Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Energy
Industry
Residential
Infrastructure
Ref. 6302K
CONTENTS
4.0 Products
6.0 Contact Us
7.0 Design
8.0 Materials
15.0 Standards
16 0
16.0 F
Franchised
hi d Panel
P l Builder
B ild Certificate
C tifi t
20 0
20.0 Installation Testing and Commissioning Certificate
Installation,
24.0 j Clients
Major
2 of 51
Ref. 6302K
1.0 ABOUT SWITCHGEAR MANUFACTURING DIVISION
Verger Delporte UAE Ltd has been operating in UAE since 1977 and have developed
extensive experience in the field of Low Voltage Switchgear. Our facility is located in
sharjah where we manufacture wide range of Low Voltage Switchgear products under
franchising
g agreement
g with Schneider Electric. The p
products are listed in the PRODUCTS
section of the website.
Verger Delporte UAE Ltd is committed to environment, health and safety excellence. We
believe in good corporate environmental citizenship in the communities in which we
operate and in providing a healthy and safe work place. We committed to complying with
all environmental, health and safety laws and regulations.
We supplied low voltage switchgear all over UAE for several projects for applications as
diverse as Power Stations, Oil and Gas, Utilities, School, Hospitals, Private Industries,
Airports, Shopping Centres and Commercial Buildings.
Our high-tech design office is fully capable of meeting client’s requirement while strictly
adhere to BS, IEC standards and Local Regulations. We are constantly updating and
improving our products through advances both in terms of quality and design, in line with
latest product standards and with the technical support from our franchiser.
franchiser We extend our
after sales service to the customer through well trained service team.
3 of 51
Ref. 6302K
1.0 ABOUT SWITCHGEAR MANUFACTURING DIVISION
Verger Delporte U.A.E. Ltd an ISO 9001, ISO 14001 and OHSAS 18001 certified company
and a franchised panel builder of Schneider Electric, in the services of Low Voltage Switch
Gear panel building, testing & commissioning and after sales activities over three decades
has committed to make everyy p
possible endeavor to follow up
p the development
p witnessed
by the Industry and to contribute effectively in supporting this progress.
We always exert efforts to adhere to the latest technology with the aim of enhancing our
competitive ability and meeting the goals set by ourselves in terms of quality, functionality
and safety.
We fully understand and exceed our customers’ needs, wants and preferences and
provide greater value to our customers than our competition.
Our team work and culture build on the company’s reputation and image internally and
externally while driving initiatives to ensure Verger Delporte remains as employer of
choice. We implement best-in-class operating practices and leverage company wide
opportunities and best practices.
With the experience, standard reached by us and our efficient team, we offer outstanding
services of high quality. We have strategies concentrating on all issues and difficulties and
establish in a manner that contribute in enhancing and supporting permanent cooperation
with our Customers satisfying their increasing needs.
4 of 51
Ref. 6302K
2.0 ORGANIZATION CHART
M.RAMAKRISHNA
MANAGER
SWITCHGEAR MANUFACTURING
DIVISION
K. KRISHNARAJ
ASSISTANT MANAGER
ABU DHABI & AL AIN
ARZA MADHUMURTHY
ASSISTANT MANAGER
DUBAI & NORTHERN EMIRATES
SALES
ABU DHABI & PRODUCTION
AL AIN
SALES
DUBAI & AFTER SALES
N.EMIRATES
TESTING AND
DESIGN
COMMISSIONING
MATERIALS QUALITY
5 of 51
Ref. 6302K
2.0 ORGANIZATION CHART
Verger delporte had established its own name in the field of low voltage switchgear as a
reliable manufacturer and has been build up customer confidence for services and after
sales support.
Assembling low voltage switchgear of all kinds under the franchise of Schneider Electric,
Electric
the division profits by the integrated process of panel building, stretching from the Design
(Electrical Calculation and Configuration Lay out) up to the Manufacture, Delivery and
After-Sales Service of finished products.
With a concern to stick closer to client's demand, the company have its branches in Dubai
& Northern Emirates and Abu-Dhabi (Asst. manager outpost) apart from its Sharjah head
office.
This division’s activities are shared out among 7 Sections, which are the Marketing /
Sales, Design, Materials, Production, Quality Control, Testing & Commissioning and After-
Sales Service.
6 of 51
Ref. 6302K
3.0 QUALITY PLAN
2. Project
j programming:
p g g
Under the direction of SGD Manager / Asst. Manager, to plan adequately the tasks
and their related human and material/equipment resources as to meet project /
contract requirements.
¾ Design, Material selection, with optimal time margin for customers’ approval.
