Sei sulla pagina 1di 24

Liebert® LBS Controller™ for Liebert NX 225-600kVA

UPS
User Manual
Vertiv™ | Liebert®XXXXXXXXXX User Manual | Rev.0 | 01/17
TABLE OF CONTENTS
IMPORTANT SAFETY INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
SAVE THESE INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.1 Installation Kit - 10B14515G1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
1.2 Mechanical Characteristics. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2.0 TYPICAL CONFIGURATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.1 Two Systems with Separate Utility Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
2.2 Two UPS Units With Common Bypass Line. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.3 Liebert Systems and Electrical Generating Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.4 Liebert NX and Third Party Brand UPS in the Same Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
3.0 INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.1 Installation Kit - 10B14515G1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
3.2 Installation Tips. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
3.3 Appendix C - Liebert NX 225-600kVA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
3.3.1 Setting Parameters - Enable External Synchronization Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3.3.2 Offset Compensation Tuning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.3.3 Procedure complete for UPS1; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
3.4 Installation Example. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15

FIGURES
Figure 1 Rear panel reference supply input . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Figure 2 Front panel UPS sync. outputs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Figure 3 Two separate utility supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Figure 4 Common bypass line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Figure 5 Liebert NX systems and electrical generating devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Figure 6 Liebert NX and third-party brand UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Figure 7 Installation example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Figure 8 Offset compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Figure 9 Synchro Error 88,56 [°] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Figure 10 Synchro Error 0 [°] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Figure 11 Installation example . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15

TABLES
Table 1 Installation Kit - 10B14515G1 components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Table 2 Electrical Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Table 3 Installation Kit - 10B14515G1 components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 iManuali
Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 iiManualii
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should be followed during installation of your Liebert LBS
(Load Bus Sync) Controller. The Liebert LBS installation must be performed only by properly trained and
qualified personnel.
Read this manual thoroughly, paying special attention to the sections that apply to your installation, before
working with the UPS. Retain this manual for use by installing personnel.
Before beginning to install the Liebert LBS Controller verify that:
• The Liebert NX UPS and the Liebert LBS Controller are switched Off (all front-panel indicators are extinguished)
• The UPS and the Liebert LBS Controller and related installations are isolated from all local and remote power supplies.
• All power supplies upstream of the UPS are switched Off. Should the UPS be switched On, carry out the shutdown
procedure as described in the unit’s user manual.

WARNING
Risk of electric shock. Can cause injury and death.
Under typical operation and with all UPS doors closed, only normal safety precautions are necessary. The
area around the UPS system should be kept free of puddles of water, excess moisture and debris.
Special safety precautions are required for procedures involving handling, installation and maintenance of
the UPS system and the batteries. Observe all safety precautions in this manual before handling or
installing the UPS system. Observe all precautions in this manual, before as well as during performance of
all maintenance procedures. Observe all battery safety precautions before working on or near the battery.
This equipment contains circuits that are energized with high voltage. Only test equipment designed for
troubleshooting should be used. This is particularly true for oscilloscopes. Always check with an AC and
DC voltmeter to ensure safety before making contact or using tools. Even when the power is turned Off,
dangerously high electric charges may exist within the UPS or Liebert LBS Controller.
All power and control wiring should be installed by a qualified electrician. All power and control wiring
must comply with the NEC and applicable local codes.
ONLY qualified service personnel should perform maintenance on the UPS system. When performing
maintenance with any part of the equipment under power, service personnel and test equipment should
be standing on rubber mats. The service personnel should wear insulating shoes for isolation from direct
contact with the floor (earth ground).
Never work alone, even if all power is removed from the equipment. A second person should be standing
by to assist and summon help in case an accident should occur.

