INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
3.0 INSTALLATION
Page 1 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
See See
3.3 Cathodic Protection Refer to SATIP-X series as applicable
Remarks Remarks
SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.4 Sprinkler and Standpipe Installation
S-4062 S-4062
W W each Building / Area
Hangers and supports Installation SAIC SAIC Saudi Aramco shall be notified on start of this activity for
3.5
Inspection S-4061 S-4061
W W each Building / Area
Location and Spacing Installation SAIC SAIC Saudi Aramco to be notified on start of this activity for
3.7
Inspection S-4024 S-4024
W W each building / area
Page 2 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
See See
3.12 Fire Detection and Alarm System See SATIP-B-014-01 Fire Detection / Alarm
Remarks Remarks
Motor Operated Valves and Control See See See SATIP-P-J-700-01 Motor Operated Valves and
3.13
Valves Remarks Remarks Control Valves
4.0 PRE-COMMISSIONING
NFPA-13
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.1 Sprinkler System Acceptance Test NFPA-13 93
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms
NFPA-14
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall be
4.2 Standpipe System Acceptance Test NFPA-14 96
Fig. 8-1 (b)
H H in accordance with SATIP-A-004-002
Forms
SAIC SAIC
4.3 Final system Inspection
S-4026 S-4026
H H
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Page 3 of 4
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 REV 3 COS 06/30/2008
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 01-Jun-09 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Page 4 of 4