5. The detailed estimate, datasheet and lead statement prepared manually outside the computer
should be tied to the computer generated estimate.
A) General Information
Grant MGNREGS+SDF
1)Location_____________________ General
5) CC 210 mts
6) WBM mts
7) GRAVEL mts
8) EARTHEN mts
Quantites and Rates shall be as per technically sanctioned estimate. Rates shall be worked
out as per standard data basing on rates available in RSSR and CSSR.
Rate Per
Task Unit Amount
SNo Task Name Unit code Qty
(in Rs) (Rs.)
1 CW01.Amount for wage component days 19376 155.65 194.00 30197.00
6 CW09. Metal consisting of 40mm graded cum 19383 48.20 1302.42 62770.00
HBG/HBT metal
7 Cost for supply and delivery of pipes Rmt 32010 0.00 0.00 0.00
8 Cost for laying and jointing of pipes Rmt 32011 0.00 0.00 0.00
Signature
Estimate Cost: 15
CW01 CW02 CW03 CW04 CW07 CW09 CW10
Matrerial Component Others
Wage GSB
Sl Layi TOTAL
Description of Item component
No. in Rs. Cement in Sand for Sand for 20mm & 12mm 40mm HBG Name ng
Mts filling Mortar HBG Chips MC Metal Board of
2.36 mm Laying of Laying of Steel in
and below GSB Gravel 1:4:8 M20 M30 MTs
CC
pave
1 CW 01: Unskilled
2 labour 3 4 5 6 7 8 9 10 11 12 13 14 ment
15 16 17
for Earth work exevation
Laying
and depositing the mix
of PC.C M10 soil
1 using 40mm
on banks HB(G)
with an initial 22934.00 22934.00
metal66%
lead and and
lift20mm HBG
in all
Chips
soils 34%
etc.,including Cost
complete.for
and
drainconveyance
walls of all
2 materials and labour 11.78 24.10 48.20 54968.54 194242.48
charges, centring
chares,
Unskilledcuring
labouretc
for
3 complete.for
Filling
filling HBG
stone Drain
Stone Walls
dustChips 7263.00 7263.00
.
2.36 mm and in below
foundationstrenches as
4 per drawing and 53.55 43649.68
technical specification
clause 305 3.9 MORD and
8 Provision
304 MORTH of Name Board 4704.00 4704.00
Total : 30197.00 71.29 0.00 114.48 166.70 48.20 53.55 0.00 0.00 4704.00 231855.07 194008.61 0.00 1292833.61
155.65 1425.88
155.65 1425.88
Cost of each Item 194.00 240.00 0.00 828.09 1731.47 1302.42 815.12 526.58
Total cost ; 30197.00 342211.00 0.00 94799.00 288640.00 62770.00 43650.00 0.00 0.00 4704.00 231855.07 194008.61 0.00 1292834.68
. 474217.68
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
CW 13 - Seigniorage
Charges 17724.00
TOTAl : 1499999.61
Assistant Engineer
PRI :: Kakumanu
DETAILED CUM ABSTRACT ESTIMATE
Mandal :: kakumanu
ID No: 0 Estimate Cost: 15.00 Lakhs
Sl Discription of Measurements Rate
No Item Nos Qty unit Amount
L B D
1 2 3 4 5 6 7 8 9
Length of the Road 210.00 RM
1 CW 01: Unskilled labour for Earth work exevation and depositing the soil
on banks with an initial lead and lift in all soils etc., complete.for
drain walls
Both Sides 1 X 2 210.00 0.85 0.450 160.65
160.65 142.76 22934.00
2
Laying of PC.C M10 mix using 40mm HB(G) metal66% and 20mm HBG Chips 34%
including Cost and conveyance of all materials and labour charges,
centring chares, curing etc complete.for Drain Walls .