NOTICE
Risk of improper electromagnetic shielding. Can cause radio communication interference.
This unit complies with the limits for a Class A digital device, pursuant to Part 15 Subpart J of the FCC rules. These limits
provide reasonable protection against harmful interference in a commercial environment. This unit generates, uses and
radiates radio frequency energy and, if not installed and used in accordance with this instruction manual, may cause
harmful interference to radio communications. This unit is not designed for use in a residential area. Operation of this unit
in a residential area may cause harmful interference that the user must correct at his own expense.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 1
1.0 INTRODUCTION
The Liebert Load Bus Sync Controller is an option designed for use in complex power source systems consisting
of different distributions and static switches supplied by Vertiv and other manufacturers. It provides
synchronization between the Liebert NX 225-600V and third-party UPS systems when synchronization cannot
be guaranteed by the system configuration or when temporary conditions prevent it (e.g., during battery
operation).
The Liebert LBS Controller is available as an option with the Liebert NX 225-600V, either as a factory-installed
option or as a kit that is installed and configured by Vertiv-trained and certified personnel.
Examples of configurations where the Liebert LBS Controller can be used:
• Installation consisting of two Liebert NX 225-600V units
• Installation consisting of a Liebert NX 225-600V and electrical generating devices
• Installation consisting of a Liebert NX 225-600V and third-party UPS systems.
The Liebert LBS Controller option consists of an electronic unit housed in a metal box that can be mounted near
the UPS or inside the electrical distribution panel.
The Liebert LBS Controller requires a 480V input reference supply and can be used to supply two units. When
installing the unit inside a distribution panel or UPS, ensure that the metal box is secured so that it cannot fall or
touch metal parts containing hazardous voltages.
Vertiv recommends that the unit not be installed behind the second access panel or in front of the Liebert NX air
inlet vents.
The device operates by identifying one of the connected units as the master and using its frequency as a
reference for the other units (slaves). While a non-Liebert UPS can be used as the master, only Liebert UPS’s can
be used as slave units. Depending on their configuration, the slave units will follow the reference frequency all
the time, or only when their reserve utility supply is out of tolerance. The reference frequency will be generated
only when the master utility supply line is within acceptable limits.
The Liebert LBS Controller can drive up to two separate units. These units may be independent of each other or
connected in a parallel system. Where the installation consists of more than two slave units, or the master/slave
configuration is not the preferred option, Vertiv suggests using Liebert MultiBus Synchronization Module
(MBSM), Part No. 10B14545G1.
The Liebert LBS Controller does not affect the system’s mean time between failure (MTBF)—it is not a single
point of failure for the system). The individual units will ignore this signal if it is outside the acceptable limits.

1.1 Installation Kit - 10B14515G1


The equipment is supplied with the following components:
Table 1 Installation Kit - 10B14515G1 components
Item Description Part # Quantity
1 Circuit Board 10B10877G1 1
2 Metal Enclosure — 1
3 RJ-45 Short Cable 10H54910P15 1
4 Installation Manual 10H92873 1
5 Female IEC 10 A plug 10H46776P01/02 1

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 2
The Liebert LBS controller has the electrical characteristics detailed in Table 1.
Table 2 Electrical Characteristics
Minimum Nominal Maximum
Supply voltage (50/60 Hz sinusoidal), volts 180 480 250
Supply current, mA — 14 —
Output current (per channel), mA 25 — 30
Working temperature °F (°C) 14 (-10) — 104 (40)
Phase stability error — 0.18 —
Phase shift within voltage tolerance range, degrees * — 1.5 °
* Voltage within ±10% of nominal value.

