CALCULATIONS

Costain – Document Ref A6S/11638/MS76003

HAYDEN STW CM ICA STORM & DRAINAGE

Structural Calculations for Support Platform and Staircase.


 

 

Richard Alan House Project Ref: 39393


Shaw Cross Business Park Issue Date: 16th Oct 2015
Owl Lane Prepared by: R. Starkey
Dewsbury WF12 7RD Reviewed by: D. Clegg
Tel No: +44 (0)1924 467040 Revision: A

Rev. Date Description Calc. By Reviewed


A 16/10/2015 First Issue RS DC

A6S/11638/MS76003
Calculations Ref: 39393
1 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… Date………………………
15/10/2015
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Contents

Requirements/Brief ...................................................................................................................................... 2
References .................................................................................................................................................. 3
Software ...................................................................................................................................................... 4
Location ...................................................................................................................................................... 4
Main Platform Loading .................................................................................................................................. 5
Dead Load ................................................................................................................................................ 5
Imposed Load –........................................................................................................................................ 5
Snow Load ............................................................................................................................................... 5
Decanter Load .......................................................................................................................................... 5
Centrifuge Enclosure ................................................................................................................................. 5
Decanter Operating Conditions...................................................................................................................... 5
Wind Load ................................................................................................................................................... 6
Wind Load on Enclosure ............................................................................................................................ 7
Wind Load on Bare Steel ........................................................................................................................... 7
Approximate Wind Load Totals ............................................................................................................... 7
Thermal Loads ............................................................................................................................................. 7
Open Grid Flooring ....................................................................................................................................... 7
Equivalent Horizontal Forces ......................................................................................................................... 8
STAAD Analysis ............................................................................................................................................ 9
Geometry ............................................................................................................................................... 10
Summary of Results ................................................................................................................................ 13
Member Utilisation Ratios ..................................................................................................................... 13
Deflections (Servicability Limit State – Load Combinations) .................................................................... 14
Maximum Member Forces (Factored Ultimate) ....................................................................................... 15
Maximum Support Reactions (Factored Ultimate) .................................................................................. 16
Baseplates and HD Bolts ............................................................................................................................. 17
254x254UC............................................................................................................................................. 17
203x203UC............................................................................................................................................. 17
Staircase Towers .................................................................................................................................... 17
100x100 SHS:- ....................................................................................................................................... 17
180x75PFC:- ........................................................................................................................................... 17
Steelwork Connections ............................................................................................................................... 18
152x89UB connections. ........................................................................................................................... 18
70x70x8L (S275) bracing connections ...................................................................................................... 18
254x146x31UB connections ..................................................................................................................... 18
254x254x73UC beam connections. ........................................................................................................... 18
254x254x73UC connections (Welded Frames to Column Caps). ................................................................. 19
254x254x73UC Column Splice. ................................................................................................................. 19
203x203x46UC Column Splice.................................................................................................................. 19
114.3Dia x 3.6 CHS bracing connections .................................................................................................. 19
139.7Dia x 5.0 CHS bracing connections .................................................................................................. 19
Material Sub Grades ................................................................................................................................... 20
General Sections ..................................................................................................................................... 20
Staircase Stringers .................................................................................................................................. 20
254x254x73UC Beams ............................................................................................................................ 20

Appendix A – STAAD Analysis File……………………………………………………………………………………………..…..A1 to A18

A6S/11638/MS76003
Calculations Ref: 39393
2 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Requirements/Brief
A platform is required to support a new centrifuge. The platform is at approximately 4m level above ground and
has an overall size of approximately 5.5m x 9m (plus staircase).
The platform is to have tight deflection limits to restrict centrifuge vibration problems.

A6S/11638/MS76003
Calculations Ref: 39393
3 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

References
BS EN 1990:2002+A1:2005 Eurocode. Basis of structural design + Amendment 1:2005
NA to BS EN 1990:2002+A1:2005 (National Annex)

BS EN 1991-1-1:2002 EC 1. Actions on structures. General actions. Densities, s-wt, imposed loads for buildings
NA to BS EN 1991-1-1:2002 (National Annex)
BS EN 1991-1-4:2005 Eurocode 1. Actions on structures. General actions. Wind actions
NA to BS EN 1991-1-4:2005 (National Annex)
BS EN 1991-1-5:2003 Eurocode 1. Actions on structures. General actions. Thermal actions
NA to BS EN 1991-1-5:2003 (National Annex)
BS EN 1991-1-6:2005 Eurocode 1. Actions on structures. General actions. Actions during execution
NA to BS EN 1991-1-6:2005 (National Annex)
BS EN 1991-1-7:2006 Eurocode 1. Actions on structures. General actions. Accidental actions
NA to BS EN 1991-1-7:2006 (National Annex)

BS EN 1993-1-1:2005 Eurocode 3. Design of steel structures. General rules and rules for buildings
NA to BS EN 1993-1-1:2005 (National Annex)
BS EN 1993-1-8:2005 Eurocode 3. Design of steel structures. Design of joints
NA to BS EN 1993-1-8:2005 (National Annex)
A6S/11638/MS76003
Calculations Ref: 39393
4 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

BS EN 1993-1-10:2005 Eurocode 3. Design of steel structures. Material toughness and thro-thickness properties
NA to BS EN 1993-1-10:2005 (National Annex)
PD 6688-1-1:2011
PD 6695-1-10:2009

EN ISO 14122-4:2004

Software
The Analysis and Design is undertaken using STAAD.Pro V8i software (version 20.07.11.33) from Bentley Systems,
incorporating BS EN 1993-1 design with the UK National Annex.

Location
The site is at Hayden, Gloucestershire – Map Ref SO907230 (51.905475N, -2.136145).

A6S/11638/MS76003
Calculations Ref: 39393
5 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Main Platform Loading

Dead Load
In addition to selfweight, take grating as 0.4kN/m²
Take handrail loads as 0.25kN/m run including kickers and 0.15kN/m without kickers.

Imposed Load –
Allow 5.0kN/m² or 4.5kN point load on flooring.
Allow 0.5kN/m² for services

Handrail Loading – take 0.36kN/m horizontal and 0.6kN/m vertical (per PD6688-1-1, para. 3)

Snow Load
Site Altitude is approximately 39m.
From UK NA to BS EN 1991-1-3, the location is zone 3, with a ground snow intensity = 0.5kN/m² (at 100m.m.s.l).
From NA.1, sk= [0.15+(0.1Z+0.05)]+(A-100/525) = [0.15+(0.1x3+0.05)]+(39-100/525) = 0.38kN/m²
µi=0.8, Ce=1.0, Ct=1.0; Therefore s=0.8x0.38 = 0.31kN/m²
Take minimum load = 0.6kN/m² as per NA.7 of the UK NA to BS EN 1991-1-1
By inspection, snow load is not critical compared to the platform live load.

Decanter Load
From drawing A6S/11638/MS70001 rev A, (which states all loads are evenly distributed on the vibration isolators):-
Weight of empty decanter = 4500kg = 45kN = 13kN per support leg.
Weight of Full decanter = 5000N, therefore variable load = 5kN = 1.3kN per support leg.

Maximum dynamic load at run down


= ±30000N vertical = ±7.5kN per support leg
= ±10000N horizontal = ±2.5kN per support leg

Maximum dynamic load at operating speed


= ±2000N vertical = ±0.5kN per support leg
= ±2000N horizontal = ±0.5kN per support leg

Centrifuge Enclosure
See drawing A6S/11638/MS70003 rev A
Roof Assembly = 300kg over a 6.7m length = 300/2/6.7 = 22.4kg/m per side
Side Walls Assembly = 240kg over a 6.7m length = 35.8kg/m per side
Total per side wall = 58.2kg/m (= 0.57kN/m)

Inlet end wall = 160kg over 1.7m = 94.1kg/m (=0.93kN/m)


End wall = 120kg over 1.7m = 70.6kg/m (=0.7kN/m)

Ventilation Fan = 30kg


Discharge Attenuator Assembly = 240kg

Decanter Operating Conditions


From Alfa Laval operating manual, the design requirement conditions are:-
 Operating speed ranges from 200rpm to 1500rpm (3.33Hz to 25Hz).
 The maximum support frame horizontal deflection due to a horizontal load in each direction as the
maximum static load shall be 1mm (decanter size is greater than 430mm).
 The maximum vertical misalignment of the vibration dampers shall be 4mm (decanter size is greater than
430mm).
(See sheet 14 for calculated deflections)
A6S/11638/MS76003
Calculations Ref: 39393
6 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Wind Load
Location is 51.905475, -2.136145 (SO907230)

A6S/11638/MS76003
Calculations Ref: 39393
7 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Wind Load on Enclosure


Wind on sides, h/d = 2.4/1.7 = 1.4, from NA.4(f), the net pressure coefficient = 1.16
Horizontal wind load = 1.16x2.4x0.649 = 1.81kN/m
Vertical load (due to overturning) = 1.18x1.2/1.7 = ±1.28kN/m.

Wind on ends, h/d = 2.4/6.7 = 0.36, from NA.4(f), the net pressure coefficient = 0.9
Horizontal wind load = 0.9x2.4x0.649 = 1.4kN/m (2.4kN total)
Vertical load (due to overturning) - ignore.

Wind Load on Bare Steel


From 7.11, cf = cf,o.ψλ and cf,o = 2.0
From Fig 7.36 with solidity =1.0, Take ψλ = 1.0, therefore cf = 2.0.

Therefore wind pressure on structural members = 0.649x2.0 = 1.3kN/m²

For beam/column section depth = 150mm, wind load on sections = 1.3x0.15 = 0.20kN/m length
For beam/column section depth = 200mm, wind load on sections = 1.3x0.20 = 0.26kN/m length
For beam/column section depth = 250mm, wind load on sections = 1.3x0.25 = 0.33kN/m length
For beam/column section depth = 350mm, wind load on sections = 1.3x0.35 = 0.46kN/m length

Also allow 0.1kN/m for tubular vertical bracings and 0.1kN/m for angle vertical bracings.
Ignore shielding.