For Drains on
Both Sides 1 X 2 210.00 0.85 0.15 53.55
Construction of CC Road and Drains form mannava yalamandha (H) to Muppalaneyne Sambaiah (H) in
Name of the Work :: Garlapadu Village of Kakumanu Mandal
Seigniorage
Conveyance
crushing
Blasting
Machine
charges
charges
charges
charges
Sl. Lead Conveyance Intial Excluding
Add
No Name of the Material Source in Km charges Cost 13.615% OHC & Total
CP
(5/1.13615)
1 2 3 4 5 7 8 9 10 13 14
1 5 - 7 mm size HBG M/C metal-IRC Yadlapadu 39.90 519.70 504.00 457.42 126.00 70.00 0.00 1157.42
2 2.36mm - 5mm HBG chips Yadlapadu 39.90 519.70 308.00 457.42 77.00 70.00 0.00 912.42
2.36mm & below HBG Stone Chips
3 IRC (Stone Dust) Yadlapadu 39.90 519.70 350.00 457.42 0.00 807.42
4 40mm HBT Metal SS-5 Yadlapadu 39.90 519.70 620.00 457.42 155.00 70.00 0.00 1302.42
5 20mm HBG Chips SS-5 Yadlapadu 39.90 519.70 1036.00 457.42 259.00 70.00 0.00 1822.42
6 12mm HBG Chips SS-5 Yadlapadu 39.90 519.70 822.00 457.42 205.50 70.00 0.00 1554.92
7 10mm HBG Chips SS-5 Yadlapadu 39.90 519.70 692.00 457.42 173.00 70.00 0.00 1392.42
8 Sand for Mortar Krishna River 68.30 832.90 95.00 733.09 0.00 828.09
9 Sand for Concrete Krishna River 68.30 832.90 95.00 733.09 0.00 828.09
The above said internal village roads are badly damaged and it is very much
inconvenient for moving of vehicles, particularly in rainy season.
Hence, the present detailed estimate is prepared for obtaining necessary technical
Sanction from competent authority.
(B). Provisions made in the present Estimate:
Unsilled labour for Earth work exevation and depositing the soil on banks with an
initial lead and lift in all soils etc., complete.
Unskilled labour for filling HBG Stone chips of 2.36mm & below including all labour
charges etc., complete
Cost and supply of filling HBG Stone chips of 2.36mm & below including all charges
etc., complete
Providing CC M10 Mix using 40mm HBG metal including cost and conveyance of all
materials and all labour charges etc., complete.
Providing VCC (1:2.5:5) using 20mm HBG metal including cost and conveyance of all
materials and all labour charges etc., complete.
Provision of Name Board
Construction of Granular Sub Base using well graded material, spreding in uniform
layers with tractor mounted grader on prepared surface , mixing by mix in place
method with rotovator at OMC and compacting with Smooth whel roller to achive the
desired density , Complete as per technical speficaction clause 401 of MORD
Costruction of un refinforced dowel jointed at Expansion and construction joint
only plain cement concrete pavement , thicknees as per design over a perpared sub
base ,w with 43 grade cement or any other type as per clause 1501.22 VCC (1:2:4)
coarse and fine aggregates conforming ot is :383 maximum size of coarse aggregate
not less than 0.20 cum capacity and 25m ,MIxied ina concret capacity and appropriate
weigh batcher using approved mix design,
Provisions are made for the Quality Control (QC) Charges @ 0.50% and VAT Charges @
5% on the value of the work proposed for execution.
The present estimate is prepared as per the current Common Standard Schedule of
Rates 2016-2017.
The rates of Cement and Steel are adopted as per the current rates fixed.
The amount of seignioarage charges of materials are not included in the datas and are
included in the estimate by separate calculation in a sheet, which was enclosed to
the estimate.
Further, the data for CC Pavement is adopted as per AP Revised Standard Data.
The work has to be executed as per the standards of the Andhra Pradesh Detailed
Standard Specifications (APDSS) after obtaining Technical Sanction.
