Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
By
Version 1.0
DOCUMENT INFORMATION
DOCUMENT HISTORY
DOCUMENT APPROVAL
Project Manager
Page 2 of 9
Page 3 of 9
MRP RUN
• Enter T-Code MD02 in command field.
• Enter Product group name.
• Ensure Checkbox for Product Group selected.
• Select Processing Key NETCH
• Create Purchase Req : 1
• Create MRP list : 1
• Select checkbox Also plan unchanged components.
• Select checkbox display Material List.
• Enter twice.
• System will generate PR for material of Product groups if quantity is below reorder point.
Page 4 of 9
TCODE ZVPR
• Enter TCODE ZVPR in command field
• Select Pushbutton execute.
• System will Display all PR generated for Min Max Planning
NOTE : Document Type for PR created with Min-Max Planning is ZPSP ie PR-Min Max
Page 5 of 9
Page 7 of 9
ME59n
• Enter T-code ME59n in command field
• Select checkbox for Per Plant & Per contract
• Ensure Purch Org 1000
• Plant 10A1
• Document Type ZPSP
• Execute.
• System will generate purchase Order in background.
Page 8 of 9