¾ Material procurement
p and execution.
¾ Final inspection, testing and commissioning.
¾ To carry out the electrical design in terms of power / control diagrams followed by
general arrangements (taking heed of the environmental constraints as well as
electromechanical interfaces with the use and power generation) on software,
home-developed for our specific activities.
¾ The thoroughly reviewed and approved “design output” depends on initial control
of the “design input” (Specifications, technical guides from franchiser,
International & local standards, tailor- made software).
7 of 51
Ref. 6302K
3.0 QUALITY PLAN
b). Purchasing:
To place the corresponding comprehensive order, thoroughly reviewed and
approved by SGD Manager.
Remarks: The major materials are 100% controlled by the franchiser or / and
approved supplier, with available certificates of conformity to IEC or BS standards.
5. Production: (Refer to HSIM 6301 & WI 3200 – 3209)
8 of 51
Ref. 6302K
3.0 QUALITY PLAN
With its Integrated Management System Documentation (IMSD), the company benefits
also from well-thought management processes and functional procedures, making our
organization, if not flawless, at least quick-responding to any challenging quality issues.
The personnel, whose competence and skills are under permanent watch (GP5 – Training
Procedure), can cope confidently with potential or actual anomalies (GP2 – Non-
conformity Procedure), or general issue handling, with (GP3 – Corrective and Preventive
actions Procedure).
Furthermore the whole practices related to business key-processes, which affect the
delivered quality,
quality are regularly audited to ensure that optimally defined proceeding,
proceeding
conform to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 requirements (GP4
– Internal QHSE Audit Procedure).
Customer oriented QHSE policy, the driving force behind the major decisions and actions
of senior management has led the company to monitor its quality performance against
tough targets of business excellence (GP8 – Indexes and Indicators Procedure).
Procedure)
9 of 51
Ref. 6302K
4.0 PRODUCTS
6000A Switchboard
10 of 51
Ref. 6302K
5.0 SALES & MARKETING
A team of qualified and well experienced people render their services in estimation by
handling Qualitative and Quantitative major tendering works well with in the given target
dates.
11 of 51
Ref. 6302K
6.0 CONTACT US
12 of 51
Ref. 6302K
7.0 DESIGN
The in-house design office structured with an engineering team of Design Engineers and
assisted by designers is capable to design the client’s requirements strictly according to
local regulations, I.E.C and other International / National Standards. It is equipped with all
records of technical documents provided by our principals and by other suppliers,
catalogues, manuals, product qualification & conformity certificates and complete latest
international standards for ready reference. Verger delporte office expertise in offering
solutions to clients in the electrical power distribution, programmable logic controls and
energy management system.
Total design system is accommodated with local computer network system and also linked
with external offices to extend highest service. Engineering drawings are prepared with
the latest AUTO CAD and EPLAN software. They are standardized with self developed
libraries according to the local regulations, system requirements and principals regulations.
13 of 51
Ref. 6302K
7.0 DESIGN
The marketing / sales, design office, materials control and production sections are all
equipped with the state of the art available technology and networked at all levels to
facilitate communication which helps us in effective time management.
A team of well experienced engineers assist the division in the use of customized
programs developed by verger Delporte based on our principal M/s Schneider electric
technical guides & Technical know how, International standards, National standards and
local regulations, besides standard office automation and latest operating systems.
Our programs act as a useful tool and helps us optimize the technical solution offered to
customers. From environmental and electrical constraints they help to bring-out the very
best definition of the panels in record time. They include (non limitative features)
calculation and design of power and control circuits, selection of components outlay of
external and internal configuration.
Materials and production planning are also done through the computerized network which
resulted in a better material management and inventory of the stocks available.
This total computerization of our process has given us the added bonus of increased
efficiency and output.
14 of 51
Ref. 6302K
8.0 MATERIALS
We stock more than 8000 different items worth of 20 Million UAE Dirhams. The material
section comprises of a well competent Material Co-ordinator and his assistants. The
entire material section is fully computerized, and connected to the common network so
that the management monitoring of the material procurement, allocation, safety stock and
order processes is easily carried out from computer work station.
The materials are selected based on our standard Design Manual, our principal
recommendation and also Client requirements and by adopting the International, National
standards and Local regulations. The Bill of Material is prepared based on the job
requirement, subsequently the purchase order also prepared and under the approval of
Division manager.
In order to ensure quality of materials received we have a special team for checking the
incoming goods. As per the standard procedure, the Non-Conformance is raised to the
supplier if any materials are found as faulty. The major materials are 100% approved by
the franchisee or are from an approved supplier with available certificates of conformity to
International, National standards and Local regulations.
