Inspection of Works

A-2.2/04-13-1 - Inspection Request Schedule

Project Administration

Inspection Request Schedule


Project: Joyville ,Virar
To: Mr. Tanuj / Mr.Vipul
Item(s) to be Inspected (with Location : Tower 01)
PILE CAP /FOOTING
PILE CAP WORKS
PILE CAP REBAR PILECAP SHUTTER
C337

COLUMNS
REBAR SHUTTER

REBAR SHUTTER

PLINTH BEAMS
REBAR SHUTTER
PB-164

REBAR SHUTTER
PB-168

Drawings Reference/ Specific Reference attached


# Pour Card
# Pile Checklist
# Drawing No. 7932/WD-05-R0 PILE CAP/FOUNDATION LAYOUT & RCC DETAILS.
# TM Batchsheet/Invoice

< SP E&C Insp.Engr >


< SP E&C Site Engr > < SP & RE Project Manag< SP E&C QA-QC Manager / Engg. >
Inspection Comments

Approved Approved with Comments

Date: 20/Feb/18 < For Client's Re

Shapoorji Pallonji E&C


e
20/Feb/18
187
Time

PPILECP CONCRETING 12.00 PM

CONCRETING
02.00 PM

CONCRETING
02.00 PM

CONCRETING
03.00 PM

CONCRETING
03.00 PM

Rejected

< For Client's Representative>

Page 1 of 1
Inspection of Works
A-2.2/04-13-1 - Inspection Request Schedule

Project Administration

Inspection Request Schedule


Project: Joyville ,Virar (W) 20/Feb/18
To: Mr. Tanuj / Mr.Vipul 187
Item(s) to be Inspected (with Location : Tower 6) Time
PILE CAP /FOOTING WORK INSPECTION REQUEST ACTIVITIES IN PILE CAP
COLUMNS REINFORCEMENT UPTO 1st FLOOR
REBAR SHUTTERING CONCERTING
C1,6,11,16 10.00 AM

REBAR SHUTTERING CONCERTING


C2,5,12,15 10.00 AM

REBAR SHUTTERING CONCERTING


C3,4,13,14 10.00 AM

REBAR SHUTTERING CONCERTING


C7,8,9,10 10.00 AM

SHEARWALL REINFORCEMENT UPTO 1st FLOOR


LEVELING SHUTTERING CONCERTING
SW-1,2,21,26 10.00 AM

LEVELING SHUTTERING CONCERTING


SW-3,8,18,20 10.00 AM

LEVELING SHUTTERING CONCERTING


SW-4,7,22,25 10.00 AM

LEVELING SHUTTERING CONCERTING


SW-5,6,23,24 10.00 AM

LEVELING SHUTTERING CONCERTING


SW-10,13,14,17 10.00 AM

LEVELING SHUTTERING CONCERTING


SW-11,15,27,28 10.00 AM

BOULDER SOLING FOR PERIPERIAL


TOP LEVEL SHUTTERING CONCERTING
BAY-1,2,3,4 05.00 PM

TOP LEVEL SHUTTERING CONCERTING


BAY-1',2',3',4' 05.00 PM

Drawings Reference/ Specific Reference attached


# Pour Card
# Pile Checklist
# Drawing No. 7932/WD-122 PILE CAP/FOUNDATION LAYOUT & RCC DETAILS.
# TM Batchsheet/Invoice

< SP E&C Insp.Engr >

< SP E&C Site Engr > < SP & RE Project Manager / Engg> < SP E&C QA-QC Manager / Engg. >

Inspection Comments

Approved Approved with Comments Rejected

Date: 20/Feb/18 < For Client's Representative>

Shapoorji Pallonji E&C Page 1 of 1


Inspection of Works
A-2.2/04-13-1 - Inspection Request Schedule

Project Administration

Inspection Request Schedule


Project: Joyville ,Virar 20/Feb/18
To: Mr. Tanuj / Mr.Vipul 187

Item(s) to be Inspected (with Location : Tower 7)

PILE CAP /FOOTING WORK INSPECTION REQUEST ACTIVITIES


COLUMNS STARTERS FOR BELOW FFL
LEVELING SHUTTERING CONCERTING
C1,2,3,4,5,8,9 4.00 PM

LEVELING SHUTTERING CONCERTING


C14,13, 4.00 PM

SHEARWALL STARTERS FOR BELOW FFL

REBAR SHUTTER CONCERTING


SW-01,4,5,6,7 4.00 PM

REBAR SHUTTER CONCERTING


SW-11,15,14,10 4.00 PM

SW- REBAR SHUTTER CONCERTING


9,18,24,23,22,21,20,1 4.00 PM
9
BOULDER SOLING FOR PERIPERIAL
TOP LEVEL SHUTTER CONCERTING
BAY-1,2,3,4,5 4.00 PM

# Pour Card

# Pile Checklist
# Drawing No. 7932/WD-122 PILE CAP/FOUNDATION LAYOUT & RCC DETAILS.

# TM Batchsheet/Invoice

< SP E&C Insp.Engr >

< SP E&C Site Engr > < SP & RE Project Manager / Engg> < SP E&C QA-QC Manager / Engg. >

Rejected

Approved Approved with Comments

Date: 20/Feb/18 < For Client's Representative>

Shapoorji Pallonji E&C Page 1 of 1

Potrebbero piacerti anche