1.2 Mechanical Characteristics


The Liebert LBS Controller has these dimensions:
• Length = 7.1" (181mm)
• Width = 3.7" (94mm)
• Height = 2.5" (64mm)

Figure 1 Rear panel reference supply input

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 3
Figure 2 Front panel UPS sync. outputs

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 4
2.0 TYPICAL CONFIGURATIONS
2.1 Two Systems with Separate Utility Supplies
When two UPS’s are connected to separate power sources, the inverters attempt to synchronize with their
respective bypass lines, but the lines may not be in phase, so synchronization cannot be guaranteed. Even if the
two units are supplied from a common line, when one or both is operating on-battery there will be no common
input signal, and the outputs will not be synchronized. When the Liebert LBS Controller is installed, one of the
UPS outputs must be chosen as the master, all the other UPS (slave) outputs will then follow this reference: see
Figure 3 for details.
Figure 3 Two separate utility supplies
Power Source A Power Source B

Master Slave

UPS A UPS B

Liebert LBS
Controller

Source Source
Line A Line B
Static Switch

To Others To Load To Others


Static Switch Static Switch
N.B. fuses should be installed in the phase signal line, upstream of the Liebert LBS Controller to protect against
the damage caused by short circuits. Installation tips: UPS B should be configured so that it follows the external
synchronization signal. This is achieved by setting the main synchronization source to external signal. Otherwise,
the UPS will be in phase with its own bypass line and will follow external synchronization only when this is out of
tolerance.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 5
2.2 Two UPS Units With Common Bypass Line
When two UPS’s are connected with a common bypass line, the bypass line synchronizes the two inverters.
Synchronization can be lost because of protection upstream of the bypass line. Using the following solution, the
two systems will be always synchronized, even if one of the two bypass lines is out of tolerance. These units will
usually be capable of synchronous operation.
Figure 4 Common bypass line
Power Common Bypass Power
Source A Line Source B

L1 -Phase Signal
Master Slave
UPS A UPS B

Liebert LBS
Controller

UPS
UPS A
B

L1 -Phase Signal
Liebert LBS
Neutral Controller

Static Switch
Source Source
Line A Line B

To Others To Load To Others


Static Switch Static Switch

N.B. fuses should be connected at the beginning of the signal line to avoid fires in case of short circuit in the
wires.

NOTE
UPS A and UPS B should be configured with main synchronization source to bypass. Otherwise the UPS’s won’t
be capable of synchronous transfer to bypass.

2.3 Liebert Systems and Electrical Generating Devices


The Liebert LBS Controller can be used to provide phase reference to the Liebert NX UPS in installations with
alternative power sources, such as diesel generators, see Figure 5.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 6
Figure 5 Liebert NX systems and electrical generating devices
Master Power Source Power Source

UPS

L1 -Phase Signal
Liebert LBS
Neutral Controller

Source Source
Line A Static Switch
Line B

To Others To Load To Others


St ti S it h St ti S it h
N.B. fuses should be installed in the phase signal line, upstream of the Liebert LBS Controller, to protect against
the damage caused by short circuits.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 7
2.4 Liebert NX and Third Party Brand UPS in the Same Installation
The device can also be used to synchronize a Liebert NX UPS with other manufacturer’s UPS systems. The
Liebert NX units must be configured as slave devices so that they follow the phase reference signal derived from
the non-Liebert master UPS. UPS #1 and UPS #2 may be configured as parallel or single units, see Figure 6.
Figure 6 Liebert NX and third-party brand UPS

Power Power Power


Source A Source B 1 Source B 2

UPS 1 UPS 1 UPS 2


UPS 2

L1 -Phase Signal

Liebert LBS
Neutral Controller

Source Source
Static Switch
Line A Line B

To Others To Load To Others


Static Switch Static Switch
Installation Tips: UPS #1 and UPS #2 should be configured to follow the external synchronization signal. This is
achieved by setting the main synchronization source to external signal. If UPS #1 and UPS #2 are not set to
follow the external synchronization signal, the UPS will be in phase with its own bypass line and will follow
external synchronization only when the bypass line is out of tolerance.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 8
Figure 7 Installation example

Liebert NX UPS
Parallel System
Liebert
LBS
Short connection
between UPS’s and
Liebert LBS

Floor X
Supply

Long connection
between Master
source and
Liebert LBS Floor 2
Supply

Floor 1
Fuse Supply

Third-Party
UPS
(not by
Vertiv)

