NOTE

- THE CONTRACTOR IS FULLY RESPONSIBLE FOR CHECKING ALL


DIMENSIONS ON SITE BEFORE CARRYING OUT ANY WORK. HE IS
DESIGN NOTES ALSO RESPONSIBLE FOR INFORMING THE ARCHITECTS OF ANY
0
DISCREPANCY RESULTING ON THE PLAN AND THAT MIGHT DELAY
EXECUTION.
DESIGN BASIS - DO NOT SCALE THIS DRAWING AS A BASIC FOR CONSTRUCTION WORK
- ALL DIMENSION ARE IN METER UNLESS SHOWN OTHERWISE
- The design is performed according to ACI 318-14 code requirement complying for designing all concrete members ( foundation, Tie beams and floors). - ALL LEVELS ARE IN METER UNLESS SHOWN OTHERWISE

- Net allowable bearing capacity is assumed to be 180 kN/m2


MATERIALS
CONCRETE STRUCTURE:
- Portland cement ASTM C150 used in the work shall correspond to basis of concrete for designing concrete mixture proportions. Cement must be identified
in its actual service in order to produce concrete with adequate strength and durability.
- Normal weight aggregate ASTM C33 shall conform to the requirements of test to identify actual service and produce concrete with adequate strength and
durability.
- Minimum CUBIC compressive strength (Fc') of ALL CONCRETE MEMBERS must be more than 30 MPa for cube tests.
- Carbon steel ASTM A615 must be used to requirement specification, minimum tensile strength must be more than 420 MPa for all sizes of steel
reinforcement.
STEEL STRUCTURE
REVISIONS
- Steel frames are designed based on euro-code and AISC- code
Revision Note Rev. No.
- Foundations should be accommodated safely against all the imposed forces. Attention is requred to the connection between all the member of superstructure
and to the substructure to the anchoring of any holding-down bolts.
- The connection between Beam-column, beam-beam and column- foundation are pinned connection (shear resistance). ****m²

- Ordinary bolts grade8.8, A325 and 2mm clearance for holes must be provided for connections PROJECT NAME

- Distance between bolts (fasteners) must be greater than 2.5 diameter of bolt and edge distance must be greater than 1.4 diameter of hole of fasteners
SHOW HALL
- Beams, columns, and base plate should be accordance to steel grade S235.
OWNER Hawree Yaseen khalid
- Column inserted bar anchorage length requirements of 35d, when the anchorage length of straight line section should be bent anchorage is not enough,
284
horizontal length after bending should be more than 15d. LAND NO.
870 k 5 ankawa
LAND AREA BUILT AREA

DEAD LOAD 200m²

The load of the structure and super dead load with 100mm slab thickness have been considered in the design. Moreover, the cladding load has established
on the beam perimeter. On the other hand, the seismic loads is applied according to ASCE7-10 on the structure. Although, the wind load maybe neglected in
the design based on code, it has been applied in order to gain more safety to the building.
LIVE LOAD
-live load for warehouse building is assumed to be 5 kN/m2 for the entire building accept for stairs, which is 4.5 kN/m2 based on ASCE7-10 table 4-1. For
the Roof 2kN/m2 live load is applied.
DURABILITY
-The clear cover between lean concrete and bottom reinforcement in the pad foundation should be restricted to 75 mm
IRAQ - KURDISTAN REGION / ERBIL
-The clear cover between internal form face and closest steel reinforcement in tie beams should be restricted to 75 mm MOBILE : +964 750 482 8603
+964 750 432 8768
-The clear cover between internal form face and closest steel reinforcement in walls and slabs should be restricted to 25 mm Erbil - 60m street - opposite to Qadrbla mosque
E-mail : arastaeng@gmail.com
- Exposure categories such as freezing and thawing, sulfate and chloride attack,requirement for low permeability and reinforcement
WWW.facebook.Com/ Arasta
corrosion protection need to be considered precisely due to different weather throughout construction process according to clause 4.1 in ACI318-14
- Any embedment materials such as conduits, pipes and sleeves must not be harmful to endanger concrete components and rebar. Rashid Zakaria Rashid

PRACTICES TO MINIMIZE PLASTIC CRACKS


+ dampen the sub-grade and form works before placing concrete to avoid excessive water loss
+ Place concrete in deep sections first (beams) and let it settle prior to placing and compacting the top layers (slab) to eliminate occurrence
of plastic settlement due to restraining edges of the form works.
+ Precaution needs to be exercised for avoiding damage of bond between rebar and concrete.
+ Prevent excessive moisture surface evaporation by providing for sprays or wind breaks.
+ Cover concrete with wet burlaps or polyethylene sheets between finishing operation
+ Use cooler concrete in hot weather and avoid extremely high concrete temperature in cold weather
+ After the excavation of foundation pit shall timely make the foundation construction, no water and exposure. The underground part after the
construction should be timely backfill of pit. Backfill soil shall be compacted, compaction coefficient should be not less than 0.94.

Drawn By
Rashid Zakaria
ID Card No. :11074
Drawing Name

SITE
DIMENSIONS
Drawing No. Scale Size Rev. Date

A-001 1 A3 R-01 22.05.2017


File Location :
PARTITION -D- / WORKING 2017 / MA3RAZ NWE
100