Technology
UP DATE - UISGE
GORM FPSO is lined up
for Service on Ithaca’s
ATHENA Field with 1st
Oil late 2010.
This Contract Failed.
Jumper
Spools Spools Manifold Spool
Several Km
Pipeline Protective Structure Cluster
Exports ESD Valves Flowlines Well
RESERVOIR A
RESERVOIR B
Manifold & Cluster of Wells
W.I Manifold
Flowlines Pipeline & Header
Pipeline Risers Typical
Exports ESDV Crossing W.I.Well
Oil & Gas
xx
Control Umbilical
Jumper Spools
J-Tube Production Manifold -Flowlines
& Header -Control Umbilical
Argyll Field
First Floating
Production
in the UKCS
Balmoral Field
First FPSOs -
Castellon and
Tazerka Fields
PETROJARL 1 - Extended
Well Testing & Early
Production Vessel
Sea bed
Sea bed
SPAR TRUSS SPAR Devil’s Tower Truss
Spar - GOM
Sea level
Sea bed
Mars Tension-leg
Platform - GoM
TENSION LEG PLATFORM
Sea level
Sea bed
Greater Plutonio – Main Contracts
FPSO HULL - $200 Million
TOPSIDES - $700 Million
Main contractor:
Hyundai Heavy Industries (HHI).
External Disconnectable
Turret
Vessel considered to be
too old by Woodside -
To be taken out of service
2009 and replaced by
newer FPSO
FPSOs with Disconnection
Capabilities