Bored Piling
Details Category: Bored Piling Published: August 02, 2012 Hits: 8671
Bored
Piling
Contiguous
With a standard rig, working a 12 hour shift, a typical output rate of 66
hrs/hole/rig is possible. Piling
Ground
• As-Built Information. On Central Reclamation, Contract UA11/91, borehole
Anchors
drilling completed with the following results...
Hand Dug
1. Average depth of 61.15 m, total depth of 428 m Caissons
Secant
The Target Founding level Piling
Sheet
Piling
Plant
Productions
Road and Rail
Tunneling &
Mining