Approximate Wind Load Totals


From an initial analysis, the total serviceability wind loads are approximately:-
38kN in X direction
48kN in Z direction

Thermal Loads
The structure is external and would be subject to direct solar radiation.
Take T0 = 15°C, T5 = 42°C.
From BS EN 1991-1-5, UK-NAD, Tmax=33°C and Tmin=-16°C
Take equivalent summer temperature (Temax) = Tmax +16 +2 = 51°C. , ΔTu =51-15 = 36°C
Take equivalent winter temperature (Temin) = Tmin -3 = -19°C. , ΔTu =-19-15 = -34°C

Open Grid Flooring


The flooring span is 1.5m (beam centres)
For 5.0kN/m² imposed load,
Use Minimum of 30x3 loadbearing bars at 30mm centres with binding bars at maximum 100 centres
OR – Minimum of 35x3 loadbearing bars at 41mm centres with binding bars at maximum 100 centres

A6S/11638/MS76003
Calculations Ref: 39393
8 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Equivalent Horizontal Forces


Initial calculations for the frame show that the total loads on the frame are as follows
Platform level steelwork selfweight = 80kN; 72x1.35 = 108kN
Decanter and Enclosure = 66kN; 66x1.35 = 89kN
Platform variable load = 213kN; 213x1.5 = 320kN
Decanter variable load = 5kN; 5x1.5 = 8kN
Total factored vertical load at platform level = 525kN.
φ =φ0 ×αm ×αh ; φ0 =1/200, αh = 2/√4.0 = 1.0, αm = √[0.5(1+1/m)]
For simplicity, take φ=1/200
Therefore, Total EHF = 525/200 = 2.63kN minimum.
“V”
28kN 36kN 28kN

70kN 60kN
Factored dead + imposed column (and “V”
bracing) loads shown total 573kN (plus
staircase) > 525kN therefore OK

44kN 44kN

82kN 73kN

33kN

“V” 27kN
48kN

7kN
7kN
12kN
Factored dead + imposed column loads

For 20kN to 30kN use EHF=0.15kN, for up to 50kN use EHF=0.25kN, for 60kN to 70kN use EHF=0.35kN, for up to
90kN use EHF=0.45kN
(Use EHF=0.07 for staircase posts)
Total EHF’s applied = 3.6kN (plus 15kN ultimate dynamic load from centrifuge).

Due to EHF’s, Maximum X deflection = 0.23mm


Maximum Z deflection = 0.31mm (=h/13,000)
The above EHF’s also include the horizontal dynamic forces, and are therefore very conservative
Note – unfactored wind load on the structure is approximately 38kN in X direction and 48kN in Z direction.
With factored vertical platform load of 573kN, 15% of 573 = 86kN, which is greater than the factored wind load
and therefore sway imperfections need to be included.

Include EHF’s in all ultimate load combinations, and also undertake a Pdelta analysis.

A6S/11638/MS76003
Calculations Ref: 39393
9 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

STAAD Analysis
(See Appendix A for full input and output)

A6S/11638/MS76003
Calculations Ref: 39393
10 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Geometry

A6S/11638/MS76003
Calculations Ref: 39393
11 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

A6S/11638/MS76003
Calculations Ref: 39393
12 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

A6S/11638/MS76003
Calculations Ref: 39393
13 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Summary of Results
Member Utilisation Ratios
(Ratio of Design Forces /Design Strength Based on BS EN 1993-1-1 and the UK National Annex)

A6S/11638/MS76003
Calculations Ref: 39393
14 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

The maximum utilisation ratio for the structure is only 0.35; however, reducing the sizes would produce larger
deflections and would exceed the deflection limitations for the centrifuge (or would exceed other geometric
limitations).

The maximum calculated deflections due to a load equal to the weight of the centrifuge, applied horizontally is:-
δx = 0.7mm, and δz = 0.9mm (the specified limit is 1.0mm, therefore OK).
Horizontal Vertical Horizontal
Node L/C X mm Y mm Z mm
Max X 122 22 DEFLECTION LIMITS 0.7 -0.2 0.9
Min Y 123 22 DEFLECTION LIMITS 0.7 -0.2 0.9
Max Z 120 22 DEFLECTION LIMITS 0.7 -0.2 0.9

The maximum calculated vertical deflection of the centrifuge support points is less than 1.0mm.
Therefore the deflections are within the specified limits for the resonance criteria.

Deflections (Servicability Limit State – Load Combinations)


Horizontal Vertical Horizontal
Node L/C X mm Y mm Z mm
Max X 143 521 DEAD+TOTAL.LIVE.1+ WIND(X) 2.2 -0.8 -0.5
Min X 140 543 MIN. DEAD+ WIND(-X) -1.0 -0.5 -0.3
Max Y 75 551 MIN. DEAD+WIND(Z) 0.0 0.0 0.8
Min Y 54 503 DEAD+TOTAL.LIVE.1+ WIND(-X) -0.3 -3.2 -0.1
Max Z 30 551 MIN. DEAD+WIND(Z) 0.0 0.0 0.8
Min Z 135 507 DEAD+TOTAL.LIVE.1+ WIND(-Z) 1.6 -1.9 -1.5
Maximum horizontal deflection = height/1800 << h/300 therefore OK

A6S/11638/MS76003
Calculations Ref: 39393
15 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Maximum Member Forces (Factored Ultimate)


Axial (kN) Shear (kN) Torsion (kNm) Bending (kNm)
Section Fx Fy Fz Mx My Mz
UC254X254X73 Max +ve 101.8 1.0 1.0 0.0 1.0 1.0
Max -ve -12.6 -1.0 -1.0 0.0 -1.0 -1.0
UC203X203X46 Max +ve 49.2 0.8 0.8 0.0 0.8 0.8
Max -ve -17.6 -0.8 -0.8 0.0 -0.8 -0.8
UC152X152X23 Max +ve 25.1 0.8 0.5 0.0 0.4 0.8
Max -ve -16.5 -0.8 -0.5 0.0 -0.4 -0.8
CH180X75X20 Max +ve 12.0 9.3 2.9 0.1 1.4 6.3
Max -ve -8.3 -8.5 -2.9 0.0 -1.4 -6.3
UC254X254X73 Max +ve 13.5 36.2 4.6 0.0 2.1 20.3
Max -ve -16.6 -31.1 -4.4 0.0 -2.1 -18.3
UB254X146X31 Max +ve 17.8 23.0 2.9 0.0 0.7 14.8
Max -ve -21.4 -24.4 -3.1 0.0 -0.8 -21.8
UB152X89X16 Max +ve 3.1 11.7 0.3 0.0 0.1 0.0
Max -ve -3.2 -11.7 -0.3 0.0 -0.1 -5.2
UA70X70X7 RA Max +ve 18.9 0.2 0.2 0.0 0.0 0.0
Max -ve -17.4 -0.2 -0.2 0.0 0.0 0.0
PIP1395.0 Max +ve 34.9 0.8 0.5 0.0 0.0 0.0
Max -ve -29.2 -0.8 -0.4 0.0 0.0 0.0
Rect 0.01x0.25 Max +ve 5.5 0.2 2.8 0.0 1.4 0.1
Max -ve -5.2 -0.1 -0.8 0.0 -1.4 -0.1
PIP1143.6 Max +ve 48.5 0.5 0.4 0.0 0.0 0.0
Max -ve -25.9 -0.5 -0.4 0.0 0.0 0.0
Note – listed forces are not necessarily concurrent, but conservatively treat as such.

A6S/11638/MS76003
Calculations Ref: 39393
16 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Maximum Support Reactions (Factored Ultimate)

Note – Reverse signs for Base Loads

Horizontal Vertical Horizontal Horizontal Vertical Horizontal


Node Load Fx kN Fy kN Fz kN Node Load Fx kN Fy kN Fz kN
+ve 1.2 72.6 27.8 +ve 1.0 92.6 1.0
1 9
-ve -1.1 -7.5 -10.9 -ve -1.0 -9.4 -1.0
2 +ve 1.2 64.1 10.7 +ve 1.3 85.4 12.3
10
-ve -1.1 -12.8 -22.4 -ve -1.3 -4.6 -14.3
+ve 22.9 64.6 1.2 11 +ve 0.8 17.7 0.2
3
-ve -26.5 -12.1 -1.2 (Post) -ve -0.8 -16.2 -0.2
+ve 20.2 61.9 1.2 12 +ve 0.8 31.5 6.0
4
-ve -23.1 -9.7 -1.2 (Post) -ve -0.8 -12.1 -8.0
+ve 1.2 60.3 22.6 13 +ve 0.2 20.8 0.3
5
-ve -1.1 -9.0 -11.6 (Post) -ve -0.6 -7.6 -0.3
+ve 1.2 55.5 10.6 14 +ve 0.4 22.0 9.0
6
-ve -1.1 -8.8 -19.1 (Post) -ve -0.4 -14.1 -9.7
+ve 18.0 103.9 1.4 15 +ve 2.9 5.9 2.8
7
-ve -14.8 -1.3 -1.4 (stringer) -ve -3.8 -0.4 -2.6
+ve 17.1 110.9 13.0 16 +ve 2.1 5.6 2.8
8
-ve -14.1 -7.9 -15.3 (stringer) -ve -1.1 0.0 -2.8
A6S/11638/MS76003
Calculations Ref: 39393
17 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Baseplates and HD Bolts

254x254UC.
From the ultimate limit state foundation load table, Nodes 7 to 10:-
Maximum vertical load is 111kN / -10kN with maximum shears of 18kN and 16kN (Resultant shear = 24kN).
By inspection, Use 450x450x20 thick baseplate with 8mm c.f.w.
Use 4N0 M20 Grade 8.8 HD bolts x 300 long (200mm embedment) with 100sq. x 15 thick washer
plates

203x203UC.
From the ultimate limit state foundation load table, Nodes 1 to 6:-
Maximum vertical load is 73kN / -13kN with maximum shears of 28kN and 2kN (Resultant shear = 28kN).
By inspection, Use 450x450x20 thick baseplate with 8mm c.f.w.
Use 4N0 M20 Grade 8.8 HD bolts x 300 long (200mm embedment) with 100sq. x 15 thick washer
plates

Staircase Towers
Note that the staircase tower columns have been modelled as 152x152x23UC’s but previous similar projects have
used 100x100x4.0SHS for the taller tower and 180x75PFC for the legs supporting the half-landing.
By inspection, these sections will be suitable without any re-analysis (the staircase towers do not contribute to the
main frame stiffness’s)

From the ultimate limit state foundation load table, Nodes 11 to 14:-
Maximum vertical load is 32kN / -17kN with maximum shears of 10kN and 1kN (Resultant shear = 10kN).

