Sei sulla pagina 1di 6

stixyarn.

com/tangled
Lace Blanket Shawl
by Denise Twum

craft: knitting sizes: one size


difficulty: intermediate measurements: ~ 33” wide and 68” long

I wanted to showcase my recently acquired lace-knitting skills by making something beautiful and feminine
for my mother. Looking through a few knitting books, I got inspired to put four lace patterns together. The
edges of the small afghan are worked in one lace pattern, and the main body is three lace panels worked at
the same time to give a highly textural blanket that is beautiful to look at and warm to snuggle under.
1
materials: stitch guide:
yarn KnitPicks Swish Worsted The Chevron Rib Pattern is from Classic Elite Yarns: Make it
(100% Superwash Merino Modern book, and the Knotted Openwork, Moss Stitch Diamond
Wool; 110 yd[101m ]/1.76 Panel and Lacy Diagonals are all from Harmony Guides Lace &
oz [50gm]; CYCA 4): Dove Eyelets: 250 Stitches to Knit, edited by Erika Knight.
Heather, 11 skeins.
Moss Stitch Edging
needle US size 8 (5mm) 24” (or Row 1 K1, *p1, k1; rep from * to end.
longer) circular needle
Row 2 P1, k1; rep from * to end.
Adjust needle size to obtain
correct gauge.
Chevron Rib Pattern (multiple of 7 sts)
notions 8 Stitch markers (m); Row 1 (RS) *K1, k2tog, yo, k1, yo, ssk, k1; rep
tapestry needle from * across

gauge: Row 2 (WS) Purl.


17sts and 26 rows = 4” in Chevron Rib pattern
pre-blocking Row 3 *K2tog, yo, k3, yo, ssk; rep from *
across.
14 sts and 23 rows = 4” in Chevron Rib pattern
post-blocking. Row 4 Purl.

To make swatch: Rep Rows 1-4 for Chevron Rib.


With your needles, cast on 31 sts. Knit 7 rows
in moss stitch pattern.
Knotted Openwork (multiple of 3 sts)
Knit 8 repeats of the Chevron Rib patt, Row 1 (RS) K2, *yo, k3, with left-hand (LH)
keeping 5 sts on each side in the moss stitch needle lift first of 3 sts just knitted
pattern. over the last 2; rep from * to last
st, k1.
Knit 7 rows in moss stitch pattern and bind off.
Block lightly. Measure between the two moss Row 2 (WS) Purl.
stitch borders to get gauge for the Chevron Rib
Pattern. Row 3 K1, *k3, with LH needle lift first of
the 3 sts just knitted over the last
Notes: 2, yo; rep from * to last 2 sts, k2.
This pattern is made up of four easy lace
panels, with three of the lace panels worked Row 4 Purl.
simultaneously in the center section. Please
read through the pattern completely before
beginning. Moss Stitch Diamond Panel (worked over 29 sts)
Row 1 (RS) K13, yo, sl 1, k2tog, psso, yo, k13.

Row 2 (WS) Purl.

Row 3 K12, k2tog, yo, k1, yo, sl 1, k1,


psso, k12.
2
stitch guide: Row 22 P12, (k1, p1)2x, k1, p12.
Moss Stitch Diamond Panel (continued)
Row 4 Purl. Row 23 K9, yo, sl 1, k1, psso, k2, p1, k1,
p1, k2, k2tog, yo, k9.
Row 5 K11, k2tog, yo, k3, yo, sl 1, k1,
psso, k11. Row 24 P13, k1, p1, k1, p13.

Row 6 Purl. Row 25 K10, yo, sl 1, k1, psso, k2, p1, k2,
k2tog, yo, k10.
Row 7 K10, k2tog, yo, k5, yo, sl 1, k1,
psso, k10. Row 26 P14, k1, p14.

Row 8 Purl. Row 27 K11, yo, sl 1, k1, psso, k3, k2tog,


yo, k11.
Row 9 K9, k2tog, yo, k3, p1, k3, yo, sl
1, k1, psso, k9. Row 28 Purl.

Row 10 P14, k1, p14. Row 29 K12, yo, sl 1, k1, psso, k1, k2tog,
yo, k12.
Row 11 K8, k2tog, yo, k3, p1, k1, p1,
k3, yo, sl 1, k1, psso, k8. Row 30 Purl.

Row 12 P13, k1, p1, k1, p13. Repeat rows 1 - 30 for the Moss Stitch Diamond Panel.

Row 13 K7, k2tog, yo, k3, (p1, k1) Modified Lacy Diagonals (multiple of 6+1 sts)
twice, p1, k3, yo, sl 1, k1, psso, Row 1 (RS) *K1, k2tog, yo, k1, yo, k2tog; rep
k7. from * to last st, k1.

Row 14 P12, (k1, p1) twice, k1, p12. Row 2 (WS) Purl.

Row 15 K6, k2tog, yo, k3, (p1, k1)3x, Row 3 K2tog, *yo, k3, yo, (sl 1) twice, k1,
p1, k3, yo, sl 1, k1, psso, k6. p2sso; rep from * to last 5 sts, yo,
K3, yo, k2tog.
Row 16 P11, (k1, p1)3x, k1, p11.
Row 4 Purl.
Row 17 K5, k2tog, yo, k3, (p1, k1)4x,
p1, k3, yo, sl 1, k1, psso, k5 Row *K1, yo, k2tog, k1, k2tog, yo; rep
from * to last st, k1.
Row 18 P10, (k1, p1)4x, k1, p10.
Row 6 Purl.
Row 19 K7, yo, sl 1, k1, psso, k2, (p1,
k1)3x, p1, k2, k2tog, yo, k7. Row 7 K2, *yo, (sl 1) twice, k1, p2sso, yo,
k3; rep from * to last 5 sts, yo, (sl 1)
Row 20 P11, (k1, p1)3x, k1, p11. twice, k1, p2sso, yo, k2.

