For Authorised use onlv

ZTLLA PARISHAD, PI-INE-4 1 1 OO 1


"\
RURAL WATER-SUPPLY-WORKS DIVISION,PI-INE
B-1 TENDER

FOR

Piped water Supply Scheme

(Taluka

(B-1/ for the year - )

Tender Notice, Detailed Tender Notice, B-1 Form,


Schedule
tAt,schedulesBt and Drawings,
Conditions and Specifications.

OFFICE OF THB

EXECUTTVE ENGINEER
RURAL WATER-SUPPLY-WORKS DTVISION,
PUNE
JrmiorAccormts Ofrcer

' ExecutiveEngineeq,
RuaI Water Supply Works DivisiorL
Contraslor No. of Corrections Zilla Parishad, Pune.
:..'
ZTLLAPARISHAI),
PUNE - 411 001.

NameofWork:

(faluka -

INDEX
Sr. No, Brief Description of Contents Pages '

From To

I t 3 4

I Check List I 7

2. Detailed Tender Notice 8 ll


J. Form B- 1 (Contract) tz JI

A
Schedule'A 38 39

5. Schedule'B' 40 o/

o. General Conditions & Specifications 68 103

7. Declaration to be Signed by the Contractor 104

8. Undertaking for Guarantee 105 106

9. Drawings. 107 110

Executive Engineer,
Rural Water Supply Works Divisiorq
Contractor No. of Corrections Zilla Parishad, Pune.
ffi
g
:t
=
=':
a€
it
ZILLAPARTSHAD,
:{
PUNE - 411 001.
:1

il RURAL WATER-SUPPLY WORKS DIVISION, PUNE


l't

1'
Name of Work: Piped Water Supply Scheme
i
:: (Taluka - , District - Pune)
i
,,

- CHECK LIST
:

I
t I. T\r,o envelopes systern shall be foilowed.

2. The challa'fro'r Pune District cenhar co-op Ba'k (Branch -


Z.-p.) i'support ofhaving
unless exempted is required. rfexempted, the attested
:::ii::A:::l?
copy of an eamest money exemption _ certificate may be attached.
orthe photostar

The should be in separato cover

Valid Incorne Tax Clearance Certificate in original


or pllotostat copy.
A certified or photostat copy ofvalicl Rcgistration Certificate.

Photostat or attested copy of partnership deed


and power of attornev.
A list of works tendered fbr anC in hand (statement .
No. 1)
A list of works of similar type and magnifude carried
out (Statement No. II)
L-ist ofnrachinery and plants available
wittr the tender for immediate use on this work (Staterne't
No. {il)

Details ofTechnical personnel on the roll


ofthe tenderer (Statement No. IV)
Details ofworks executed in the interior,
backward and hilly areas during the preceeding
years. (StaremenL No. V)

Important Note : please note that


omission to attach any document rs rikely to invalidate
the tender.

Contractor
No. of Corrections Executive Engineer
+< I
ho
fJ t!q)

o d
!to .jr 6
qxR F
o
o
x
.FE U
a
o
I
d
F.e-
icd
.9
o co *88
.9
-t iFF @

tt
o f {D
o
o .5X t--
at,
tt
o
a o
.i:
oo x
Fl
t!)
I
.(u
|- \o O
z!t
uJc A
z
=g
Fr; qi 9p
-o v Ft .x
o! o cq
.qE9
;
! l-E-
au
f l€e
o
ro
lE"
o h
o
tttr
c_)
o dd
o o
o
ta (l
o F
3
o
+<
.9,
G
o
f (\
o (.)

a
z

,fE
0)
I
lI)
!
o
t-
(t) u
& l;i trl

;,

k
od
I
s.e
J;i
+& \o

q)
'r .j
:

q2-
fi.Y 4." a
o t0)
o.;
A
z a
I ct,

Fr
z
b0 oo

F i '-.

a h
L

tri

rl B

;l o

2l O
.il
rl
I ,j
>
c.l
F

z
E
az i^.1
;l
5

E
E
so
o
'E

d
qt

lr
Iq)

tf
c)

z'a
I
2P
t-{
lFi .:=
2E
r-i cJ
Ftr
ti= 7,
-4E

a)

a)

Q
E
c-

'5b
E]
q
c)

-cqJ q)
E.ltI
Etg \o
rJ.l

d c€
9
.: 9s
lr .E
b 5.'

I
E3;
'd r-s I

H3e '- |
li3
Fb; .l

F-1
= ti
Z1
ET] OJ
5H
tsitr
2tr
r-i o
Ah
-J aY
5-:
o 0.)

!41 ,l
\t) <,

:l
.q
F .9
!

'l

a ,:
.'

+r
.:
B
N
c)

(n '7
9s

i;
:
t,,,,

:r- l
nl:li-.
tr
q)

00

q)
I
I
{)

!!
'il
15'
arl
ctl
9l

A
\J
EI li
i
z ; l!
.(!f-
FEI
Z !.\ till
rg
r-i .! l,:-
F l)i
ts
1
..
^O l"i
: J.E
F-,* !.r lA
ct) el
'rq)l l-

- l-U
x l5
8la
o lv
rYl
I l--.-
tl
--l

o lt
E
r: t!
'}
(|) le
A le

,r2 /-
8

ZILLA PARISHAD, PIJNE - 411 001.

RURAL WATER.SUPPLY WORK$ DIVISION, PI.INE..

DETAILEDTENDERNOTICE

Nane of work :

i,.
sealed percentage tenders in B.l form are invited from contractors regist€red in
cate9ory............. and above, under the System of approved list of'
Maharashha Jeevan Pradhikaran. The name ofworlg estimated cost, eamest money, security deposi!
time limit etc, are as urder

Sr. NameofWork Timelimit


Calender
in Rs.

',

3.1

J.Z

Ru-al Water Supply Works Division,


Contractor No. of Corrections Zilla Paristrad, Pune.
9
3.3 Eamest money in any other form of D.D. or cheque will not be accepted.
3.4 The atnount of eamest money will be forfeited, in case surcess:fi contractor does not pay the amount
ofinitial security deposit, within the time specified as stipulated by the Executive Engineer apd complete
the contract docurnent. In all other cascq, eanest qolrey will be pfundable.
3 . 5 The successful tenderer shall have to pay, halfttre security Deposit in cash or in the form ofapproved
security form and the balance is recoverable through running account bill at the percentage qtipulated in
theagreement. I

3.6 In the event offailure ofthe tenderer to pay cash security deposit within l0 days (unless extended i1
writing by the the Ex. Engineer) from the date ofreceipt ofnotice (Sent by Registered Post) ofacceptance
ofhis tender, the amormt ofeamest money shall by forfeited to Govt. and the acceptance ofhis tender;
shall be considered as withdrawn. Except that in the event of the notice ofacceptance ofhis tendernot
being issued within 120 days ofthe date dfopening oftenders, the tenderer shall have the c]ption (to be
intirnated in good time before the expiry of 120 days period ) ofwithdrawing his tender, inl which case
the eamest money should be refunded in full. All the tenders shall be kept open for 120 ddys frbm the
date ofthe tenders.

3 '7 Eamest money ofthe rmsuccessfl tenderers will be refinded on their application only, after an intimation
ofrej ection oftheir tender is sent to them or on the expiry ofthe validity period whicheverl is earlier.
3 . 8 The accqrtance ofthe tender may be intimated to the conractor telegraphically or otherwiqe and either
by the oficer, Zilla Parishad Pune and such intimation shall be deemed to be an intimation ofacceptance
ofthe tender, given by the authority competent to accept the tender.
4.1 Deleted
42 In case ofBJ Tender, the tenderer shall enter in the blank space on No. 14 ofthe printgd B-l form
under para "Tender for the Work" the percentage in figures and words and score out one cifthe wor ds
"belodabove" as necessary under his attestation. In case there is difference between perceniage wnuen
in figures and words, the lower offer will be taken as final.

5. No pages should be removed from, added in, or replaced in the Tender.

6. Submission ofTender :

The tender should be submitted in two separate sealed covers as under:

(A) One seaied cover should contain the followine documents onlv.

I Forwarding letter indicating the docr:ments attac,hed therelr, In case ifcontactor desiros to submit
with any,mgdition etc. these mnditions should also be-submitted in the first cover.
the tender

iii)

iv) Any upto date and valid Income Tax clearance certificate in original or true copy thereofduly
attested by a Gazetted oflicer.

Executive Engineer,
Rural Water Supply Works Division,
Contractor No. of Corrections Zilla Parisha{ Pune.
10
v) Details of works of similar type and magnitude carried out by the tenderer as peq proforma
I
attached with the tender with the certificate form head-ofofficer concemed.r" '-r r':l:li:i';r' .l ,

o
vrD Details ofplant and machinety irnmediately availablg with the te,nderer for use on t\is work, as
per proforma attached with the tender. i

wD

ix)

(B)

,7
Opening ofTender :

D The second sealed cover, containing the 'sealed Quotation,will be opened in the
tenderers or their authorised representatiyes only after the part ofthe.tender
has been scrutinished and the conditions got clarified ifnecessary.

*) The sealed quotation based on the DeparFnental Desigr, as well as on tenderer's


design, when so permitted will be considered for opening, only when the auttrority

the sealed. cover containing the quotation will not be opened at all,but willbe returned to the
tenderer treating it as invalid and his acknowledgrnent obtained in token ofreceipt ofthe same.

8. The confactor will have to sign the original copy ofthe tender papers and the drawings according io
which the work is to be carried out. He shall also havelo give a declaration to the effect that he has fuIl
studied the plans, specifications, local conditiors, availability;flabour and mater.ials and that he
has quoted his rates with due consideration to all these factbrs.
9. The right is reserved to revise or amend the contract documents, prior to the date noticed for the
receipt of tenders or extended date. Such deviations,amendments or extensions, of any, shall be
communicated i4 the form of corrigendum by letter or / and by notice in Newspapers as may be
considered suitable.

10. The tenderer shall in the letter, forwarding the tender, state any points he may wish to make in addition
to all points prescribed to be stated under the specifications and conditions ofthis contact. Zilla parishad
reserves the right to reject any tender, iftho same becomes a conditional tender therebv.

Bxecutive Engineer,
Rural Water Supply Works Division,
Contractor No. of Corrections
.ii
1Jfr
, rr'l

l1
11.

by him, he

12.

13.

t4.

15. Right to reject any or all tenders


tender lies with the CompetentAuthority. r
16.

t7.

18.

D upto bglowrated tender - Initially


@ 2% ofTender cost * From each R.A .Bill.@2% .

D
iii)

.l:i

Executive Engineer,
Rural Water Supply Works Diisron,
Contractor
Noi of Corrections Zilla paristrad, ?une.
t2
FOBMB -.1.

DIVISION : : Execrrtive Engineerr,Rural Water, g.pply Works,,Division;

I . All worla proposed to be executed by conbagt shall be notified in a form ofinvitation to


on a board hung up in the office ofthe Executive Engineer and signedby the Executive

the percentage, ifany, to be deducted from billsi,It will statewhether refund ofa quarry fees;royalties,
dues and grorurd rents will be granted,.copies ofthe specifications, designs and drawings estimated

Where the works are proposed to be execirted according to the specificatioiis recommende bya
sucli
,9$t9eryntsilq9r{Ft "1ri: i,. r :,;,.:,-',.
-In'the- eventof. the tenderbeing submittdrby. A lfirtn;liitimust,.uc",sigred'-b! eachi
and in ttre event ofthe absence ofany partner, it shall be signed on his behalfty a

..:- (Rs ,,.,......'..;..,,1..;.t;:...:...i.,.r;,.:.'.:,r,) as andby wayof€amestmoney::lhecontractor-may.pay the


said amount by forwarding alongwith the tender challan of P.D.C.C, Bank @r. Z.p.).:The said

, ,emo]|Irtsf93lltFstpgngy"sfyl-1ry1-c9qy,?nli+l,e,,rtsjylletfg:€y.€$.;,,,,,:,::t i,_, . .,.,.., .,,


Q In the event ofhis tender being accepted zubject to.the provisions ofzub/clause (rII) below, the

Executive Engineer,
Rural Water Supply Work Division,
N9, ofponpctions ZillaParisha4Pune-
J.

6.
'7.

9. All work shall be measure net by standard measure and according to the rules and customs ofthe

10.

lt.

12.

Executive Engineer,
Rural Water Supply Works Division,
Contractor No. of Corrections Zilla Parishad, Pune.
L4

13.

t.t.

15.

16.

17.
to him "

18.

19.

20.

21' The conhactor shall comply with the provision of theApprentices Act l96l and
the rules and orders
issued there rmder from time to time, ifhe fails.to do so his failure
will be a brsach ofthe contact and :.
the Executive Engineer, may in his discgetion ganaelthe qonractrThe
contractor shall also bp liable.for .
any pecuniary liability, arising on accountpfany violation by.him ofprovision
ofAct.