100x100 SHS:-
Try 260x260x10 thick baseplate with 4No M16 anchors at 200x200 centres.
With C25 concrete, bearing area required = 32x1000/(0.56x25) = 2286mm² = Pcol(t+2c), Pcol = 400mm
Therefore c = [2286-(400x4.0)]/400 = 1.7mm which is negligible therefore no plate bending due to vertical load.
Check uplift – Load per bolt = 17/4 = 4.3kN
Bolts are at 45° to the corners of the section, therefore take simple bending over the whole plate width.
Lever arm m = 50mm, moment = 2x4.3x50 = 430kNmm
Plate thickness required, t = √[430x1000x6/(260x275)] = 6mm
Use 260x260x10 thick baseplate with 6mm c.f.w.
Use 4N0 M16 Grade 4.6 HD bolts x 300 long (200mm embedment) with 80sq. x 10 thick washer
plates (or resin anchors)

180x75PFC:-
Try 150x180x10 thick baseplate with 2No M16 anchors at 100 centres.
With C25 concrete, bearing area required = 32x1000/(0.56x25) = 2286mm²
The area of a 180x75PFC is 2590mm² therefore there is no plate bending due to vertical load.
Check uplift – Load per bolt = 17/2 = 8.5kN
Take simple bending over the whole plate width.
Lever arm m = 45mm, moment = 17x45 = 765kNmm
Plate thickness required, t = √[765x1000x6/(180x275)] = 9.6mm
Use 150x180x10 thick baseplate with 6mm c.f.w.
Use 2N0 M16 Grade 4.6 HD bolts x 300 long (200mm embedment) with 80sq. x 10 thick washer
plates (or resin anchors)

A6S/11638/MS76003
Calculations Ref: 39393
18 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Steelwork Connections

152x89UB connections.
From the table of maximum section forces, the axial load is <±5kN with vertical shear of 12kN.
Beam is notched at the top – 135 x 30.
Try 10 thick endplate with 2No M20 bolts.
By inspection, endplate and bolts are OK.
Check notch:- (ref “Green Book”)
Section Properties
About Centroidal Axis Parallel to Original Axis
Notch depth < 152/2 therefore OK
f = 0.000 deg X-dim = 88.7 mm d/t = 27.1 < 54.3;
A= 1549.39 mm^2 Y-dim = 121.7 mm notch length (135) < beam depth (152),
Xcg = 0.000 mm Zx(top) = 62197.50 mm^3 therefore OK
Ycg = -37.877 mm Zx(bot) = 28104.65 mm^3 Therefore local stability is not an issue.
Ixo = 2355828.3 mm^4 Zy(left) = 10190.90 mm^3
Iyo = 451966.4 mm^4 Zy(right)= 10190.90 mm^3 Bending moment = 12x0.14 = 1.7kNm
Ixyo = 0.0 mm^4 rx = 38.99 mm Low shear, Mv.NR,d = 28104x275/106
ry = 17.08 mm = 7.7kNm >> 1.7kNm therefore OK
By inspection use a 2-bolt endplate connection. M20 Grade 8.8 bolts at 90mm X-Crs.
Minimum 150x120x8 plate (S275) with 6mm c.f.w.

70x70x8L (S275) bracing connections


From the table of maximum section forces, the axial load is <±20kN.
By inspection use a 2-bolt M16 connection. Minimum 90x8 plate (S275) with 6mm c.f.w. (weld to beam flanges)

254x146x31UB connections
From the table of maximum section forces, the axial load is ±22kN with 26kN vertical shear and 5kN horizontal
shear. All connections are nominally pinned. All connections are beam to column.
By inspection use a 4-bolt full depth end plate connection. M20 Grade 8.8 bolts at 90 X-Crs.
Minimum 150x240x10 plate (S275) with 6mm c.f.w. (Note – 6-bolt connection has actually been used)
From SCI “Simple Joints to Eurocode 3”, VRd = 301kN; NRd,u = 324kN

254x254x73UC beam connections.


From the table of maximum section forces, the axial load is ±17kN with 37kN vertical shear and 5kN horizontal
shear. Some connections are welded to form a welded frame assembly (254UC to 254UC) and others are bolted to
the perimeter support beams (254x146x31UB’s).
The welded secondary beams are 212, 213, 218, 219, 223 and 226.
The members are profile welded (6mm f.w.) down the webs and prep welded flange to flange. – By inspection OK.

Main Beam Connections:-


The ends of main beam members 121, 133, 141 and 151 are bolted to the main support beams (254x146x31UB)
via a “T” stub welded to the perimeter beam (to provide a flush face).
The stub beam to support beams are nominally pinned except for the eccentricity to the “T” stub – nominally
73+12 say 100mm eccentricity.
With 37 (say 40)kN shear, the moment = 40x0.1 = 4kNm
By inspection use a 6-bolt end plate connection. M20 Grade 8.8 bolts at 120 X-Crs.
Minimum 200x240x12 plate (S275) with 6mm c.f.w.

Use minimum 200x240x12 face plate and fitted 70x10 stiffener to “T” stub - S275 with 6mm c.f.w.

From SCI “Simple Joints to Eurocode 3”, VRd = 260kN; NRd,u = 324kN (based on 254x146x31UB S275).

A6S/11638/MS76003
Calculations Ref: 39393
19 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

254x254x73UC connections (Welded Frames to Column Caps).


The 254UC welded frames are continuous over the central columns. From the analysis the maximum loads at the
tops of these columns (members 11 to 14, which are also 254UC73’s) are:-
Axial load is +100kN / -13kN with nominal shears. All connections are nominally pinned.
From SCI P363 “Steel Building Design 2013 - Design Data”, page C-144,
Stiff bearing length Ss = 250mm, C will be in excess of the limiting value, (C>C lim)
Therefore FRd(Clim) = 911kN > >100kN therefore OK.
By inspection use a 4-bolt connection to a 250x250x20 thick cap plate. M20 Grade 8.8 bolts.

254x254x73UC Column Splice.


For installation purposes the main columns are to be spliced approximately 1.2m from the top of floor level.
From above, the axial load is +100kN / -13kN with nominal shears.
All connections are nominally pinned.
For splice plates the thickness should be at least equal to the column element thickness:-
Flange Plates - T=14.2mm therefore use minimum 15m thick cover plate for the flanges.
Minimum 500mm overall length and 250mm wide.
By inspection use 8 - M20 Grade 8.8 bolts at 150 X-Crs spaced at 40, 160, 100, 160, 40 (250x15x500 plates).

Web Plates - tw = 8.6mm therefore use min. 6m thick cover plates (each side) for the web. Min. 125mm wide.
By inspection use 4 - M20 Grade 8.8 bolts at 100 vertical pitch and 80mm horizontal (150x170 plates).

For strut action:-


Take Mmax = (py/pc-1)fc.Wpl ≈ (275/215-1)x15x992/1000 = 4kNm (at mid-height).
The strut action moment at the splice location is less than this – by inspection the standard splice detail is suitable
for the additional moments.

203x203x46UC Column Splice.


For installation purposes the main columns are to be spliced approximately 1.2m from the top of floor level.
From above, the axial load is +50kN / -18kN with nominal shears.
All connections are nominally pinned.
For splice plates the thickness should be at least equal to the column element thickness:-
Flange Plates - T=11mm therefore use minimum 12m thick cover plate for the flanges.
Minimum 400mm overall length and 200mm wide.
By inspection use 8 - M20 Grade 8.8 bolts at 120 X-Crs spaced at 40, 170, 80, 170, 40 (200x15x500 plates).

Web Plates - tw = 7.2mm therefore use min. 6m thick cover plates (each side) for the web. Min. 100mm wide.
By inspection use 4 - M20 Grade 8.8 bolts at 80 vertical pitch and 80mm horizontal (150x150 plates).

For strut action:-


By inspection the standard splice detail is suitable for the additional moments.

114.3Dia x 3.6 CHS bracing connections


From the table of maximum section forces, the axial load is <±50kN.
With 10mm thick endplate and 10mm thick “T” plate the effective length of weld is 2[2x2.5x10+10] = 120mm.
Load per mm = 50/120 = 0.42kN/mm. Use minimum 6mm leg = 0.94kN/mm therefore OK
By inspection use a 2-bolt M20 Grade 8.8 connection. Minimum 120x10 plate (S275) with 6mm c.f.w.

139.7Dia x 5.0 CHS bracing connections


From the table of maximum section forces, the axial load is <±40kN.
With 15mm thick endplate and 10mm thick “T” plate the effective length of weld is 2[2x2.5x15+10] = 170mm.
Load per mm = 40/170 = 0.24kN/mm. Use minimum 6mm leg capacity = 0.94kN/mm (transverse) therefore OK
By inspection use 2 - M20 Grade 8.8 bolts. Minimum 150x10 plate fin plate, 150x15 endplate (S275). 6mm c.f.w.

A6S/11638/MS76003
Calculations Ref: 39393
20 of 20
Sheet No. ……………………………………. A…
Rev . ………
R. Starkey
Calc By ……………………………………… 15/10/2015
Date………………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

Material Sub Grades


Ref PD 6695-1-10:-

General Sections
Since the maximum utilisation ratio is generally <0.3 (exceeded up to 0.35 only for a staircase stringer and a CHS
bracing) then:-
Taking the typical case of σEd/fy(t) <0.3 and moderate welding, then from Table 3, Comb. 6:-
S275 material, maximum element thickness for sub-grade JR is 27.5mm thick.
S355 material, maximum element thickness for sub-grade JR is 15mm thick.
Use Grade S275JR hot rolled steel to BS EN 10025-2 (Except as noted below)

Staircase Stringers
Full strength butt weld at position of maximum major axis moment:-
180x75PFC, T = 10.5mm
From STAAD analysis the maximum tensile stress is 64.2N/mm²
For S275 material, stress ratio = 65/275 = 0.23< 0.3
Taking the case of σEd/fy(t) <0.3 and severe welding, then from Table 3, Comb. 9:-
S275 material, maximum element thickness for sub-grade JR is 12.5mm thick.
For S355 material, stress ratio = 65/355 = 0.18>0.15 but < 0.3
S355 material, maximum element thickness for sub-grade JR is 7.5mm thick, therefore need JO.
For Staircase cranked section:-
Use Grade S275JR or Grade S355J0 hot rolled steel to BS EN 10025-2

254x254x73UC Beams
Cross flange weld to stiffeners at various positions along the beam
For 254UC, T = 14.2mm.
For the stiffeners, t=10mm and the attachment length = t+2 welds = maximum 26mm which is less than 50mm
(BS EN 1993-1-10 Table NA.1) therefore ΔTRD = 0
For the cross beams (254x254x73UC), the length of weld is 254mm > 150mm, and the width of weld is 14.2mm <
50mm, (BS EN 1993-1-10 Table NA.1) therefore ΔTRD = -20

From STAAD analysis the maximum moment is 20.3kNm and maximum tensile force is 16.6kN.
Therefore maximum tensile stress is 16.6x1000/9310 + 20.3x1000/992 = 22N/mm²
For S275 material, stress ratio = 22/275 = 0.1< 0.15
Taking the case of σEd/fy(t) <0.15 and ΔTRD = -20, then from Table 3, Comb. 7:-
S275 material, maximum element thickness for sub-grade JR is 22.5mm thick.

