Permeable Interlocking Concrete Pavements Structural and Hydrological

Design Inputs
Project: without contributing area and underdrain pipes
Site Information
Pavement Length 1478 m
Pavement Width 11.1 m
Pavement Area 16,338 m²
Catchment Area 16,337.8 m² (Avg CN=75.17)
Layer Information
Paving Layer Concrete Pavers + ASTM No 8 Stone
Structural Coefficient 0.3
Structural Number 39.0 mm
Thickness 130.0 mm
Base Material ASTM No 57 Stone
Structural Coefficient 0.09
Structural Number 9.0 mm
Thickness 100.0 mm
Porosity 0.318
Void Ratio 0.47
Permeability 0.011 m/s
Subbase Material ASTM No 2 Stone
Structural Coefficient 0.06
Structural Number 9.0 mm
Thickness 150.0 mm
Porosity 0.347
Void Ratio 0.53
Permeability 0.397 m/s
Subgrade Material
Subgrade Strength 161.1 MPa
Porosity 0.342
Void Ratio 0.52
Permeability 1.642 E-07 m/s
Structural Design Information
Average Annual Daily Traffic 19,169
Design ESALs 147,667
Design Structural Number 37.6
Pavement Structural Number 57.0
Structurally Adequate Yes
Hydrological Design Information
Rainfall Location Sampaloc, MNL, AZ
Storm Type IA

Storm Return Period 24-hour Rainfall Satisfies Infiltration Satisfies Storage Satisfies Storage
(Years) Intensity mm Capacity Goal Capacity

2 153 Yes Yes Yes


5 224 Yes Yes Yes
10 270 Yes Yes Yes
25 329 Yes Yes Yes
50 372 Yes Yes Yes
100 416 Yes Yes Yes
Storage goal represents 85 percent of maximum water storage capacity

Page 1/4 1/29/2018 5:20:44 PM


Permeable Interlocking Concrete Pavements Structural and Hydrological
Design Inputs
Project: without contributing area and underdrain pipes
Hydrological Design Results
Equivalent Design Storm
Storage Goal 100 year storm
Storage Capacity 100 year storm
Pavement Water Storage Capacity 1,370 m³
Combined Site Hydrological Characteristics for Permeable and Non-Permeable Areas
Catchment Area 16,337.8 m²
Average Curve Number 75.17
Average Rational C Value 0.00077

Page 2/4 1/29/2018 5:20:44 PM


Permeable Interlocking Concrete Pavements Structural and Hydrological
Design Inputs
Project: without contributing area and underdrain pipes

Page 3/4 1/29/2018 5:20:44 PM


Permeable Interlocking Concrete Pavements Structural and Hydrological
Design Inputs
Project: without contributing area and underdrain pipes

Page 4/4 1/29/2018 5:20:45 PM