.,.;:.- -..,_ .' :


.) ...:....,'.,.. ...::.:.. , .,. ....,,,r,,,._ir,a..r,, . t,....,.j.",, ,.i
:- ,: ,

Exocutive Enginee,
Rural Water Supply Works Divisioq
Contractor No. of Corrections
)..'l'' Zillaparishd,l1q1p, .
15
.:)! . .: ..: .,!i-

In figures as well as in

'i ''ir. , '' :,.rnrvndnsrcfe-'..sdtprgculp11seofeul;a*iri.i.iliJffi"ffi,ilifiilll


,.lrseptSipsq@1*rr".1aspa.a-lsfeigre*"rr",i],",-rf a-eqpv,h"
f; ".:ffi*ff :.Ty*andthe;;t*.t"b;;;g:q;iiffi.biibr_6provided
res to be paid tbrthern shall be as provide
./-.. -4.1r-'.:
,.. i .,... ... .. r r.ii:r ,,,:.._ i:.-t..,lii;.,.i,tri,.,..",
tr4EO4OMNDUM.,,:,,,,:^.,,:.,..,i1
RANDUM ^,...,;.. ...
a) Ifseveral subworks are . l.-' a) General descrjDtioril:.-.';
.

included they should be ,, : .: : ' -, - ,---; ,: : tlieed ",


, r
Piped Water Supply Schone
Sc.l
'
ailled in a seperate list. --.
( t aluKa - Distl f Pun6)
I
c) The amount ofeamest b)'
.i,. i...:.l-:li.':. r.i:;t,r::;..i .. : ' Ir :iii"i
!.r.-,jjtiiir

ii
;"';i;;;;;ffi EstimatedPsti ::',::"':
.' 'j '::-j.::'t ' :': ' I Rs.
'j:i'i"':Ji::',!r,, '
'urr,u.-i""""J.J-i'.....]i.r.|,i;:'.i..]ij,;i':
with the provisions of c) Eamestmoney 'i '!" 'R-i;.:t,.',ir':;.', -...
f:

where security deposit is by the cost is doen


laken see note to clause 1
.......,. percent
of the conditions oi the
conract.
!l\i fl Time allowed forthe work from date
f) Give schedule where
ofwritten order !o comrnence
""""".calender
ri necessary showing dates
, ;;;il"
:::^':1.::lvt;i*"o#'olTff ffiT""ffi 'fli'trffi#Tff l#trfrffi HililH
comprete. wittrdrawnuvtirJ*-uir"tJrtr'"Hi'gai,rv-ff;iltd;,ffiryopenins
are to be

the tenders and sent by registoed postAD


oi ottrerwise derilr!fi*uiti" om"" or
:
,r:,r-i;:,:_.-i J.'ri.i ,v?, i

...- 1:...., 1,..:.1" Executive Engineer,


Contractor ' rr" '
Nolof 'Cii'necti6hs
Rural Water Supp.ly Works Diisron,
j
"a Zilla parisha4 punie.
l6
such authority. Treasury- Bank challan No. & date or Depopit a1 c4l1 recelpt No.
& date or term deposit receipt for a period ofone year receiptNo ....,.........,.......
date -.................... in respect ofthe surn ofRs.*............................................ in
worcls ................ representing the eamest money is herewith
forwarded. The amount of eamest money shall not bear interest and shall be
liable to be forfeited to the Govemment shoutd I / We fail to (i) abide by the
stipulation to keep the offer open for the period mentioned above or (ii) sigr and
complete the contract documents as required by the Engineer and fumish the
security deposit as specified in itan (d) ofthe mernorandum contained in paragraph
(i) above wittrin the time limit laid dorvn in clause (I) of the annexed. General
Conditions ofContact. The amount ofeamest money may be adjusted torvards
the security deposit or refunded to me/us if so desired by me/us in, yritting,
udess the same or any part thereofhas been forfeited as aforesaid.
3. IAVe have secured exemption from payment of earnest money after
executing the necessary bond in favour ofttre Govt. a tue copy ofwhich enclosed
herewith should any occasion for forfeihue ofeamest money for this work arise
due to failure on myiour parl to (i) abide by the stipulations to keep the offer
open for the period mentioned above or (ii) sign and complete the contract
documents and fumish the security deposit as specified in itern (d) of the
Memorandum contained in paragraph 1 abovewithinthe timelimitlaiddown in
clause (I) ofthe annexed General Conditions ofConhact the amormt payable by
mdus may at the option ofthe Engineer be recovered out of *re amount deposited
in lump sum for securing exemption in so far as the same may extend in terrns of
the said bond and in the event of the deficiency out ofany other moneys which
are due or payable to rne/us by the Govemmeirt under-any othqr contract or
farsaction ofany nature whatsoever or otherwise.
4. Should this tenderbe accepted I/We hereby agree to abide by and fulfil
and the terms and provisions ofthe conditions ofcontact annexed hereto so far
as applicable and in default thore ofto forfeit and pay to Govemment the surn of
money mentioned in the said conditions.
Receipt No..............., dated ....,........... from the Govemment Treasury or Sub Amount to be spqcified in
- Treasury at ........,..... ........ in respect ofthe sum ofRs. * ........,.....,....,............... words and figures.
is herewith forwarded representing the eamest money (a) ttre firl I val ue of which
is to be absolutely forfeited to Govemment should I/We not deposjt the firll
amount ofsecurity deposit specified in the above memorandum in accordance Strike out (a) if no cash
with clause l(A) of the said conditions, otherwise the said sum of security deposiit is to be
Rs......................................... shall be refirndrcd. taken.
Contractor
Address

Dated the day of I9


(Wihess)
Address.
Signature of wihress
to Confractors signature
(Occupation)
Executive Engineer,
Rural Water Supply Works Dvisior4
Contractor No. of Corrections zilla Parisha4 pune.
17
The above tender is her*y accepted by me for and on behalfoftl Govcmment
of Maharashtra.

Dated day of ry srgnature o{ the officer


- by whom accepted

securitvDeposit c11ry9 r The person/persons whose tender


:
-uy b" u"""pt"f (hereinafter
pwD Resolution N".
lyp,T::"ty::f, .;,il;ff#ffifr"trJf"ft::TJl:lHffiffij},i*:',llffjffii
,T,l**,::y::1,^:Tchexpressionshallwnessexduaibyoi."pugo_,
cAr / 1087 / cR- 94/Bldg' 2 {A) wit}rin
O;;ti;t;;;v b" extended bv the Superintending Engineer
dt. r4-6-8e
r
iongerlea.gnto
!si^v"iriri".-t*aireEd;;,ffi;'i;iiii
receipt by him ofthe notification ofthe acceptance
ro; ortr,"
ofhis tender deposit with
tire
lxecutile Englneer in cash or Govt. securities endo.rJ to tt n*."otiu"
Engineer, (fdeposited formore than 12
-ontlo) ofs.on;;ffi;;;which "
will
the deposit specified in th! tend* o.iejai,;..it
T-a|e:e ldl :ecwiry
aT me tlme.ot making any payment
Co"t.
to him for work done under the contract
deduct such as will amount to *............ percent
ofall money so payable zuch
d:^1Tr.1:1r b:h:ld by Govt. by way orr."*iry
1"
J"po.iij,rroti.a ur*uy,
a Iump ium ty *ay ors""*ity
lll:,1li"as ":-l-"fr+e.c:ng:r3;.deplsiting
deposit contemplatecl at (A) abov" th"o"^d;1;;h;;,;it";il;
aeposlted shall not amount to ............ percent ofthe
total estir4ated_ cost of
work, it shall be lawful for Govt. at thl time of makine
anv
conhactor for work done under
w urrr uuue uuucr c,onuaq
conhact to maKe
make upup the irll
tull arno$nt
an ofperc€nt
by deducting a zufficient zum Aom every such payment
astust uio."srO urrtit
the firll amomt of the security deposir is naae
s'ms 01 money payable by the contractor to Govt. undir
up. el co;p;-*rt";;#;
the:terms of his
contractmay be deducted from or paid by the sale
ofrrffi"i.ni;; ;ilj;
interest arisingtirerefrom, or tom _f su_s *rri"r,
:Ty?ggi1t"1fromttre
may be due or may become due by co;. to the ;;;;;io, ,ind". *u otlr".
hansactiorr ofany nature on any account whatsoeu,e.
:onqaq:.r anj in the
evenl ol tus security deposit being reduced by reason
ofany such deduction
or sale as aforesaid, the contractor shall wiihin
tep daysti".i aft"r, make
gbod in cash or Govt. securities endorsed
as ufo."ru-i'Junv sum or sums
which rrayhavebeendeducted from orraised bysale
or any part thereof The security deposit refenedio
oidil;;;dJ
when paid in casi rnay, at
the cost ofttre depositorbe converted into interest
bearing's**itio p.oUd"a
that the depositers has expressly desired this
in writin

lt^1".1^"T, gtthe security deposit to be paid in a lump sum within the


above is not paid the tender/conrracf aheady
:.":?l^T:li "](A)
snall oe consldered as cancelled and legal steps taken against
accepted
the contractor
for recovery of the amounts. The amout of ihe securi[r deposit lodged by
the contractol shallbgpfi+ded alongwittr the paymeniJf,f,J n rf tiff,
iftf,"
Note : * Thii will be the.same percentage as that tn the tender at ge1

Executive Engineer,
Rural Water Supply Works. Division,
Contractor
Zilla parisha4 pune.
l8
date upto which the contractor has agreed to maintain the work in good order is over.
Ifsuchdate is not over, only 50/o arnourtofseority deposit shall berefimded alongiwth
the payment ofthe final bill. The amormt ofsecuritydeposit retainedby theGovl shall
be released after expiryofperiod upto which the conhactor has agreed to maintain the
work in good.order is over. In the event ofthe contractor. failing ofneglecting the
complete rectification workwithin the period upto which the contactor has agreed to
maintain the work in good order, then, subject to provisions ofclauses 17 and 20
hereofthe amount of Security Dep.osit re@ned by GovJ. shall be adjusted towards the
excess cost incurred by the departrnent on rectification ofwork. l
l

Clause 2 : The time allowed for carrying out the work as entered in the tender shall Compensation fpr delay
be strictly observed by the confactor and shall be reckoned from the date on which
the order to commence work is given to the contractor. The work shall through the I

stipulated period ofthe contractproceeded with all due dilligence (tirne being deemed .l

to be ofthe essence ofthe contract on the part ofthe contacto4 and the contractor
shall pay as compensation an arnount equal to one percent or such smaller amount
as the Superintending Enginea (Whose decision in writting shall be fnal) inay decide,
ofthe amouqt ofthe estirnated cost ofthe whole work as shown by the tenderer for
every day that the work remairn rncommenced, or urfinished after the proper dates.
Aad firrther to ensure good progress during execution ofthe work, the contractor
l
shall be bound, in all cases in which the time allowed lbr any work exceeds one
month to complete.
1/4 of the work in
1/2 of the work in
3/4 of the work in
Full ofthework in

The following proportion will usually be found suitableln 1/4,1/2, 3/4 ofthe time
Reasonable progress of earth wprl . l l 6, l l 2, 3 /4 of the total value of the work to
be donel

work to be done.
In the event ofthe contractor failing to comply wifl this conditions he shall bo liable
to pay as compensation an amount equal torone percqnt or sugh s.maller amount as
drc Superintending Engineer (whose decision in witing shall.bc final) maydeoide of
the said estimated cost ofthe whole work for eve. ry day. that the dup quanlity of
work remains incomplete,provided always drat the total amount of cornBe"nsa.dgn to
ofthis claus eshallnot acceed l0 pgrceqt gfthe,esgmated
be paid nnder the provisions
cost ofthe work as shownin tlre tender. Sqperintending Engt'ggr, should be the final
authority in this respect irrespeolivg -the fapt thQt,thp tgnder is_ qcgepted.by Chief
Engineer,Addl.
Executive Enginee4
Rural Water Supply Works Division,
No. of Corrections Zi[a Parishe4 Pune.
19

CtriefEngineer/Supgr,ntending Enginger/Exec.utivg Engineer or,Assist. Engineer/


DepulyEnginegr,

Action when whole of Clause 3 : In any cases in which under any clause of this mntract conracbr
security deposit is forfeited shall have tendered himselfliable to pay compensation amou: whole of
his security deposit whether paid one sum or deducted by ir or in the
case ofabandonment ofthework owing to serious illness or death mntractor
or any other cpuse the Executive Engineer on behalf of the of
Maharashha shall have power to adopt any of the following as hemay
deem best suited to the interest of Government.
(a) To rescind the contact (forwhich recession notice in writing to thp conbactor
under the hand ofExecutive Engineer shall be conclusive evidence) and in that
case the Security deposit ofthe contractor shall stand forfeited and b9 absolutely
at the disposal of Government.

(b) To carry out the work or any part of the work departrnentally debiting the
contactor with the cost ofthe work, expenditure incurred on tools and plant,
and charges on additienal sqpg-rvisory staflincluding the cost gfwork - c,larged
establishment employed for getting the unexecuted part ofthe complete
and crediting him with the value of the work done deparhnen!,ally in]all respe.cts
in the same manner and at t}te same rates-as if it had been out by the
contactorunderthe t€rms ofhis contact. The certificate ofthe :Engineer
as to the cost and other allied expenses so incurred and as to the ofthe
work so done depart4entally shall be final and conclusive against contactor.
(c) To order that the work ofthe conhactor be measured up and take such
part there ofas shall be unexecuted out ofhis hands, and to give to another
contractor to complete, in which case all expenses incurred to at
for fixing a new contacting agenc,y;r sddifisnal zupervisory the
cost of work charged establishment, and the cost ofthe work by the
new contmct agency will be debited to the contractor and the value
'
done or executed through the new contractor shall be credited to the contractor
in all respects and in the- same manner.and at the same rates as if it had been
carried out by the cnntractor under the terms ofhis conhact. The certificate of
the Executive Engineer as to all the cost ofthe work and other expenses inqqr€d
as aforesaid for or in getting the unexecuted work done by the nerv contractor
and as to the value ofthe work so done shall be final.and conclusive against the
contractor.
In case the contract.shall be rescinded under c_larise (a) above the contractor
shall not be entided to recover or be paid, any sum for any work therefore actually
performed by him under this confact,unless and until the Executivelngineer
shall have certified in writting the performance ofthe such work-and the amount
payable to him respect thereofand he shall only entitlod be paid the amount so
certified in the event ofeith€r ofthe courses referred in clause (b) or (c) being
adopted and the'cost of the work exeeuted departrnentally or tbrough a new
contaclor and other allied expenses e. xceeding the value ofsuch work credited
ir.i -,.:,'.

Executive Engineer,
l1

llr
'.1: )),J.1 / Rural Water Supply Works Division,
i;ti Contractor No. of Corrections Zilla Parishad Pme.
iri
iri
20
to the contractofs the amount ofexcess shall be deducted from any money due
to the conhactom by Got. under the conhact or otherwise howsoever or from
his security deposit or the sale proceeds thereofprovided however that the mnt act
shall have no claim against Govt. even ifthe certified value ofthe work done
departmently ofthrough a new conkactor exceeds the certified cost ofsuch
work and allied expenses provided always that whichever ofthe three cources
mentionedin,clause (a), (b), (c) is adopted. by the Executive Engineer, the
i-.
contactor shall have no claim to compensation for.any loss sustained by him by i
reason ofhis having purchased by procured any materials or entered into any .

engagements or made any advanceon account ofor with aview to the execution
ofthe work or theperformance ofthe contracl .,

Action when [he progress


of any particirlar portion
of the Work is
unsatisfactorv
I

Contractorremins liable to
pay compensafion ofaction
not taken under clause 3
and 4.

Power to take possession


of or require removal of
or sell contractor's plant

Extension oftime.