15 of 51
Ref. 6302K
9.0 MANUFACTURING / ASSEMBLING
The Production premises is made up of two shop floor areas of 2000 sq. meters (each of
1000 sq. meter area). Besides a storage capacity of 900 sq. meter area with 8000
different items worth of 20 million UAE Dirhams.
The production team comprises of production incharge a supervisor and a group of team
leaders under whom a batch of trained and well experienced technicians put their
combined efforts to bring out the best in quality products of various L.V. switchgear panels
and control panels etc.. In all above three levels their work-in-progress is documented
through auto-control sheets.
The factory is well equipped with manual bending machines, hydraulic bending machines
for bus bar shaping, punching machines for drilling, shearing and bending machines, free
standing drilling machines for fabrication, besides miscellaneous equipments such as
drilling machines, saw cutters, heat gun for basic operations. this machinery and
equipments are carefully checked on monthly basis so as to ensure a consistency in the
performed operations (corrective and preventive actions are recorded).
As a part of the weekly schedule, production, material, co-ordination and design people
meets to discuss the progress of jobs and planning for new ones.
Our workshop is equipped with latest tools & machines, upgraded time to time inline with
growing technology.
16 of 51
Ref. 6302K
10.0 FACTORY INSPECTION AND TESTING
At the end of the manufacturing process, an LV Switch Gear assembly must undergo
various individual inspections and tests at the factory, following an established programme.
Tests must be carried out in a clearly defined area and in compliance with applicable
regulations, by qualified personnel. Testing area must be cordoned-off using warning chain
or rope and warning sign.
Inspectors must be qualified personnel, must have attended and passed a special training
course. They must be qualified for working in the proximity of live parts.
The necessary tools should be correctly and periodically calibrated and maintained in good
working condition. Some of the necessary tools are:
17 of 51
Ref. 6302K
10.0 FACTORY INSPECTION AND TESTING
Routine Tests intended to detect faults in materials and workmanship. Tests are carried out
on every new assembly after it has been assembled or on each transport unit. Hence
repetition of routine tests at the place of installation is not required.
Assemblies, which are assembled using standardized components outside the works of
the manufacturer and assemblies, by the exclusive use of parts and accessories specified
or supplied by the manufacturer for this purpose, shall be routine-tested by the firm which
is going to assemble
18 of 51
Ref. 6302K
11.0 QHSE INSPECTION / AFTER SALES
¾ The duties are carried out by proficient personnel, whose skills are regularly updated
by Schneider Electric’s quality and technical experts.
¾ It is made up of :
1) QHSE Manager
2) Quality Control Responsible.
3) Strictly selected quality conscious technicians from production.
4) Audit from Schneider Electric.
5) Audit from external parties (BV, Consultants, Clients, etc.)
¾ The quality inspection procedure ranges from correctness of the component ratings
up to compliance to the international, national standards & local regulations. Apart
from the above standard routine tests are carried out by quality personnel only. The
testing equipment provide for all low voltage testing needs. Functional tests are also
done.
¾ The test equipment are calibrated by certified laboratories while being thoroughly
checked internally, on regular intervals (Results logged and filed accordingly).
19 of 51
Ref. 6302K
12.0 INSTALLATION, TESTING AND COMMISSIONING
When contractually requested, the installation, testing and commissioning team carries-
out the tasks, under the strict supervision of their Engineers / Authorized personnel.
We also undertake optional tests viz. Low Resistance test, Primary injection test,
Secondary injection test, etc. If required contractually.
20 of 51
Ref. 6302K
13.0 TECHNICAL ASSISTANCE
It consists of :
21 of 51
Ref. 6302K
14.0 WARRANTY & SPARES PARTS CAPABILITY
Our goods are guaranteed with a warranty period of 18 months from the date of delivery
or 12 months from the date of commissioning, which ever comes earlier against any defect
in construction or operation arising from faulty design, materials or workmanship.
We stock 8000 different items with a safety level of 2 to 3 months for moving items. This
enables us to provide a speedy service to our customers.
The stock level of every item is maintained by an ERP Integrated Solution, controlled and
maintained by thoroughly trained staff.
22 of 51
Ref. 6302K
15.0 STANDARDS
The division adapts to the reliable technology of manufacturer and it’s standards to provide
the state of the art design to the requirements of the Local Authorities and End users.
All our panel conform to latest IEC and BSEN standards with ASEFA / ASTA / KEMA or
DEKRA certifications.
certifications
All panel designed and assembled at verger delporte are totally type tested as specified
below.
