NTPC Ltd., formerly known as National Thermal Power Corporation Limited,Headquarters in New Delhi.
is an IndianPublic Sector Undertaking, a company incorporated under the Companies Act 1956 and a "Government Company" within the meaning of
the act.state-owned power distribution companies and State Electricity Boards in India.
founded on 7 November 1975 in Uttar Pradesh

Gurdeep Singh is the present CMD of NTPC (As of Sept 2017).

Vindhyachal Thermal Power Station, Singrauli, Madhya Pradesh is the largest power producer in the country.

NTPC is a Maharatna Company with 20 coal based power stations and the largest thermal power generating company in the country. The company has a
coal based installed capacity of 38,755 MW.

Mundra Thermal Power Station by Adani Group is largest private thermal power producer.

*Singrauli Super Thermal Power Plant located at Shaktinagar in Sonebhadra district of Uttar

Pradesh is the first power plant of NTPC.

Mahagenco has the highest overall generation capacity and the highest thermal installed capacity amongst all the state power generation utilities in
india. In terms of installed capacity, it is the second highest generation company after NTPC.

Vindhyachal Thermal Power Station, Madhya Pradesh

4,760MW It is a coal-based power plant owned and operated by NTPC.

Mundra Thermal Power Station, Gujarat

4,620MW coal-fired power plant owned and operated by Adani Power.

Mundra Ultra Mega Power Plant, Gujarat

4,000MW coal-fired power plant owned and operated by Coastal Gujarat Power Limited (CGPL)

Talcher Super Thermal Power Station, Odisha


3,000MW coal-fired power plant owned and operated by NTPC

Sipat Thermal Power Plant, Chhattisgarh

2980MW coal-based power plant owned and operated by NTPC

NTPC Dadri, Uttar Pradesh

2637MW (1820MW- coal based and 817MW gas based)

NTPC Ramagundam, Andhra Pradesh

the largest in south India 2600MW

Korba Super Thermal Power Plant, Chattisgarh

2600MW It is a coal-fired power plant owned and operated by NTPC.

Rihand Thermal Power Station, Uttar Pradesh

2,500MW owned and operated by NTPC.

Jharsuguda Thermal Power Plant, Odisha

a 2400MW coal-fired power plant owned and operated by Sterlite Energy, a 100% subsidiary of Vedanta Resources.

Upcoming projects

GODHNA THERMAL POWER STATION

Location: Godhna, Janjgir District, Chhattisgarh State

Capacity: 2 x 800 MW

 Detailed project report was prepared by M/s. Fichtner Consultancy Engineering Pvt. Ltd., Chennai.
 Land possession: Private land possession completed, Govt. land possession is in final stage.
 Awaiting for coal allotment, followed by MoEF clearance.
NTPC

Sr. No. COAL BASED(Owned by NTPC) STATE COMMISSIONED CAPACITY(MW)

1. Singrauli Uttar Pradesh 2,000

2. Korba Chhattisgarh 2,600

3. Ramagundam Telangana 2,600

4. Farakka West Bengal 2,100

5. Vindhyachal Madhya Pradesh 4,760

6. Rihand Uttar Pradesh 3,000

7. Kahalgaon Bihar 2,340

8. Dadri Uttar Pradesh 1,820

9. TalcherKaniha Orissa 3,000

10. Feroze Gandhi, Unchahar Uttar Pradesh 1,550

11. Talcher Thermal Orissa 460

12. Simhadri Andhra Pradesh 2,000

13. Tanda Uttar Pradesh 440

14. Badarpur Delhi 705


15. Sipat Chhattisgarh 2,980

16. Mauda Maharashtra 2,320

17. Barh Bihar 1320

18. Bongaigaon Assam 500

19. Kudgi Karnataka 1600

20. Solapur Maharashtra 660

Total 38,755

Coal Based (Owned through JVs)


Sr. Inst.Capacity in
Name of the JV Location State
No. Megawatt

1 NSPCL. Joint venture with SAIL. Durgapur West Bengal 120

2 NSPCL. Joint venture with SAIL. Rourkela Odisha 120

3 NSPCL. Joint venture with SAIL. Bhilai Chhattisgarh 574

4 NPGC. Joint venture with Bihar State Electricity Board. Aurangabad Bihar 1980

Muzaffarpur Thermal Power Station (MTPS). Joint venture with Bihar State Electricity
5 Kanti Bihar 610
Board.

