The document discusses points from a meeting between ADMA, HHI, and ETAP regarding power energization relay settings. Key discussion points included:
1) Generator input data and load flow/short circuit reports will be included in revised relay setting reports.
2) ETAP confirmed load flow and short circuit studies were performed based on submitted data and reports were sent to ADMA.
3) CRS sheets and revisions to reflect proposed ungrounded grounding scheme will be included in next report revision.
4) Overvoltage ground relay settings of 20% were discussed and may be fine tuned after energization.
Descrizione originale:
xcx
Titolo originale
ADMA-HHI MOM 14-12-17 for Power Energization Relay Setting
The document discusses points from a meeting between ADMA, HHI, and ETAP regarding power energization relay settings. Key discussion points included:
1) Generator input data and load flow/short circuit reports will be included in revised relay setting reports.
2) ETAP confirmed load flow and short circuit studies were performed based on submitted data and reports were sent to ADMA.
3) CRS sheets and revisions to reflect proposed ungrounded grounding scheme will be included in next report revision.
4) Overvoltage ground relay settings of 20% were discussed and may be fine tuned after energization.
The document discusses points from a meeting between ADMA, HHI, and ETAP regarding power energization relay settings. Key discussion points included:
1) Generator input data and load flow/short circuit reports will be included in revised relay setting reports.
2) ETAP confirmed load flow and short circuit studies were performed based on submitted data and reports were sent to ADMA.
3) CRS sheets and revisions to reflect proposed ungrounded grounding scheme will be included in next report revision.
4) Overvoltage ground relay settings of 20% were discussed and may be fine tuned after energization.
ADMA/HHI/ETAP Discussions points on Power Energization Relay setting
report
Following points where discussed
Description Action Generator Input data such as Will be included in the next revision of the KW, FLA, pf, Xd”, Xd’, Xd etc., relay setting reports(Action by ETAP) has to include in Annexure in report. (for Main as well as Power Energization report) Attach Load flow and short Will be included in the next revision of the circuit ETAP Report relay setting reports(Action by ETAP) Load list and Short circuit study. ETAP confirmed that load flow and short circuit study for Various phases of energization has been carried out based on the load list and SLD submitted by HHI and same is already been sent to ADMA for reference. In addition, the same is attached in this mail. CRS sheet need to included CRS sheet will be sent along with the report in next revision. However please note that most of the comments are pertaining to permanent settings. Power System Grounding The report is prepared and submitted to through NGR HHI/ADMA before the change in the grounding scheme from NGR to Ungrounded.
However report shall be revised based on
the proposed ungrounded scheme. Overvoltage ground relay 59 The setting proposed is 20%. However as Settings already mentioned in our Email correspondence dated 6th December 2017, after energizing 13.8 kV network up to transformer primary the unbalance voltage at the open delta VT to be measured and fine tuned to the next available setting available. Maintenance switch for ADMA requested ETAP to check the Temporary power energization requirement of maintenance switch for the temporary power energization considering safety of the operating personnel, Since ETAP has already recommended to installation of maintenance switch in Main relay setting report. Revision in relay settings for Small feeders connected to HVAC system small feeders and incorporation having feeder cable lengths more than 20 of Notes in the TCC curves. meters, proposed permanent settings adopted for the feeders are not sensitive for operation due to low fault current caused by high cable lengths. ETAP to indicate “These settings to be revised to permanent settings after energization of Temporary Power supply and Coordination is not Applicable for these feeders” in the TCC Curves. ADMA requested ETAP to check ETAP informed that considering safety of the proposed Un-grounded personnel and to reduce over-voltages to arrangement for the Generators ground, as per Industry standard, the and the proposed ground generator neutral is normally grounded protection system (OVGR) for solidly or grounded through a resistor or the temporary Generators reactor depending on the generator design. considering safety of the Considering the proposed Generators are operating personal and the meant for Temporary power supply equipment. energization, and 59/64 sensitive Over Voltage Ground relays are connected to the Generator system for Ground fault detection/protection the proposed Ungrounded Generators can be connected in principle to the power system. However, the suitability of the Generators and the associated power system to operate as an Ungrounded Power supply source needs to be checked and confirmed by HHI thru proper documentation.