Executive Engineer,
Rural Water Supply Works Divisioq
No.-of Co{regtions: Zilla parisha4 pune"
2l

fo,r gxterylon occ.ured whichever is earlier and the Executive Engineer or


3f;in8
in the opinion ofSuperintending Engi4eer or ChiefBngiqeer as the casp ;Lay be if
h lis opinion, there were reasonable grounds for granting an extension, grant
such extension as he thinks necessary proper the decision ofthe Execitive
.or
Engineer in this matter slnll be final
Final Cenificate Clause 7 : On the completion of the work the contractor. shall beifumish with a
certificate by the Executive Engineer (hereinaftercallcd thc Enginepr. in _ charge)
ofsuch completion but no such certificate shall be given nor lhall work be
considercd to be complete rmtil the confactor shall havi ttre worldbe considered
to be complete mtil the contractor shall have removed from thle premises
on
which the work shall have been executed alr scaffording all surptu$ rnateriats
ana
rubbish and shall have cleaned ofthe dirt from all wood work dqors,
windows
walls floor or other pars ofany building in or upon which the work, shall
haye
been executed all scaffolding, all surplus materials and rubbish
lnd shall have
clganed of the dirt from all wood work doors, windows walls floo1 or other parts
ofany building in or upon which the worlg has been executed or ofwhich he mav
have had possession for the purpose ofexecuting the work nor until the
wort
shall been measured by the Engineer - in - chargi or where the measurement
have been taken by his subordinates until they have ieceived a$proval
ofthe
Engineer - in - charge the measurern€xt being binding and conclusive agairst
the
contractor, ifthe contactor shall fall to comply with therequirements
ofthis
clause as to the removal ofscaffording s'rplus materials and .bbi.h
*d
"I"-irrg
ofdirt on or before the date fixed for ttre completion ofthe work thg Engineer-inl
charge may at the expenses ofthe contractor remove such scaffcildinl
sumlus
an!_rubbish and dispose of the same as he thinks fit ana ptean*offsuctr
Tatenls
dirt as foresaid and the contract or shall forthwith pay zuch amourt
rifall expenses
so incuned but shall have no claim inrespect olany such
scaffotding sirplus
materials as aforesaid except for any sum actually realised by the
sale thereof
Payment on intermediate Clause 8 : No payment shall be made for any work estimated to cost less
than
certificate to be regarded rupees on thousand till after the whole ofwork shall have been completed
and a
as advances.
::fl:11"
than rupees "t":Tnletion
given but in the case of works ..d-"t"d il;.;;;;
one thousand the contractor shall on submitting amontl ybfll therefore

F pddd,tg rytle paymentproportionate to tfrpurtoFtir" *o*than approved


and passed by the Engineer-in-charge, whose certificate
ofsuch approval and
HSq:f fu so payable shall be final and mnclusive agairst the contractor.
"q
a :T:"*,T.Satepayrnarjs sha]l be regarded as paymorts by way ofadvance
agatn-$ m9 mgt payments only and not as payments for
work actually done and
complet{ and slall not preclude the Engineer.in-charge fiom reqliring
any bad
unsound imperfect or unskillfirll work to be re-&"a or taken
aivay and
reconstructed ofthe due performance of the contract or any part
treieofin anv
respect or the occ'rring of any claim nor shall it conclude
aa"r-lne o,
any other way the powers ofthe Engineer-in_chargeas to the final "reJirl
settlement and
adjustnatt ofthe accounts or otherwise or in an-y other way very ofeffect
the
contact' The final b l strallbe submittedty the contractor r"rtt
in-on" -on*, or
...l ,:.,. ..,rL.:.|

Executive Engineer,
Rural Water Supply Works DvisiorL
No, of.Oonections ,
Zilla parishad, puner
22

the work, other-wise the Enginer-in-ctrarge's certificatg of the meas. urerngnts


and ofthe total amount payable fo1 work shall be linal and binding o_n all partiq.

Clause 9 : The rates for several items ofwork estimated to cost more than Rs. Payment at redlced rates
1000 agreed to within, shall be valid only when the item concemed is accepted on account of items of
as having been compeJed firlly in accordance with the sanctioned speci.fications. work not acfepted as
In cases where the items of wofk are not accepted as so completed. by. the completed, to be at the
Engiqeer-in-charge may m-ake paytnent 9q 4ssount ofluah items.at such itpnls. discretion of thp Engineer
reduced rates as he may consider reasonable in the preparation offinal or on -m-cnarge. )

account bills.
. :' ;

Clause l0 : Abilt shall be subrnifted by the conbactor in each month or before Bill to be lubmitted
the date fixed by the Engineer-in chalge for all wolk executed in the previous monthly. .I .

month, and the Engineer-in charge shall take or cause to be taken the requisite
me.Nurement for the purpose ofhaving the same v- €rified and the clatrL so far as
it is adrnissible,shall be adjusted ifpossible,within ten days from thepresentatiorr
of the bill. If the contrqctor does not submit the bill within the time fixed as
aforesaid the Engineer;in -charge 1ngy depute. -a subordinate_ to measweup the
said wor! in the presence ofthe contractor pr his duly authorized agent whose
counter sjgnature tlo the mgaslnpm_entlist shall bc suffcien(yau-an! and Enginw
in-charge may pre. pare 4bill from sqph lisr. which shall,be binding on m" uU
respects.

Clause 11 : the contractor sball sub{nit all bills on the prinled forns- tobe onhad.
on 4ppliqation at the offis€,ofthp Engfrree.r-in -ctrarge.,Tt\E charge ,to,bemado in
the bill shall alrvays qe gpter, d aUhe rates specifid jn.th. e-teoden.orinthq qase
of
any. extra workordergd.irlpw6r,En6sof,thesp,cquditiplrsartd_ngt,q9_ntii_rtpd.,br
prpvidg{,f,o.1infutsr-ldsr'alilheralp+bgr.eu.-ra-fierplevid€df,sr,sucbwp,r.k._ .r..

the contractor but not so as in any way to control the meaning or eflect ofthis
contract specified in the schedule or memorandurn- hereto arurexed), contractor
shall be supplied with such materials and stoies asmay be required fiom time to
time to be used by him for the purpose ofthe conhact only,and value of,the firll
quantity or the materials and stores so supplied shall be set offor deducted from
any sums then due, or thereafter to become due to the contractor under the
contact or otherwise, or from the security deposit or the proceeds ofsale thereof-
if the security deposit is held in Govemment securities, the same or sufficient
portion thereofshal I in that case be sold for the purpose. All materials supplied to
the contractor shall remain the absolute properiy oiGovemment and shail on no
account be removed from the site ofthe work; and shall al all times be open for
inspection_by the Engineer-in-charge. Anysuch materials unused and in perfectly
good condition at the time of completion of termination of the connaci shall bi
retumed to the Deparhnental store if the Engineer-in-charge so requires
by a notice in writing givor under his hand but thp contractor shall not be entifled

Executive Engineer,
'.--1'.]:]r: Rural Water Supply Wo*s Division"
Cgntractqr ' No. Pf Correctiqns Zilla parishad,,pune,,
23

to return any such materials except with consent ofthe Engineel-in-charge and
he strall haveno claim for comperxation on account ofany such mbtsrial zupplied
tohim as aforesaid but rc4naining unusedby him or for any wastage in or damage
to any such materials.

Clause 12(a) :,All stores ofcontolled materials zuch as conenl steel etc. suppliod
to the contractor by Govemment should be kept by the confactQrunder lock &
key and will be accessible for inspectionby Executive Engineer orhis ager.rt at all
the time.

Works to be executed Clause 13 : The confactor shall execute the whole and every part of the work
in accordance with in the most zubstantial and worknanlike manner, and both regards rnaterial and
specifications, drawings, every otherrespect in sfict accordance with specifications. The contactor shall
orders etc. also confomr exactly firll and faithful to the designs, drawing and instructions in
writing relative to the work signed by the Engineer-in -charge and lodged in his
offico and to which the contractor shall be entitled to have access for the purpose
ofinspection at such of,fice, or on tho site.ofthe work during of,fice hows. The
contactor will be entitled to receive three sets of mntract drawing and working
drawing as well as one certificate copy ofthe accepted tender along with the
orrder free of mst. Further copies ofthe contract drawings and working drawings
if required by him, shall be supplied at the rate Rs.......... pertset of contract
drawings and Rs.,...... per work drawing except where otherwise specified.
Alterations in alteration in
specifications and designs that
not to invalidate contracts ofthe,work
with any

Rates for works not


entered in estimate or
schedule of rates of the
district.

Brecutive Engineer,
Ru'al Water Supply Works Divisiorq
Contractor No. of Corections Zilla Parishad. Prme.
'A

The time limit for the completion ofthe work shall be extended in theproportion Extensions df time in
that the increase in its cost occasioned by altemations or addi$ons be4rsto the consequtince df additions
cost ofthe original mntract work and the certifioate ofthe Engineer - in - charge or alteration.
as to zuch proportion shall be conclusive. i

Clause 15 : i) lf at any time after the execr.rtion of the contract documents the No claim to apy payment
Engineer shall for any reason what - so - ever (other than default on the part of of compenlation for
the mntractor for which the govermnent is entitled to rescind the contract) desires alteration in reshiction
,that the whole or anypart ofthe work specified in the tender should be suspended ofwork
for any period or that the whole or part ofthe work should not be carried out at
all he shall give to the contractor a notige in writing ofsuch deste and he shall
give to the confactor a notice in writinlof such desire arid upon the receipt of
such notice the contractor shall forthwith suspend orstop the work wholly or in
part as required after having due regard to the appropriate stage at which the
work should be stopped or suspended so as not to cause any damage or injury
to the work already donq or endanggr the safe-ty th€reofpro$ded that the decision
of the Enginqer as to the stage at which the work or any part ofit coqld be or
would have been safely stopped or suspendqd shall be ot any part ofit could be
or woulC have been safely stoppd or qspp{dedshall be final and coaclusive
whatsoever by reason ofor in pursuance of,any notig€as afotgsaid, on aqcount
ofany suspension gtoppage or cudailment exqqpt to the exlent specified herein

2) Where the total suspension ofwork ordered as aforesaid continued for a


mntinuous period exceeding 90 days the contactor shall be at liberty to withdraw
from the bontractual obligations under the contract so far as it pertains to the
unexecuted part of the work by given a 10 days prior notice in writing to the
Engineer within 30 days ofthe expiry ofthe said period of90 days ofsuch
intention are requiring the Engineer to.record ttre final measurement ofthe work
already done and to pay final bill. Upgn grving slch nqtiqe the Contractqr shall
be deemed to have been dischargp from his otliga$gn tq complptp tlrc rer-naining
unexecuted work rmder his co-n!4q!. On repgipt ofsucl notice the Engioeer sball
proceed to complete the measurement and makg such paymg4t as {naybe
finaly due to the contractor within a period of90 days'from the rebeipt ofsuch
notice in rcspect of0re work dready doneby the mntactor, zuchpayment shall
not in any marurer prejudice the right of the cont{aclor !9, any further,
compensation under the ronaining provisions ofthis clause.

3) Where'the Engineer required tlie 'iontactor to"suspend{ the-


work for a period in excess of30 days at any time or 60 days in the aggregate
the conhactor shall be entitled to apply to the Engineer within 30 days ofthe

. , , ..r ': Drecutive Engingo,


. .i.. ... ... ...,..' .) :t ...i1::) Rural Water Supply Wot*s Divisioq
Contmctor', . l,.iir,! No:.of Corrections'. ZllaPar,ishadtPpe-.1
?5
resurnptign of work after such sqspglsi-o.p for,na)r{n.9r-I! of compgpation tq the
extent ofp€cuqiarylosqpg$ed by{4 rnrcspqqt of}v-o.rkingmachingJryqin€d
idle on the site or on the account ofhis having aq{ tq 44ythe,sgtryy o4114ggq gf
labour engaged by him during tlrc said period of susporsion providing always
that the contactor shall notbe entitled to any claim in respect ofany suchworking
rnachinery, salary or wages for the first 3 0 dals whether consegutive or in the
aggre-gate of such susptlnsion or in'respect of any suspelsiqin whatsoever
occaisoned by unsatisfactory work or any other default on his pait Thedecision
ofthe Engineer in this regard shall bg fina! and conc.lusive,againqf the aonbactor

No claim to compensation
on account of loss due to
delay in supply ofmaterials
by Government

Executive Engineer,
Rural Water Supply Works Divisiorl
Contraclof No..of Cpneqtiong; r ZillaParisbadBure.,
l

fn *re gaso in the.zu.nRly ot-ut"riuf". Cululrn-*t shail grant suctr.


9{ruc{delaV
extension oftime for the completion ofthe works as sh;all appear to thJExecutive
Engineer to be reasonable in accordance with the circumstances ofthe case The
decision ofthe Executive Engineer as to the extension oftime shall be accepted
as final by the contrirctor

Clause 16 : Under no circrunstances whatever shall be Confactiibe entitled to


an1 pmpensation from Golernment on any account rurless thc Enginoer-in-charge
within one month of the case of such claim occwing
Clause 17 : Ifany timebefore the security deposit or any part there ofis refimded
to the sontaator it shali appear to the Engineer - in - charge or his subordina-te in
oharge ofthe work, that any work has been executed with unsorurd imperfect or
ruskillfirl! wqrknanship or with materials of inferior quantity, orthat any materials
or articles provided by him for the execution of the work are unsoun{ or ofa 'i:
quantity inferior to that contracted for or are otlerwise not in accordance with l' "',-
the contract it shall be Iawfirl for the Engineer m charge to intimate this fact in
writing to the conhactor and then not witlrs1anding the fact that the work nuterials PWD Resolution
or articles.complained ofmay have bee4 lnadvertently passed c€nified No CAT-108?/CR-94/
and paid
for, the contactor shall be borurd forthwith to recti&, 6, ,"-olru o, nu"o*ouc, Bldg2dt 14;6-89
the work to specified in whole or in part as the case may requfe or ifso required,
shall remove the materials or articles so specified and proyldd other proper ana
suitable materials or articles at his own charge and cost and in the event ofhis
failing to do so within period to be specifiedby the Enginegr in charge in the
written intimation aforesaid, the contractor shall be liable to pay compensation at
r-ates gfone percent on the amount ofthe estimate for every day not
the exceeding
10 days, during which the failure so continues and in the casi ofanv such
failure
the Engineer in - charge may rectifo or remove and re-execute the work or
remove and replace the materials or articles compla.ined of as the case may be at
the risk and.expense in all respects ofthe gontractor should the Engineei _ in -
charge consider th{ any quch inferior work or materials as clescribeiabove may
be accepted or made use ofit shall be within his discretion to accept the same at
such reduced rates as hemay fix therefore
Clause 18 : All works under or incourse ofexecuted in pursuance ofthe conbact
Work to be open to
shail at all times be open to the inspection and supervision of the Engineer_in inspection.
char.ge and his subordinates a4d ft6, conkactor shall at a iimes duringihe
usual
hours and at allother- times at which reasonable notice to t}re iitentionof
1vo{!q
the Elgineer - in charge and his subordi4ate to visit the work s-hall have bqen
given to the contactor eitherhimselfbepresent to receive oders ;a hsnuctions
or have a. responsible agent duly credited in writing present for that purpose
Urder.s glven to the contractors duly authorised agent shnll be_ considered to Contractor or responsible
have the same force and effec! as ifthey had beur given to the conhactof agent to be present.
himself
Clause 19 : The conhactor shall give not less than five days notice in writing
to Notice to be given before
the Engineerin - ctrarge or his subordinate, in ctwge ofthe work before coveing
work is covered.
up or otherwise placing beyond tlre reaoh ofmeasurcment any work in order
ftat
the same may be measured and correct dimensions thereoftaken before the
same is so covered and or placed beyond the reach ofmeasurement and shall
not cover up or place beyond the reach ofmeasurement any work without the

Executive Engineer,
Rural Water Supply Works Divisio4
No. of Corrections Zilla Parisha4.pune..
)1

the same was executed. : .


