CHENAB ENGINEERING

Q076.17 Rev. 01 Dated 04-12-2017


KIND ATTENSION: MR. TALHA

Subject : ASM Steel Buildings Quotation

Our Ref. : Proposal No. Q076.17 Rev. 01 Dated 04-12-2017

Project : CHENAB ENGINEERING

Location : Faisalabad, Pakistan.

Madam / Gentlemen:

Thank you for giving ASM Steel Buildings, the opportunity to submit a proposal on this project.

This proposal is based on ASM Steel’s Standard Design criteria and Standard material Specifications.
However, the overall dimensions and layout are in general accordance with your inquiry.

We are committed to deliver quality workmanship and extraordinary services for your esteemed project
with great perfection and customer satisfaction.

We look forward to doing business with you.

Sincerely yours,

For and on behalf of ASM Steel Buildings

________________
Ali Sajid Malik
Principal Engineer
ali@asmsteel.com.pk
+92 322 4557991
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 1 of 9

Section 1. Building Description: Building No. 1

Usage : Industrial Unit


1.1 Building No: 01 Quantity of identical buildings : One
Areas: The building is made up of 1 area

1.1.1 Area No. 01

Building Parameters
1 Type Clear Span
2 Width (m) 12.898 Out to Out of Steel
3 Width Module (m) 1@12.898
4 Length (m) 45.962 Out / Out of Steel
5 Bay Spacing (m) 6.488+2@6.619+6.21+5.046+5.381+4.906+4.67
6 Eave Height (m) As per the Approval Drawings
7 Roof Slope 1 : 10
8 Type of end Frames LEW - REW Main Frames

Design Loads
1 Design Live Load (kN/M2) on Frame 0.57
2
2 Design Live Load (kN/M ) on
0.57
Purlin/Roof
3 Wind Speed (KM/Hr) 160
4 Additional Collateral Load (KN/M2) N/A
5 Earthquake Zone 2A
6 Maximum Rain Fall Intensity 150 mm/hr

Roof & Wall Sheeting


1 Roof Panel 0.50 mm (nominal) Pre-painted G.I.
2 Wall Panel 0.50 mm (nominal) Pre-painted G.I.

* ASM Steel will only use ASM standard color.

Open Wall Conditions


1 Near Side Wall GL1 to GL 4; 11.278m Common with RCC Structure;
Balance Height Sheeted
GL5 to GL 9; 3.353m Open for Access; Balance Height
Sheeted
2 Far Side Wall 7.925m Common with RCC Structure; Balance Height
Sheeted
3 Left Endwall 3.353m Open for Access; Balance Height Sheeted
4 Right Endwall 3.353m Open for Access; Balance Height Sheeted
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 2 of 9

Ridge Ventilator (RV1.3) Optional


3M Length: 8 No. Ridge ventilator
ASM Steel highly recommends the use of RV for its excellent ventilation.

Crane Systems
Our supply includes Runway Beams, Columns Brackets and Crane stops for the top
running cranes listed below. Our supply does not include the Crane System and Crane
Rails. In the absence of actual crane data (that should be provided to ASM Steel by the
buyer or specifier), ASM Engineering department will design the crane runway beams and
the frames supporting them on the basis of crane loading data provided by ASM Steel.
Crane Crane Capacity Crane Span Length of Crane Run
No. (M.T.) (m) (m)
1 3 11.5 19
2
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 3 of 9

Section 2. Applicable Codes & Deflection Criteria

ASM STEEL COMPLIANCE WITH LATEST INTERNATIONAL CODES


Loads on all buildings are applied in accordance with:
1996 edition of the Low Rise Building Systems Manual (MBMA1996 -2002)

Manufacturing and Erection tolerances are applied as per:


1996 edition of the Low Rise Building Systems Manual (MBMA1996)

Cold formed members are designed in accordance with:


2001/2007 Edition of AISI 2001/2007- American Iron and Steel Institute

Welding is applied in accordance with:


2008 American Welding Society (AWS 2008)

ASM STEEL RESERVES THE RIGHT TO USE OTHER CODES WHEN NEEDED

ASM STEEL STRICT DEFLECTION CRITERIA

Deflection
Deflection Structural Member Load Case
Limitation
Live or 10 years
1 Main frame rafters Span/ 180
Wind
Snow or 10
2 Roof purlins Span/ 150 years Wind or
Vertical Live
Deflection 3 Mezzanine beams and joists Span/ 360 Dead Load
4 Top running crane (TRC) beams Span/ 600 Crane load
5 Underhung crane (UHC) beams Span/ 450 Crane load
6 Monorail crane (MR) beams Span/ 450 Crane load
Main frame columns with eave
1 Eave height/60 10 year Wind
height (EH) up to 9.0 m
Main frame columns with eave
2 height (EH) greater or equal to 9.0 Eave height/100 10 year Wind
Lateral m
Deflection Main frames supporting top 10 year Wind or
3 Height/100
running cranes Crane lateral
4 Wall Girt Span/ 120 10 year Wind
5 Endwall wind columns Span/ 120 10 year Wind
6 Portal frames Height/120 10 Year Wind
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 4 of 9