For S355 material, stress ratio = 22/355 = 0.06>0.15


Taking the case of σEd/fy(t) <0.15 and ΔTRD = -20, then from Table 3, Comb. 7:-
S355 material, maximum element thickness for sub-grade JR is 12.5mm thick, therefore need JO (maximum
37.5mm thick).

For the 254x254x73UC Floor Beam Sections:-


Use Grade S275JR or Grade S355J0 hot rolled steel to BS EN 10025-2

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A1 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

STAAD Analysis File


****************************************************
* *
* STAAD.Pro V8i SELECTseries6 *
* Version 20.07.11.33 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= OCT 15, 2015 *
* Time= 12:57:46 *
* *
* USER ID: Richard Alan Engineering Co. Ltd *
****************************************************
1. STAAD SPACE
INPUT FILE: H:\JOB FILES\Job Files 39001 - 40000\39393 - Costain - Hayden STW Centrifuge\3.
Design & S.. .STD
2. START JOB INFORMATION
3. ENGINEER DATE 14-OCT-15
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. PAGE LENGTH 10000
7. UNIT METER KN
8. JOINT COORDINATES
9. 1 0 0 0; 2 0 0 5.5; 3 4.43 0 0; 4 4.43 0 5.5; 5 8.85 0 0; 6 8.85 0 5.5
10. 7 3.35 0 1.78; 8 3.35 0 3.72; 9 6.37 0 1.78; 10 6.37 0 3.72; 11 -1.45 0 0
11. 12 -1.45 0 1.28; 13 -0.45 0 4.2; 14 -0.45 0 5.2; 15 -3.78 -0.197 4.2
12. 16 -3.78 -0.197 5.2; 17 3.35 2.8 1.78; 18 3.35 2.8 3.72; 19 6.37 2.8 1.78
13. 20 6.37 2.8 3.72; 21 -0.45 1.77 3.91; 22 -1.45 1.77 3.91; 23 0 2.8 0
14. 24 -1.45 1.77 5.2; 25 -0.45 1.77 4.2; 26 -0.45 1.77 5.2; 27 -1.45 1.77 4.2
15. 28 0 2.8 5.5; 29 4.43 2.8 0; 30 4.43 2.8 5.5; 31 8.85 2.8 0; 32 8.85 2.8 5.5
16. 51 0 4 0; 52 4.43 4 0; 53 8.85 4 0; 54 1.48 4 0; 55 2.95 4 0; 56 7.38 4 0
17. 57 5.9 4 0; 58 -0.45 4 0; 59 -1.45 4 0; 60 -0.45 4 1.28; 61 -1.45 4 1.28
18. 62 0 4 1.28; 71 3.35 4 1.78; 72 6.37 4 1.78; 73 0 4 1.78; 74 8.85 4 1.78
19. 75 4.43 4 1.78; 76 1.07 4 1.78; 77 0.55 4 1.78; 78 8.3 4 1.78; 79 1.48 4 1.78
20. 80 7.38 4 1.78; 81 7.78 4 1.78; 82 2.95 4 1.78; 83 5.9 4 1.78; 84 8.85 4 2.75
21. 85 0 4 2.75; 91 3.35 4 3.72; 92 6.37 4 3.72; 93 0 4 3.72; 94 8.85 4 3.72
22. 95 4.43 4 3.72; 96 1.07 4 3.72; 97 0.55 4 3.72; 98 8.3 4 3.72; 99 1.48 4 3.72
23. 100 7.38 4 3.72; 101 7.78 4 3.72; 102 2.95 4 3.72; 103 5.9 4 3.72; 111 0 4 5.5
24. 112 4.43 4 5.5; 113 8.85 4 5.5; 114 1.48 4 5.5; 115 2.95 4 5.5; 116 7.38 4 5.5
25. 117 5.9 4 5.5; 118 3.35 4 2.18; 119 3.35 4 2.61; 120 3.35 4 3.04
26. 121 6.37 4 2.18; 122 6.37 4 2.61; 123 6.37 4 3.04; 124 -1.45 1.33 0
27. 125 -1.45 1.33 1.28; 126 -1.45 2.67 1.28; 127 -1.45 3.8 1.52
28. 128 -1.45 3.6 1.76; 129 -1.45 3.39 2; 130 -1.45 3.19 2.24; 131 -1.45 2.99 2.47
29. 132 -1.45 2.79 2.71; 133 -1.45 2.58 2.95; 134 -1.45 2.38 3.19
30. 135 -1.45 2.18 3.43; 136 -1.45 1.98 3.67; 137 -0.45 3.8 1.52
31. 138 -0.45 3.6 1.76; 139 -0.45 3.39 2; 140 -0.45 3.19 2.24; 141 -0.45 2.99 2.47
32. 142 -0.45 2.79 2.71; 143 -0.45 2.58 2.95; 144 -0.45 2.38 3.19
33. 145 -0.45 2.18 3.43; 146 -0.45 1.98 3.67; 147 -1.68 1.58 4.2
34. 148 -1.92 1.38 4.2; 149 -2.15 1.18 4.2; 150 -2.38 0.986 4.2
35. 151 -2.61 0.788 4.2; 152 -2.85 0.591 4.2; 153 -3.08 0.394 4.2
36. 154 -3.31 0.197 4.2; 155 -1.68 1.58 5.2; 156 -1.92 1.38 5.2
37. 157 -2.15 1.18 5.2; 158 -2.38 0.986 5.2; 159 -2.61 0.788 5.2
38. 160 -2.85 0.591 5.2; 161 -3.08 0.394 5.2; 162 -3.31 0.197 5.2; 163 -3.55 0 4.2
39. 164 -3.55 0 5.2
40. MEMBER INCIDENCES
41. 1 1 23; 2 2 28; 3 3 29; 4 4 30; 5 5 31; 6 6 32; 7 7 17; 8 8 18; 9 9 19
42. 10 10 20; 11 17 71; 12 18 91; 13 19 72; 14 20 92; 15 23 51; 16 28 111
43. 17 29 52; 18 30 112; 19 31 53; 20 32 113; 21 14 26; 22 13 25; 31 11 124
44. 32 12 125; 33 124 59; 34 125 126; 35 126 61; 101 51 54; 102 54 55; 103 55 52
45. 104 57 52; 105 56 57; 106 53 56; 107 111 114; 108 114 115; 109 115 112
46. 110 117 112; 111 116 117; 112 113 116; 121 73 77; 122 77 76; 123 76 79
47. 124 79 82; 125 82 71; 126 71 75; 129 75 83; 130 83 72; 131 80 72; 132 81 80
48. 133 74 78; 134 78 81; 141 93 97; 142 97 96; 143 96 99; 144 99 102; 145 102 91
49. 146 91 95; 147 95 103; 148 103 92; 149 100 92; 150 101 100; 151 94 98
A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A2 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
50. 152 98 101; 161 51 58; 162 58 59; 163 60 61; 164 62 60; 165 58 60; 166 59 61
51. 167 25 26; 168 26 24; 169 22 27; 170 21 25; 201 51 62; 202 62 73; 203 73 85
52. 204 93 111; 205 53 74; 206 74 84; 207 94 113; 208 84 94; 209 85 93; 211 52 75
53. 212 71 118; 213 72 121; 214 95 112; 215 56 80; 216 100 116; 217 76 96
54. 218 77 97; 219 78 98; 220 81 101; 221 118 119; 222 119 120; 223 120 91
55. 224 121 122; 225 122 123; 226 123 92; 227 54 79; 228 99 114; 229 55 82
56. 230 57 83; 231 102 115; 232 103 117; 301 4 111; 302 3 51; 303 7 72; 304 8 92
57. 305 8 71; 306 10 72; 307 5 84; 308 6 84; 309 2 85; 310 1 85; 311 73 54
58. 312 54 82; 313 82 52; 314 52 83; 315 83 56; 316 56 74; 317 94 116; 318 116 103
59. 319 103 112; 320 112 102; 321 102 114; 322 114 93; 331 14 25; 332 12 124
60. 333 124 126; 334 126 59; 401 61 127; 402 60 137; 403 27 147; 404 24 155
61. 405 127 128; 406 128 129; 407 129 130; 408 130 131; 409 131 132; 410 132 133
62. 411 133 134; 412 134 135; 413 135 136; 414 136 22; 415 137 138; 416 138 139
63. 417 139 140; 418 140 141; 419 141 142; 420 142 143; 421 143 144; 422 144 145
64. 423 145 146; 424 146 21; 425 147 148; 426 148 149; 427 149 150; 428 150 151
65. 429 151 152; 430 152 153; 431 153 154; 432 154 163; 433 155 156; 434 156 157
66. 435 157 158; 436 158 159; 437 159 160; 438 160 161; 439 161 162; 440 162 164
67. 441 163 15; 442 24 27; 443 164 16; 501 127 137; 502 128 138; 503 129 139
68. 504 130 140; 505 131 141; 506 132 142; 507 133 143; 508 134 144; 509 135 145
69. 510 136 146; 511 22 21; 512 147 155; 513 148 156; 514 149 157; 515 150 158
70. 516 151 159; 517 152 160; 518 153 161; 519 154 162; 521 25 27; 522 163 164
71. START GROUP DEFINITION
72. FLOOR
73. _FLOOR1 101 TO 106 121 TO 126 129 TO 134 201 202 205 211 215 227 229 230
74. _FLOOR2 107 TO 112 141 TO 152 204 207 214 216 228 231 232
75. _FLOOR3 121 122 141 142 203 209 217 218
76. _FLOOR4 133 134 151 152 206 208 219 220
77. _FLOOR5 161 TO 166 201
78. _INFIL 123 TO 126 129 TO 132 143 TO 150 212 213 217 220 TO 226
79. JOINT
80. END GROUP DEFINITION
81. DEFINE MATERIAL START
82. ISOTROPIC STEEL
83. E 2.05E+008
84. POISSON 0.3
85. DENSITY 76.8195
86. ALPHA 1.2E-005
87. DAMP 0.03
88. TYPE STEEL
89. STRENGTH FY 253200 FU 407800 RY 1.5 RT 1.2
90. ISOTROPIC NODENSITYSTEEL
91. E 2.05E+008
92. POISSON 0.3
93. DENSITY 0.1
94. ALPHA 1.2E-005
95. DAMP 0.03
96. TYPE STEEL
97. STRENGTH FY 253200 FU 407800 RY 1.5 RT 1.2
98. END DEFINE MATERIAL
99. MEMBER PROPERTY BRITISH
100. 7 TO 14 TABLE ST UC254X254X73
101. 1 TO 6 15 TO 20 TABLE ST UC203X203X46
102. 21 22 31 TO 35 TABLE ST UC152X152X23
103. 161 TO 170 401 TO 441 443 521 TABLE ST CH180X75X20
104. 121 TO 126 129 TO 134 141 TO 152 212 213 218 219 221 TO 225 -
105. 226 TABLE ST UC254X254X73
106. 101 TO 112 201 TO 209 TABLE ST UB254X146X31
107. 211 214 TO 217 220 227 TO 232 TABLE ST UB152X89X16
108. 311 TO 322 331 TO 334 TABLE RA UA70X70X7
109. 301 302 TABLE ST PIP1395.0
110. MEMBER PROPERTY BRITISH
111. 442 501 TO 519 522 PRIS YD 0.01 ZD 0.25
112. 303 TO 310 TABLE ST PIP1143.6
113. CONSTANTS
114. BETA 180 MEMB 165 167 170 402 404 415 TO 424 433 TO 440 443 521

