o imple!
And of coure tank and veel are tagged TK-1, TK-2, TK-3 (or V-1, V-2, V-3). Could do
thi in m leep...

And o on...Life i good. Later on, though le common equipment tart getting added, and
thi tart to tre the "intuitive" nature of the tem. For example, a centrifuge i initiall
tagged C-1 ut now the need to add a conveor ut C i taken o the decide to call the
conveor CO-1. Now the think, well, we will jut revie the centrifuge tag to C-1. Crii
avoided...ut wait, later the need to add a chemical feed package and want to tag that CF-1.
OK, that' cool ut then a unch of cro flow filter module i added the decide to "teal"
the CF lael for thoe and change the chemical feed to C, no wait...can't do that, C i taken
 the centrifuge. o the ite the proverial ullet and call the chemical feed kid C-1
where  i "intuitive" for uppl. Right? Tr again quiz kid. Nood i going to ee that a
intuitive. And then one da, it hit GitRDun' proce engineer that their initiall conceived
o-called intuitive tagging tem i a heap of roken confuion and nood know their C'
from their CO'. Cue the Jackon 5 ong A  C, imple a 1 2 3!

A etter Tag Numering tem
To avert the prolem inherent in the aove example, man proce indutrie utilize a
numeric-onl tem for tagging equipment. Thi help implif the logical categorization of
equipment during the proce deign phae. Moreover, a tructured tag tem i more
intuitive for the development of deign documentation, operating procedure and training,
and general documentation upkeep/maintenance. With that in mind (and conidering the
point preented earlier in thi Part), the following method i ut one example of how to tag
proce equipment uing an extenile tem.

Area Numer, AN Mot izale proce plant are compried of multiple area. An area i a
phical, geographical, or logical grouping determined  the ite. It ma contain proce
cell, unit, equipment module, and control module (more detail can e found at ia.org).
To facilitate a hierarchical organization of equipment, equipment tag hould then
https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 5/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

incorporate area deignation.

A mall or imple project ma have onl one area. Converel, larger more complex project
ma have multiple area. The aignment of area i at the dicretion of the proce engineer
and can e ujective. The onl general rule that I like to emplo i that common equipment
that erve multiple area, e.g., utilit and infratructure tem e placed into a "Common
Reource" area rather than e made a part of an other proce area. Once area have een
deignated for a particular project tpe, engineer hould trive to maintain common area
deignation on future, imilar project. For example, the area hown in the figure aove
ma e defined on the lead heet for a fictitiou project.

quipment Tpe, T
quipment can e identified aed on it tpe uing a numeric tem uch a the imple one
hown elow. In cae where equipment ha multiple function, uer dicretion i advied in
electing the mot uitale tpe code.

equence Numer, Q
Thi i the conecutive numering of like equipment in a particular area. The equence
egin with 01. All equipment i to a have it own equence numer. The ue of alphaetic or
other tag uffixe i to e avoided.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 6/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

xample quipment Tag
Uing the tem outlined aove, a four-digit tem emerge that ma not e intantl
recognizale in term of what the pecific equipment i (or where), ut it will eventuall
ecome ver familiar to thoe who are intimate with the plant. A few example uing the
area numer defined aove are provided elow:

1101 - The firt pump in the tank farm area.
1701 - The firt tank in the tank farm area.
1405 - The fifth mixer in the tank farm area.
2901 - A vendor package in the Train 1 area.

The equipment tag numer hould e prominentl diplaed near the mol ued for the
equipment. For example, the tag numer for a centrifuge might appear a follow on a P&ID.

Latl, all major equipment hould e named and provided general pecification in a lael
placed along the drawing order. A couple example for a pump and tank follow.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 7/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

It i up to our compan to decide on the final formatting, location (ome companie like to
put certain equipment lael near the top of the order), and which particular pecification
hould e included along with each major equipment lael. The tem preented here i
fairl imple and roadl applicale. Irrepective of thee detail, I highl recommend that
ever piece of major equipment receive a lael with a imilar level of detail.

Intrument Loop Numer
A enefit of uing four digit equipment numering tem uch a the one preented aove
i that the tag lend themelve toward application in defining aociated intrument loop.
Thi make grouping equipment and aociated intrumentation device more logical. Think
ack to our friend at GitRDun Proce, Inc. Their tagging tem conited of tag like P-1,
AG-1, C-2, etc. Thee tag are not amenale for ue in defining intrument loop. However, a
four digit tem doe neatl tuck into intrument ule and when ou think aout it,
mot intrument and device erve or are primaril aociated with a piece of equipment.
And even when that i not the cae, the can readil orrow from the equipment tpe code
"9" in cae where, for intance, a preure gauge on an air header erving the entire area
mut e defined. Conidering the aove point, the following intrument and device tagging
tem i ut one effective wa to tag intrument and device:

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 8/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

Where;

