ADDITIONAL AGREEMENT/APPROVAL RECORD

Party Ref Ind. Name Sign Date

Revision Philosophy
• Revisions for Review - First issue will be issued at R01, with reason of issue description - Issued for Review, (with
subsequent R02, R03, etc. as required to be used in dependence of review status received by SPDC). Last issue: A01,
• Revisions for Review - First issue will be issued at R01, with reason of issue description - Issued for Review, (with
A02… with R02,
subsequent reason of etc.
R03, issue
as description
required to be - Issued
used in for approval,ofA02
dependence might
review be received
status reissuedby in SPDC).
case further modification
Last issue: A01,
occurred A02, with reason of issue description - Re-Issued for approval. When document
A02… with reason of issue description - Issued for approval (Final Issue) (A02 might be reissued in case further is considered closed by
SPDC, the occurred).
modification revision must be changed to C01, C02…. with reason of issue description - Approved for
Construction.
••Revisions
Revisions for Design
DesignDocumentation
Documentation- First- Firstissue
issuewill
willbebeissued
issuedat at
D01, with
D01, reason
with reasonof issue description
of issue - Issued
description for Review,
- Issued for
(with subsequent
Review, D02, D03,D02,
(with subsequent etc - D03,
issueetc
description - Issued
as required to befor Design
used (Design review).
in dependence as required
of review to be used
status received byinSPDC).
dependence
Last
of review
issue: C01,status receivedof by
with reason SPDC).
issue Last issue:
description C01,
- Issued for with reason of(Final
Construction issueDesign)
description
(C02- Issued
might befor Construction
reissued in case (Final
Design) (C02 might be reissued in case further modification occurred). When document is considered closed by SPDC, the
further modification occurred). When document is considered closed by SPDC, the revision must be increased (with no
revision must be increased (with no change on the document itself) and issued, with reason of issue description - Approved for
change on the document itself) and issued , with reason of issue description - Approved for Construction (Final Design).
Construction (Final Design).
• Revisions for Purchase - First issue will be issued at P01, with reason of issue description - Issued for Purchase, (P02, etc.
• Revisions for Purchase - First issue will be issued at P01, with reason of Last
to be used in dependence of review status received by SPDC).
issueissue:
description - Issued for Purchase, (P02,
P03, with reason of issue description
etc to be used in dependence of review status received by SPDC). Last
- Approved for Purchase (Final Issue) (P0X might be reissued in case further modification occurred). issue: P03, with reason of issue
description
• Revisions - Approved
for Information for Purchase
- First issue will(Final Issue)
be issued (P0Xwith
at R01, might be reissued
reason of issue in case further
description modification
- Issued occurred).
for Information.
• Revisions for As built - Documents or drawings revised as “As built” will be issued as Z01, Z02 Z03 etc. as required.
••Revisions for Information - First issue will be issued at R01, with reason of issue description - Issued for Information.
Narrative sections revised from previous approved issues are to be noted in the table below and/or highlighted in the RH
margin (using the appropriate revision status).
••Revisions for As built
Previous revision - Documents
highlighting or drawings
to be removed revised asissues.
at subsequent “As built” will be issued as Z01, Z02 Z03 etc as required.
• Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by the use of a
•triangle
Narrative sections
containing revised
the revisionfrom previous approved issues are to be noted in the table below and/or highlighted in the RH
status.
margin (using the appropriate revision
• If a document is cancelled the document status).
will be issued at the next sequential number by adding the suffixed with a X. For
example if R02 is the current revision then X03 will be the Cancelled revision, with reason of issue description - Cancelled.
• Previous revision highlighting to be removed at subsequent issues.
All revisions to this document must be approved by the relevant Technical authority.
• Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by the
use of a triangle containing the revision status.
• If a document is cancelled the document will be issued at the next sequential number by adding the suffixed with a X.
For example if R02 is the current revision then 03X will be the Cancelled revision

• All revisions to this document must be approved by the relevant Technical authority.

Revision No. Date of issue Document ID/Reason for change

C01 26-Nov-13 Approved for Construction

A01 18-Oct-2013 Issued for Approval

R01 26-Nov-2013 Issued for review and comments

SSG-NG01012401-GEN-BA-6066-00004 Existing PQR


Project Overview
The SSAGS Project Scope is to Modify the existing Flowstations located in Benisede , Opokushi,Ogbotobo,
Tunu and supply new gas Central Production Facilities ( CPF ) in Tunu in order to Gather all
Associated Gas , which is flared till now , and to export the NAG / AG gas to the Domestic Market
at the Required Specification.

Scope / Purpose of the Document


The Scope/Purpose of this Document: PQR S058 is to provide qualification of the SSAGS Structure WPS STR1
and STR2 that will be applied to Weld the Structure Section according to AWS D1.1 by SMAW Welding Process .
This Document is a PQR to be used for Structure welding, it was previousily Qualified in accordance to AWS D1.1
Additional PQR ( S059 / S065 ) are also used to qualify the above mentioned WPS . The same PQR are issued as this
one , but as separate document

Attachment : PQR S058

SSG-NG01012401-GEN-BA-6066-00004 Existing PQR

Page 3 of 3
This document is controlled electronically and uncontrolled when printed