Section 3. Material Specifications


The following is the list of the material standards and specifications for which the building
components have been designed:

MATERIAL SPECIFICATIONS FOR PROJECT

Material Specifications

Minimum
No Components Specifications Applicable Design Code
yield strength

ASTM A572 – Gr50 AISC – American Institute of


Built –up Fy = 34.5
(or equivalent) Steel Construction – Latest
1 (Plates) kN/cm2
<20mm Edition

AISC – American Institute of


ASTM A-36 (or Fy = 24.5
Steel Construction – Latest
Angles equivalent) kN/cm2
Edition

2 Hot Rolled AISC – American Institute of


ASTM A-36 (or Fy = 24.5
Steel Construction – Latest
Beams equivalent) kN/cm2
Edition
ASTM A653M SS
Cold Form Fy = 34 AISI – American Iron & Steel
Galvanized Grade 340 Class 1
3 kN/cm2 Institute – 2001 Edition
(or equivalent.)
AZ150
4 Fy = 34 AISI – American Iron & Steel
Roof panel Zinc Aluminum Base
kN/cm2 Institute – 2001 Edition
ASTM A792 Gr. 50
ASTM A475 – Extra
Galvanized High Strength Class A
Pu = 90 kN ASCE –American Society of
5 X-Bracing cable ( Ωt =2.50 ) Civil Engineers Standards
bracing (or equivalent)
Anchor bolts ASTM A36 AISC – American Institute of
Fu = 40.0
6 Steel Construction – Latest
(Galvanized) (or equivalent) kN/cm2
Edition
Ft = 30.3
High strength Bolts ASTM A325 Type 1 kN/cm2 AISC – American Institute of
7 Steel Construction – Latest
(Galvanized) (or equivalent) Fu = 72 to 83 Edition
kN/cm2
Ft = 13.8
Machine Bolts ASTM – A 307 kN/cm2 AISC – American Institute of
8 Steel Construction – Latest
(or equivalent) Fu = 41.0 Edition
(Galvanized)
kN/cm2

ASM Steel reserves the right to substitute partly some of the materials in case of material non-
availability or supply shortages
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 5 of 9

Section 4: Supplied Items:


The following are normally supplied unless mentioned otherwise:
1. (Anchor bolt Grouting/Supervision is not in the scope of ASM STEEL)
2. Roof and Wall Sheeting (As Per Section 1)
3. Roof & Wall Insulation (As Per Section 1)
4. All Necessary Flashing & Trims
5. Sheeting Fasteners
6. Connection Bolts
7. Foam Closures
8. End lap Mastic
9. Bead Mastic
10. Eave Gutters

Section 5. Steel Work Finish


 All primary members shall be sand blasted.
 All primary members (columns and rafters) will be painted with 40 microns of Red oxide paint

Section 6. Supply Delivery Period:


1. Our current Delivery Period (Ex-Works at factory) is to start 8-12 weeks from the latest date
of receipt and acceptance of the following in our head office.
 Signed Contract. (Any change must be noted and initialed by both parties).
 Down payment
 Signed final "approved as noted" or “approved as is” Approval Drawings
 Final change order

2. The Delivery Period is considered to start on the date of first delivery of the materials to the
carrier.
3. Please allow minimum of 02 weeks for Approval Drawings submittal, 05 weeks if buildings
are complex.
4. Customer is required to return Approval Drawings to ASM Steel office within 02 weeks
from the dated of receipt. Any delay in the return of the Approval Drawings back to ASM
Steel office may result in a change to our delivery commitment and contract price.

Section 7. Proposal Validity:

1. This proposal is valid for 07 days from the above noted date. Any extension of validity by
ASM Steel must be in writing.
2. If the job (project) is not “Released for Production” within 30 days from the date of entering
this order at ASM Steel head office, it will be subject to delivery change and price change
in accordance with the prevailing delivery schedules and prices at the end of the above
noted period
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 6 of 9

“Released for Production” means that the Approval Drawings has been returned by the
buyer “Approved as Noted” or “Approved as Is”, the agreed upon payment terms, as per
Section 10, have been fulfilled by the buyer and the job has been released for final
engineering production and fabrication at ASM Steel.
3. The portion of this order that is not shipped within Two months from the date of entering
this order at ASM Steel head office will be subject to a price change in accordance with the
prevailing prices posted at the above noted time period.