i

Clause 20 : Ifduring the period of ......... monthsfears from the date oipompletion
Contractor liable for
as certified by the Engineer - in - charge pwsuant to clause - 7 ofthelcontact or
damage done and for
....,........ months / years after commissioning the worlg whichever js earlier in ttre
imperfections for three
months after certificate. opinion ofthe Exeqrtivefngineer, the said work is defective in any manner
PWD. Resolution No. whatsower the contactor shall forthwith on receipt ofnotice in that behalf from
CAT- 1087/CR-94/Blgd. the Executive Engineer duly mmmence exeoution and mmpletelycarryrout at his
-2 dt. 14/6/89 cost in ev€ry respect all the work that may be necessary for rectiffing & setting
right ftedefects specified tlrereinincluding disnrantling and recons{nrction ofr:rsafe
portion strictly in accordance with and in the manner prescribed and under the
supervision ofthe Executive Engineer. In the event ofthe contractor failing or
neglecting to commence execution ofthe said rectification work witirifr ttreper,roA
prescribed therefor in the said notice and /or to complete the same qs aforesaid
as required by the said notice, the Executive Engineer get the same e4ecuted and
carried out departnentally orby any other agency at the risk on acclunt and at
the cost ofthe contactor. The conbactor shall forthwittr on demand pay to the
Covt. the amount ofsuch costs, charges and expenses sustained or incuned by

to be anears oflmd revenue and on the eventofthe con-hac'tor failins


to pay the same on demand as aforesaid with-out prejudice to any rights
and remedies ofthe Govemman! the same may be recovered conEactor
as arrears ofrevenue. The Govemment shall also be entitled the same
from any amount which may then be payable orwhich may thereafter become
payable by the Government to the contractor either in respect ofthq said work
or any other work whatsoever or from the amount ofsecurity deposit retained
by Goverrmrenl
Conhactor to supply plant,
Clause 21 : The contractor shall zupply at his own cost all materials (except
ladders, scaffolding etc.
such special materials, ifany as may, in accordance with the contractbe supplied
from th_e stores) plant tools, appliances implementi ladders, cordage, iackle
scaffolding and tanporary work requisite for the proper execution ofthe work,
whetlrer in the original, altered or substituted fiom and whether included in the
specification or other documents forming part ofthe contact or referred to in
these conditions or not and which may be necessary for the purpose ofsatisfuing
or complying with the; requirernent ofthe Engineer - in - charge as to a4y matter
as to wlich unfer-thgsg co4di.dons he is g-ntitled tq
b9 satiqfi.g{ qr \ryhich be iq
entitled to require togeth€r with the oarriage thenefpr to and fromthe wo,rk. The
co.nh4clor slt3ll alsp supply without charge.ttrereqrlsite numbe.r ofp.C4qons yl(b
the means, and q44terialp neq-eqsgqy for,thg purpgqg of5gltingguJ ,1yg1ts.apd

Executive Engineo,
Water Supply Works Division,
Zilla Parishad. Fune..
28

countin& weighing and assisting the measurernent or examination at any time &
from time to time of the work or the materials, failing which the same may be
provided by the Engipeer-in-charge at the expense ofthe contact &-the qxpe4qes
may be deducted from any money due to the contractor under the conhact or
from his security deposit or the proceedsofsale thereofofa sufficient portion Ald is liable for darnages
thereof, The contractor shall provide all necessary fencing and lights required to arising from non prov-
protect the public from accident and shall also be bound to bear the expenses of isions oflight fencing etc
defence ofevery suit, action or other legal proceeding that may be brought $y
anyperson for injury sustained owing to neglect ofthe abwe precautions and to
pay any damages and costs which may be awarded in any such zui! action or
proceedings to any such person or which may with the consent ofthe contactor
be paid for compromising any claim by and subh person.

List ofmachinery in contractor's possession & which they propose to use on the
works should be submitted along with the tender.
Clause 21A: The contractor shall provide suitable scaffolds and working
platfotms gangways and stairways and shall complywitrthe following regulatiors
in connection therewith

a) Suitable scaffolds shall be provided furworknen for all works that


cannot be safely done from a ladder or by other means

b) A scaffold shall not be consfucted. taken down or substantiallv


altered except

All scaffoldq and appliances coqrected there with and all laddgrs
slull
i) be ofsound material

ii) be ofadequate stength having regard to the loads and stains to which
they will be subjected, and .

iii) be maintained proper condition

c) Scaffolds strall be periodically inspected by a competent person


,, I . |,. i ,,

. ':,
ExeotriveBrgineer,
Rural Water Supply Works Dvision,
No. of Corrections Zilla Parishad Pune.
.:ll.rl.-:.-,': t :'.'',;:,1!.:;1;
29

' 'l) Before allowing ascaffold to beused by his workrien the contactQr
shall whettrerthe scaffold has been erected by his worlanen ornot take steps to

, i)be so constructed tlat no part thereof can sag mduly

iii) every working platform, gangways; working place and stairway shall
D€ StUraDle renccq
ofabuilding or in a working platform $hall except
k) Every opening in the floor ofab
for the time. and to thg qxtenl r.equi5d to pllow the exce,ss of pe;sons or the
nansport or shifting ofmaterial be provided with suitable means tq
tansport to gey-ent
grey-ent the
fall ofpersons or material
'' i
i
.. t: .l
,i " -
I) When persons areernployed on roofwhere there is a danger of friiling from a
height exceedirig 3 meters zuitable precautions shall be taken forprgventthe fali
ofpersons or materials I

m) Suitable precautions strall.be taker-r to prevent persons beingstudk by articles


which might fall from scaffolds or other working places
n) Safe means ofaccess shall be provided to all workingplatforrns & other
working pla.wq. ,, . .
,. .. . .. .. :
: .,. j,:,.

o) The conbzctor (s) will have to make paymeirts to the labourers - s per.Minimlm
WagesAct.

."1 Hgi.F.g machines and gckl":


l]9$iog
ftT attachmenfs, ancharges
anl zupports shall
.. ,..,. . :: -.. .,.
) be of good mec-hgnical conshuctioq soundmg1,g.i. tuand adeWate
srength and free from patent defect
and
^:,' -:.:l; I ':l:' '- ' : :"r''i :' 1 -
"li' "':-"" i. '

r .,,,.'0,..'.!Fo.fgoodr,ep"airandln,gpodw-grlqqgordpr. ; .' :,
b) Every rope used in hoisting or lowering materials or as a means of
suspansion slnll be ofsuitable quality and adequate stength and free from patent
defect.

. ..;" i ,-.. ;- -
Executive Engineer,
,..r!..i.. ,u-.t.
--.. I ... -..rt.,-'i ,.-,...: zr,.;rj:,,:.r.i..rl:j..r,_,17. RuralWaterSupplyWprks,Diyipip.n-
Contractor No. of Conections ZillaParisba4 Pune.
30
c) Hoisting machines and tackle shall be exanined and adequately tested after
erection on the site and befop use.and be ree:raminedand.in positionat intervals
to be presctibedby,the Govgrnment. : .. ...;.. )-:. .

d) Every chai4 ring hoo( shackle, swivel and pulley block used in hoisting or
lowering materials or as means of suspension slrall 'be periodically examined:'-

f) No person who is below the age of..............years shall be in conhol of any


hoisting nachine, including ary scafiold which or give signals to the operator:"
g) Inthe case ofwery hoisting machine and or every chairq ring shackle, swivel,
pulleyblock usod in hoisting or lowering or as ameans suspension the safe working
load shall be ascertained by adequate means.

h) Every hoisting machineand all gear refened to in prec€€ding regulation

k) Motors, gearing tansnission, elecfic wiring and other dangerous part of


hoistingappliances shall be providedwith efficient safeguards. .
1) Hoisting appliances shall be provided with such means as will reduce to
minimftn & the risk ofthe accidental descent ofthe load;

Executive Enginea,
Rural Water Supply Works Dvisior5
ZllaPerishaqPme.
:,_.t -,::: tj i:rr _i
.'

;,

Employment of
Clause 24 : The employment offemale labours on work in neightorhood
female labour of
soldiers barracks should be avoided as far as possible
Work on Sunday bedone on Srnday withoutthe
shalt
fr:S:31.1..*ork sanctiol in wriningof
m.e ungrreer - in- charge

Work not to sublet C-laus! 26 : Contact shall notbe assigned or subject without the wiitten
approval
ofthe Engineer-in-charge. And ifthe contactor siral assign or subj;
or attempt so to do or become insolvent or commen"" urry proie"dings
ht"-;;*
to get
Contract may be rescinded himselfadjudicated and insolvent or make any compositions with
hs creditors or
and security deposit attempt so pecuniary or other,nrise shall eithendirectly or indirgctly be given
forfeited for subleting it promised or offered by.th€ contractor any ofhis sCrvants or agerus rc any
without approval or for 9r
orbc€r:r per.son t1 emplgy of Govemment in any way relating to his
bribing a public officer or fyttc o. tlp,lgytlent the
or if any such officer or person shall become in any way
if contractor becomes :T*- or indirectly interested
drccfly in ttre contact the Engineer_in-chqrge mai their
insolvent upon by no!c9_r1 writing rescind the contract and 6e se""rity
dftosit oitf,e
contractor shall th€re upon stand forfeited and be absolutely ui
d" arpo.J bi
Govemment and same consequences shall ensure as ifthe condact had been
rescinded under clause 3 here ofand in addition the contractotr shall
not be
enttJed to tecover or be paid for any work therefore actually
under
the conbact.
Sum paryable by way of
conpensati(,n to be Clause,2? : A1l sun rs payable by a contractor by way ofcompeqsation under
considered as reasonalbe om' ofthese
any ^frl.-.- condition ^L^ri L^
^^-..t:+:^- shalt ^^-^:r-- r as a reasonable compensation
be considered to be
compensation without annlid
reference to actual loss
fn tho
applied to ^f /:^',*-*+,..:+L^.-+
''"^ of
the use -^.-- - - .-
Government without reference .|-
to the-
. --'
rffy fq*
I
a*rg"
sustained and whether any damage has or not been sustained. ""t ",
Changes in the constituon Clause 28 : In the case oftender by the parhrers any change in the constifution
of firm to be notified
ofa firm shall be forthwittr notified by the contactoi to tfr" EngJ"e€" _ in _ .ha.g"
for his information.
Direction and conhol Clause 29 :All wo rktabe acecutedunder theconbact shalt !s o(ecuted
of the Superintending undler
the directio^nand subject to the approval in all respects ofthe Superintending
Engineer Engineer of the circle for the time being who shali be entitled to direct
at what
point or points and in what marurer they are to be commenced and from
time to
time carried on.
Direction and conhol
Clause 30.: (l) Except where otherwise specified in contract and subject
ofthe Superintending to the
powers delegated to him by Govemment under tlre codg rules
than in force the
Engneer. decisron ofsuperintending Engineer of.trre circle forthe time being
st'll be final,
conclusive end binding on all parties ofthe conbact upon all questions
relating to
themeaning ofthe qpecification, desip, drawingand instuctions h@n
bef;re
merfionedand as to the.quali$ of,worknanship or materials used on thework,
or. to any gther-question claim, right ma(ter or"thing whatsoever i.f,any
ry way
arising ortr oforrelating to the cont'act, designq drarr..ings speificatioa
insauctions, orders or these conditions or ottrerwise conceming the works,
*6."t"i
oi
Executive Engineer,
Rural Wat€r Supply Works Dvisiorq
Contractor
Zilla Parishad, pune.
7)
the execution or failure to execute sane, whether arising dgnng thg pqogress of
wo* or after the completion oi abandonment thereofl

a)
Lakhs)
b) Amount of claim is not less thanRs.l.00 Lak[ (Rs. One LalS).. ;.
(3) Ifthe contactor i.: not satisfied withthe orderp4s,q€d bythe ChiefEnginw.r
as aforesaid the contractor may within 3 0 day ofregpipt !y him of 4ny. such
order.appeal against it to the concemed Sgpretary, public Works Deparfinent/
Irrig4tion Deparhnenl who, oonvinced that prima-facia thg cgntactor's claim
rejectedby Superinturding Engineqr/ChiefEngineer is not ftivolous and that ttrere
is some zubstance in the claim ofcontactor as would merit de.tailed examination
and decision by 0re level for suitable decision (vidp.PW Circle No.CA11.086
CR- I lO/Bldg-2 dr.7-5-86)
Clause 31: The contactor shall obtain-from the Deparhnental stores all stores Stores of E
and articles of Europeanor.American manqfactur€ which may be required for American
the work or any part thereofor in making up any articlesrequired drere foriorin beo
Govemment.
connection therewith unlesq he has qbtained permission in writting from the
Enginee,r-in-clarge to obtai+ sugh stores end artiqlgs elqe.v/here Thq yalug 9f
such stores and articles may be supplied to the confractor by the Engineer:in-
charge will be debited to the contactor in his account at rates shown in the
schedule, in fromA attached to 0re contract and ifthev are not entered in the said
schedule, they shall be debited tohim at cost price wiictrfor thrc purpose ofthis
contract shall include the cost ofcarriage and other expenses wkitsoever which
strall have been incurred in obtaining deliveryofthe same at the stores aforesaid.

Clause 32 : When the estimate on which a tender is made includes lumpsums in


respect ofpart ofworks the contractor shall be entitled to payment in iespect of
the item ofwork involved or the part ofthe work in question at the same ftrtes as
are payable rurder this. coqtact fo[ eachiturl orifthe part ofwork in question is.
. no1 the opiniolr gfthe Engineerrin charge.capable ofmeasurernent.ofEngineer.
in-chalge may at *ris discretion pay the lurnp zum amount entered in the estimare
and the certifircate inwritingofttre Engineer-indrarge slral be final and m,nclusive
againstthe conta:toqwi.!lregard to any sum or tofrirnl+rd9.r,ttre,
provisiors of this clause.
1ryg.aya!l9

Action where
specifica-tion

, ,... . t -!.i
Delination of wort, ::: :- J;r -
': , ):..: :i:l .i

ExeoiliveEngineer,
Rual Water Supply Worls Divisiorl
No, of C-o.1.rpc_tio, nq ZllaParisbadglpg., '
Contractor's Percentage
whether aPPlied to net or
gross amount ofbill.

Refund ofquarry fees and


royalties
Clause 37 : The contraotor shall be responsible
for'and shall pay any
Compensation under q: Y"IS:T Act
workmen's comPensatron '
compensation ro his worknen payable T9* Act) for inj uries to the
Act 1923 (VIII of 1923) (therein atte; cailed the said
by principal
workmen if such compensation is payable an{ grlaid
*ut-t".tiut (lj ofseotion i2 ofthe saidAct on behalfof
1I

""4.. ons (2)


*raiU" t"oououUli Ly Govemment from thecontractor'under laid
in the
oitU" tolJ t""ti"n such compensation shall be recovered
downin clause I above'

Claim for quantities


entered in the tender or
gstimates.