Row 21 K8, yo, sl 1, k1, psso, k2, (p1, Row 8 Purl.


k1)2x, p1, k2, k2tog, yo, k8.
Repeat rows 1-8 for Lacy Diagonals.
3
Instructions Note: the panels on either side of the center
panel may not end exactly at the end of a pattern
Cast on 103 stitches. repeat; this is not important.

Note: The stitch count includes one stitch on each Section D


side for a selvedge. For the selvedge, on EVERY Moss Stitch Divider
ROW of this afghan, knit the first stitch and slip
the last stitch wyif. Beginning with a RS row, work all sts in Moss St for
8 rows.
Work 8 rows of Moss Stitch pattern (see Stitch
Guide), remembering to work selvedge sts. Section E
Final Chevron Rib section
Section A
Beginning Chevron Rib section Row 1 (RS) Selvedge st, pm, work 5 sts in
Moss St (see Stitch Guide), pm,
Row 1 Selvedge st, pm, work 5 sts in work 13 repeats of row 1 of
Moss St (see Stitch Guide), pm, Chevron Rib pattern, pm, work
work 13 repeats of row 1 of 5 sts in Moss St, pm, end with
Chevron Rib pattern, pm, work selvedge st.
5 sts in Moss St, pm, end with
selvedge st. Continue in pattern as established, working rows
1-4 of Chevron Rib pattern 15 times.
Continue in pattern as established, working rows
1-4 of Chevron Rib pattern 15 times. Work 8 rows Moss Stitch pattern and then bind off
all sts loosely (you can go up a needle size or two
Section B for binding off if necessary).
Moss Stitch Divider
Finishing
Work all sts in Moss St for 8 rows. Soak the shawl in some lukewarm water with a
few drops of wool wash or baby shampoo for 30
Section C mins to an hour. Rinse gently with lukewarm water
Main Body about two or three times, and gently squeeze
water out. Roll shawl in a towel to get more water
Setup Row (RS) Selvedge st, sm, work 5 sts in out, and block to desired measurements.
Moss St, pm, (work Row 1 of
Knotted Openwork) 9 times, pm, Original design by Denise Twum
work 5 sts in Moss St, pm, work Denise was introduced to knitting by her
Row 1 of Moss Stitch Diamond supervisor while working at her college’s science
Panel, pm, work 5 sts in Moss library in 2006. Knitting kept her company as she
st, pm, work repeats of Row 1 traveled to five countries for a year of
of Modified Lacy Diagonals over independent research, and she’s been addicted
next 25 sts, pm, work 5 sts in ever since. You will most likely find her
Moss st, pm, selvedge st. watching a lengthy Bollywood movie or Korean
drama while knitting. You can email her at
Continue working the pattern as established, niseyknits@gmail.com and keep up with her
slipping the markers when you come to them. knitting exploits at www.niseyknits.com.
Work until rows 1 - 30 of the Moss Stitch Diamond
Panel have been worked 7 times.
4
Chevron Rib Chart Key
cdd (centered double decrease) : slip 2 sts together, k1, pass 2
slipped sts over together

k (knit) : Knit on RS, purl on WS

k2tog (knit 2 together) : Knit 2 sts together


Knotted Openwork Chart
yo (yarn Over) : Bring yarn to front

lsd (lifted decrease) : K1, with LH needle lift first of 3 sts just
knitted over the last 2

ssk (slip, slip, knit) : slip 1 knitwise, slip 1 knitwise, insert LH


needle in front legs of knit sts, k sts together

Modified Diagonal Chart


p (purl) : Purl on RS, knit on WS

s2kp (slip, k2tog, pass) : slip 1, k2tog, pass slipped


stitch over

skp (slip, knit, pass) : slip 1, k1, pass slipped stitch over

Schematic

It is of the utmost importance to Tangled to provide accurate and well-written patterns. All Tangled patterns have been carefully
edited for errors. If you think you may have found a mistake please contact the Stix Chix at contact@stixyarn.com

This pattern is copyright 2012 by Denise Twum and may not be distributed in any way. Photos by Brittany Tyler.

5
Moss Stitch Diamond Chart

Key
cdd (centered double decrease) : slip 2 sts together, k1, pass 2
slipped sts over together

k (knit) : Knit on RS, purl on WS

k2tog (knit 2 together) : Knit 2 sts together

yo (yarn Over) : Bring yarn to front

lsd (lifted decrease) : K1, with LH needle lift first of 3 sts just
knitted over the last 2

ssk (slip, slip, knit) : slip 1 knitwise, slip 1 knitwise, insert LH


needle in front legs of knit sts, k sts together

p (purl) : Purl on RS, knit on WS

s2kp (slip, k2tog, pass) : slip 1, k2tog, pass slipped


stitch over

skp (slip, knit, pass) : slip 1, k1, pass slipped stitch over

Potrebbero piacerti anche