6 BRBCL Joint venture with Indian Railways. Nabinagar Bihar 1000

7 Aravali Power CPL JV with HPGCL & IPGCL Jhajjar Haryana 1500

8 NTECL JV with NTPC & TNEB Chennai Tamil Nadu 1500


Sr. Inst.Capacity in
Name of the JV Location State
No. Megawatt

Uttar
9 Meja Thermal Power Station JV with NTPC & UPRVUNL Allahabad 1320
Pradesh

10 PUVNL(Patratu) Patratu Jharkhand 325

Total 9049

Adani is the largest private thermal power producer in India with an installed capacity of 10,480 MW. Our four power projects are spread out across the
states of Gujarat, Maharashtra, Rajasthan and Karnataka.

Mundra, Gujarat
4620 MW (5 X 660 MW + 4 X 330 MW)

Tiroda, Maharashtra
3300 MW (5 X 660 MW)

Kawai, Rajasthan
1320 MW (2 X 660 MW)

Udupi, Karnataka
1200 MW

Bitta, Gujarat 40 MW, India’s largest, solar power plant


40 MW

The solar power plant uses Solar PV Technology and has over 400,000 Solar PV modules mounted on 21,600 structures

Mundra Ultra Tata Power Mundra/Kutch/Gu Private Western 4,000 (5 X 800)


Mega Power jarat
Project
Sasan Ultra Mega Reliance Sasan/ Singrauli/ Private Western 3,960 (6 x 660)
Power Project Infrastructure Madhya Pradesh
Amravati Thermal Indiabulls Nandgaonpeth/A Private Western 2,700 (10 X 270)
Power Plant mravati/Maharas
htra
Trombay Thermal Tata Trombay/Mumbai Private Western 1,400 (1 x 150, 2 x
Power Station /Maharashtra 500, 1 x 250)
Essar Power Essar Power Jamnagar/Salaya/ Private IPP Western 1,200 (2X600)
Gujarat Ltd. Gujarat
Jindal Megha Jindal Tamnar/Raigarh/C Private Western 1,000 (4 x 250)
Power Plant hhattisgarh
LancoAmarkantak Lanco Pathadi/Korba/Ch Private Western 600 (2 x 300)
Power Plant hattisgarh
WardhaWarora KSK Energy Warora/Chandrap Private Western 540 (4 x 135)
Power Plant Ventures ur/Maharashtra
Dahanu Thermal Reliance Dahanu/Thane/M Private Western 500 (2 x 250)
Power Station Infrastructure aharashtra
KSK Mahanadi KSK Energy Nariyara/Bilaspur/ Private Western 135 (1 x 135)
Power Ventures Chhattisgarh
Sabarmati Torrent Power Ahmedabad/Gujar Private Western 400 (1 x 60, 1 x
Thermal Power at 120, 2 x 110)
Station
CESC Chandrapur Thermal Power Chandrapur/Chand Private Western 300 (1 x 300)
CESC rapur/Maharashtra
VS Lignite Power KSK Energy Gurha/Bikaner/Ra Private Northern 135 (1 x 135)
Plant Ventures jasthan
DB Thermal DB POWER Raigarh/JanjgirCh Private IPP Eastern 1,200 (2X600)
Project Ltd. ampa/Chhattisgar
h
SterliteJharsugud Vedanta Jharsuguda/Jhars Private Eastern 2,400 (4x600)
a Power Station uguda/Odisha
Vedanta JharsugudaJharsug Private Eastern 1,215 (9x135)
Jharsuguda Captive Power uda
Vedanta /Odisha
Angul Thermal Jindal Steel and Angul/Angul/Odis Private Eastern 1,200 (2x600)
Power Station Power ha
Budge Budge CESC Budge Private Eastern 750 (3 x 250)
Thermal Power Budge/South 24
Plant Paraganas/West
Bengal
Pynampuram TPCIL Krishnapattanam/ Private Southern 1,320 (2 x 660)
Power Station Nellore/Andhra
Pradesh
JSW Vijayanagar JSW Energy Vijayanagar/Bellar Private Southern 860 (2 x 130, 2 x
Power Station y/Karnataka 300)
Muthiara Thermal Energen Tuticorin/Tuticori Private Southern 600 (1 x 600)
Power Station n/Tamil Nadu
IL&FS Thermal ITPCL Cuddalore/Cuddal Private Southern 600 (1 x 600)
Power Station ore/Tamil Nadu
Simhapuri SPL Krishnapattanam/ Private Southern 600 (4 x 150)
Thermal Power Nellore/Andhra
Station Pradesh
Hinduja Thermal HNPCL Gajuwaka/Visakha Private Southern 525 (1 x 525)
Power Station patnam/Andhra
Pradesh
Power Generation in India by Thermal Power Stations Region wise brake-up
40% Western Region
25% Northern Region

