Sei sulla pagina 1di 2

F-11

RECURSOS UTILIZADOS : EQUIPOS Y MAQUINARIA


"INSTALACION Y MEJORAMIENTO DE COBERTURA LIVIANA COMO MEDIDA DE PROTECCION DE LA RADIACION UV EN LAS INSTITUCIONES EDUCATIVAS DE EDUCACION BASICA REGULAR DEL NIVEL INICIAL BAJO LA JURISDICCION DE LA
PROYECTO : UGEL MARISCAL NIETO - REGION MOQUEGUA"
"INSTALACION Y MEJORAMIENTO DE COBERTURA LIVIANA COMO MEDIDA DE PROTECCION DE LA RADIACION UV EN LAS INSTITUCIONES EDUCATIVAS DE EDUCACION BASICA REGULAR DEL NIVEL
OBRA: INICIAL BAJO LA JURISDICCION DE LA UGEL MARISCAL NIETO - REGION MOQUEGUA" SECUENCIA FUNCIONAL: 218

RESIDENTE: ING. ALEJANDRO AMERICO AYALA COCHON INSPECTOR DE OBRA : ING. ALFREDO NINCA TINTAYA
FECHA DE INICIO : 19 DE JUNIO DEL 2017
ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.
MODALIDAD: EJECUCION PRESUPUESTARIA DIRECTA FECHA DE TERMINO : 15 DE DICIEMBRE DEL 2017

ADQUIRIDO POR OBRA ADQUIRIDO POR OBRA UTILIZADOS EN OBRA h/m


SALDO
ITEM DESCRIPCION SEGÚN EXPEDIENTE TÉCNICO COMPRA ANTERIOR ACTUAL ACUMULADO
UND CANTIDAD P.U. PARCIAL UND CANTIDAD P.U. PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
1 NIVEL hm 2.55 S/. 10.00 S/. 25.52
2 ESTACION TOTAL hm 79.94 S/. 20.00 S/. 1,598.78
3 NIVEL TOPOGRAFICO hm 59.97 S/. 10.00 S/. 599.70
4 HERRAMIENTAS MANUALES %mo S/. 55,164.53
5 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 hm 218.76 S/. 20.00 S/. 4,375.19
6 COMPACTADORA VIBRAT. 4.0 HP hm 312.72 S/. 18.00 S/. 5,628.90
7 CIZALLA P/CORTE DE FIERRO hm 1009.54 S/. 2.00 S/. 2,019.09
8 EQUIPO DE SOLDAR hm 9557.77 S/. 10.00 S/. 95,577.72
9 EQUIPO DE PINTAR hm 1806.61 S/. 10.00 S/. 18,066.10
10 GRUA HIAB S/CAMION 4x2 175 HP, 5 TON hm 617.98 S/. 180.00 S/. 111,236.03
11 EQUIPO DE CORTE PARA FIERRO hm 4488.42 S/. 5.00 S/. 22,442.09
12 ESMERIL DE MANO hm 7099.14 S/. 5.00 S/. 35,495.72
13 MARTILLO NEUMATICO DE 24 kg hm 292.87 S/. 25.00 S/. 7,321.86
14 BARRENO hm 292.87 S/. 8.00 S/. 2,342.99
15 CORTADORA DE ASFALTO Y CONCRETO hm 30.21 S/. 35.00 S/. 1,057.39
16 COMPRESORA NEUMATICA 125-175 PCM, 76 HP hm 169.29 S/. 85.00 S/. 14,389.58
17 CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3 hm 30.43 S/. 160.00 S/. 4,868.90
18 CAMION 4TN día 300.00 S/. 130.00 S/. 39,000.00
19 VIBRADOR DE CONCRETO 4 HP, 2.40" hm 144.61 S/. 10.00 S/. 1,446.14
20 CUERPOS DE ANDAMIO METALICO hm 24090.90 S/. 5.00 S/. 120,454.48
21 TECLE DE 5 TON. hm 1679.34 S/. 20.00 S/. 33,586.78
22 CAMION VOLQUETE DE 10 M3 hm 60.75 S/. 140.00 S/. 8,504.43
23 CAMION BARANDA 135-155 HP 10 TN hm 467.14 S/. 180.00 S/. 84,084.48
24 CAMION VOLQUETE DE 6 M3 hm 74.64 S/. 90.00 S/. 6,717.73
AMOLADORA ELECTRICA 2600 W (DISCO DE 230 MM)
25 UND 2.00 790.00 1,580.00
BOSCH (6 UUS 26-230=LHI)
SIERRA CIRCULAR MANUAL DE 1500 W (DISCO DE 7
26 UND 2.00 560.00 1,120.00
1/4") BOSCH MODELO GNS-190 DE (1400 W)
MARTILLO DEMOLEDOR ELECTRICO DE 200 W BOSCH
27 UND 1.00 6,770.00 6,770.00 31.00 31.00 62.00
MODELO GSH 27 VC
28 MEZCLADORA DE CONCRETO DE 9P3 HONDA UND 1.00 4,840.00 4,840.00 173.13 34.15 207.28

29 VIBRADORA DE CONCRETO DE 5.5 HP HONDA UND 1.00 1,640.00 1,640.00 53.41 13.15 66.56
APISONADOR TIPO CANGURO DE 2.2 O 3 HP MASALTO
30 UND 1.00 4,845.00 4,845.00 155.00 25.00 180.00
HONDA
TALADRO PERCUTOR ELECTRICO DE 550 W BOSCH
31 UND 1.00 260.00 260.00
(INCLUYE MALETIN Y 101 ACCESORIOS)

TOTAL 676,004.12 21,055.00