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A3 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
115. BETA 90 MEMB 7 TO 14
116. MATERIAL STEEL MEMB 1 TO 22 31 TO 35 101 TO 112 121 TO 126 129 TO 134 141 -
117. 142 TO 152 161 TO 170 201 TO 209 211 TO 232 301 TO 322 331 TO 334 401 TO 441 -
118. 443 521
119. MATERIAL NODENSITYSTEEL MEMB 442 501 TO 519 522
120. SUPPORTS
121. 7 TO 10 15 16 PINNED
122. 1 TO 6 11 TO 14 FIXED BUT MX MZ
123. MEMBER TRUSS
124. 301 TO 322 331 TO 334
125. MEMBER RELEASE
126. 11 TO 14 103 104 109 110 162 163 165 166 169 170 204 207 211 214 TO 217 220 -
127. 227 TO 232 END MY MZ
128. 101 106 107 112 161 164 TO 168 201 205 211 214 TO 217 220 227 TO 232 401 402 -
129. 521 START MX MY MZ
130. 121 133 141 151 START MY MZ
131. 121 133 141 151 END KMX 50 KMY 50 KMZ 100
132. 11 TO 20 START KMX 100 KMY 150 KMZ 200
133. LOAD 1 LOADTYPE DEAD TITLE SELFWEIGHT
134. SELFWEIGHT Y -1.1
135. LOAD 2 LOADTYPE DEAD TITLE FLOORING ETC
136. ONEWAY LOAD
137. _FLOOR1 ONE -0.4 GY TOWARDS 201
138. _FLOOR2 ONE -0.4 GY TOWARDS 204
139. _FLOOR3 ONE -0.4 GY TOWARDS 218
140. _FLOOR4 ONE -0.4 GY TOWARDS 219
141. _FLOOR5 ONE -0.4 GY TOWARDS 201
142. _INFIL ONE -0.4 GY TOWARDS 124
143. MEMBER LOAD
144. 101 TO 112 161 162 164 166 TO 168 202 TO 209 UNI GY -0.25
145. *HALF LANDING GRATING
146. 168 521 UNI GY -0.2
147. *STAIRCASE TREADS AND HANDRAIL
148. 401 TO 441 443 UNI GY -0.5
149. LOAD 3 LOADTYPE DEAD TITLE DECANTER DEAD LOAD
150. MEMBER LOAD
151. 123 TO 126 129 TO 132 143 TO 150 UNI GY -0.57
152. 220 UNI GY -0.93
153. 217 UNI GY -0.7
154. 144 CON GY -1.87 0.05
155. 124 CON GY -0.8 0.05
156. JOINT LOAD
157. 118 120 121 123 FY -13
158. LOAD 7 LOADTYPE DEAD TITLE TOTAL DEAD LOAD
159. REPEAT LOAD
160. 1 1.0 2 1.0 3 1.0
161. ************************************************************************
162. LOAD 11 LOADTYPE LIVE TITLE PLATFORM LIVE LOAD
163. ONEWAY LOAD
164. _FLOOR1 ONE -5.5 GY TOWARDS 201
165. _FLOOR2 ONE -5.5 GY TOWARDS 204
166. _FLOOR3 ONE -5.5 GY TOWARDS 218
167. _FLOOR4 ONE -5.5 GY TOWARDS 219
168. _FLOOR5 ONE -5.5 GY TOWARDS 201
169. _INFIL ONE -0.5 GY TOWARDS 124
170. *HALF LANDING
171. MEMBER LOAD
172. 168 521 UNI GY -2.5
173. 101 TO 112 161 162 164 166 TO 170 202 TO 209 401 TO 441 443 UNI GY -0.6
174. LOAD 12 LOADTYPE LIVE TITLE DECANTER LIVE LOAD
175. JOINT LOAD
176. 118 120 121 123 FY -1.3
177. ************************************************************************
178. LOAD 13 LOADTYPE LIVE TITLE DECANTER RUN DOWN VERTICAL DYNAMIC
179. JOINT LOAD

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A4 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
180. 118 120 121 123 FY -7.5
181. LOAD 14 LOADTYPE LIVE TITLE DECANTER RUN DOWN HORIZONTAL DYNAMIC
182. JOINT LOAD
183. 118 120 121 123 FX 2.5 FZ 2.5
184. LOAD 15 LOADTYPE LIVE TITLE DECANTER OPERATING VERTICAL DYNAMIC
185. JOINT LOAD
186. 118 120 121 123 FY -0.5
187. LOAD 16 LOADTYPE LIVE TITLE DECANTER OPERATING HORIZONTAL DYNAMIC
188. JOINT LOAD
189. 118 120 121 123 FX 0.5 FZ 0.5
190. ***********************************
191. LOAD 17 LOADTYPE LIVE TITLE TOTAL COEXISTING LIVE LOAD 1
192. REPEAT LOAD
193. 11 1.0 12 1.0 13 1.0
194. *************************************************************
195. * ULTIMATE FACTORED STR LOADS
196. *************************************************************
197. LOAD 21 LOADTYPE NONE TITLE TOTAL ULTIMATE VERTICAL LOAD 1
198. REPEAT LOAD
199. 7 1.35 17 1.5
200. ****************************************************************
201. LOAD 22 LOADTYPE LIVE TITLE DEFLECTION LIMITS
202. JOINT LOAD
203. 118 120 121 123 FX 13 FY -13 FZ 13
204. LOAD 25 LOADTYPE TEMPERATURE TITLE THERMAL INCREASE
205. TEMPERATURE LOAD
206. 1 TO 22 31 TO 35 101 TO 112 121 TO 126 129 TO 134 141 TO 152 161 TO 170 201 -
207. 202 TO 209 211 TO 232 301 TO 322 331 TO 334 401 TO 443 501 TO 519 521 -
208. 522 TEMP 36
209. LOAD 26 LOADTYPE TEMPERATURE TITLE THERMAL DECREASE
210. TEMPERATURE LOAD
211. 1 TO 22 31 TO 35 101 TO 112 121 TO 126 129 TO 134 141 TO 152 161 TO 170 201 -
212. 202 TO 209 211 TO 232 301 TO 322 331 TO 334 401 TO 443 501 TO 519 521 -
213. 522 TEMP -34
214. LOAD 31 LOADTYPE WIND TITLE WIND X
215. MEMBER LOAD
216. 7 TO 14 212 213 218 219 221 TO 226 UNI GX 0.33
217. 201 TO 209 UNI GX 0.46
218. 1 TO 6 15 TO 20 22 165 TO 167 169 170 401 402 405 TO 424 UNI GX 0.26
219. 21 22 31 TO 35 211 214 TO 217 220 227 TO 232 UNI GX 0.2
220. 301 TO 310 331 TO 334 UNI GX 0.1
221. JOINT LOAD
222. 76 96 FX 1.2
223. LOAD 32 LOADTYPE WIND TITLE WIND -X
224. MEMBER LOAD
225. 7 TO 14 212 213 218 219 221 TO 226 UNI GX -0.33
226. 201 TO 209 UNI GX -0.46
227. 1 TO 6 15 TO 20 165 TO 167 169 170 401 402 405 TO 424 UNI GX -0.26
228. 21 22 31 TO 35 211 214 TO 217 220 227 TO 232 UNI GX -0.2
229. 301 TO 310 331 TO 334 UNI GX -0.1
230. JOINT LOAD
231. 76 96 FX -1.2
232. LOAD 33 LOADTYPE WIND TITLE WIND Z
233. MEMBER LOAD
234. 7 TO 14 101 TO 112 121 TO 126 129 TO 134 141 TO 152 UNI GZ 0.33
235. 1 TO 6 15 TO 20 161 TO 164 168 403 404 425 TO 441 443 521 UNI GZ 0.26
236. 21 22 31 TO 35 UNI GZ 0.2
237. 166 169 170 301 TO 310 331 TO 334 401 402 405 TO 424 UNI GZ 0.1
238. 123 TO 126 129 TO 132 143 TO 150 UNI GZ 0.905
239. 143 TO 150 UNI GY -1.28
240. 123 TO 126 129 TO 132 UNI GY 1.28
241. LOAD 34 LOADTYPE WIND TITLE WIND -Z
242. MEMBER LOAD
243. 7 TO 14 101 TO 112 121 TO 126 129 TO 134 141 TO 152 UNI GZ -0.33
244. 1 TO 6 15 TO 20 161 TO 164 168 403 404 425 TO 441 443 521 UNI GZ -0.26