PX - device tpe prefix (a per IA 5.1)
Q - the aociated equipment tag (a defined aove)
X - duplicate or redundant device uffix (ee detail elow)

Duplicate uffix, X Rule
A uffix i provided to accommodate intance were man device of the ame tpe are
aociated with a given piece of equipment. For example, a veel ma have man line
connected to it, each having it own actuated valve. To reolve thee intance o that each
device ha it own unique loop numer, there are two uffix tag method that can e
emploed,

1.  If a piece of equipment ha redundant device aociated with it, an alphaetic uffix ma
e appended to the loop numer, e.g., FV1101A, FV1101, FV1101C, etc. (Note: Redundant
mean erving the ame purpoe a another device in a ackup fahion.)
2.  If a piece of equipment ha multiple item of the ame tpe, each of which with different
function (not redundant) then a numeric tem hould e emploed, e.g., FV1101-1,
FV1101-2, etc.

xample Loop Tag
aed on the aove dicuion, ome example loop tag are provided elow. If needed, the
reader can viit a more though dicuion in Part 3 regarding intrument areviation.
(Note: In the example provided, I ue the example Area Numer preented a example

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 9/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

aove.)

PI1101 - A preure indicator on the dicharge of the firt pump in the tank farm area.
LT1701 - A level tranmitter on the firt tank in the tank farm area.
IT1405 - A current tranmitter (for the motor) on the fifth agitator in the tank farm area.
A1701A - One of at leat two redundant analzer on the firt tank in the tank farm.
Hence, one would expect to ee A1701, A1701C... a indicated.
XV1701-1 - An actuated valve on the firt tank in the tank farm area. The uffix -1 implie
there are other valve aociated with tank 1701 ut in an alternate ervice (i.e., not
redundant). For example, XV1701-1 ma e on the inlet to the tank, while XV1701-2 ma
e on the outlet.

Line Numer
imilar to equipment and intrumentation, ever pipe on a P&ID require a unique tag
numer o that it can e uniquel identified during deign, or referenced in operating
procedure. ince mot line are alo affiliated with a major piece of equipment to which
the connect, I like to emplo a numering tem imilar to that ued for intrument loop
where the equipment tag i integrated into the line tag in the following manner (Note:
D002 provide an alternate method that emplo drawing numer intead of equipment
numer ut I generall prefer the method given elow.)

X"--VC--T:Q--L

Where;

X" - the nominal ize of the pipe
VC - the ervice code for the material that normall flow in the line (ee example
elow for lit)
T:VC - a unique line tag that include two part, the equipment tag from which the
line originate followed  a unique equential numer
L -line pecification for the pipe, including cla and material tpe, valve etc.

ervice Code, VC
ervice code are areviation for the fluid the line primaril handle.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 10/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

ince ome line can erve man different proce fluid, the fluid ued to pecif the
material for the line hould go here. The lit hould e availale on a lead heet in a manner
imilar to that provided in the example aove.

Line pecification, L
Line pecification cover all the detail related to the piping tem ued to handle the fluid
for the line. Thi hould include all detail regarding material of contruction, valve and
trim, gaket, fitting, T/P limit, and much more. Thi i eond the cope of thi erie ut
i uch a critical component of plant deign that I might expand on thi in a future pot.

Hand Valve
Hand valve require a conitent and clear tagging tem for reference in operating
procedure. There are a numer of technique that can e ued, ut one that I generall
prefer i a follow.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 11/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

In the example provided at left, one can dicern valve ize, pec and tag numer. Thi might
e more information than ou want to include on ome P&ID. In cae where ou jut want
to how the valve tag and allow the pec and ize to e derived implicitl from the line tag,
the following method i one option:

"V" - D# - Q

Where;

HV or V - A literal and required part of all hand valve tag
D# - lat two digit of P&ID drawing numer
Q - equence Numer (01 to 99)
V0001 - The firt hand valve on P&ID D100
V1205 - The fifth hand valve on P&ID D102

xample Hand Valve Tag
V0001 - The firt hand valve on P&ID D100
V1205 - The fifth hand valve on P&ID D102

Wrap-Up
Further to the content in thi part, D002 include a few more example of common tag and
code applied in P&ID, uch a inulation, interconnecting arrow, etc. Thee are important
part ut are prett elf-evident. Aide from that, mot companie have ver pecific wa
and mean on thee item o I won't cover them in depth here. Well, I tarted thi out 
aing it wa going to e fun and imple and I hope ou leave thi erie feeling like I made
ome olid point that will e of value to ou going forward. In a follow-up to thi erie, I
will put together a complementar video where I take a few tpical P&ID (like the one I've
attached here) and dicu all of thee apect in what I hope to e a much more engaging
manner. You will then e ale to get a much etter feel for eeing and hearing thi
information. Now venture forth with our new knowledge and appl it for good. ta afe
and have fun.