Sei sulla pagina 1di 13

CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &

INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA


Issue date: 2015/Mar/2

PRIVATE ENGINEERING OFFICE PROJECTS

Project’s(representative)PICTURE
ENGINEERING VERIFICATION CALCULATION FOR
AHU EXTERNAL STATIC PRESSURE D-AHU-9
Construction, Completion & Maintenance of Worker Hospital &
Integrated Health Center at Ras Laffan Industrial Area

PEO PROJECT No.: 11009


Document
QACC-WH-DCA-02-H-003 Revision No.: 0
No.:

Issue Status: For Approval Project Phase: Construction

Prepared by: Reviewed by: Reviewed by: Approved by:

Rajmohon Ahmed El
Name Md.Musthafa Simon Gardener
Rajkumar Singh Ghazouly

Mechanical
Design Manager - MEP Manager - Project Manager -
Job Title Engineer -
ETA QACC QACC
ETA

Signature

Date 2015/Mar/2 2015/Mar/2 2015/Mar/2 2015/Mar/2

Controlled DAR AL-


1 Issued to:
Copy No: HANDASAH

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 1 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

Table of Contents
Section Description Page No.

1 Verification calculation Summary of AHU external static pressure for D-AHU-9


2 Air handling unit D-AHU-9 external static pressure calculation sheet
3 Supporting Documents
1. Reference List
2. HVAC IFC Schedule
3. HVAC IFC layout
4. Datas used for Calculation

4 Result

Appendix A List and Samples of Standard Forms – Not Applicable -NA-

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 2 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

1. VERIFICATION
CALCULATION
SUMMARY OF D-AHU-9
EXTERNAL STATIC
PRESSURE
CALCULATION

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 3 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

2. AIR HANDLING UNIT


D-AHU-9 EXTERNAL
STATIC PRESSURE
CALCULATION SHEET

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 4 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

3. SUPPORTING
DOCUMENTS

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 5 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

The list of Supporting Documents for This Engineering Verification calculation attached
herein with this submittal as follows:

1. Reference list
2. HVAC IFC Schedule – WHIHC (RLC)
3. HVAC layout – WHIHC (RLC)
4. Datas Used For Calculation – WHIHC (RLC)

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 6 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

3.1 REFERENCE LIST

3.1 Reference List

Sl.
Reference Description Reference No.
No

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 7 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

1. M-SCH-EQP-2 Rev.4
1 AHU Schedule
1. WH-02-HC-H-BL-SD-002-01 Rev 3
2 HVAC plan layout 2. M-100B-WH1-Z1 , M-100B-WH2-Z2 REV4

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 8 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

3.2 HVAC IFC SCHEDULE –


WHIHC (RLC)

3.3 HVAC LAYOUT -


WHIHC (RLC)
Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 9 of 13
CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

3.4 DATAS USED FOR


CALCULATION

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 10 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

3.5 DATAS USED FOR


CALCULATION

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 11 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

4.RESULT
From the verification calculation, below is the summary of Specified and Calculated (Verified) External
static pressure for Air handling unit D-AHU-9 located in WH-zone 2-Basement Mechanical room.

External static pressure (in External


Sl Pascal) static
No. AHU Tag No Location Of AHU pressure to
Design Calculated
be offered,
specified Value
(in pascal)

WH-zone 2-
1 D-AHU-9 Basement 1252 837 1252
Mechanical room

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 12 of 13


CONSTRUCTION, COMPLETION & MAINTENANCE OF WORKER HOSPITAL &
INTEGRATED HEALTH CENTER AT RAS LAFFAN INDUSTRIAL AREA
Issue date: 2015/Mar/2

Document No.: QACC-WH-DCA-02-H-002 Rev.0 Page 13 of 13

Potrebbero piacerti anche