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 9
3.0 INSTALLATION
3.1 Installation Kit - 10B14515G1
The equipment is supplied with the following components:
Table 3 Installation Kit - 10B14515G1 components
Item Description Part # Quantity
1 Circuit Board 10B10877G1 1
2 Metal Enclosure — 1
3 RJ-45 Short Cable 10H54910P15 1
4 Installation Manual 10H92873 1
5 Female IEC 10 A plug 10H46776P01/02 1

Connect the PE, and master phase and neutral signals to the Liebert LBS Controller reference signal input (see
Figure 1) using the female IEC 10 A plug and a suitable power cable.
Connect the slave UPS to the Liebert LBS Controller UPS output (see Figure 2) using the RJ-45 short cable.

3.2 Installation Tips


• Connect the Liebert LBS Controller input earth cable to a protective earth terminal.
• Position the Liebert LBS Controller near to the slave units.
• Use shielded RJ-45 cables.
• Connect the RJ-45 cable (10H54910P15) directly to the control board; do not use terminals to extend connections.
• Position the Liebert LBS Controller in a suitable location, protected from harmful conditions such as: vibration, dust,
corrosive atmospheres and high humidity.
• Install a 2A slow-blow fuse on the phase signal line as close as possible to the master unit
• If the Liebert LBS is mounted on top of a UPS, ensure that it does not obstruct air outlets.
NOTICE
Risk of improper electrical connections. Can cause equipment damage.
The Liebert LBS must be supplied from L1 and N.

NOTE
Once the connections above have been completed, follow the procedure related to the UPS model in 3.3 -
Appendix C - Liebert NX 225-600kVA

3.3 Appendix C - Liebert NX 225-600kVA


3.3.1 Setting Parameters - Enable External Synchronization Control
Once all connections are completed, switch on QS1 on the first UPS and set the following parameters:
1. In PPVis, click on “Service Tools” and select “Parameter.”
2. Set “Access level” to “Superservice”: PNU 51=4.
3. Set “Function Selection” to “HW-In it”: PNU 52=2.
4. Set “External synchronization control” to “Enable:” PNU 700=1.
5. Set “Function selection” back to “Return”: PNU 52=0.
6. Set “Access level” back to “Normal operation:” PNU 51=1.
7. Once back in normal operation, open QS1 and the electronics will shut down.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 10
Follow these steps for ALL the units connected to Liebert LBS Controller.

NOTE
Since the DIC FW Rev. 1.10 users may change parameters through a graphic interface:

1. In this case in PPVis click on “Service Tools” and select “Parameter” -> “Parameter set” -> “DIC1 - Service commissioning”
2. Set PNU 51 “Access level” to “Superservice(4).”
3. Set PNU 52 “Function Selection” to “HW-Init(2).”
4. Set PNU 700 “External synchronization control” to “Enable(1).”
5. Set PNU 52 “Function selection” back to “Return(0).”
6. Set PNU 51 “Access level” back to “Normal operation(1).”
7. Click on “Send all set values” push button.”
8. Once back in normal operation open QS1 and the electronics will shut down.

3.3.2 Offset Compensation Tuning


The parameter 731.32 has been designed to compensate the phase error, introduced by the UPS control,
between the frequency reference coming from the ESB and the inverter output signal. To carry out this
procedure an oscilloscope between reserve input and inverter output must be used. The Liebert LBS Controller
must be installed and interconnected to the UPS system. The PNU 700 must be set to 1. The PNU 731.32
calibration must be done on each UPS in the system. Perform the following steps:
1. Connect an oscilloscope to the first UPS.
Connect “Channel 1" to “Bypass Input L1 and N” and “Channel 2" to “UPS Output L1 and N”, as shown in Figure 8) Main BUS A.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 11
Figure 8 Offset compensation

Main Bus A

CH1 Oscilloscope

CH2
Reserve Input
ESB UPS An
Fref

2. With NO LOAD connected, start the inverter.


3. Open the reserve input switch QS2.
4. Verify on the oscilloscope the phase error between inverter and bypass. The following figures show an example of NO
SYNC (Figure 9) and SYNC (Figure 10).