17% Eastern Region


18% Southern Region

Region Total Total Units in Central State Private State & Power Gen
Thermal Plants Gov Gov Sector Central (MW)
Plants Plants Plants Plants Joint Plant
30,842.50
Souther 28 83 4 12 10 2
n

Tamil nadugovt firms

Neyveli Thermal NLC Neyveli/Cuddalore Central Souther 1,970 (7 x 210,


Power Station II /Tamil Nadu n 2 x 250)

Vallur Thermal NTPC & TNEB Vallur/Chennai/Ta State & Souther 1,500 (3 x 500)
Power Station mil Nadu central n

Tuticorin Thermal TNEB Tuticorin/Tuticorin State Souther 1,050 5 x 210)


Power Station /Tamil Nadu n

Neyveli Thermal Power Neyveli/Cuddalore/Tam Central Southern 1,020 (6 x 50,


NLC il Nadu 3 x 100, 2 x 210)

NTPL Thermal NLC & TNEB Tuticorin/Tuticori State & central Souther 1,000 (2 x 500)
Power Station n/Tamil Nadu n
Mettur Thermal TNEB Mettur/Salem/Ta State Souther 840 (4 x 210)
Power Station mil Nadu n

North Chennai TNEB AthipattuThiruvall State Souther 630 (3 x 210)


Thermal Power ore/Tamil Nadu n
Station

TamilnaduPrivate firms tn

Muthiara Thermal Energen Tuticorin/Tuticori Private Southern 600 (1 x 600)


Power Station n/Tamil Nadu

IL&FS Thermal ITPCL Cuddalore/Cuddal Private Southern 600 (1 x 600)


Power Station ore/Tamil Nadu

Tutiorin (Pvt) Indbharat Tuticorin/Tuticori Private Southern 300 (2 x 150)


Thermal Power n/Tamil Nadu
Station

COAL Processing involves crushing, screening and beneficiation.

Processing takes place at Griffin Coal’s Ewington Mine. It is a process wherein coal is converted from
Run of Mine to a product that meets the customer’s requirement.

Crushing

Mined coal can include lumps up to a metre in size, so crushing to a manageable size is required. Coal
crushing can include a two stage process dependant on deposit size.

Crush One: Feeder Breaker

Coal is crushed in a feeder breaker, a chain conveyor under a toothed drum that breaks the biggest
lumps.

Crush Two: Sizer

Coal size is further reduced through a sizer, where each oversize particles are reduced to less than 75
millimetres.

Screening

Screening is used to separate different sizes of crushed coal. In this process coarse and fine coal is
separated so to accommodate for specific markets and industrial usage. Screening takes place at a
processing plant adjacent to Ewington Mine.

Griffin Coal’s screened coal is ideal for burning in horizontal kilns. In these kilns uniform particle grading
is used to create even combustion along the length of the kiln. Coarser coal is also required by
customers who burn coal in grate–fired applications.
Beneficiation/Washing

Beneficiation has been trialled at Ewington. During beneficiation, coal is processed to remove
impurities reducing ash and sulphur thereby improving the market value of the coal. Beneficiation can
improve the quality of contaminated coal that would otherwise be wasted.

Most cleaning processes involve washing the coal in order to separate coal particles from stone
particles as coal is considerably lighter.

Charring

Coal can be charred, a process wherein hydrogen and oxygen are removed from the coal to make it
purer form of carbon. Once processed according to specifications, coal is loaded and transported
accordingly.