Executive Engineer'
Rural Water Supply Works Divisioq .
ZiUa Parishad' Pune'"
No. of eorreiciions " '
I

invited For the purpose ofoperation ofthiq clause, this cost shall be taken to be
Rs...'''''..''...'....'.....inwords...'.'..'.'.....'.'.....'..'...'.......'''..'.......

more.than Rs5,00-0/.(The clause is not applicable to exha items;)l .i-:.,,,, i,


Clause 39 : The conhactor shall employ qny faming convict or ottrer labof ofa
*
particular kind or class ifordered in *.iiti"g to Ao 6y rh6 en$neer-in-chaige.
Clause 40 : No compensation shall bC aliowed Of +ry pif"y q4lriiC 6 th9
e lars for
for delay
starting ofthe work on account ofacquisition ofland or in the case ofclearance
work on account ofdealy in,accordin! sanctionofqstirnates 'r'i 11 ii : r';ri' '';o'il '
' l : 'i .

Clause 4l : No compersalqg q[all be allolved fgr any delgy in the gxFg{iqn.q{ for delay execution of
the work on accoqnt of Water stagdingig b,p. ffow, pjts gr,compar$renls. T[e, work.
ratp.s arq inclusive fol hard o.q gracked soil,,eigavatiop lnmr.rd subsoil wafeJ gr
waterstanding in bonow pits anrd no claim fdr.an exEa rate shall bp entertained
unk6g gtherwise e.xpressly p.pgcifi{. r ., .
Entering upon or
Commenc-ing any portion
of work.

Minimum age of persons


employed, the employment
of donkeys and or other
animals and the paymentof
. 2) Na co.nF-_-agto( ghaU S@p_loy donkeys-orother aninrals with breachingof
fair wages
sting ort-rin rope,. The.breaching must,be ai least three inches rvide ard strould

ExertiveEngina,
Rural WaterSupply Works Division,
No,r,.of Coneotions
| r./ ,L:' .., , ZillaParishad"?HfF.;
'.1r,...:? -
,

Method of payment

Acceptance of condition
compulsory. beforE
tendering the work . ' .

Employment
labour.

..''::''' Executive Engineer,


. r,i,.r ,,i , .', .,1
,:,ia i.:il:i ..".,r.;r
Rural Water Supply Works Dvision,
:; r': i ' i.;r :'
QbntraClglr Zlla Paristrad Punb. '
t!.i'

36
Clause 47A: The tendered rates shall be inclusive ofall taxes, rates and cases Maharashtra Act XIX of
and strall also be inclusive
ofthetax leviable in respect ofworks contact under 1985, Clausp regarding
the provision ofthe Maharashtra Sales tax on transfer ofproperty in goods turnover tax vide FWD
involved in the execution ofrjvotks Contsact Act, l9g5 (MaharashtraAct No. Circular No. CAT-1086/
XIX of 1985) cR-330Bldg-? 0+19e7

Clause 50 : The contraqtor shall employlt ieast g07o ofthe total number of
unskilled labour to be employed by him on the said work from out ofthe persons
ordinarily residing in the dishict in which sit€ ofthe said work is located:, ,
Provided, howeve4 that ifthe required number ofunskilled labour.from that
distict is not availablg the oon!-actorslnll in tlre frst ins.tance qmploy suchnnnb€r
ofpbrsons as is available and there after may with the previous permission in
writing ofExecutive Engineer-in-charge ofthe said work obtain the rest ofthe
requirernort ofunskilled labour frrom outside distict

Clause 51 : Wages to be paid to 'Jre skill.-d and unskilled labourers engaged by


the conhactor.

1) Thecontactor shall pay tlre talo.urers skilld4cgording to. ttre wrgp


by theMinimum Wages Act of 1948 ppplicable to the areain whii:h the work of
the contactor is located.

Clause 52 : All amounts whatsoeverwhich the contactor is liable to pay to the


Governrn€nt in connection with the e"xecutioq of t_he ryork ingluding the amount
payable in respect of(i) materials and g gtores s.u.p.
nJidi+sqedhere-i{rder.Uy the
Government to the conbactor (ii) hire charga- in rispect ofheavy planimachinery
and equipment given on hire by the Govemment to the contractor for ocecution
byhim ofthe work and/oron which advances havebeen given by the Governrnent
to the contractor shall be deemed to be arrears ofthe Land Revenue and the
Government may without prejudice to and other rights and remedies of the
Government r€cover the same from conhactor as arrears ofrevenue.
Clause 53 : The successful f€rders will be requirul to prod,ce to the satisfaction
ofthe specified concemed authority a validand consequent licence issued in
favour urder the provisiors ofthe oontact labour @egulation andAbolitionAct
1970) before starting tlre work On failure to do so, 0re acceptanceofthe terder
strould be liable to be withdrau,n ard also eamest money.

Clause 54 : Where the workers are required to work near Machine and are
liable to accident they should not be allowed to wear loose cloth like Dhoti.
Jhabba etc.
Executivg Enginoql,
' ,: . t:. ..,; .,. Rural Water Supply Works Division,
Contractor No. of Corrections Tilla P61is[4L ftpq .
!
i
.,i
JI

j
1
Sqper-intending :

actorlshall 4lsp
:
byhim

b),'
Deductionsof lncome Tax at 27ti pf the value ofthe work bne
will bemade fromtlre contactorR.A.Bi['
r- '. '' ::'r:"i':""" '-': :' 1t: "' ' '" :

'.'-';:;,:''..':'.ii''](j,./,j:jij,i,j;'i..i;:'j:'.'1':,';:'':'.::'';..,';.'-il:.,:..:'..}.|ii.
li';: r.j;,.\. .-.! tt:;;ri:"i:'J' j"' : ;'i ; i::'"'t:t'---'
;i-J,i,-;?it-lf,r !'i'J:rilr-:
',iil
irr-1i:,r!-,i,.,.i,ir\'ti'r-;;r;ii:":4-,|.iir-',i'''"i.r:i-i;ii ;.::"lrrr; ;lni"'j:;j''i'Lr^'i
'-1'
'-ll l:rit: t-),:\ liii*. I url;'1' , , it;t tlt )ii 'i: ;!.irr,'l ?li i;' ;'- 'r ' i'rl1;;f -: l'l;;J i'j r

"r"i
'Jlii1r;!:riirr,,r'Jrijl,!,.rjlill:l'l'.jjiliji,tir.ji,jl.tJiL!i:.r:li1;-i{.j;il;ra(J'iiil;iiii'tti;r''(';l
!l!!i \tJ'i ;!.) 4:\2 it;4r; -:. riJ];rlijui, ii r(;'i: !i riLi. ijli ; J ' i;t;i l:;':;:'t ii i ' tti';') !

rl.,i::r;"i-1.,,.,,j!r,ti.,';:,'.,ril1,i;.rtt.i.t;ij{'\tti'ia',ufitttitll'''r.::}!i'J?!Lit L?:crrci 't


,{i iirj.j?:+. r:, r;r,,;rI lli:rl.iiJr'i ili Ii, Liit] Li{', r. '1.-rt';hlr' t"ri I'r:";'iil)ii't'){i' !rjl l''
l:r!-r, i:l;;,.,:, .i),1::r';ii,,i;.;:'-Jl;;r:,,r.lri ;-!.'.1:ii.i', : i i,' l{i ::; liiiiii /il1{ i " -'}i iairiti! i'' r'r '-il
', :,'-'..t,,r": )i::.ji. ;'t,u;1..,ta"i.,,'.zi.,llii';"r'.;!1, trri.;:-at,-ii:t!';l;i-"i';ii::Qi
1 r .r '',:- ';: '' ':'" "": '
" "
.. 1 rr.::. r.:. - :.:" 1L,., :t:ti: .i. J-.;:)ri::1".J.. I :r,r':'.! " :.,j 'i1.,: lt : I'i;1,.r'ili.'
-i ; rii .,:, :r,-:1,:.-. ...1 ,' . . ,: ;.i: '"': -' :. 1,i.,'r 'I :..,-i :tr' :.r,: :'
:i'''':''..::.

ExecutiveEnginea,
: ,,,'.,:.:; Rural Water Sqpply Works Division,
No. of Correotions ' ' Zilla Paistnd Pune;' '
38

a)

qr

H
D
6

-o

>6
o9
.qg
I
E'

,4

o
.)
()
;
z

c.l $H
.6&
,.t':r o
rtr i,- ):'. ..',.i ::.:i" :. .:'.t:: ' : ,
,,.r:r99rr. .,, r'-:jir.,,ri. , ;:..-., i::;:t:,.
9Eo
E#
!s
r.i
U' (J
r. i..il';
39

CONDITIONS OF

6.

8.

12.
13. All the materis{ in s}rcedule 'A , required for the work iitrall Qe taken frorp Z.P. only. The,materialifrom
lhe outer sources in lieu ofmaterials in shcedule 'A shall not be allowed e;r.cept under written pennission
from the Execulve Engineer. The samples ofsuch materis{shall be&sied at the contracters cost. The
materials not co.nfirming to 0re required standar,d slra! be rgnoved hy the contractor at once from the
urs of
site wurtr.lurs
ur work at his own cost.
uwu eusr. i:.
.j, i' ji ..,
L i: II

14.' Proper account & day to day consumption of thc.rathiAsjas per sgr{ufe 'e , be maintained by the
confactor or hip authorised representative onsite and it shbll be ch&ckpd by dre officr{every day in
cortectness. -"
token ofits i,: i I i
:
,li:
*lii
-"
I '.:

i
:*-T - ---*1
.
;::

Contractor No. of Corrections


i i nu;ari,*os*ffi-,1'trfr
Zilla Parishad, Pune.
40

All the materials used in the vrork shatl be ofbest quality and any materials rejected
fiom the site within 24 houm.

All other nrles regardingWorknen'g Comp;satipu, etq, shall be binding on

4. All items to be executed in the coune of the work have to be executed by the' as per
specifications in the P,W.D. Hand Bqgl<s, thebool$of standad qpecifications putlished lhePublic
Works, M.J.P ofGo-vemm€qt pfMaharastrte relevent I.S. Speciflcatio4s,latest a{dpractice
in vogue, at the mtes as psqrules pf.theh4.J,F-, e{d "conditions ofagreemeut inttlis rcspeet
shall be respornible ancl.ljablg to pay for damage topublic property caused byuru.L
accounts of zuch mqteri4q ing.uitablebook which for proper handling and.safe custod:it
delivered byhim for usE on werk'Themalerials includirlg pipes shall.be procured bythe
per requirement ofwork an! np- excess matorials shall be procured. Only
to the Contractor.

5. Forall agcidents o4 tbgcontracied w.orlr.s the Co.nfactor sball be responsible to pay


to the sufferer or his legal dependents as per the Legal CompensationAct in force.. .. ",-,"r

l'he Cqntractcr shall,errgage arr authprispj agent or an orperiencd qgalified for-the'rvorh


capable ofmanaging and guiding the work on his behalf. He shall takesuchprder as be givan to

7. A work order book shall be maintained at the work site. The Conhactor shall sip the
the Engineer-in-charge and Depuity Engineer and shall carry thern promptly. After con
work, the work order bookrshall be surrendered to the R.WS.W. Division, Z.P.
-'"-'

Quantities given in the tender are approzimate and are liable for variation. Excavation ofthe henches
will be according to actual shata met with. The Contractor shall have no claim'for compensation op
account ofany variation in the quantities and also for any variation iq.thf.rdplt& fqrltfld6.qhaggin thp-.
drawings.

9.

10. All items occuring in the v,orL nnd as i'cund necessary in actual execution shall be carried out in
workmanship like manner as per specifications given in P.W.D. Hand book and as perthe current
specifications prevalant in Maharashta Jeevan Pradhikaran Circle, as per orders ofthe Engineer-in-
charge; as stated above.

Contraitor ExecutiveEngineer
4l
I 1. It mustbe clearly understood that the conditions ofthe conaact 4n{ specifications are intended to be
rigidly enforce and no relar<ation odthgground ofconditions.pOVaiting is to be allowed.

12. The Contactor shall be gntirely,responsiblefor-breach oflaw.s oflocal bo{ies, Govqr4lneri,t qtq. while
using private or public conveygnce ptocur.ing and stacking glaterialg, employrnent oflabopr etc. and he
will meet out all expenses in this contract without any claim whatsoe-ver on the Dept. and the Dept. shall
not take any resporsibility on this account.

13. Before entering any property, plot,land, prernises or areas etc. the Contractor shall mafe his own
independent investigation through Collector or Inspector ofland Records etc. on his owp about the
. ownership of the plot, etc. and he will be liable for action for act ofencroachement, trEspass, erc.
committed by him or his labour or for the steps taken by the pa ty concemd. ,

14. The Contractor shall have to clear the site ofwork before the commencement ofwork and after the
completion ofthe work without any exha cost. The Contactor'stnll construct at his cost a temporary
. shed ofabout 20 sq;mt..as per specification, carpet areafor use as office for inspection oftfre work by
the officers and for discussing the details of worlg writing work orde4 etc: NeceSsary firmi(ure such as
chair's, tables,'wooden bo,x,,etc. will be provided forwithin.fi.fteen days frorn the date ofieceipt of
work order..It will be maintained properly-till,the work is completed: The shed and firniture will be
,' allowed to be taken back by the Contractor after the work is completed. .The Dept shall not pay may
rent, charges for the shed, etc. and no Dept. materials will be issued by the Dept. for his shed, :

15. Ajeepable service road w.herevtrnecessary strallbe provided and maintained by theConbgctor at his
cost till the completiori of the work.,. l , '
.

16. The Conracbr shall arrange for fuial lineoutofwor*s at his own cost andurder supervision ofpsporsible
. rqlrsenlative ofthe Depf . : .. . I

17. All Cement concrete shdlLbe michine;rri*ua


-a**trln"vibratd u'nlesJ o*r"r*is" iostupteO ty m"
Executive Engineer. .

,..i,.:-, - .".,.,.-",-.-.. : j:.-r i.:,. rL.l.- ,.ri. ..' :. r,ir.-':- ,ir...: i;i' lri
.,,. -,.r,i:t1 tt . ', tii,.,,.. r.j:. rirljr,;rl:;.i.ilii i!i.j t' ii.;,.;;,r!; ,,i:i i,i.i,.-::;,ll-,iit,,..'
.1 ,:.a.j. ./':.,, );rr,t-:j.;.ij ,."i ,li,J:ll,-ariiiiiii;li,::.r./.::I:iii:irtr,.li t'. .,..J:it,1'.

Contractor No. of Corrections


i.,..'i.. :., .;'
SPECIAL CONDITIONS OF
PAYMENT AGAINST EXCESS QU
1.

2.

J. Engineer strould
_spgoifieC in thp

la#sttaUbe
?!i",F.erates

z. whthma.y
9Q-qsiderand
rock,

OUTI,INEOFWORKS
l.

1. Thentes quoted for each item are for units meritioned in Schedule-B against each item.

SITE CONDITIONS

l. It shall be presumed that the Contractor has satisfied as to the nature and locations of the works,
general and local condtions, particulary those bearing on transport handling, storage ofmaterialq,
availability oflabour, weather conditorns and has estimated the cost and quoted his rates accordinagly.
Dept. will bear no responsibility for lack ofsuch acquaintance wittr site conditions and consequences
ttrereof.

No. of Correctioni Executive Engineer


43

2.

sltall

for
2.
water

4.

ti..

