Sei sulla pagina 1di 1

Bar Bending Schedule OF Box Culvert

B = 2.00 H = 2.00 L = 12.50 12500


Cover = 40.00 mm

a b e
g
c
H j
B
h i c
f L

Out side wall Top slab


Bottom slab

Concret
Length Wt/ mtr Total
Bar Shape Bar Space e No. of
Part of bars Row of bars weight
mark of Bar Dia mm Length bars
(m) (Kg) (Kg)
(mm)

Top slab 1
Top steel a 12 mm f @ 150 mm c/c 2.57 1 12.42 83 0.88889 190
Bottom steel b 12 mm f @ 150 mm c/c 2.57 1 12.42 83 0.88889 190
Distribution j 12 mm f @ 200 mm c/c 12.42 2 2.42 24 0.88889 270
Thickness T = 300 mm Clear Length 2000 mm Total Length 2500 mm
Bottom slab 1
Top steel h 12 mm f @ 150 mm c/c 2.57 1 12.42 83 0.88889 190
Bottom steel i 12 mm f @ 150 mm c/c 2.57 1 12.42 83 0.88889 190
Distribution j 12 mm f @ 200 mm c/c 12.42 2 2.42 24 0.88889 270
Thickness T = 300 mm Clear Length 2000 mm Total Length 2500 mm
Out side wall 2
Out side steel c 12 mm f @ 152 mm c/c 2.57 2 12.42 164 0.88889 380
In side steel d 12 mm f @ 203 mm c/c 2.57 2 12.42 122 0.88889 280
Distribution j 12 mm f @ 203 mm c/c 12.42 4 2.42 48 0.88889 530
Thickness T = 250 mm Clear Height 2000 mm Total Height 2600 mm
Top Corner 2 e 12 mm f @ 152 mm c/c 1.47 2 12.42 82 0.88889 110
Bottom Corner 2 f 12 mm f @ 152 mm c/c 1.47 2 12.42 82 0.88889 110
Hunch 4 g 12 mm f @ 152 mm c/c 1.00 4 12.42 82 0.88889 80

Total steel Required 2790 Kg


2.79 Tons

Potrebbero piacerti anche