Private power companies

Reliance

Sasan Ultra Mega Power Project


Location
:
Madhya Pradesh
Capacity
:
3,960 MW
Rosa Phase I
Location
:
Uttar Pradesh
Capacity
:
600 MW
Butibori Power Project
Location
:
Maharashtra
Capacity
:
600 MW

Meenakshi energy

Chhattisgarh 900mw

Tata power

7340mw

Essar

1200mw guj jhrknd paradip


Vedanta

Odisa 2400mw 270 mw balco chttgrh

100mw tn malco

Bhel

1103 hp 87.3 t/hr

1203 hp 103 t/hr

Bbd 4772 110 t/hr

Technical Parameter:

Inner
Diameter
Feeding
Roller Roller Height & Output Capacity Power Overall
Model Size
No. Size(mm) Length of Size(mm) (t/h) (kw) Dimension (mm)
(mm)
Grind Ring
(mm)
0.613-
YGM65 3 210×150 650×150 ≤ 15 0.4-1.8 15 4100×3300×4500
0.033
0.613-
YGM75 3 260×150 780×150 ≤ 15 1-3 18.5 4300×3500×5100
0.033
0.613-
YGM85 3 270×140 830×150 ≤ 20 1.2-4 22 5300×4100×5200
0.033

YGM85B 3 270×140 830×150 ≤ 20 0.613-0.03 1.2-3.5 22 5300×4100×5200

0.613-
YGM95 4 310×170 950×170 ≤ 25 2.1-5.6 37 7100×5900×7900
0.033
0.613-
YGM130 5 410×210 1280×210 ≤ 30 2.5-9.5 75 7900×8000×9700
0.033

Fineness of
Mainframe Overall
Model the final Capacity(t/h) Weight(t)
Power(kw) Dimensions(mm)
product(mm)

YGM65 0.198-0.033 0.4-1.8 15 3.8 4100*3300*4500

YGM75 0.198-0.033 1.-3 18.5 4.8 4300*3500*5100

YGM85 0.198-0.033 1.2-4 22 8.5 5300*4100*5200


YGM88 0.198-0.033 1.5-4.5 30 9.2 6500*4100*5200

YGM95 0.198-0.033 2.1-6.5 37 16 7900*5900*9100

YGM130 0.198-0.033 2.5-11 75 25.7 9200*8000*9700


SIZE OF MILL CAPACITY MOTOR HP OF SHIPPING WEIGHT
(#LBS./HR.) MILL & EXHAUSTER MILL & FAN
312 3,500 lbs/hr 40 HP 15,500 Lbs
352 4,450 lbs/hr 50 HP 18,500 Lbs
372 6,200 lbs/hr 75 HP 22,000 Lbs
412 8,000 lbs/hr 100 HP 27,500 Lbs
452 9,700 lbs/hr 100 HP 34,000 Lbs
453 11,500 lbs/hr 125 HP 36,000 lbs
473 13,300 lbs/hr 150 HP 43,000 Lbs
493 16,800 lbs/hr 200 HP 45,000 Lbs
533 20,300 lbs/hr 250 HP 52,000 Lbs
573 26,500 lbs/hr 250 HP 57,000 Lbs
593 28,200 lbs/hr 300 HP 82,000 Lbs
613 37,700 lbs/hr 300 HP 84,000 Lbs
633 36,500 lbs/hr 350 HP 90,000 Lbs
673 41,500 lbs/hr 400 HP 94,000 Lbs
713 50,100 lbs/hr 450 HP 100,000 Lbs
753