Figure 9 Synchro Error 88,56 [°]

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 12
Figure 10 Synchro Error 0 [°]

When there is NO SYNC we need to determine the offset between the two wave forms, in the example Figure 9
there is a difference of 88.56°. To ensure a correct synchronization, enter a value in PNU 731.32 (the offset).
To calculate the offset value:
PNU 731.32 = phase-error [°] * 65536 / 360 PNU 731.32 = 88,56° x 65536 / 360 PNU 731.32 = 16121

NOTE1
If by using this formula you are not able to compensate the offset, try with the following formula: PNU 731.32 =
(360 - phase error [°]) * 65536 / 360

After calculating the new value for PNU 731.32, proceed with following steps to change it.
1. Close QS2 on the first UPS.
2. Wait for the Warning W1.1 - Bypass Switch Open - to be cleared.
3. Stop the inverter.
4. In PPVis click on Service Tools and select Parameter.
5. Set “Access level” to “Superservice”: PNU 51=4.
6. Set “Function Selection” to “HW-Init”: PNU 52=2.
7. Set PNU 731.32 “EXT_SYNCH_OFFSET” to “the new calculated value” (16121 in our example).
8. Set “Function selection” back to “Return”: PNU 52=0.
9. Set “Access level” back to “Normal operation”: PNU 51=1.
10. Start the inverter and open QS2 again, check that the SYNC is now according to example in Figure 10.
11. Close QS2 again.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 13
3.3.3 Procedure complete for UPS1;

NOTE
This offset compensation procedure must be followed for ALL the units connected to ESB.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 14
3.4 Installation Example
Figure 11 Installation example

Liebert NX UPS
Parallel System
Liebert
LBS
Short connection
between UPS’s and
Liebert LBS

Floor X
Supply

Long connection
between Master
source and
Liebert LBS Floor 2
Supply

Floor 1
Fuse Supply

Third-Party
UPS
(not by
Vertiv)

Note the position of the Liebert LBS Controller. This unit’s location should be selected so that the connections to
the slave units are as short as possible. Install a 2A slow-blow fuse on the phase signal line, as close as possible to
the master unit.

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 15
NOTES

Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 16
Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 17
Vertiv™ | Liebert® LBS Controller™ for Liebert NX™ 225-600kVA UPS Installation Manual | Rev. 1 | 02/2017 18
TECHNICAL SUPPORT / SERVICE
Web Site
www.vertivco.com
Monitoring
liebert.monitoring@vertivco.com
800-222-5877
Outside North America: +00800 1155 4499
Three-Phase UPS & Power Systems
800-543-2378
Outside North America: 614-841-6598
LOCATIONS
United States
1050 Dearborn Drive
P.O. Box 29186
Columbus, OH 43229
Europe
Via Leonardo Da Vinci 8
Zona Industriale Tognana
35028 Piove Di Sacco (PD) Italy
+39 049 9719 111
Fax: +39 049 5841 257
Asia
29/F, The Orient Square Building
F. Ortigas Jr. Road, Ortigas Center
Pasig City 1605
Philippines
+63 2 687 6615
Fax: +63 2 730 9572
©2016 Vertiv Co. All rights reserved throughout the world
VertivCo.com | Vertiv Headquarters, 1050 Dearborn Drive, Columbus, OH, 43085, USA
Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names,
trademarks or registered trademarks of their respective owners.
While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no responsibility, and disclaims all
liability, for damages resulting from use of this information or for any errors or omissions. Specifications are subject to change without notice.
This document may contain confidential and/or proprietary information of Liebert Corporation, and its receipt or possession does not convey
any right to reproduce, disclose its contents, or to manufacture or sell anything that it may describe. Reproduction, disclosure, or use without
specific authorization from Liebert Corporation is strictly prohibited.
SL-25358_REV1_02-17

Potrebbero piacerti anche