Unit = cum
(a) Labour
5.00 day Mason (1st class) 445.00 1 No 2225.00
5.00 day Mason (2nd class) 400.00 1 No 2000.00
150.00 day Mazdoor (Unskilled) 350.00 1 No 52500.00
6.00 day Mazdoor (Unskilled) 350.00 1 No 2100.00
2.00 day Surveyor 600.00 1 No 0.00
6.00 day Mazdoor (semi-skilled) 350.00 1 No 2100.00
Add 20% MA on Labour charges 15231.25
(b) Machinery
2.25 Sqm Joint filler board of 20mm thick 630.00 1Sqm 1417.50
18.00 KL Water for curing 77.00 1 Kl 1386.00
(d) Formwork @ 3% on (a+b+c) 387847.21 11635.42
Rate per cum = a+b+c+d+e+f 399482.63
5326.44
6 Laying of PC.C M10 mix using 40mm HB(G) metal66% and 20mm HBG Chips
34% including Cost and conveyance of all materials and labour
charges, centring chares, curing etc complete.for Drain Bed.& Key
walls.Below GL
Unit - 1 Cum
(a) Material
162.00 Kgs Cement 4800.00 1 MT 777.60
0.45 Cum Coarse Sand for Concrete 828.09 1 cum 372.64
0.90 Cum 40mm aggregate 1302.42 1 cum 1172.18
1.20 Kl Water 77.00 Kl 92.40
(b) Labour
0.10 Day Mason (1st class) 445.00 1 No 44.50
1.39 Day Mazdoor Unskilled 350.00 1 No 486.50
Add 25% MA on Labour charges 132.75
1.00 Hour Concrete Mixer 10/7 cft (0.40/0.28 cum) 471.10 1 Hour 471.10
1.25 litre Paint ready mixed approved brand 276.00 1 ltr 345.00
Cost for 10 sqm = a+b+c+d 1126.76
Rate per sqm = (a+b+c+d)/10 112.68
Country Bricks
Name of the Lead in Lead in Gravel or Lead in Lead in Lead in
Sand for filling Sand for Mortar HBG Metal and RR
Habitation Km Km Quarry rubbish Km Km Km
Stones
1 2 3 4 5 6 7 8 9 10 11
Appapuram Baptla 20.6 Krishna River 74.6 Boyapalem 44.6 Yadlapadu 46.6 Kolluru 70.0
B.K.Palem Baptla 27.5 Krishna River 71.9 Boyapalem 44.7 Yadlapadu 46.7 Kolluru 64.0
Bodipalem Chndolu 23.1 Krishna River 74.4 Vejendla 35.2 Lam 52.6 Kolluru 57.0
China Lingayapalem Chndolu 25.7 Krishna River 56.7 Vejendla 37.5 Lam 37.7 Kolluru 60.0
Garikapadu Chndolu 26.8 Krishna River 74.3 Boyapalem 46.8 Yadlapadu 48.8 Kolluru 61.0
Garlapadu Baptla 30.1 Krishna River 68.3 Boyapalem 37.9 Yadlapadu 39.9 Kolluru 73.0
Kakumanu Baptla 25.4 Krishna River 69.8 Boyapalem 39.8 Yadlapadu 41.8 Kolluru 66.0
Kollimerla Chndolu 20.7 Krishna River 63.7 Vejendla 27.4 Lam 44.6 Kolluru 54.0
Kommuru Baptla 29.9 Krishna River 65.3 Boyapalem 34.9 Yadlapadu 36.9 Kolluru 70.0
K.B.Palem Chndolu 27.1 Krishna River 58.1 Vejendla 38.9 Lam 39.1 Kolluru 61.0
Kondapaturu Baptla 28.9 Krishna River 73.3 Boyapalem 42.9 Yadlapadu 44.9 Kolluru 69.0
Kothivanipalem Chndolu 20.5 Krishna River 71.6 Vejendla 32.6 Lam 50.0 Kolluru 54.0
Lingamguntla palem Chndolu 31.1 Krishna River 50.6 Vejendla 43.8 Lam 31.4 Kolluru 66.0
Pandrapadu Chndolu 21.6 Krishna River 60.8 Vejendla 33.2 Lam 41.8 Kolluru 55.0
Peddivaripalem Baptla 32.4 Krishna River 66.5 Boyapalem 36.1 Yadlapadu 38.1 Kolluru 71.0
