Sei sulla pagina 1di 1

Product Proposed capacity

------------- -------------------------
------------- -------------------------
2. The Contractor shall determine and optimize the location of liquid ammonia tanks
3. Storage, silo facilities shall be provided by CONTRACTOR for off spec. products in additional
loading and unloading facilities for recycling off spec.

Potrebbero piacerti anche