': :j..,',) :.:'i'tt:.:'::J-;lu!::!;.'ii'lilrl"i:llr-''r:'lii'i' r''j :'1i"'i;-Ji 1'


"' i"ji:ii':f'r];r;:i!;tr'l'i"

4 ;'i l ) i'f i {'r tl ii "l' , ri I lf.

No. of Corrpctions Executive lqtioQgr


Contractor ''..\'
44

l.

Conbactor shall not sell or otherwisedispose offorrernove except for the purpose ofthis I the
nrbblg stong metal sand or other materjals which may be obtained fiom any excavation" made for the
purpose of thq contract, All such materials shall.beDept's" property and shall be disposS offin the
mar-mer and-at place.as may be direclgd by the Engineerin=charge. Contactor may,with
of the Engineer:in-ahargq n writint and when direpted byhim, use,any of
t. Other unforeseen iterns to be done in the course ofwork will have to be done bv the Con
specifications in P.W.D. Hand Book Volume I and II will be paid at mutually
standard practice in vogue. -,.:_:
Extra charge of claims in respect of exba ryork st-rall not b.e allowed unlesS.qg_.ryCf\
!9.
ralate are in the spirit and meaning ofUra speChcation, oi-*i'*, .o"h *orks are ordJdd ir

4. The Contraotor shall makehis.own.arragernents for obtainingrubble;khandki; headers; san4


murum etc. from Dept; for iirivate quarry. Applications of.the €ontrdctor for reasona
,

Govemment and required for this.purpose,can be rbcommended to Revenue. without

All the materials involed in the corstruction shall be ofbest quality and specifications
splc1n4tib;s and ffrafi be got
ana $hall
approved from lhe Engineer-in-charge before use. Ifnecessary; materials shall be got testk fi.om the
Iaboratory at his cost. Samples requiring appro-val shall be submitted by ttre Contraclor to thp Engineer-

5.

e*atiu"irigiii#
per IS
rvill be
,of test
shall

The contractor shall take all precautions against darnage by floods or like or from accident etc. No
compensation will be ailowedto the Conhactor on this account or for corecting and repating any such
damage to the work during construction. The contractor shallbe liable to makegbod,any part of
materials which is in c.hqEge o{the Contr:cto; 4nd wtfuh is lqst gfdamagg b: floods.ql,frpm.anJ oth€r
carxe. If the work execulrd is r,lamaggd, trenchgs filled due to any_rggson, Contrarcto^r shall have to

Contractor No. of Corrections Executive Engineer


.:r; ,:r,, :. rrJ:.:iiJ-: . ,
.':

15. SUPPLY OF RATE ANALYSIS IN CASE OF


EXTRAITEMS
mat'er he
Rate Analysis based on labow and
In case of the EIRLthe Contractor shall supply
, ': :.-:i, !iiil L:i.iiii"i;
is called uPon to do so '

20.
27.
:. ' ': " : i j' r'rrr;:;j' ;r
;" : "' r' .' i
, ,: ',ti.r,i , -,iir.':i -:,::::i-:l-i

...t
No. of Corrections
ExecutiveErigin#
^n
ITEMWISE DETAILED SPECIF'ICATIONS

, Following specificatiors ORin additionto the specifications for rhe resp€ctiYe items
are in amplification
given in PW.D. Hand Book Volume I and.Il (t"afest Edition), Red Book of Govemment ofMaharashba
and shall be strictly adhered to. Relevant ISS shall- also be r.effered. ,

IDS I EXCAVATION IN SOFT MATERIALSAI\D HARD MA-TERJALS


The classification for all excavation met with shall be i9 two categories only, as under.

SOFTMATERAILS

HARDMATERIALS

as hard materials.

No,erlo,iTl9 ..
Executive Engineer
_ .Ji ,,1, i.l
Sr. Outside dia of piPe
: Nature of Stratar -' r'

':-ll, iL', ;- ,

No, .-,.: ' -r .l


A) PVC Pipes ''
l. Upto 110 mm '0.70M In soft and hard material
l
a l40mr\ l60tnm 0.75 M In siift and hrlrd rnaterial
J 180mm,200mm,, , , ,..0.90M In soft and hard material"
4 25Orrn 0.85 M ln soft and hard material

No. of Corrections
49
280 mm, 3 15 mm, 0.90 M ln soft and hard material
B) G L Pine
.- :..i.

25mm,40mm, 50mn\ 0.60 M In soft and hard. material -

65mm
7 SfuurL 100mm

The Confactor shall.carry out exta excav. ation fo1 go[ar-pits atjoints wherevernecessary and such
extra collar pit excavation shall be a{mis+ible.fo.r paym.qnt and wjlt npt be measured. ,

Dwing excavation and till the tenches areproperly refilled, ifanypublic orprivate watertap cqruiections,
telephone wires, cables, etc. are {g4taggd, the Conlractor shall reigstatet}rem 4!his cosl . _.

The Contactor strall at his own cost give the satisfacory hydraulic testing which shall include all labour
cost ofwater to.feed and while testing, repairs roquird shall have to be'carried out by the Confractor.

by the boulders or the excavated stuf. T,his pqrtion of.he.rrdr shall be ref;lled by the so$

Contraotor No. of Conections Executive Engineel


;;;.,-..)'1{'-|,,!.'
:
I
I
i"
I
I
n

:j.d;ri,..ii., J il,, i l Irrli;i,,jrt{r;


No. of Corrections Executive Engineer
Contractor
51
IDS4 WEEPHOLES

S. Bar

IDS 6 MURUM BEDDING


The murum to be used shall be ofapproved quality soft murum to be laid in I 5 cms average thickness
' !o the grade as directed by the Engineer in charge. The width admissible for payment shallbe the same
as per excavation trench width admissible under excavation item. The murum bedding
shall be canied
out where there is black cotton soil or hard material below pipes or wherever directi and it shal I be
well rammed so as not.to sink thepipe lhe. Exta excavation for murum bedding wherever required as
aboveshallbeadmissibleforpaymentrurderexcavationf6nd6lilgms. . :;, .

IDST PVC PIPES

ITYDRAT]LICTEST

Contractor No. of Corrections Executive Engineer


' ::r-r r ,l: -,., r l i-, .., ij :.ii i,.-. -;
'

l
52

s$9$op. lactor at
,Ws{e"o\q'leaks'

IDS 8
Unless othawise specifically mentioned in the tender itons the required sluice
valves. Scor
ad per
valves, etc. shall be suppliedty the Contactor. The materials zupplied shall be flanged
The valves are to be oarted to the sitg from supply place, lpwered in the r-enches EntLj
pipeline as directed with cost of al.l jojnting maJerials, suph.as lead alqe-rqpe; rubb't
Loits, fire wood, etc. and the labour cos! which included in the tenler items' The.
flag;ed or S. & S lead joirrts depending upon tho nature of valves zupplied
and Conr
exka claims for any partiorlartype ofjoint required to be done' Therequired number
these valves is inciuied in tlr.g tendtr iterns. The measurqment will be pengrnber gf-vql. thelength
jointing- 9trlo qrlqryf willbepaid rsurplv and
for tail piece,s will bepayable uncler iterr oflaymg all
remai{ng amorurtwill.be released on complefionoffix$g and tesJing' '
..
IDS 9 B.B. MASONARY CHAMBER (PROVIDINGAND CONSTRUCTING)'
The work is to be done in worknanlike marmer as per type designs and as directed,
excavatircn is in
excavation in all strata which is in addition to thepipe line henches
is adrni
while excavation covered undbr plpe line tenches coming in the charnber
separately under the respective tJnio items ofexcavation items
ofexcavation for p

IDS 10

Cont&ctor. No, .of .0orrections


53

-The cost involved in fixing pipes and specials in walls; etc. together with leak proofariangements
thereofrequird is included in the tgndg{ raJg and no 91tra clarn1 f91 any provisiorl reguired shall be
entertained.

Satisfactory hydraulic test shall be givenby the Contactor at his mst which is included in tender item.
During testing if any joints are found lealry they shall be repaired at the Contactorrs cost.

IDS 11 TWO TAPSTAI\DPQSTS (PROVIDINGAND CONSTRUCTING)


l.

J.

6.

Ng..of Cprre9tions ExecutiveEogt$pgE


Contractor ..
The mode ofmeasurernent shall be on the basis of each nrlr.nber of com.plotqd ilgrll. ;; ii::
IDS 13 PROVIDINGAND FIXINGMANIIOLE F'RAMES AND COVER.-'
VENTILATORS
The cost ofproviding the above items is included in the tender item' These are to be I
place and manner as dtected. Painting witlr two coats of anti conosive black paint is
this item-Iflocking arrangements are.required they shall be doneby the Contractor
any extra cost.

IDS 14 SURFACE ROAD BOXES WITII CHAMBER


The Road Box should be ofCI and trapezoidel having a s ize of22.5
qnx30 crn at heightiThti wfleht
of the road-box should not be less than I 8 kgs. The road box should have a hinged, spv.e.+-fiJ€d io the
p.ltire
body. The Contractor shall produce sample ofroad box and get it approved and p-rpquJQ.lbq
,rrr-b". per upproved sample. The item includes nec€ssqry excavation rgfillng, guptg-:+b.g|-CA
*
pipe (450mm dia) or BB masonry, etc. complete'

IDS 15 SPECIFICATION FOR RECUPERATION TEST:.

Taking recuperation test of zupply well after completing the required depth of
etc. comDlete.

The item includes carrying out recuperation includingproviding ofelecticavdiesel


The test is to performed by pumping out the complete water from well, by providing zu
ofpimps (the tcltal horse power ofpumpS shall not be less than the horse power ofthe
in the scheme). The test is to be carried out as indicated in the Manual on Water Supply
and as per the instructions issued in circular no. (Marathi) MJP/ QCC/TB/2597,dateal20!111199:1,
vide Appendix V .) ,. . ,:

MEASUREMENTS
The measurements are to be recorded in the measurement book as per marutu4l on
Treatnent by an officer' not below the rank ofDpputy Engtneer.

MODEOFPAYMENT

a) Constricting Stcirage ReservoirsViz. ESR, GSR/SIJMP olDepqrtnental Desigr' - '

Contractor No of Corrections Executive Engi4eer


))
l) The reservoir will be a covered RCC container zupported on RCC mlumrs with &gIUg qg4 hl€11pE{e,te
braces etc. as per &awings.

2) Sutaible MS ladders with landing at regular intervals for approach to the gallery and top slab ofESR
:':
beorovided -:-' ''' :': : I

shall

RCC contilever catwalk (Gallery) of 1.0 meterwidth, GI pipe railing sball be provided at

Ventilators shall be provided on top slab ofESR. I

One number of CI Manhole fraure aod. qover shall.be prorridcd and fixed in the roof of {ank and at
catwalk way. i

One M.S. ladder shall be provide and fixed for acess into the tank through manhole left in the roof.
Ladders shall be provided as per specifications.

Water level indicator assembly ofapproved.type shall be provided and installed. l-

Cpntraltot,:,,..| Np., p{ Qprreptip.lC ExecutiveEnginel


if
SAI\D. METAL AND BRICKS.
a lead of 30 kms' will be'insisted-'
Sand, metal and bricks of best variety within-
have to be got approved prior to use on work'

CEMENT
each) shall be used for all
L & T cement in JutdPVC bags (weighing 50 kg'
REINFORCEMENT
450 as per design. fr9,cq4rlq
The steel to be used shall be of grade Fe-250, Fe
procurethesteel fromopenmarkit.ThesteernrogureaUl-C15--ag^li:111i:r:1*
nott
ffi;;;# r.J""J --ur**"r's test c€rtifi cate \4.ithout which it shall

the Contractor shat arrangeto getioiJ-V


tu-pfo fro1l st?elbro-uglt {U,b.4
"
frir *.tft shoulJ be submitted tothe Dept' Defective steel brought by
"*i "ta
reiected and will not be allowed to be used'

CONCRETE
The PCC and RCC works shall be as Per IS 456/1976

Concrete mixer shall be used {br preparing concrete'

VibratorshallbeusedtoconsoJidateconcretewhileplacinginposition.
While concreting representative samples in form oftest cubes. shall be taken bl tlte
-ha'go of t"ttittg shall be bome by th3
and shall be tested *td", hi, soperui-"io'\
1-"-;-:-) |

be recovered frombills payable tohim r I ';i ':'


WATER LEVEL INDICATOR ASSEMBT'Y

Exeoutive Engineer'
Contractor No. of Corrections
57

7, PIPE RAILINGAT FREE EI\D OF'CATWALK


Railing shall beof GI pipes 'A class not less than 25 mm diameter in the two rows and shall be fixed in
position to RCC posts or M.S. angle posts of size 65mm x 65 mm x 6 mm.;'l$ meter inheight,located
at a maximum distance of I M. c/c. The railing andthepoSts shall be providod with two'goats of oil
paint of approved shade.

8, M. S. LADDER
One number of M. provided and fixed to givg access,into the !4gt tlnoug[ manhole
S. ladder sh41l be
in the roof slab. The ladder shall be comprising of 65 mm x.6 mrn M.S. angfes plape4 at 45 crn' apart
with 16 mm diameter M.S. bars in double rows as steps at 20 cm.c/c.
SCHEDULE OF INTERMEDIATE PAYMENTS
A) FOR SUB WORK OF ELEVATED SERVICE RESERVOIR
1) Excavation offoundation 5% I '
2) Footing and columns upto CL. 9%
Z: - bottom ofcontainer
Columns and braces upto
' ' - 206/o
t :
4) gallery
Floor slab and .
)Ao/^

5) Vertical w"tt , . a) , $a{-h9.ight


. b) Remainingheight ,.. ..,,' .,;.!9Ya, ,. ..t ;,:; , . , .. :,', -

Miscellaneous such as errection ofinlet. .i.

'.:::' i"

Coatr,4ctor \,1.9. of C-orrections


58

PUMPINGMACIIINERY
The items quoted by the Confactor in Schedule 'B' are to be executed as per detailed s1
mentioned below including all materials, labour, tansport to site, watch and ward and all .

to run and commissionrequired forthis worlg is included in rate quoted foritems in

ITEMNO. 1 (A): SUBMERSIBLE MOTOR PUMPSET


Giving discharge as specified in Schedule 'B'. The pump shall also cover the head rang
1 10% ofthe head specified. The shuroffhead shall not be less than 120% ofhgad spa

Thepump shall be ofminimrun size of 150mm. and strall have bronze impeller (impeller
shall not be accepted) stainless steel shaft, minimum number ofstages sheamlinod r
brass strainer, etc. complete. The efficiency ofpump shall be maximum at duty point. 1

conform to IS 8034. The submersible motor strall be weVwater filled, fitted with stainlssr
sha.ft, seat cap, expansion chamber, thrust bearing etc. zuitable to operate on 360 volts t
ph. 50 FIz A. C. supply- The HP ofmotor shall be such that it shall have 20olo reserve
above the maximum power required in the specified head range. The pump and motor
directly, the motor pump set shall be suitable for vertical and horizontal installation. The
provided wittr flanged outlet cormection for 80 mm size and above.