Returu Baptla 18.2 Krishna River 76.6 Boyapalem 46.6 Yadlapadu 48.6 Kolluru 72.0
Telagayapalem Chndolu 23.3 Krishna River 67.7 Vejendla 35.2 Lam 49.6 Kolluru 57.0
Vatticherukur Villages
Valluru Chndolu 27.9 Krishna River 53.9 Vejendla 40.3 Lam 34.9 Kolluru 62.0
RATES OF MATERIALS 2015-2016 SoR w.e.f 13-08-2014
Page SoR S No Name of the Material Rate
P-7 35 1 1st Class Painter 480.00
P-6 1 2 1st Class Barbender 490.00
P-6 11 3 1st Class Mason, Brick Layer, Carpentor, Blacksmith 420.00
P-8 35 4 2nd Class Mason, Brick Layer, Carpentor, Blacksmith, painter & Mate 375.00
P-8 3 5 Man / Women Mazdoor 320.00
P-256 4 6 Diploma Engineer / Surveyor 600.00
7 S/F of 125 Microns thick polythene Sheet by EE,PR. Markapur 18.00
P-13 1 8 Rough Stone for Masonary OTG 160.00
P-13 2 9 225mm thick Revetment stone 144.00
P-13 3 10 300mm thick Apron stone 164.00
P-13 12 11 Rough Stone for Masonary Granite, Trap 252.00
P-16 45 12 HBG /HBT MORTH 2.36mm to 5 mm 308.00
P16/14 46/25 13 HBG /HBT MORTH 5 to 7 mm 504.00
47/26 14 HBG /HBT MORTH 9.5 to 11.2mm 656.00
P16/15 48/27 15 HBG /HBT MORTH 12 to 14mm 780.00
49/28 16 HBG /HBT MORTH 19 to 22mm 984.00
50/29 17 HBG /HBT MORTH 25 to 27mm 944.00
51/30 18 HBG /HBT MORTH 40 to 45mm 588.00
P17/15 52/31 19 HBG /HBT MORTH 50 to 55mm 456.00
53/32 20 HBG /HBT MORTH 60 to 63mm 419.00
54/33 21 HBG /HBT MORTH 65mm 379.00
55/34 22 HBG /HBT MORTH 75mm 304.00
P-15 36 23 Add Rs 70-00 towards Blasting charges item S No 12 to 22 70.00
P-18 79 24 Soling Stone 150mm Granite, Trap 95.00
P-18 81 25 Soling Stone 150mm OTG 66.00
P-18 90 26 Gravel 103.00
P-18 91 27 Quarry Rubbish 89.00
P-18 92 28 HBG Stone Chips 2.36 mm and below / Stone Dust 350.00
P-19 93 29 Sand for Mortar, Plastering, Ceiling coat including washing & Screening 677.00
P-19 94 30 Sand for Concrete 610.00
P-19 95 31 Sand for Filling, Blindage 460.00
P-19 100 32 Shell Lime Slaked and Screened 987.00
P-19 101 33 White Cement 36.00
P-20 109 34 Clearing of Heavy Jungle 3.20
P-20 110 35 Clearing of Light Jungle 2.80
P-20 112 36 Clearing Juliflora(prosafts) jungle including uprooting&removing of Juliflora stumps 4.40
P-20 113 37 Uprooting&Removing of stumps of other kinds of trees includi stacking of girth 30-100cm 21.00
BMT-A.01 38 Clay Bricks 23 X 11 X 7 cm Non-Modular or Traditional size 5200.00
BMT-A.02 39 -do- 19 X 9 X 9 cm Modular or Traditional size 5850.00
BMT-A.03 40 Fly Ash Cement / Lime Solid Blocks 290 X 225 X 140 mm size 25.00
BMT-B.01 41 Kadapa slab 40mm thick not less than 0.457X0.457M 96.00
BMT-B.02 42 -do- 50mm thick 110.00
BMT-B.06 43 Black Polished Kadapa stone slab minimum 15mm th (0.457X0.457M) 1379.00
BMT-B.07 44 White Polished Betamcherla Marble minim 25mm th (0.254X0.254M) 3859.00
BMT-B.08 45 Bethamcherla Polished coloured minimum 25mm th (0.254X0.254M) 2756.00