MAKERS

Kappati

AlstomI

Thermal –private-MW-N

E DATE TIME MACHINE used manufac

-PUB-MW-

Design specs

Tender perquisites

Upgrade

Global manufacturers

2.2.5.4 Coal pulverisers (mills) i) Pulveriser type: The coal pulverizes shall be of vertical spindle type. The
pulverisers offered by the bidder can be of Ball and Race/ Roller/ Bowl/ MPS type or approved equivalent type.
ii) Classifier design: a) The classifier design shall be of static type and shall be capable of maintaining rated
conditions of fineness under all conditions of operation, load changes and specified fuels. Further, the classifier
vanes shall be adjustable externally and shall be lined with suitable wear resistant material to ensure the
guaranteed wear life. b) The classifier shall ensure reduction in particle of 50 mesh without increasing 200 mesh
percentage to ensure uniform sizing and distribution of particles. Fineness adjustment shall be possible while the
mills are in service. c) Outlet of the classifier shall have aerodynamic shape to prevent eddies. iii) Provision shall
be provided in the mill design for future accommodation of rotary classifier in place of stationary classifier. For
this purpose necessary structure, piping, spare piece etc. shall be provided. iv) Mill noise level: The mill noise
level shall not exceed the specified values. While selecting lagging, background noise from adjacent mills, drive
system and other secondary and stray noises shall be taken into account. v) Mill seal air system: a) 2x100% seal
air fans common for all the mills shall be provided for ach steam generator unit. The fans shall preferably be
located at ground floor. b) The sealing system shall prevent ingress of any dust into the bearings and leakage of
coal-air mixture to atmosphere. c) The seal air fans shall take their suction from atmosphere/ PA fan cold air bus.
Silencers shall be provided, if required, at the suction of the fans to restrict noise level within permissible limits.
vi) Mill gear box: The gear box shall be planetary type. The gear box design shall ensure that there is no ingress
of coal dust into gear box under all conditions of operation. The gear box shall give trouble free operation of not
less than 100,000 hours of mill operation. Standard Technical Specification for Sub- critical Thermal Power
Project - 2x(500MW or above) Main Plant Package Section- 2 (Steam Generator and Auxiliaries) 2 - 41 vii) Mill
motor capacity: The mill motors shall be adequately sized and selected motor capacity shall enable restart of the
mill after a trip with mill full of coal. Such restart shall not call for any emptying of the mill. viii) Inlet coal pipe
between RC feeder and the mill shall not have any reduction in section throughout the length, including at entry
point on top of the mill. ix) Each mill shall be fed with coal by an independent coal feeder. x) Materials of
construction: a) The material of construction of wear parts shall be selected taking into account highly abrasive
nature of coal resulting from coal contamination with silica sand and alpha-quartz. b) The grinding rings/ race
shall be made of material having hardness of minimum 550 BHN at the surface with adequate chilled depth. The
grinding balls/ rolls shall be of material with minimum hardness 350 BHN. Minimum difference between
hardness of rings/race and balls/rolls shall be 100 BHN. c) The classifier cone shall be lined with minimum 15 mm
thick ceramic tiles on both inside and outside surfaces of the cone. The classifier vanes shall be lined with
suitable material to provide minimum specified wear life. xi) Lubrication system: The design of lubrication
system shall ensure continuous operation of mill bearings. Suitable arrangement shall be provided for readily
determining the oil level in the gear box(es) and all other lubricated parts. xii) Pulverised coal sampling: a)
Tapping points shall be provided on each pulverized coal pipe at mill outlet and shall be suitable for coal
sampling as per ISO 9931. The sampling provisions shall be complete with screwed plugs, compressed air purging
connections at tapping points, heating arrangement and other requirements as per ISO 9931. b) One (1) no. of
Rota probe shall be provided for each steam generator for coal sampling as per ISO 9931. Further, four (4) nos.
of Dirty Pitot tubes shall be provided for steam generator and shall be suitable for measurement of coal-air
velocity in the coal pipes. c) Convenient approach/access from nearest platform floor shall be provided for coal
sampling/ measurement points. xiii) Mill outlet temperature control shall be capable of achieving and
maintaining rated temperature for adequately drying the specified coal range for all unit loads. xiv) The flap of
power operated mill discharge valves shall be totally out of coal path during operation of the mill. Standard
Technical Specification for Sub- critical Thermal Power Project - 2x(500MW or above) Main Plant Package
Section- 2 (Steam Generator and Auxiliaries) 2 - 42 xv) All mill wear parts shall be arranged so as to facilitate easy
replacements without total dismantling of pulveriser(s). xvi) The mill shall be capable of running at part loads
and ensure minimum turn-down ratio of 2:1. xvii) Handling of pulveriser parts: a) The pulveriser shall be
designed to facilitate ease of handling of heavy parts for maintenance purpose. b) Motorised hoists shall be
provided for O&M works of components below separator top. c) The gear case shall be accessible and suitable
for removing gearing/ removing upper structure. xviii) Adequate numbers of access doors/windows with access
ladders shall be provided to facilitate access to various parts of mill. The access doors shall be suitable for on
load inspection and maintenance of the mill. The oil pumps and filters shall be readily accessible. xix) Necessary
ladders and approach platforms for mill bay hoist shall be provided at one end/ corner to carry out any
maintenance activity on hoists.