The pump set shall be installed on tube welVopen well in vertical/horizontal position. Two
heavy duty clamps ofsuitable size shall be provided for errection. The pumps shall t
square Aames of size 1M x 0.5 M fabricated from ISMC 75 for pumps upto l0 HP and
1 00 for pumps above I 0 HP. The frarnes shall be supplied by the-Contractor. The

frame shall be such that the pumping unit and flangedjoints ofdrop-pipes shall pass
easily. The square fiame shall be fixed on main girders by nuts and bolts with 'Jpl@]st

In case ofinstallation, pump set shall be lowered dolvn upto botompf well failing
not be made.

Make approved - As per schedule attached.


ITEM NO. 1 (B): CENTRIf,'UGAL PUMP

provided at one end to take entire thrust Impellers shallbe enclosed type and statically.and dynrnically
59

The casing shall be provided wittr priming fiumel and air-release vent and with tappings for installing
suction and delivery p-rgsfue g.aug,es, _ .

The pump set shall be coupled to,motor tl-rough pin-bushtype flexible.couplings. Thq coupling halves
shallhaveprecisemacbined qurface. A,suitablecouplingguard shall beprovided. ,

Material of Construition i
1) Casing CI-IS 210 cr. Fg.200.
2) knpelle I Bronze-IS 380 Gr. II
3) Weavingring Bronze-IS 380 Gr. IllorlV
4) Pumpshaft En8/C40

The pumpsetshall be capable of discharging as specified.{n Schedule 'B'on 415V 3ph. 5OHZAC
supply. The head range shall be 75% to I 10% ofthe duty he4d spgc!fied. Thg pump shall have end

foundation duly levelled.

The offer shall accompany performance chart and curve indicating thrc effi.cjency of the pumpset. The
supply shall aacompany manufac,turer's test r€port and waqanty.
... ".,r,.:.. I . L i l , ::i.:-i_i:. "'! '
.
Makes approved ; As per sl19e! gnclosed/rnentioned i4 Schdul.e lE:.
ITEMNO.2T: MOTORS :i,,,.,i,,....i . t;/t;!t:jt. ) ' ' . " -.1;...', ,-1,'., .. l

The motor shall confirm to IS 325 and shall be SPDD or superior 3 phase, 415V suitable for driving the
pump in item No. 1 . Class of insulation shall be olass 'B' or superior. Motor rating shall be adeque with

Coltra,c. tor Executivg fngi4ee.5


lL"t,.,t9ggrdep;
' Each set A
(i4coming)
Upto 7.5 HP 63

I5 HP 100

16 to 20 HP 100
. It shall be
inside the
ing length

t: ; 'ii.i-;.-;;.lU I
\". i::.
No, of Corrections Executive EnginePr
Contractor
62

Approved makes: As per schedule attached/mentioned in schedule iBt .. ;,i-t. .

ITEMNO.8:REFLUXVALVE : '' r:''

The item includes providing, errecting, jointing withjointing material and r


flanged Reflux Valve of dia specified in Schedule 'B'ofPNl rating for dutyhead below MandPN
1.6 rating for head from 100 M to 160 M. The valve shall conform IS 53 l2(part- 1). The shall
be provided with a concrete block for support.
In case of centrifugal pumpset, the valves shall be providod with by pass anangements'
Approved makes : As per schedule attached/mentioned in schedule 'B?
ITEMNO.9:AIRVALiE

ITEMNO. 10: SPECIALS


The item includes providing errecting jointing with jointing material and commissipning ngedpjTes
and specials, hydraulically tested to withstand twice the duty head ofpump or 1 '5 tim the pump's
shut-offhead, whichever is more. Rubberjointing of 1/8" thickness with nut bolts shall riSed.'Ihe
Engineerin charge 'as directed
specials shall be supplied as per layout drawing, got approved from
by him at the time actual errection work. Specials, pipes and valves shall be given tw
qfanti
corrosive black paint. The work also includes the dismanfling and re-constructing the ofslabl
wall for taking out delivery piping. Flanges of 1 0 mm thickness shall be used for ali Speci audp-ipps.
CC supporl shall be provided at each 1 .5 M interval.

Size ofpipes and specials On suction shall be so selected that velocity ofwater in
exeed 2 M/S. Size ofpipes and specials on delivery shall be so selected that vel
delivery pipe shall not exeed 2.5 IWS.
The weiglrt in schedule 'B' is tentative. Payment will be made on weight basis for weight ofsp@als and
pipes actually enected, Weight ofnut bolts, etc. The basis for weights shail be as per relevant ISS with
permissible tolerance on weight.

ITEM NO. 12 : MS LADDER


In case ofopen well, a MS ladder shall be provided to give access to pump-flbor. The ladder shall
comprise of65 x 6mm MS angle placed at 45cm apart with 16mm dia. MS bars indouble rows atsteps
at 20crn center to center. The ladder shall bggivgn tw9 coats gfred oxide and two coats gf"e-nqgtgl pgnJ

The length in schedule 'B' is tentative, PalT nent will be madp on actual lgngt{ pflad{e1
meterbasis.
ITEMNO. 13 I EARTHING

':! -.- i:-,..

Contractor No. of Corrections Executive Engineer


63

pipe of I .5M lengttr above G.L. outside the switch room, fixed on wall with camps. A seperate 1 5mm
dia" GI pipe shall be provided for watering approximately 0.3 M above ground lwel. The earthing shall
be connected at two points on each elbctrical equipment.

ITEM NO. 14r ELECTRIFICATION


The itern includes electrification to lhe switch house. The wiring shall be done in copper
sq. run wire,, PVC insulated wire onJy. FVC conduit offlat ofsuitable size shall be
Following elechical fittings shall be provided.
I . Fluroscent tube fitting, box type

I x4Wcomplete
2. Bulk head fitting with 60 W bulb
3. Bulb, 60 W with holder insidethe room
4. ;. Plug point with switch 1No.
Separate wooden board with sunmica with 16 Amp. kitkat, switches of paino type and
provided for fittings.

ITEMNO. 15: TOOLS


Following tools ofapproved makes shall be supplied
l. Double ended spanner set I set
(6rnrn to 32 mm)
Ring spanner set (6mm to 32mm) l.set
J. Hammer lkg I No.
/ Screw driver 150 mm / 300 mm
5. Insulated plier 200 mm
6.' Plier, 250 mm '

7. Plier wrench 300 mm


8. Pipe wrench 600 mm
9. Hacksaw frame with blade 300 mm
10. Halfround srnooth file
11. Test lamp kit
12. Electricianstester
ITEM NO. T6 : LIFTINGARRANGEMENT
The item includes providing errec'ting arid commissioningfollowing arratrgeinent forhois'ting ofpumpsets.

F'ORPUMPSETSONOPENWELL. : ..

A 2 tonne capacity CD block, riple spear gear and 5 M lifting chain shalt !e provided with a wire rope
hook for hanging the CD block.

Approved makes: As per schedule aitached.


i ] . I

ITEM NO. 17: TESTAND TRIAL .

Contracior No. of Conections Executive Engineer


GS 1 SANDANDMETAL

2.1 The wooden shuttering planks shall be not less than 40 mm thicker:such other
thickr{ess as may be
allowed by the Executive Engineer for a piuticularjob. The entire forrn worlq
whetlrer ofiteel, plywood
or wooden planks, shall be very seongly proposed and braced with sufficienfly
strong vertical and
horizontal mernbers and the entire zupporting strucnrc shall be of suffieiently strong
to taie up the load
ofconcrete and all stresses it may. be subj ected to without any defleotion, The donhactor
shall be
wholly and firlly respoosible for any defects in ttreq$re,form work and its slpporting
shrcfure.
2'2 The form work shall be very smooth and entirely fiee from any dust particles direct
and its inner surface
shall be oiled for the easyfacilityof form. rgmoval,qad,shallle watertight.,

3.1

3.2 To ensure that the minimum cover required for slabs,beams, etc. is provided. Separators
ofprecast or
cast in situ CC block with wires embedded shall beused and shall be tied to the reinforcement
with
wires. Between two or more layers ofreinforcement, separators, of 20 mm or 25 mm size bars
as
directed_shall be used dlly tied- Thg separators ofM.S. bar piece sh4ll not be admissible forpayment,
the G I. binding wire shall not be admissible for payment.

3.3 When Conbactor has to bring steel then it shall be only tested one and contractor shall produce
the
manufacturers rolling mills test c€rtificate without which it strall not be accepted. Furflrer the
Contactor
'shall arrang€ to get tested any samples from steel brought at site in a laboratory at his cos! and results
should be submitted to Dqpt. Defective steel stnll be rej9cted

GS4 MIXING
4.1

4'2 For R. C. C. reservoirs and for other works whicir in the opinion of the Executive Engneer
are

Contractor Executive Engineer


4.3

4.4
For one cum of concrete t:\,,\ ,:. : i. I

1:2:4(M-150) 1:1:!2;3(Ir
6.27 bags 7.9 bgg- 4.42.bags. .):;1,,1.i'.,

it shall be laid in maximurn 0.6 M height only at a time.

Contractor No. of Corrections


:

67
i: fi
I

.All RCC work will be waterpd and kept constantly.wet for,23 days after initial set.r means of
wet gunny bags and ponding as dinrted by.the Engineer in ctrarge,This operation
after initial set ofthe,mncrete. Shouldthe Crntraotor.fail to waterthe.concrete

charge. ..."t,i".;." . i. :;: :ti '.:....


",,;-,'..
Columnand B,eam qid-eq,._.. ,"; .:_ ...:j:..;..: jtr. i,t,,., i .,_3_QaJo.,,, .., ,:,., :,::,.;,..; ..,)..:.:.,. , . ,1,, ,.,, : , I r

Vertical walls ,/'..' -,j-"6Davs!: .--, r. -'.


Bottom ofSlabs
Bottom of Beams 14 Days )i-i:rLl',:j :r.i !irl,il'rit, r :' ):i

Bottom ofBeams ofspan4.5 M:'and u6ou"r|1. i'i1 Diys i:I :.rr., r -..: ; il ,- . i

BottomofPlain Cg .t"-...i -t .; 3 Day5.i '. . i!r.f i !.i;


GSS ,INSPECTrIONS i:r 3!'riLJi}J;{J ulb '{(l L:xinicib ec od lisrlz nuncl r l;.rrr\x.r lfr,ri', r3'J !l L xjilr rrr Lu trllr rorl
i ri;lr :;:' .r
.'.,,-;r- t- ,-,.,, r' i:ri.r.i::i:,
. iiillt-i:;,:,1,'- --llr ;zd:.1115ll1c3,
--ll
:.L,i::rr :rir rzr;-; nmulog J i)l.;a3r;rrj
l)!}il
','lJ6ur9! nrnuioT'J,Dl.z
rzri-J 'zlJr:Urc. nrnuiol rr: rriF:c; :;d
qi J^i,"lrrl
J^i,"lr {lrilr !r.,dd LJ,luiiilr,
JrJ {lriLia'rvi,rle it
l:,:noiiir:rrfl{l c,
The work of each catesorv category ofooelbtion i.e. mmoletionof forin ,work nlacins reinforc€menl conc
of opobtiorl,i.e_..ff
$?lS$g!SFEhr\y.S
removal ofform etc. must be got inspected by theJunior EnSneer
itlrult
l**d'e
'86i"ib"f';
rallbe
hmlcBfR works
:., ,._ 9o.n9!e!t.B_rF-$F1b9C.9"ry lq,p$qqgqe.p,f/ilBiqg,EqgrlreEg,.l+g.ap,Cfeilurete,s0t!0ply.yjt!,above
specifications, the work is liable to be pulled down ifdirected.by Dgp,t.,and redOnq4t full.ggst of the
Contractor. No measurernents will be recorded for anv work which is done confary to specificatigns
t' t '::
and no paymeni thereofshall be admisibli,
. 't'. -'i'
'u'',',''.,'t ,",t.",' " , , ,

GSe FINISSANDQUALITYOT,99ilgBPTP''..,,.,,
. .!; ..,.;.'.,;i.,; :;,. . ..
9.1 The RCC work cast shall be ofdense mix, homogenous, withoul any honey coJnbing, true in sipe,
alignment and shape. Any defectiie work strall not be entitled for ftllitcndo"a i"to f* p"Vrrent and ii
the defects are major, no mbasurements and paymort are adniissible arib Conuactor shait trave to putt
down such defectivework and reil,o-at his cosf Thedeciqiqn ofttle Exa:i"utive Engineq re.gardiirg zuch
riri"inj *io *.-ay
defective work and the decisiorL vizpulling it down or be nfusary-itttuu U" Arra
andbindingontheContactor.i..'',.].n'..:.,...,'''.'.'.:..
9 .2 All RCC work shall be finished as dhected by th9 Exautiye Errgineer. It should be cleg,qly understoo$
that the finishing is not meant to cover the casting defecs buti.nty to gve a smcioth bppearance. In
case of RCC reservors and otfer mqjolR Wolf-s Congctor sh-all not comnience nnisfring unfess
.''CC

Contractor No. of Corrections Executivg,,}_rg1y


, .",t:i)i,..
tool.
!'.;
wi$

GSl0 TESTING
10.1

;i

eostand
10.2 Conhactorhas to makehis own arrange'tnents forwater for'testingathis
containers.t: fiIl..3
shallbe zuch that immediately after initial setting ofplaster"the
flled'witlt
satisfactory water tightress lest tlre contaiaer s.hall bgkgpt aonstantly
cost till the comPletion ofwork.
at his cost' to the
- -'- Till satisfactory water
10.3 tighttress test is given by the Contractor''
p"pt., onfy 907o tenderJ rates shall be attmissible for payment for RCC concrete

10.4

l:2:4.
150Kg/cm'z

Execulvc Enlilteer
Contractor
The Executive Engineer at his discretion consider substandard work at a suitable
reduced rate, provided
such weak concrete is restricted to such members and in such quantities,
waich in the opinioa ofthe
Executive Engineer will not endanger the safety ofthe stuctures. Executive
Engineer ,s {ecision in such
cases shall be final and bin{ing'ou the Conm;tor , : ': ''"'-T--- :r-:-:.. ,.
GS 11 MEASUREMENTS I

*.-"T**ents shall be the units as menrioned in the schedule,B' and break-up sghedule.
]l]1.2 Mode ofmeasurernenls
1 shall be : . .

a) columns : Height from top offooting to bottom ofbeams shall be measured as columns: . .

b) Braces for columns shall be measwed as net between column faces.