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A5 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
245. 21 22 31 TO 35 UNI GZ -0.2
246. 169 170 301 TO 310 331 TO 334 401 402 405 TO 424 UNI GZ -0.1
247. 123 TO 126 129 TO 132 143 TO 150 UNI GZ -0.905
248. 143 TO 150 UNI GY 1.28
249. 123 TO 126 129 TO 132 UNI GY -1.28
250. ************************************************************************
251. LOAD 41 LOADTYPE WIND TITLE WIND X
252. REPEAT LOAD
253. 31 1.0
254. LOAD 43 LOADTYPE WIND TITLE WIND -X
255. REPEAT LOAD
256. 32 1.0
257. LOAD 45 LOADTYPE WIND TITLE WIND Z
258. REPEAT LOAD
259. 33 1.0
260. LOAD 47 LOADTYPE WIND TITLE WIND -Z
261. REPEAT LOAD
262. 34 1.0
263. ************************************************************************
264. LOAD 51 LOADTYPE LIVE TITLE EHF'S +X (PLUS DYNAMIC)
265. JOINT LOAD
266. 53 111 113 FX 0.15
267. 51 52 84 85 112 FX 0.25
268. 72 92 FX 0.35
269. 25 26 59 61 FX 0.07
270. *INCLUDE RUN-DOWN DYNAMICS FACTORED BY 1.5 = 2.5X1.5 =3.75
271. 118 120 121 123 FX 3.75
272. 71 91 FX 0.45
273. LOAD 52 LOADTYPE LIVE TITLE EHF'S +Z (PLUS DYNAMIC)
274. JOINT LOAD
275. 53 111 113 FZ 0.15
276. 51 52 84 85 112 FZ 0.25
277. 72 92 FZ 0.35
278. 25 26 59 61 FZ 0.07
279. *INCLUDE RUN-DOWN DYNAMICS FACTORED BY 1.5 = 2.5X1.5 =3.75
280. 118 120 121 123 FZ 3.75
281. 71 91 FZ 0.45
282. ******************************************************************************
283. ******************************************************************************
284. * ULTIMATE LIMIT STATE LOADS TO EN 1993-1 UK NA TABLE NA.A1.2(B) (EQ 6.10) *
285. ******************************************************************************
286. * ULTIMATE LOADS - MAIN VARIABLE 1 WITH EHF'S X DIRECTION *
287. *********************************************************************
288. LOAD 101 ULT DEAD+TOTAL.LIVE.1+EHF(X)
289. REPEAT LOAD
290. 7 1.35 17 1.5 51 1.0
291. LOAD 102 ULT DEAD+TOTAL.LIVE.1+EHF(-X)
292. REPEAT LOAD
293. 7 1.35 17 1.5 51 -1.0
294. *********************************************************************
295. * ULTIMATE LOADS - MAIN VARIABLE 1 WITH EHF'S Z DIRECTION *
296. *********************************************************************
297. LOAD 103 ULT DEAD+TOTAL.LIVE.1+EHF(Z)
298. REPEAT LOAD
299. 7 1.35 17 1.5 52 1.0
300. LOAD 104 ULT DEAD+TOTAL.LIVE.1+EHF(-Z)
301. REPEAT LOAD
302. 7 1.35 17 1.5 52 -1.0
303. *********************************************************************
304. * ULTIMATE LOADS - MAIN VARIABLE WITH THERMAL AND EHF'S X DIRECTION *
305. *********************************************************************
306. LOAD 111 ULT DEAD+TOTAL.LIVE.1+EHF(X) + THERMAL INCREASE
307. REPEAT LOAD
308. 7 1.35 17 1.5 25 0.9 51 1.0
309. LOAD 112 ULT DEAD+TOTAL.LIVE.1+EHF(X) + THERMAL DECREASE

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A6 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
310. REPEAT LOAD
311. 7 1.35 17 1.5 26 0.9 51 1.0
312. *********************************************************
313. LOAD 113 ULT DEAD+TOTAL.LIVE.1+EHF(-X) + THERMAL INCREASE
314. REPEAT LOAD
315. 7 1.35 17 1.5 25 0.9 51 -1.0
316. LOAD 114 ULT DEAD+TOTAL.LIVE.1+EHF(-X) + THERMAL DECREASE
317. REPEAT LOAD
318. 7 1.35 17 1.5 26 0.9 51 -1.0
319. *********************************************************************
320. * ULTIMATE LOADS - MAIN VARIABLE WITH THERMAL AND EHF'S Z DIRECTION *
321. *********************************************************************
322. LOAD 115 ULT DEAD+TOTAL.LIVE.1+EHF(Z) + THERMAL INCREASE
323. REPEAT LOAD
324. 7 1.35 17 1.5 25 0.9 52 1.0
325. LOAD 116 ULT DEAD+TOTAL.LIVE.1+EHF(Z) + THERMAL DECREASE
326. REPEAT LOAD
327. 7 1.35 17 1.5 26 0.9 52 1.0
328. *********************************************************
329. LOAD 117 ULT DEAD+TOTAL.LIVE.1+EHF(-Z) + THERMAL INCREASE
330. REPEAT LOAD
331. 7 1.35 17 1.5 25 0.9 52 -1.0
332. LOAD 118 ULT DEAD+TOTAL.LIVE.1+EHF(-Z) + THERMAL DECREASE
333. REPEAT LOAD
334. 7 1.35 17 1.5 26 0.9 52 -1.0
335. ****************************************************************************
336. ****************************************************************************
337. * ULTIMATE LOADS - MAIN VARIABLE 1 WITH SECONDARY WIND AND EHF'S X DIRECTION
338. ****************************************************************************
339. LOAD 201 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(X) + WIND(X)
340. REPEAT LOAD
341. 7 1.35 17 1.5 25 0.75 41 0.75 51 1.0
342. LOAD 202 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(X) + WIND(X)
343. REPEAT LOAD
344. 7 1.35 17 1.5 26 0.75 41 0.75 51 1.0
345. *********************************************************************
346. LOAD 205 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(-X) + WIND(-X)
347. REPEAT LOAD
348. 7 1.35 17 1.5 25 0.75 43 0.75 51 -1.0
349. LOAD 206 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(-X) + WIND(-X)
350. REPEAT LOAD
351. 7 1.35 17 1.5 26 0.75 43 0.75 51 -1.0
352. *********************************************************************
353. * ULTIMATE LOADS - MAIN VARIABLE 1 WITH SECONDARY WIND AND EHF'S Z DIRECTION
354. *********************************************************************
355. LOAD 211 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(Z) + WIND(Z)
356. REPEAT LOAD
357. 7 1.35 17 1.5 25 0.75 45 0.75 52 1.0
358. LOAD 212 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(Z) + WIND(Z)
359. REPEAT LOAD
360. 7 1.35 17 1.5 26 0.75 45 0.75 52 1.0
361. *********************************************************************
362. LOAD 215 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(-Z) + WIND(-Z)
363. REPEAT LOAD
364. 7 1.35 17 1.5 25 0.75 47 0.75 52 -1.0
365. LOAD 216 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(-Z) + WIND(-Z)
366. REPEAT LOAD
367. 7 1.35 17 1.5 26 0.75 47 0.75 52 -1.0
368. *********************************************************************
369. * ULTIMATE LOADS - MAIN WIND WITH SECONDARY VARIABLE 1 AND EHF'S X DIRECTION
370. *********************************************************************
371. LOAD 221 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(X) + WIND(X)
372. REPEAT LOAD
373. 7 1.35 17 0.75 25 0.75 41 1.5 51 1.0
374. LOAD 222 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(X) + WIND(X)

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A7 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
375. REPEAT LOAD
376. 7 1.35 17 0.75 26 0.75 41 1.5 51 1.0
377. *********************************************************************
378. LOAD 225 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(-X) + WIND(-X)
379. REPEAT LOAD
380. 7 1.35 17 0.75 25 0.75 43 1.5 51 -1.0
381. LOAD 226 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(-X) + WIND(-X)
382. REPEAT LOAD
383. 7 1.35 17 0.75 26 0.75 43 1.5 51 -1.0
384. *********************************************************************
385. * ULTIMATE LOADS - MAIN WIND WITH SECONDARY VARIABLE 1 AND EHF'S Z DIRECTION
386. *********************************************************************
387. LOAD 231 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(Z) + WIND(Z)
388. REPEAT LOAD
389. 7 1.35 17 0.75 25 0.75 45 1.5 52 1.0
390. LOAD 232 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(Z) + WIND(Z)
391. REPEAT LOAD
392. 7 1.35 17 0.75 26 0.75 45 1.5 52 1.0
393. *********************************************************************
394. LOAD 235 ULT DEAD+TOTAL.LIVE.1+THERMAL INCREASE+EHF(-Z) + WIND(-Z)
395. REPEAT LOAD
396. 7 1.35 17 0.75 25 0.75 47 1.5 52 -1.0
397. LOAD 236 ULT DEAD+TOTAL.LIVE.1+THERMAL DECREASE+EHF(-Z) + WIND(-Z)
398. REPEAT LOAD
399. 7 1.35 17 0.75 26 0.75 47 1.5 52 -1.0
400. ****************************************************************************
401. *********************************************************************
402. * ULTIMATE LOADS - MAIN WIND WITH MINIMUM DEAD AND EHF'S X DIRECTION *
403. *********************************************************************
404. LOAD 241 ULT MIN. DEAD+THERMAL INCREASE+EHF(X) + WIND(X)
405. REPEAT LOAD
406. 7 1.0 25 0.75 41 1.5 51 1.0
407. LOAD 242 ULT MIN. DEAD+THERMAL DECREASE+EHF(X) + WIND(X)
408. REPEAT LOAD
409. 7 1.0 26 0.75 41 1.5 51 1.0
410. *********************************************************************
411. LOAD 245 ULT MIN. DEAD+THERMAL INCREASE+EHF(-X) + WIND(-X)
412. REPEAT LOAD
413. 7 1.0 25 0.75 43 1.5 51 -1.0
414. LOAD 246 ULT MIN. DEAD+THERMAL DECREASE+EHF(-X) + WIND(-X)
415. REPEAT LOAD
416. 7 1.0 26 0.75 43 1.5 51 -1.0
417. *********************************************************************
418. * ULTIMATE LOADS - MAIN WIND WITH MINIMUM DEAD AND EHF'S Z DIRECTION *
419. *********************************************************************
420. LOAD 251 ULT MIN. DEAD+THERMAL INCREASE+EHF(Z) + WIND(Z)
421. REPEAT LOAD
422. 7 1.0 25 0.75 45 1.5 52 1.0
423. LOAD 252 ULT MIN. DEAD+THERMAL DECREASE+EHF(Z) + WIND(Z)
424. REPEAT LOAD
425. 7 1.0 26 0.75 45 1.5 52 1.0
426. *********************************************************************
427. LOAD 255 ULT MIN. DEAD+THERMAL INCREASE+EHF(-Z) + WIND(-Z)
428. REPEAT LOAD
429. 7 1.0 25 0.75 47 1.5 52 -1.0
430. LOAD 256 ULT MIN. DEAD+THERMAL DECREASE+EHF(-Z) + WIND(-Z)
431. REPEAT LOAD
432. 7 1.0 26 0.75 47 1.5 52 -1.0
433. ****************************************************************************
434. ******************************************************************************
435. * SERVICABILITY LIMIT STATE LOADS TO EN 1993-1 (UK NA) TABLE A1.4 (EQ 6.16B) *
436. ******************************************************************************
437. * SERVICABILITY LOADS - MAIN VARIABLE 1 *
438. *********************************************************************
439. LOAD 500 DEAD+TOTAL LIVE 1