We have a share of 59% in India's total installed generating capacity contributing 69% (approx.) to the total
power generated from utility sets (excluding non-conventional capacity) as of March 31, 2012.

We have been exporting our power and industry segment products and services for over 40 years. BHEL's global
references are spread across 75 countries. The cumulative overseas installed capacity of BHEL manufactured
power plants exceeds 9,000 MW across 21 countries including Malaysia, Oman, Iraq, the UAE, Bhutan, Egypt and
New Zealand. Our physical exports range from turnkey projects to after sales services.
Neyveli Thermal NLC Neyveli/Cuddalore/Tamil Central Southern 1,020 (6 x 50, 3 x 100,
Power Nadu 2 x 210) 62,70

Kothagudem TSGENCO Paloncha/Khammam/Telan State Southern 1,720 (4 x 60, 4 x 120,


Thermal Power gana 2 x 250
Station ,1x500)
(66,67,74,77,97,98,11)

Ennore Thermal TNEB Ennore/Chennai/Tamil State Southern 450 (2 x 60, 3 x 110)


Power Station Nadu 70,71,72,73,75,15(NT
RUN)
Dr Narla Tatarao APGENCO Ibrahimpatnam/Krishna/A State Southern 1,760 (6 x 210, 1 x
TPS ndhra Pradesh 500)
(79,80,89,90,94,95,09)

Tuticorin Thermal TNEB Tuticorin/Tuticorin/Tamil State Southern 1,050( 5 x


Power Station Nadu 210)(79,80,82,92,91)

Raichur Thermal KPCL Raichur/Raichur/Karnataka State Southern 1,720 (7 x 210, 1 x


Power Station 250)
(86,94,99,02,13)
Mettur Thermal TNEB Mettur/Salem/Tamil Nadu State Southern 840 (4 x 210) (1x600)
Power Station (87,89,90)(13)

NTPC NTPC Jyothi central southern 2,600 (3 x


Ramagundam Nagar/Karimnagar/Telanga 200(83,84,84),
na 4 x 500(88,89,89,04))

Neyveli Thermal NLC Neyveli/Cuddalore/Tamil Central Southern 1,970 (7 x 210, 2 x


Power Station II Nadu 250)
(88,93)(14)

Rayalaseema APGENCO Kadapa/Kadapa/Andhra State Southern 1,050 (5 x


Thermal Pradesh 210)(94,95,07)
Power Station
North Chennai TNEB AthipattuThiruvallore/Tam State Southern 630 (3 x 210) (2x600)
Thermal Power il Nadu (94,95,96)(14)
Station
Simhadri Super ntpc Vishakapatnam/Andhra Central Southern 2,000 (4 x
Thermal Power Plant pradesh 500)(02,04)(11,12)

Bellary Thermal KPCL Kudatini/Bellary/Karnatak State Southern 500 (1 x 500) 07,12


Power station a
Vallur NTPC & Vallur/Chennai/Tamil Nadu State & Souther 1,500 (3 x 500) (10,11,12)
Thermal TNEB central n
Power Station
Kakatiya Thermal TSGENCO Chelpur/Warangal/Telanga State Southern 1100 (1 x 500,1x600)
Power Station na 10,16
NTPL Thermal NLC & Tuticorin/Tuticorin/Tamil State & Southern 1,000 (2 x 500) (12)
Power Station TNEB Nadu central

Sri Damodaram Andhra Krishnapattanam/Nellore/ State Southern 1,600 (2 x 800) (14)