BMT-C.01 46 Ceramic Floor Tiles of not less than 7.3mm thick
BMT-C.15 47 Vitrified Polished Floor Glossy finish Tiles of size not < 598X598X8mm thi
BMT-C.16 48 Vitrified Polished Floor Regular finish Tiles of size not < 598X598X8mm thi
BMT-E.01 49 Medium Teakwood Scantlings/Frames Size upto 2M Rs 80094.00 / M3 2268.00
BMT-E.04 50 -do- Shutters or Planks any thickness Rs 160189-00 / M3 4536.00
BMT-E.05 51 Best Teakwood Scantlings/Frames Sizes upto 2M Rs 137941-00 / M3 3906.00
BMT-E.08 52 -do- Shutters or Planks any thickness Rs 173539-00 / M3 4915.00
BMT-E.15 53 Sal Wood Scantlings or Frames or Sizes any length Rs 51994-00 / M3 1472.00
BMT-E.16 54 -do- Shutters or Planks any thickness Rs 69327-00 / M3 1963.00
BMT-F.07 55 Galvanized Steel Barbed wire Type A IOWA / Type B Glidden 82.00
BMT-F.18 56 Galvanized Iron Fly Proof wire mesh of not less than 20 gauge 217.00
BMT-F.28 57 Rabbit wire Mesh (Chicken Mesh) of not less than 30 gauge 17.00
BMT-G.08 58 Alluminium Tower bolt 150mm long 114.00
BMT-H.01 59 Impervious Water Proofing Powder Compound (Accoproof)
BMT-H.64 60 Concrete Plasticizers
BMT-H.94 61 Bitumen Solution primer
BMT-H.95 62 Tar Felt Rain seal Felt / Zorifelt BT Sheet Type 2 Grade I
BMT-J.01 63 Cement Primer of interior Grade I 165.00
BMT-J.02 64 Cement Primer of exterior Grade 2 210.00
BMT-J.03 65 Red Oxide iron Primer Paint for iron works Grade 1 142.00
BMT-J.05/06 66 Wood Primer or Metal Paste (Putty) for Steel Work 158.00
BMT-J.08 67 White Lead 118.00
BMT-J.11 68 Linseed Oil 63.00
BMT-J.21 69 Oil Bound Washable Distemper 90.00
BMT-J.23 70 Synthatic polymer Laxuary Plastic Emulsion Paint 473.00
BMT-J.25 71 Synthatic Polymer acrylic Exterior Plastic Emulsion Paint 196.00
BMT-J.24 71 Water proof Cement Paint of Snowcem 53.00
BMT-J.26 72 Water Proof Cement Paint Pack Snowcem Powder Rs 1375-00 / 25Kg 55.00
BMT-J.27 73 Paint Grade White lime for wash Suryacem Powder Rs 600-00 / 25Kg 24.00
BMT-J.30 74 Synthatic Enamil Paint Grade I in all shades 276.00
BMT-J.40 75 Wall Putty of White Cement Rs 875-00 / 20Kg 43.75
BMT-M.37 76 Thermocole Supply 12 mm thick 26.00
BMT-M.53 77 Supplying & Fixing of Plaster of Paris board 12mm thick 441.00
BMT-N.48 78 Supplying & Fixing of Fly Mesh Shutters of size 20X40mm FFM with SS
BMT-U.02 79 Joint filler Board 20mm thick 902.00
BMM-V.14 80 Labour charges Fabricating steel works,window Grills Excluding fixing 24.00
BMM-V.15 81 Labour charges for Fixing Window Grills in position 4.00
BMS-W.15 82 Cement Jali 25mm thick for Ventilators 226.00
BMS-W.20 83 Mastic Pad (0.60 X 1.2 M) of 1" or 25.4mm thick 991.00
BMS-W.21 84 Mastic Pad (0.60 X 1.2 M) of 1/2" or 12.7mm thick 568.00
BMS-W.45 85 Roofing with 0.5mm thick GI Profiled sheets fixed to Purlins 799.00