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A8 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
440. REPEAT LOAD
441. 7 1.0 17 1.0
442. *********************************************************************
443. * SERVICABILITY LOADS - MAIN VARIABLE 1 WITH SECONDARY WIND X DIRECTION *
444. *********************************************************************
445. LOAD 501 DEAD+TOTAL.LIVE.1+ WIND(X)
446. REPEAT LOAD
447. 7 1.0 17 1.0 41 0.5 51 1.0
448. LOAD 503 DEAD+TOTAL.LIVE.1+ WIND(-X)
449. REPEAT LOAD
450. 7 1.0 17 1.0 43 0.5 51 -1.0
451. *********************************************************************
452. * SERVICABILITY LOADS - MAIN VARIABLE 1 WITH SECONDARY WIND Z DIRECTION *
453. *********************************************************************
454. LOAD 505 DEAD+TOTAL.LIVE.1+ WIND(Z)
455. REPEAT LOAD
456. 7 1.0 17 1.0 45 0.5 52 1.0
457. LOAD 507 DEAD+TOTAL.LIVE.1+ WIND(-Z)
458. REPEAT LOAD
459. 7 1.0 17 1.0 47 0.5 52 -1.0
460. *********************************************************************
461. * SERVICABILITY LOADS - MAIN WIND WITH SECONDARY VARIABLE 1 X DIRECTION *
462. *********************************************************************
463. LOAD 521 DEAD+TOTAL.LIVE.1+ WIND(X)
464. REPEAT LOAD
465. 7 1.0 17 0.5 41 1.0 51 1.0
466. LOAD 525 DEAD+TOTAL.LIVE.1+ WIND(-X)
467. REPEAT LOAD
468. 7 1.0 17 0.5 43 1.0 51 -1.0
469. *********************************************************************
470. * SERVICABILITY LOADS - MAIN WIND WITH SECONDARY VARIABLE 1 Z DIRECTION *
471. *********************************************************************
472. LOAD 531 DEAD+TOTAL.LIVE.1+ WIND(Z)
473. REPEAT LOAD
474. 7 1.0 17 0.5 45 1.0 52 1.0
475. LOAD 535 DEAD+TOTAL.LIVE.1+ WIND(-Z)
476. REPEAT LOAD
477. 7 1.0 17 0.5 47 1.0 52 -1.0
478. *********************************************************************
479. * SERVICABILITY LOADS - MAIN WIND WITH MINIMUM DEAD - X DIRECTION *
480. *********************************************************************
481. LOAD 541 MIN. DEAD+WIND(X)
482. REPEAT LOAD
483. 7 0.9 41 1.0 51 1.0
484. LOAD 543 MIN. DEAD+ WIND(-X)
485. REPEAT LOAD
486. 7 0.9 43 1.0 51 -1.0
487. *********************************************************************
488. * SERVICABILITY LOADS - MAIN WIND WITH MINIMUM DEAD - Z DIRECTION *
489. *********************************************************************
490. LOAD 551 MIN. DEAD+WIND(Z)
491. REPEAT LOAD
492. 7 0.9 45 1.0 52 1.0
493. LOAD 553 MIN. DEAD+WIND(-Z)
494. REPEAT LOAD
495. 7 0.9 47 1.0 52 -1.0
496. ****************************************************************************
497. PDELTA 5 ANALYSIS SMALLDELTA

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A9 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...
P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS 126 NUMBER OF MEMBERS 194


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 16

SOLVER USED IS THE IN-CORE ADVANCED MATH SOLVER

TOTAL PRIMARY LOAD CASES = 74, TOTAL DEGREES OF FREEDOM = 698


TOTAL LOAD COMBINATION CASES = 0 SO FAR.

++ Adjusting Displacements.
++ Adjusting Displacements.
++ Adjusting Displacements.
++ Adjusting Displacements.
++ Adjusting Displacements.

498. PARAMETER 1
499. CODE EN 1993-1-1:2005
500. NA 1
501. SGR 1 ALL
502. LY 3 MEMB 32 34 168 TO 170 401 TO 441 443 521
503. UNL 3 MEMB 32 34 168 TO 170 401 TO 441 443 521
504. UNL 4 MEMB 1 TO 13 15 TO 20
505. LY 4 MEMB 1 TO 13 15 TO 20
506. LZ 4 MEMB 1 TO 13 15 TO 20 31 TO 35
507. LY 1.5 MEMB 121 TO 126 129 TO 134 141 TO 152 161 TO 164
508. LZ 3.5 MEMB 121 TO 126 129 TO 134 141 TO 152 168 TO 170 401 TO 441 443 521
509. UNL 1.5 MEMB 121 TO 126 129 TO 134 141 TO 152 161 TO 164
510. LZ 4.5 MEMB 101 TO 112
511. LZ 5.5 MEMB 201 TO 209
512. UNL 2 MEMB 201 TO 203 206 208 209 212 213 221 TO 226
513. LY 2 MEMB 201 TO 203 206 208 209 212 213 221 TO 226
514. LOAD LIST 101 TO 104 111 TO 118 201 202 205 206 211 212 215 216 221 222 225 -
515. 226 231 232 235 236 241 242 245 246 251 252 255 256
516. CHECK CODE MEMB 1 TO 22 31 TO 35 101 TO 112 121 TO 126 129 TO 134 141 TO 152 -
517. 161 TO 170 201 TO 209 211 TO 232 301 TO 322 331 TO 334 401 TO 441 443 521

STEEL DESIGN
STAAD.PRO CODE CHECKING - BS EN 1993-1-1:2005
********************************************
NATIONAL ANNEX - NA to BS EN 1993-1-1:2005

PROGRAM CODE REVISION V1.11 BS_EC3_2005/1

ALL UNITS ARE - KN METE (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

1 ST UC203X203X46 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.053 206
48.28 C -0.00 0.36 1.40
2 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.044 206
40.19 C 0.00 0.36 1.40
3 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.052 211
44.70 C -0.38 -0.00 1.63
4 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.052 211
44.72 C -0.38 -0.00 1.63

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A10 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

5 ST UC203X203X46 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.035 216
28.04 C 0.38 0.00 1.63
6 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.035 212
28.02 C -0.38 0.00 1.63
7 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.056 216
100.34 C -0.00 -0.46 1.40
8 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.045 202
75.25 C -0.45 -0.00 1.40
9 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.051 216
91.13 C 0.00 -0.46 1.40
10 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.045 202
76.08 C -0.45 -0.00 1.40
11 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.055 216
98.85 C -0.00 -0.42 0.00
12 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.044 212
77.01 C -0.00 0.42 0.00
13 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.050 216
89.64 C 0.00 -0.42 0.00
14 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.032 202
74.60 C -0.43 -0.00 0.00
15 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.052 206
47.34 C -0.00 0.33 0.00
16 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.043 206
39.25 C 0.00 0.33 0.00
17 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.049 211
43.92 C -0.34 -0.00 0.00
18 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.049 211
43.94 C -0.34 -0.00 0.00
19 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.032 216
27.26 C 0.33 0.00 0.00
20 ST UC203X203X46 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.032 212
27.24 C -0.33 0.00 0.00
21 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.023 231
5.20 C -0.22 0.00 1.18
22 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.039 236
20.32 C 0.12 -0.03 0.89
31 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.2.9.2/3 0.041 221
8.09 C -0.19 0.78 1.33
32 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.061 232
23.27 C -0.17 -0.00 1.00

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A11 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

33 ST UC152X152X23 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.039 221
5.82 C 0.19 -0.78 0.00
34 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.060 226
17.50 C 0.02 0.80 0.78
35 ST UC152X152X23 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.032 226
9.85 C 0.02 0.79 0.00
101 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.214 206
10.43 C 0.00 21.36 1.48
102 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.215 212
7.27 C -0.04 -21.73 0.74
103 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.209 212
7.27 C 0.00 -21.22 0.00
104 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.208 212
7.34 C -0.01 -21.07 0.00
105 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.215 212
7.34 C 0.04 -21.60 0.74
106 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.202 206
0.76 C -0.00 21.18 1.47
107 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.214 206
10.65 C -0.00 21.36 1.48
108 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.216 216
7.95 C 0.04 -21.74 0.74
109 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.210 216
7.95 C 0.00 -21.22 0.00
110 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.209 215
8.31 C -0.00 -21.08 0.00
111 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.216 215
8.31 C -0.05 -21.60 0.74
112 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.202 205
0.70 C 0.01 21.18 1.47
121 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.035 215
4.46 C -0.00 0.00 0.00
122 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.043 215
3.08 C 0.53 11.82 0.52
123 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-661 0.049 215
3.08 C 0.33 13.22 0.41
124 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.048 215
3.08 C -0.33 -13.22 0.00
125 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.075 216
7.74 C -1.09 -20.29 0.40