c) For shaight beams, duly ribs between column top and slab bottom surface shall be measured to beams
and rest in slabs.
d) tor.nng beams the li l section ofbeams from bottom to top shall be rneasured in bearng and quantities
laying outside the full beam section in beams. Slant walls, slabi, etc. as the case r4ay be shall
be
measured in the respective slant wall, vertical wall, flat slab, etc. as the casemay be.
e) vertical walls shall be measured for net quantity outside columns beams, slabs.
f) No deduction shall be made for reinforcement in RCC work.
r I J rne measurement under RCC works tbr :

net diamensions cast asdirected without any allowance for


rendering finishing, etc.
GST2 UCRMASONARY,GSRS. I..
In cqqe ofUCR masgngy r-ese,ryou, releyant specificgtiogq fgr.Egg and g!!er fouowed.
!t94s s1.r,4f t bq
The work shall be carried out as per type design.
GS 13 SPECIFICATIONS F'OR MASONARY\4Z. UCR/C& BRICK MASONARY, KHANDKI
F'ACING,ETC.
13 . 1 The masonry shall be either UCR/CR khandki facing, BB masbnry, etc. as specified in the respective
tender items.
I3 .2 For stone masonaryeither UCR/CR or khandki ,facing with 1 :4 proportion c9mgnt motai,
w.hic.h has to
retain water, the pucentage,of mortar shall be between 4A%o b45Yoof the gr.oss built-up.masonary
and in no case less than 40%. The cement to be used.in masonary shall be on.ttrebasis ofthis pocentage.
Ifless cernent is used proportionate reduced rate shall only.be paid and ifthe masonary is consfucted
with less percentage ofthe mortar than specified above and ifin theopinion ofExecutive Engineer it is
not suitable.to retaiq lvater presswe, it shpll hav, 9.to b9 disraqgtl,€4 g{d ,s
rcdqns at contactor cost with
correct percent^ge of mortar.
13.3 For all other masomies viz. UCR/CR/BB, ofmortar shall be as per p.WD. Hand
etc. the p€rcentage
book specifications and cernent to be used shall be based on thee percentages.
13 .4 For CR masonary, Kandki facing masonary etc. all i:ourses shall be of equal height; to bo specified
by
the Engineer in charge and only one row ofKhandkies strall be allowed 1Ir one co'rse.
13.5 Tender rates ofmasonary itenr, unlesq otherwise r-nentioned spgcifically in the tender items, s.haq include
suaffolding, watering curing and conerrt pointing in CM l:2 to rhe exposed facrs, where necessary and
as directed

Contractor No. of Corrections Executive Engineer


u
i
.L
. -..:r .r :

I J.O

13.7

13.8

13.9

ccTW DOORS, WINDOWS ETC'

'' -
l4.2Theworkshall.beexecutedasperthesizeofframethickrressofshuttertypeviz'dainntl
item. Iron bars
;i;;J;;". as described in tender item i:l:l*J:,fl1""::j,:t gtantar
at contactor's cost specificatisnsin!w "ffill
ffiffiffi#;il;;"il;
shall be apPlicable.
before
14.3 rhedesigrofshuttersaildqualrtvofwqoclshallt:ryt,1ry':-:,T:T3i::#=#t:if.tr from
ffi ;;;il;.ffi;;;;;;"aiq'yo*Y?'k.'g:::t::*::::n6: book
ffi::,l"ffi [:;;;Jh"#'il;'1;*'^r"r1u"9ii:tr1*?:*fi ii:"{l#B'
ffi;;*i;-;*r""e*r6"te-epunish{b.1n&-c-.Q,s,
iiltr5nffiJffi -* of
shall be pT1* ith the tar' The'frames
14.4
- -'
Parts of wood embedded in masonary
embedded ln masonary'
Ventilators etc. shall have proper holdfasts

14'5Whereverironbalistobeplovidedaspertenderitem,theratethereofisincludedintendqitem'.."

14.6

GS 15 PLASTERING
plain or waterproof'
15.1 l2mm, 20rnm and 25 mm cement plaster either

, 'ri 41llf .t

Executive Engheer
No. of Corrections
Contmctor
15.2

15.3

15.4 Neeru finish wherever directed by the Dept.; shall be done fiom inside at no *u *J.
15.5 specrncatron grven tor this item in standard specifications Book (Red Book) publislied by B and C
Departrnent slull be followed. :,-.,. .- " I i
15.6 Ctring and watering shall be done asdirected andplastrrstral be in alignmant and lwel. A[ry sgbstandrd
work is lible to be rejected and shall have to be redone at Confactor's cost. Sand to
\e used shall be
of approved quality only.

t'r.2

GSIS.PAINTING
18.1

GS 19 Providing and Fixing M. S"Lldder ,. ._.,,,_-., :. .. : . .:,.: .- .


Laddershall be manufactured as pqr.the details Fovided in ttre tender itein, All tlremate,rjals and labour

Contractor No. of Corrections Executive Engineer


GS20 GIII and Railling
I
The item shall be executed as specified in the tender item and as shown on drawin!. The vertical
supports shall be properly fixed at base either in masonary or concrete by nuts and bolts
{uly embedded
in the form, right anchorage holes in the vertical support to pass GI piping in it or weldihg to fix the GI
pipes to supports together with MS cleats, etc. are included in this item. The GI piping phall be bent in
circular or sprial railing pipes and shall bejointed by GI collars orwelded as per necessiryi The diameter
ofcl piping, nunber ofrows, size and type ofvertical posts together with its cente to {entre di.trr"",
height, etc shall be as specified in the tender item. Thg rate shall also include two coAts ofapprqved
shade oil paints. Cost ofall the materials which shall be procured by the Contractor, labdur incolved for
executing this item is included in tender item. The measurements and the payment shall be on.the basis
of lengtts inrunning meters.

GS 21 Providing Fixing RS J and Other Structural Steel Works.


21.1 This item covers fixing MS/RS girders. MS angles, channels, flats, base plates,
bracket, etc. and other accessories as per requirement and as directed and fabricating
cutting, drilling holes, etc. and errecting and fixing at site with necessary iivetted c
fixtures with nuts and bolts etc. wherever necessary, together wittr their proper fixing
masonary or slabs ofconcrete as directed. Structural steel works materials shall be bythe
Contractor from open market at his cost. The item includes three coats ofoil Daint of directed
to all sffuctural work.

21.2 All above operalions including cost ofmaterials and lobour there of, are included in tire tenderitem.
The meassurement and payment shall be on the weisit basis in the r.rnit as mentioned irl Schedule 'B'.
actually enected at site, as directed shall be admissible for pay.ment. RSJ channels, anglgs, flats, gusset
plates, brackets, base plates, cleats, packing pieces actually used as directed shall be admissible for
pa1'rnent but not the rivets, nuts and bolts etc. The rivetted or weldedjoints or fixing with nuts are
included in the tendered rates. The specificatiot for thig item given in Standard Specificaton (Red
Book) published by B and C Deparlment will be followed.

GS 22 Murum Filling, Bedding etc.


22.1 When tender item provides that murum svailable from excavation is to be used fiee ofcos! whatever
murum that is available and suitable from excavatecl stuffshall be used by Contractor, free ofcost.

22.2 The murum filling or beddings is to be done in 15 to 20 cm thick layers, walered and duly consolid4ted
by hand rammers as directed.

Contractor No. of Corrections Executive Engineer


MATERIAI,.,TOBEUSED

Sr.
No.
I
2

PVC Fipes and . IS.4985/1988 .. SSI Units registered with GovL of

PVC Specials
SluiceValveg

AirValves

DatedlT:1.92': '
8 RefluxValves Is-5312 :

1. "

No:,gfcqn?:tignl
1i

i"i I

TECHNICAL SPECIF'ICATION
.tj
Sr. No. Specifi cations referance from book
,..:1 ,.,.
Specification of Govt.' of
,l BgoD . :
.., ri,., , .:.,.,...1
I Excavation in all sorts g{m.ate-'nal Sp. No. BJ PageNo-24 tq 28,
2. Plain Cernent Concrete Sp. No. B-6 on Page No. 33 to 38 o
and Bd-EP No. 287 to 291 ofvohr
GS-ItoGSJI
J. Masonary work (Stone Masonary) Sp. No. B-9 PageNo. 55 to 60 of
BH and Page ofvolume II Spn. Gs-lp
MurwnBedding Sp.,No. Bd. 4,} No, 262., to 265 of Vplr
IDS.6. GS-22
. M.S. Reinforcement Grade II or T or Steel Stress as per IS"
(Fe 4l s)
6. CC I :2:4 proportio:r
1:l l/2:3 proportion for RCC work Part I and Part II, Sp No. Bd. F. P. \o.29? io
309 and ISA 456-1976 Spn.GS-I tolqt"l t
7. B. B. Masonry work Sp. No. 88(b) Page No. 42 Volume IlSpn.cs-
13 ! ',':
8. Dewatering Sp. No. BR-4 Page No. t 03 to!0ia'
9. Cement Plasters Sp. No. B-l 1 , Page No. 60 to 66 S{ncS-15
10. Whitewash and Colour Washing Sp. no. BD-PI, Page No.411 to 4ll Spn.
GS-I8
11. Oil Bound Distemper etc. Sp. No. BD-P, ii P. S. P. No.431,414 Spn
GS-I8
12. T. W. Doors and Windows As per Sp. No. B and C-7, Page No,418 And
Sp Bd. 1.4 Page No. 479 Spn. GS-14
13. Stuctual steel Sp. No. Bd-C-6, Page No. 277 Spn. GS 2l
14. Rough Shahabad stone flooring Sp. No. Bd.-Ml. Page No. 379 Spn. Gs.l6
15. Lowering Laying and Jointing ofall
types ofpipes Erecting flanged pipes etc.
to Road Sruface Boxes

17 B. B. Masonry Chamber As per type design

Contractor No. of Coirections


'7\

18.

19. Refiiling

), . ; ri , -:,. i...
20. .. Storage Reservlirs ._.. .. j Spn. IDS- 17
21. Fixing fkrlet, Outleg overflow and As per Depaftnental Dawings and Designs
washout &
dc Specifications
speclttcahons iI

22. Llgnunng Lonductor As per ISS and IS rulesj


rules SD;.
Spn. IDS-I7
zJ- M.S. Ladder Sp. No. Bd. VI9, Page No 559 Spn.
Spn. GS-
l9 rD$:3
24. Providing and fixing weep holes Spn{DS-4
25. G I. Pipe Hanad Railing with RCC bars Sp. No. BR-s1 (a) Page No. 136 and 139
Spn. cS-20
Depuri type steps Spn. IDS-5
27. Providing and fixing CI MH frame and Cover Spn. IDS-15
28. Spn. GS-15
29. Spn. GS-l6

Note
shall be refened.

i j , ,:

- i-i^ -iit::
i.r -{i l

. {lt\-t-l) . .',.

Contractor No. of Corrections Executive Engineer


:''
76

I
L

ZLL-PARISHAD,,P]LIM - 411 001. i

RURAL WATER - SUPPLY WORKS DIVISION, PU]YE


'' : ' : '

DECLARATION

I / we hereby declare that, I / we have made myself/ ourselves thorouglrly


the local conditions, regarding all materials such as stones, murum, and
and labour, on which I / we have based my / our rates for this.work. The
for this work have been carefirlly studied and understood by me / us, before subr
I / we undertake to use only the best materials, approved by the Executive

I hereby undertake to pay the labours engaged on the work as per Minimum wages Act;
1984, applicable to the zone concemed.

Executive Engineer,
Rural Water Supply Works Division,
Contractor No. of Corrections Zilla Parishad, Pwre,
t
t1
I
ft:
t 77

I
{dr.,q{r*H, q*rft-+rsqvo+iqnqfrqrq, vncqfiufqtr.
t r.Trg-to3i_*fte+n_w(u,)/ts1er;,
rirrdq, Im - r r . fr . I \e - q q q q
- x gs* fr+"eqemilfuAq ftA-o A;der erqF
a
qrd wrgn +ri qf
{rqdd{ -a-cq -sc qrm-qd'a teqrd-*,
ffi
I
t
ft r ft qra-^, nsrrt Eiq-srq i *#0"
a.
I
weaH ffi q-srM rffir derror* rr$g
i
I
I ANNEXURE E l
i
DEFECT. LIANrr,rrV PNNTOO, FOR.TIIE
{VORK, OF
.
RURALWAERSUPPLYSETTEMES
I

Sr. TYPEOFWORK
No. Defect Liability
Period after
commissioning
1.

FiveYears,

b)
c)

d)
PUMPINGMACHINERY:

b) Repairs to the works as above.


Six Months.
3. TREATMENTPLANTS:
a) Water lieatrnent plant & sewerage treatrnent plan! FiveYears,
based on contractor's desien.
b) Water Treahnent plant & sJwerage treahnent
plant, ThreeYears
based on Deptt.Desrgn.
c) Repairs to the treahnent plant (ar a & b)
4. E.SR./GS.R. (B.f.T.y Suml C iump house
etc.
Two Years.
a) Based on conaactor's own desisn.
Five Years.
b) Based on Deptt. design.
Threeyears
c) Special repairs to the B.p.T.
Two Years
d) Ordinary repairs to ESR/GSR/BPT/Sump pump
house etc. One year

Executive Engineer,
Rural Water Supply Worla Division,
Contractor
No. of 9orrections : Zilla parishad, pme.
78
PIPE LINE :

a) Pumpingmachinery, gravity mains, leading mains incl. intersectine


TwgYears
out fall sewerage cowl ofsewerage scheme.
I

b) Distribution system laterals, Branch sewerage on sewerage system


I

etc. OnqYear
c) Repairs to Pipe line under the work at A, B above.
rYears.
The instructions contained in the Govemrnent
of Maharashtra State (public wor department),
Resclutation dated ttre I 4th June l 9g9 shalr hence
forth be applicable to all the works defect
liability periods have been specified at above, suitable
actioirs strould be taken for the
same in lirther documents modi$ing the clauses, p.
17. and 20 and the works BO ORZILLA
PARISH AD, PLINE, as the case may be in place
of Government wherever necessary

Contractors.

srfrn q*
ffii qlq +.ccmr r*nq
t*sniqr tiq+cnrc* rr*fte.
3[E
q. dqli sqrrqrE q-rq adeerq 6{oqid qri. sqtrsrs croft vrq-crq i ftuqm ftq fr-drcH
vt{ eTfr,q nd{ nr**-W qrq"n +$i i ft ufi srd +rq srs€ri emrr rrTAEq{ Ams
sqq-{ie.rc ga vqffi
eri-e. aq-cr rqq-*s ril{iid€ gtd qr"n Ea* grdnq
Tild sdqurq G-mrs rirq+ sqrufd +trdil{ dqiqrsqrrri*6rt wo?Trd
qr{d.
3{. T@Rr/gRraRi*4.rt.
q. wtu eftfr /gce qrRft* q ri, TiqER, qffi qsffi , zr*qi* qrl e, a* qri vr*+r reur
qrR-fr
/UccqqrFftS+.ri6rfr qr+d
s. fucrq;++en.
+a-*tg|aqi*E.rt.
effiR-S q.FffirfrsTft"iin,
fifrq lnuft gw6r qierqm Fqm,
fuetrqfrsq, ge.

Executive Engineer,
Rural Water Supply Works Divisiorl
Contractor No. of Corrections Signature Not Verified
Digitally signed by Arvind Balajirao Chate
Date: 2018.01.29 16:13:29 IST
Location: Maharashtra