BMW-F.75 86 S & F of Nominal Bore 40mm ϕ GI Pipe Light Grade 436.00
P-85 A 87 Footings SC (Mat 277 + Lab 473 ) = 750-00 Wooden Centering=Nil -
P-85 C 88 Pedastals, Pile Cap Steel Centering (Mat 315 + Lab 753 ) 1068.00
P-85 D 89 Plinth beam Steel Centering (Mat 1335 + Lab 1141 ) 2476.00
P-85 E 90 Lintels SC (Mat 1133+Lab 1211) = 2344 WC (Mat 760+Lab 953) = 1713.00
P-85 F 91 Sunshades SC (Mat 224+Lab 186)= 410-00 WC (Mat 150+Lab 146) = 296.00
P-85 G 92 Columns SC (Mat 341+Lab 1700)= 2041-00 WC (Mat 229+Lab 1338)= 1567.00
P-85 H 93 Beams SC (Mat 2002+Lab 1426)= 3428-00WC (Mat 1342+Lab 1122)= 2464.00
P-85 I 94 Slab upto 150mm th SC (Mat 227+Lab 162)=389 WC (Mat 152+Lab 127)= 279.00
P-85 J 95 Slab 150-300mm SC (Mat 233+Lab 166)= 399 WC (Mat 156+Lab 131)= 284.00
P-85 A 96 Scaffolding over Basement Brick/Stone Masonary (Mat 9.93 +Lab 61.83)= 71.76
P-86 A 97 Scaffolding over Basement for Plastering to Walls (Mat 0.99 + Lab 6.18= 7.17
P-86 A 98 Scaffolding over Basement for Ceiling Plastering (Mat 2.37 + Lab 12.55)= 14.92
P-11 2 99 Asphalt 80/100 grade 46.00
P-11 3 100 Binding wire 70.00
P-12 15 101 Curing Compound 130.00
P-13 37 102 GI Pipe 80mm ϕ B Class 490.00
P-13 41 103 Hectometer Stone one line dressed 250.00
P-13 51 104 Kilometer Stone one line dressed 475.00
P-13 61 105 PVC Pipe of 100mm φ 175.00
P-14 70 106 Super Plasticizer 86.00
P-14 72 107 Synthatic adhesive ( Resin+ Hardener ) 360.00
P-14 73 108 Tar felt joint filler board 12mm thick 420.00
P-14 74 109 Tar felt joint filler board 20mm thick 630.00
P-14 80 110 Water proofing Compound 75.00
P-16 14 111 MS Pipe 32mm φ 185.00
P-22 4 112 Diesel 57.00
P-23 10 113 Petrole 69.00
P-25 M011 114 Fly Ash Confirming to IS 3812 72.00
P-28 M063 115 Barbed wire 80.00
P-29 M092 116 Earth Cost excluding Seigniorage 40.00
P-29 M097 117 Epoxy Primer 613.00
P-29 M098 118 Epoxy Resin - hardener mix for Prime Coat 633.00
P-34 M188 119 Un Slaked Lime 2616.00
P-34 M189 120 Water Charges Rs 103-00 in Urban Area and in Rural Area 77.00
P-34 M192 121 Chain Link Wire Mesh 8 Gauge (3mm) 2"X2" ( 50mm X 50mm ) 252.00
P-35 5 122 Thinner 140.00
13-08-2014
Per Reference
Day R & Bridge works
Day R & Bridge works
Day R & Bridge works
Day R & Bridge works
Day R & Bridge works
Day labour wages
1 M2
1 M3 Material & Work
1 M3 Material & Work
1 M3
1 M3
1 M3
1 M3 6 mm (SS 5) 532.00
1 M3 10 mm (SS 5) 692.00
1 M3 12 mm (SS 5) 822.00
1 M3 20 mm (SS 5) 1036.00
1 M3 25 mm (SS 5) 994.00
1 M3 40 mm (SS 5) 620.00
1 M3 50 mm (SS 5) 456.00
1 M3 60 mm (SS 5) 419.00
1 M3 65 mm (SS 5) 379.00
1 M3 75 mm (SS 5) 304.00
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 M3 Material & Work
1 Kg Material & Work
1 M2 Material & Work
1 M2 Material & Work
1 M2 Material & Work
Each Material & Work
