Sei sulla pagina 1di 12

MATINDOK GAS DEVELOPMENT PROJECT

(MGDP)

APPLICATION FOR INSPECTION

Document No. :

Date : 07/09/2017

Attn :

Dear Sir,

We Would like to have Your Presence for inspection according to the following schedules :
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)

APPLICATION FOR INSPECTION

Document No. :

SUB CONTRACTOR CONTRACTOR (KWT)

NAME

SIGNATURE

DATE
VELOPMENT PROJECT
MGDP)

FOR INSPECTION
VELOPMENT PROJECT
MGDP)

FOR INSPECTION

COMPANY (PEP)
PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

MOTOR SOLO RUN TEST SHEET (AT SUBSTATION)


Equipment : Temperature :

Location : Matindok, Luwuk Manufacture :

System No. : Serial No. :

Sub System No. : References Drawing :

Weather :

NAME PLATE MOTOR DATA

TAG NO. POWER (kW) CURRENT (A) VOLTAGE (V) FREQ (Hz)

TIME DURATION

TEST POINT 15 30 45 60 75 90

MIN MIN MIN MIN MIN MIN

Voltage (Volt)

Current (A) S

Inrush Current (A) R/S/T

Note:
PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

MOTOR SOLO RUN TEST SHEET (AT SUBSTATION)


Equipment : Temperature :

SUB CONTRACTOR CONTRACTOR (KWT)

NAME

SIGNATURE

DATE
ERTAMINA EP
ELOPMENT PROJECT (MGDP)

TEST SHEET (AT SUBSTATION)

POWER FACTOR
FREQ (Hz) SPEED (RPM)
(PF)

TIME DURATION REMARKS

105 120

MIN MIN
ERTAMINA EP
ELOPMENT PROJECT (MGDP)

TEST SHEET (AT SUBSTATION)

CONTRACTOR (KWT) COMPANY (PEP)


PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

MOTOR SOLO RUN TEST SHEET (AT SUBSTATION)


Equipment : Temperature :

Location : Matindok, Luwuk Manufacture :

System No. : Serial No. :

Sub System No. : References Drawing :

Weather :

NAME PLATE MOTOR DATA

TAG NO. POWER (kW) CURRENT (A) VOLTAGE (V) FREQ (Hz)

TIME DURATION

TEST POINT 15 30 45 60 75 90

MIN MIN MIN MIN MIN MIN

Noise Level (dB)

Speed (RPM)

Temp. Bearing DE (oC)

Temp. Bearing NDE(oC)

CW
Rotation
CCW

Horizontal

Vibration DE (mm/sec) Vertical

Axial

Horizontal

Vibration NDE (mm/sec) Vertical

Axial
PT. PERTAMINA EP
MATINDOK GAS DEVELOPMENT PROJECT (MGDP)

MOTOR SOLO RUN TEST SHEET (AT SUBSTATION)


Equipment : Temperature :

Note:

SUB CONTRACTOR CONTRACTOR (KWT)

NAME

SIGNATURE

DATE
ERTAMINA EP
ELOPMENT PROJECT (MGDP)

TEST SHEET (AT SUBSTATION)

POWER FACTOR
FREQ (Hz) SPEED (RPM)
(PF)

TIME DURATION REMARKS