Sanjeevaiah Pradesh Andhra Pradesh
Thermal Power Power
Station Developmen
t Co Ltd
Ramagundam B TSGENCO Ramagundam/Karimnagar/T State Southern 62.5 (1 x 62.5) 71
Thermal Power elangana
Station
Neyveli Zero TAQA Neyveli/Cuddalore/Tamil Private Southern 250 (1 x 250) 02
Lignite Power Nadu
Station
JSW Vijayanagar JSW Energy Vijayanagar/Bellary/Karnat Private Southern 860 (2 x 130, 2 x 300)
Power Station aka (09)
Meenakshi MEPL Krishnapattanam/Nellore/A Private Southern 300 (2 x 150) 10
Thermal Power ndhra Pradesh
Station
Tutiorin (Pvt) Indbharat Tuticorin/Tuticorin/Tamil Private Southern 300 (2 x 150) 16
Thermal Power Nadu
Station
Udupi Thermal Adani Power Nandikoor/Udupi/Karnataka Private Southern 1,200 (2 x 600) (12)
Power Plant
Pynampuram TPCIL Krishnapattanam/Nellore/A Private Southern 1,320 (2 x 660) (15)
Power Station ndhra Pradesh

Muthiara Thermal Energen Tuticorin/Tuticorin/Tamil Private Southern 1200 (2 x 600)(14,16)


Power Station Nadu
IL&FS Thermal ITPCL Cuddalore/Cuddalore/Tamil Private Southern 1200 (2 x 600) 15,16
Power Station Nadu
Hinduja Thermal HNPCL Gajuwaka/Visakhapatnam/ Private Southern 525 (1 x 525) 15
Power Station Andhra Pradesh
Simhapuri Thermal SPL Krishnapattanam/Nellore/A Private Southern 600 (4 x 150) 16
Power Station ndhra Pradesh

Unit Company Capacity Status District

Gummidipoondi ARS Metals 180 Pre- Thiruvallur


captive power plant permitdevelopment
Unit 2

Gummidipoondi ARS Metals 300 Pre- Thiruvallur


captive power plant permitdevelopment
Unit Company Capacity Status District

Unit 3

Athiyakurichi power NC Energy 660 Pre- Thoothukudi


project Unit 1 permitdevelopment

Athiyakurichi power NC Energy 660 Pre- Thoothukudi


project Unit 2 permitdevelopment

Athiyakurichi power NC Energy 660 Pre- Thoothukudi


project Unit 3 permitdevelopment

Athiyakurichi power NC Energy 660 Pre- Thoothukudi


project Unit 4 permitdevelopment

Chennai power OPG Power 180 Construction Thiruvallur


project IV Ventures

Cheyyur Ultra Mega Coastal Tamil 4000 Permitted Kancheepuram


Power Project Nadu Power

Cuddalor Ultra IL&FS Ltd. 600 Permitted Cuddalore


Mega Power Project
Phase I Unit 1

Cuddalor Ultra IL&FS Ltd. 600 Permitted Cuddalore


Mega Power Project
Phase I Unit 2

Cuddalor Ultra IL&FS Ltd. 660 Permitted Cuddalore


Mega Power Project
Phase II Unit 1

Cuddalor Ultra IL&FS Ltd. 660 Permitted Cuddalore


Mega Power Project
Phase II Unit 2
Unit Company Capacity Status District

Cuddalor Ultra IL&FS Ltd. 660 Permitted Cuddalore


Mega Power Project
Phase II Unit 3

Cuddalore power BGR Group 660 Permitted Cuddalore


project Unit 1

Cuddalore power BGR Group 660 Permitted Cuddalore


project Unit 2

Cuddalore SRM SRM Energy 660 Permitted Cuddalore


power project Unit 1

Cuddalore SRM SRM Energy 660 Permitted Cuddalore


power project Unit 2

Cuddalore SRM SRM Energy 660 Permitted Cuddalore


power project Unit 3

Ennore SEZ Super 660 Permitted Thiruvallur


Critical Thermal
Power
roject (Vayalur)
Unit 1

Ennore SEZ Super TANGEDCO 660 Permitted Thiruvallur


Critical Thermal
Power Project
(Vayalur) Unit 2

Ennore Thermal TANGEDCO 660 Permitted Thiruvallur


Power Project Unit 6
(expansion)

Ennore Thermal TANGEDCO 660 Permitted Thiruvallur


Power Project Unit
Unit Company Capacity Status District

Gummidipoondi Accord Energy 150 Permitted Thiruvallur


Accord power
project Unit 1

Gummidipoondi Accord Energy 150 Permitted Thiruvallur


Accord power
project Unit 2

Jaya power project Jaya Thermal 450 Shelved Thoothukkudi


Power

Manufacturers

Alstom

Raymond

L&t mhps

Ns engineering

Bhel