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A12 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

126 ST UC254X254X73 (BRITISH SECTIONS)


PASS EC-6.2.9.1 0.074 216
6.73 C 0.10 20.29 0.00
129 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.025 114
0.80 T -0.15 -6.74 1.47
130 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.054 216
2.89 C -0.35 -14.66 0.47
131 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.054 216
3.76 C 0.97 -14.66 1.01
132 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-661 0.027 215
5.69 C 0.59 -6.24 0.00
133 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.022 111
3.34 C 0.00 0.00 0.00
134 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.026 215
5.69 C -0.59 6.24 0.52
141 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.037 211
1.85 C 0.00 0.00 0.00
142 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.046 211
0.94 C -0.36 12.59 0.52
143 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.052 211
0.94 C -0.24 14.29 0.41
144 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.052 211
0.94 C 0.24 -14.29 0.00
145 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.077 212
7.77 C 1.00 -20.11 0.40
146 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.074 212
6.78 C -0.03 20.11 0.00
147 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.025 114
0.33 T 0.17 -6.81 1.47
148 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.055 212
3.48 C 0.38 -14.87 0.47
149 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.055 212
3.51 C -0.94 -14.87 1.01
150 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-661 0.024 211
3.43 C -0.13 -6.20 0.00
151 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.022 111
0.36 T 0.00 0.00 0.00
152 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.5 0.023 111
0.04 C -0.11 6.22 0.52
161 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.130 201
0.73 C 1.04 1.67 0.45

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A13 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

162 ST CH180X75X20 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.129 201
0.61 C -1.04 -1.67 0.00
163 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.116 115
0.20 C -1.27 -0.64 0.00
164 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.116 115
0.39 C 1.27 0.64 0.45
165 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.050 205
3.47 C 0.04 1.37 0.64
166 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.034 215
0.11 C 0.00 -1.21 0.64
167 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.012 226
0.93 C 0.05 0.18 0.50
168 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 206
0.30 C 1.27 2.27 1.00
169 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.050 235
1.31 C -0.06 -0.96 0.00
170 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.144 211
7.77 C 0.04 2.64 0.00
201 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.130 216
0.95 T -0.12 12.58 1.28
202 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.130 216
0.90 T 0.12 -12.58 0.00
203 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.152 117
7.43 T 0.01 -14.75 0.97
204 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.085 212
0.91 T 0.04 -8.57 0.30
205 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.072 116
0.16 C 0.01 -7.23 1.34
206 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.123 111
4.38 T -0.11 -11.91 0.97
207 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-661 0.072 118
0.16 C 0.01 -7.21 0.44
208 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.128 117
4.19 C 0.02 11.90 0.00
209 ST UB254X146X31 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.161 215
10.26 C -0.01 14.52 0.00
211 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.199 201
0.67 C 0.06 -5.23 0.89
212 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.089 101
1.53 T -0.95 0.01 0.00

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A14 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

213 ST UC254X254X73 (BRITISH SECTIONS)


PASS EC-6.2.6-(Y) 0.089 101
1.34 T -1.23 0.01 0.00
214 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.199 202
0.55 C 0.06 -5.23 0.89
215 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.200 201
0.90 C 0.06 -5.23 0.89
216 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.198 202
0.42 C 0.06 -5.23 0.89
217 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.070 202
0.18 C 0.07 -1.63 0.97
218 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.9.1 0.015 235
0.02 C 1.91 0.02 0.00
219 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.2.6-(Y) 0.014 101
0.15 C -0.12 0.01 0.00
220 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.076 206
0.28 C -0.07 -1.77 0.97
221 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.064 206
0.65 C 0.84 16.47 0.43
222 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.072 206
0.65 C 0.93 18.34 0.43
223 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.067 114
0.41 C -0.95 -18.34 0.00
224 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.064 206
0.64 C 0.85 16.46 0.43
225 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.072 206
0.64 C 0.92 18.34 0.43
226 ST UC254X254X73 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.068 114
0.55 C -0.95 -18.34 0.00
227 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.193 216
0.85 C -0.00 -5.23 0.89
228 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.198 201
0.21 C 0.06 -5.23 0.89
229 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 211
0.38 C -0.00 -5.23 0.89
230 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 211
0.38 C -0.00 -5.23 0.89
231 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 215
0.30 C 0.00 -5.23 0.89
232 ST UB152X89X16 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 215
0.34 C 0.00 -5.23 0.89

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A15 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

301 ST PIP1395.0 (BRITISH SECTIONS)


PASS EC-6.3.1.1 0.131 221
30.23 C 0.00 0.00 0.00
302 ST PIP1395.0 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.151 221
34.86 C 0.00 0.00 0.00
303 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.213 225
28.15 C 0.00 0.00 0.00
304 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.197 225
26.03 C 0.00 0.00 0.00
305 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.197 231
31.58 C 0.00 0.00 0.00
306 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.189 231
30.27 C 0.00 0.00 0.00
307 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.282 215
39.22 C 0.00 0.00 0.00
308 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.231 232
32.14 C 0.00 0.00 0.00
309 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.279 212
38.91 C 0.00 0.00 0.00
310 ST PIP1143.6 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.348 215
48.49 C 0.00 0.00 0.00
311 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.196 231
10.98 C 0.00 0.00 0.00
312 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.133 256
7.48 C 0.00 0.00 0.00
313 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.069 221
3.84 C 0.00 0.00 0.00
314 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.060 246
3.37 C 0.00 0.00 0.00
315 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.167 235
9.36 C 0.00 0.00 0.00
316 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.217 252
12.22 C 0.00 0.00 0.00
317 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.211 235
11.92 C 0.00 0.00 0.00
318 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.116 251
6.49 C 0.00 0.00 0.00
319 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.066 246
3.72 C 0.00 0.00 0.00
320 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.068 221
3.84 C 0.00 0.00 0.00

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A16 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

321 RA UA70X70X7 (BRITISH SECTIONS)


PASS EC-6.3.1.1 0.157 252
8.87 C 0.00 0.00 0.00
322 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.256 235
14.37 C 0.00 0.00 0.00
331 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.269 231
18.91 C 0.00 0.00 0.00
332 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.133 232
10.98 C 0.00 0.00 0.00
333 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.084 255
6.92 C 0.00 0.00 0.00
334 RA UA70X70X7 (BRITISH SECTIONS)
PASS EC-6.3.1.1 0.097 232
8.01 C 0.00 0.00 0.00
401 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.029 215
3.25 T -0.06 0.82 0.31
402 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.079 211
9.00 C 0.06 -0.89 0.31
403 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.224 202
4.81 T -0.04 -6.31 0.07
404 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.162 211
0.18 C 0.05 -3.85 0.30
405 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.053 215
2.76 T -0.06 1.48 0.31
406 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.2 LTB 0.071 215
2.30 T -0.06 1.99 0.32
407 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.087 235
0.44 C -0.05 1.98 0.31
408 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.097 235
0.78 C -0.05 2.18 0.30
409 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.125 221
0.11 C -0.35 1.98 0.31
410 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.122 221
0.18 C 0.32 -1.97 0.11
411 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.119 221
0.47 C 0.31 -1.93 0.00
412 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.108 221
0.73 C 0.28 -1.78 0.00
413 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.090 221
0.96 C 0.23 -1.51 0.00
414 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.078 235
2.61 C 0.06 -1.45 0.00

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A17 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

415 ST CH180X75X20 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.113 201
6.81 C 0.18 -1.62 0.31
416 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.143 201
6.96 C 0.20 -2.28 0.32
417 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.166 201
7.21 C 0.21 -2.74 0.31
418 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.183 201
7.41 C 0.21 -3.10 0.30
419 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.192 201
7.69 C 0.21 -3.28 0.31
420 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.198 211
10.68 C 0.06 -3.60 0.32
421 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.198 211
10.99 C 0.07 -3.54 0.31
422 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.194 211
10.89 C -0.02 3.55 0.00
423 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.189 211
11.20 C -0.04 3.36 0.00
424 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.178 211
11.55 C -0.05 3.03 0.00
425 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.246 215
0.18 C 0.09 5.72 0.31
426 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.247 215
0.19 C -0.09 -5.72 0.00
427 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.243 215
0.57 C -0.12 -5.47 0.00
428 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.232 215
0.97 C -0.14 -5.09 0.00
429 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.213 215
1.35 C -0.16 -4.58 0.00
430 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.187 215
1.83 C -0.16 -3.92 0.00
431 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.152 216
0.16 C -0.18 -3.15 0.00
432 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.119 215
3.06 C 0.71 1.17 0.31
433 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.174 215
0.76 C -0.09 -3.92 0.31
434 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.179 215
1.14 C -0.11 -3.90 0.30

A6S/11638/MS76003
Calculations Appendix A Ref: 39393
A18 of 18
Appendix Sheet No. …………………………. A
Rev . ………………….. …

R. Starkey
Calc By ……………………………………… 15/10/2015 …
Date……………………
Shaw Cross Business Park,
Owl Lane, Dewsbury WF12 7RD D.C.
Reviewed..……………………………………. 16/10/2015
Date…………………………
day
Costain - Hayden STW CM ICA Storm & Drainage - Support Platform
PROJECT TITLE ………………………………..……………………………..……………………………..……………………………...

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

435 ST CH180X75X20 (BRITISH SECTIONS)


PASS EC-6.3.3-662 0.181 215
1.11 C 0.12 3.90 0.00
436 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.178 215
1.46 C 0.14 3.75 0.00
437 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.169 215
1.75 C 0.16 3.47 0.00
438 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.151 215
2.09 C 0.16 3.03 0.00
439 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.132 215
2.37 C 0.15 2.48 0.00
440 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.111 216
4.64 C -0.67 -0.83 0.31
441 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.122 113
3.36 C -0.80 -1.12 0.00
443 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.115 114
4.77 C 0.80 0.81 0.00
521 ST CH180X75X20 (BRITISH SECTIONS)
PASS EC-6.3.3-662 0.345 216
0.18 C -1.33 -5.84 1.00

************** END OF TABULATED RESULT OF DESIGN **************

518. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= OCT 15,2015 TIME= 12:57:56 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2015 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************

A6S/11638/MS76003

Potrebbero piacerti anche