1000 No Blg
1000 No Blg
Each Blg
1 M2 Blg
1 M2 Blg 8821
10 M2 Blg 4410.5
10 M2 Blg
10 M2 Blg
1 M2 Blg
1 M2
1 M2 2-3M
1 Cft 3402.00 2268.262
1 Cft
1 Cft 4411.00 4914.624
1 Cft Blg
1 Cft Blg
1 Cft Blg
1 Kg Blg
1 M2 Blg
1 M2 Blg
Each Blg
1 Kg Blg
1 Liter Blg
1 Kg Blg
1 M2 Blg
1 Kg Blg
1 Kg Blg
1 Liter Blg
1Lt / 1Kg Blg
1 Kg Blg
1 Liter Blg
1 Kg Blg
1 Liter Blg
1Litre Blg
1 Kg Blg
1 Kg Blg
1 Kg Blg
1 Liter Blg
1 Kg Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 kg Blg
1 kg Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 RM Water Supply
1 M3 Blg
WC Nil 1 M3
WC Nil 1 M3
1 M3 Blg
1 M2 Blg
1 M3 Blg
1 M3 Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 M2 Blg
1 Kg Basic input Data
1 Kg Basic input Data
1 Liter Basic input Data
1 RM Basic input Data
Each Basic input Data
Each Basic input Data
1 RM Basic input Data
1 Kg Basic input Data
1 Kg Basic input Data
1 M2 Basic input Data
1 M2 Basic input Data
1 Kg Basic input Data
1 RM Basic input Data
1 Liter Basic input Data
1 Liter Basic input Data
1 M3 Basic input Data
1 Kg Basic input Data
1 M3 Basic input Data
1 Kg Basic input Data
1 Kg Basic input Data
1 Ton Basic input Data
1 KLt Basic input Data
1 Kg Basic input Data
1 Liter Basic input Data
Hire charges of Plant & Machinery for 15-16 w.e.f 28-08-15
S.
Quatturn
Page Ref N Item of the work Rate Per
per Day
o
P-25 8 1 Hire charges of Power roller per day of 8 hours 1101x8 8808.00 Day
WBM Roads & Other Roads
P-22 160 1 Loose 50 mm Compacted to 40mm thick(1.5") 740 Sqm 185.00 11.90 10 M2
P-23 161 2 Loose 75 mm Compacted to 50mm thick (2") 650 Sqm 210.00 135.51 10 M2
P-23 162 3 Loose 100 mm Compacted to 75mm thick (3") 560 Sqm 231.00 157.29 10 M2
P-23 163 4 Loose 133 mm Compacted to 100mm thick (4") 490 Sqm 248.80 179.76 10 M2
5 Soling 150mm thick (6" thick) 42.5 Cum 1 M3
6 EW or Gravel or Sand Gravel Mix compaction 425 Cum 207.25 10 M3
BT Work & Other Bituminous Pavements
1 BTSD or BTWC or Mix Seal surfacing 465 Sqm 10 M2
2 Bituminous Macadam/Built up Spray grout 50mm thick 280 Sqm 10 M2
3 BTSC or Single coat BTSD with dry chips 930 Sqm 10 M2
4 Asphaltic concrete 40mm thick (1.5") 125 Sqm
5 Bituminous Macadam 75mm thick (3") 200 Sqm
6 Sands seal coat or Pre Mixed Seal coat 930 Sqm
7 Semi-Dense Bituminous concrete 25mm thick 372 Sqm
8 Filling big pot holes or bitumenous built up Spray grout 15 Cum
9 Filling small pot holes with pre Mixed stone aggregates 9.30 Cum
10 Lean Bitumenous macadam/Dense bitumenous macada 14 Cum
P-6 7 1 Conveyance of Bitumen for Packed Rs 1.75 / KM per MT
P-6 7 2 Conveyance of Bitumen for Bulk Rs 1.50 / KM per MT (Round the Trip Rs 3.00)
P-25 2 1 Dozar D 50 1649.00 Hour
P-25 3 2 Mortor Grader 3220.00 Hour
P-25 4 3 Hydraulic Excavator 2791.00 Hour
P-25 6 4 Tipper 5 Cum / 5.5 Cum 909.70 Hour