Section 8. Changes/ Revisions:


Any change and/ or revision to the above stated scope of supply may lead to a variation in the
price and the delivery period. A change must not hold payment for work completed in the original
contract.

Section 9. Payment Terms:


Mode of payment will be as under:

Advance upon confirmation of Order 60 %

Before Material Supply 40%

Total 100%

Note:
 Down payment shall be made within 7 days of signing the contract.

Section 10: Force Majeure:

The completion period mentioned for supply and erection is subject to the enforcement of force
majeure i.e. Act of God, War, Military operation, Flood and disease etc. or any other things
beyond human control.

Section11. Assumptions, Exclusions, Exceptions and Deviations:

1. Any scope not specially mentioned is excluded from this contract.


2. Civil works are not included in our scope (foundation/anchor bolt setting).
3. No allowance has been made to design, detail, coordinate, manage or build any
architectural features or art works other than what is shown on ASM steel’s offer or ASM
Steel’s proposal drawings.
4. No allowance has been made to coordinate or manage the design of MEP (Mechanical,
Electrical and Plumbing) services nor have we allowed for the support of MEP equipment
unless specifically mentioned in our offer.
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 7 of 9

5. Our price does not include doors/windows not specifically mentioned in the offer.
6. Any additional inspection or Special Testing is excluded. Charges will be applied to
customer if any additional or special testing is requested.
7. Third Party inspection is excluded. The Cost for any Third Party inspection is to be totally
borne by Customer.
8. We have based our offer on present day market prices of materials. Any variation in the
market prices will be applicable to this offer.
9. Any change in government laws that effect the our prices shall change the price
accordingly.

Section 12: Price

Material Breakup of Total Price

Ex-Factory Lahore Prices


Description
(PKR)

Price of Steel Building 11,300,000

Total Price (PKR)

Erection Price of Steel Building 1,350,000


All Prices are Exclusive of taxes

Section 13: Terms & Conditions for Erection:

1. The Erection cost is based on our tentative working. A Separate contract will be added for
Erection favoring ASM Steel Buildings after a detailed to visit the site.
Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 8 of 9

2. Adequate supply of water and power will be given to us at construction site free of any cost
from the very beginning.
3. Sufficient space for accommodation of our staff & labor will be provided to us at site any
free of any cost.
4. The erection site shall be clear in all respects for the cranes to operate and space is
available to place steel members where required. Site clearance shall be the responsibility
of customer.
5. The erection site shall have enough space for off-loading and de-stuffing containers once
they arrive on site.
6. Space for storage of material will be provided near the work area and covered store for
small parts, insulation and T&P will also be provided nearby.
7. The Erection price does not include the cost of anchor bolt setting.
8. Payment Terms of Erection:

Mode of payment will be as under:

Advance – before Erection. 30 %


50% main frames have been erected. 20 %
100 % main frames have been erected. 20 %
After the Installation of purlins and Girts 20 %
After Completion of Erection. 10 %
Total 100 %

9. The erection time shall start from the day the material will arrive on site and the site is clear
for erection works as well as RCC columns and pedestals (where our column or rafter base
plate shall be placed) are properly poured with the anchor bolts and well cured.

Section 14. Contract Form

This Contract is entered into on __/__/2017.


Quote No. Q076.17 Rev. 01 Date 04-12-2017 Page 9 of 9

Between : on the one hand,

Located in :

Construction Site :

And represented by :

Duly authorized to enter into this Contract.

And : ASM STEEL BUILDINGS, on the other hand,

Located in : 191-COM-A DHA Phase 5 Ext Bedian Road, Lahore Cantt, Pakistan.

And represented by : Ali Sajid Malik – Principal Engineer (CEO)

Duly authorized to enter into this Contract.

NOW THEREFORE the parties agree as follows:

CONTRACT SCOPE: The Scope of work as described in this contract documents.

CONTRACT DOCUMENTS: The following documents constitute the contract documents.

1. ASM Steel’s Proposal No. Q076.17, Rev. 00 Dated _____________ with agreed and
initiated amendments (if any).

CONTRACT PRICE: PKR

IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.

FOR: FOR: ASM STEEL BUILDINGS

_______________________________ _________________________
Name : Name : Ali Sajid Malik
Title : Title : Principal Engineer
Date :……/……/……. Date :……/……/……