P-25 7 5 Vibratory Roller 8 Tonne 2609.10 Hour
P-25 8 6 Road Roller Diesel 10 Tonne/Smooth wheel roller 1101.00 Hour
P-25 9 7 Water tanker 8000 Liters 865.50 Hour
P-25 10 8 Water tanker 6000 Liters 630.00 Hour
P-25 11 9 Tractor Pulling 415.00 Hour
P-25 12 10 Tractor with Rotavator Scarifying 422.00 Hour
P-25 14 11 Air Compressor General purpose 538.20 Hour
P-26 16 12 Mechanical Broom Hydraulic Surface Cleaning 375.00 Hour
P-26 18 13 Emulsion pressure distributor applying emulsion tack coat 860.00 Hour
P-26 21 14 Hot Mix Plant 60 TPH Capacity 21700.00 Hour
P-26 23 15 Paver Finisher hydostatic with sensor controle100 TPH 3060.00 Hour
P-26 29 16 Bitumen boiler oil fired for Bitumen Spraying 219.00 Hour
P-27 38 17 Concrete Mixer 0.28 Cum 456.20 Hour
P-27 38 18 Concrete Mixer 1.00 Cum 620.00 Hour
P-28 43 19 Generator 30 KVA 816.80 Hour
P-28 48 20 Plate Compactor 58.00 Hour
P-43 40 21 Needle Vibrator 40mm (Petrole) 175.40 Hour
300mm 350mm 450mm 600mm
RCC Pipes Rate / 1M
ϕ ϕ ϕ ϕ
P-20 1 RCC NP 3 Plain ended Pipes intial cost 906.00 1117.00 1412.00 2309.00
P-21 2 RCC NP 3 Collors intial cost Each 142.00 176.00 267.00 417.00
P-26 3 Conveyance charges for NP3 P/E Pipes upto 5KM 40.95 44.10 56.70 93.45
Rate for every addl 1 Km lead or part thereof 1.12 1.26 1.95 4.34
P-22 4 RCC NP 3 Socket and Spigot Pipes intial cost 1049.00 1635.00 2623.00
P-27 5 Conveyance charges for NP 3 S/S Pipes upto 5KM 46.00 68.00 101.00
Rate for every addl 1 Km lead or part thereof 1.45 3.15 4.84
P-58 6 PVC Pressure Pipes 20mm ϕ 10 Kg /cm2 16.00 1M
HC P&M
207.247059
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
HC P&M
Machine Hire
700/750 900mm 1000mm
mm ϕ ϕ ϕ
Name of the Work: Construction of CC road from Chaganti.Narasimha (H) to Notu.Subbareddy (H) in 5Th ward (near
Nakkavagu) of Prathipadu (V) & (M).
Estimated Cost : Rs 3.00 Lakhs
Grant / Funds :MPLS Guntur.
(-)
Add
Sl. Material Name Quarry Lead Gross Add Add Add Add Add 12.28% NET Item
Seionara
No. with Detailes Name in Km Initial Blastg MCC Convey Load U'Load OHC Amount Unit
ge
8,9,10
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Sand for Mortar Krishna River 50.00 385.00 580.00 40.00 -71.22 933.78 1.00 Cum
2 Sand for Filling Ramavagu 3.00 285.00 56.00 50.00 -6.88 384.12 1.00 Cum
3 40mm HBG (MC) Boyapalem 10.00 588.00 70.00 147.00 140.00 50.00 -17.19 977.81 1.00 Cum
4 20mm HBG (MC) Boyapalem 10.00 984.00 70.00 246.00 140.00 50.00 -17.19 1,472.81 1.00 Cum
5 12.50mm HBG (MC) Boyapalem 10.00 780.00 70.00 195.00 140.00 50.00 -17.19 1,217.81 1.00 Cum
6 Stone Dust Boyapalem 10.00 330.00 140.00 50.00 -17.19 502.81 1.00 Cum
Certified that the above Leads are correct to the best of my knowledge and fact
Asst.Executive Engineer
PRI(MPP).Prathipadu.
380488774.xlsLeads