¾ MDB / MCC certified for 100kA for 1sec. / 85kA for 1sec / 50kA for 3sec and
50kA for 1sec.
¾ SMDB’s certified for 50kA / 42kA / 35kA / 25kA for 1sec.
¾ DB’S and FDB’S certified for 25kA for 0.2sec / 17kA for 0.5sec.
Four routine tests are carried out at the premises, which evidences the company’s ability
to produce international / national standards locally.
23 of 51
Ref. 6302K
16.0 FRANCHISED PANEL BUILDER CERTIFICATES
Verger Delporte UAE Ltd is a Franchised Panel builder of Schneider Electric since 1977.
Under this franchising agreement we design, manufacture, test and supply LV
switchboards, upto 6300A we hold the certificate for prisma TT and Blokset system.
1. Certified as Franchised panel builder for Blokset system till 31St March 2013.
2. Certified as Franchised panel builder for Blokset system till 31St March 2012.
3. Certified as Franchised panel builder for Prisma TT and Blokset system till
31St March 2011.
4. Certified as Franchised panel builder for Prisma TT and Blokset system till
31st March 2010.
5. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2009
24 of 51
Ref. 6302K
16.0 FRANCHISED PANEL BUILDER CERTIFICATES
6. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2008
7. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31 t M
31st March h 2007
8. Certified as Franchised panel builder for Prisma and Blokset systems till
31st March 2006
10. Certified as Franchised panel builder for Prisma system up to 4000A till
31st December 2004 1
11. Certified as Franchised panel builder for Prisma Switchboard systems till 2002
12. Certified as Franchised panel builder for Prisma, Master block & TDI Motor Control
C
Centre systems in the year 1
15th January 199
1997
13. Certified as Franchised panel builder for MASTER BLOCK types MB100,
MB200 and MB400 systems in the year 1993
14. Certified as Franchised panel builder for low voltage switch gear assembling in the
year 1991
15. Franchising contract was made in 1977 for low voltage switch gear assembling
25 of 51
Ref. 6302K
17.0 QHSE CERTIFICATES
We always believe that Quality Excellence is inseparable from Health, Safety and
environment and it is for this reason we decided to have an Integrated Management
System (IMS – ISO 9001, ISO 140001 and OHSAS 18001). By having IMS, we are
continually proving our deepest concern not only in satisfying our customer’s needs but
also to protect the health and safety of our personnel, customers, any interested parties,
materials/equipments as well as the environment where we work and live.
With the continued dedication and commitment towards QHSE since 1995, we had been
certified in May 2012 for ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.
26 of 51
Ref. 6302K
18.0 TYPE TEST CERTIFICATES
SL.
DESIGNATION CERTIFICATE No. CERTIFIED BY
No.
CAMGRO SYSTEM – 6000A
1 130a-11BT ASEFA
Main Distribution Board / MCC
C G O S3 SYSTEM
CAMGRO S S – 630
630A
11 2137902-104 DEKRA
SUB MAIN DISTRIBUTION BOARD
27 of 51
Ref. 6302K
18.0 TYPE TEST CERTIFICATES
28 of 51
Ref. 6302K
19.0 FINAL FACTORY INSPECTION CERTIFICATES
A staff of extremely experienced and competent technicians carry out these testing
activities. They are qualified for working in proximity with live parts. The necessary tools
and equipment are correctly and periodically calibrated by certifying authority.
29 of 51
Ref. 6302K
3140A
FINAL FACTORY INSPECTION REPORT
Inspection / Test carried out for Status Inspection / Test carried out for Status
1 Degree of protection of enclosure (11.2) 8 *Insulation test (before Dielectric Test)(11.9)
a Make, model, type & degree of protection a Between R-Y circuit
Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are
Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are
b Presence of gasket as per deg. of protection b Between Y-B circuit
2 Clearance and creepage distances (11.3) c Between B-R circuit
a Spacing of bus bars d Between R-N circuit
b Clearance & creepage distance e Between Y-N circuit
3 Protection against electric shock (11.4) f Between B-N circuit
a Protection of cables against sharp edges g Between R-E circuit
b Safety on normal operation & maintenance h Between Y-E circuit
c Presence of bus bar shrouds & its rigidity i Between B-E circuit
d Presence of door earthing j Between N-E circuit
switchboard drawings, factory inspection & testing procedure
e Partitions as per form of construction 9 Dielectric test (2.2 KV for 1 Second) (11.9)
f Effective continuity of the earthing circuit a Between R-Y circuit
Bolt & screws tightening of the protective b Between Y-B circuit
g
circuit connection c Between B-R circuit
4 Incorporation of built-in components (11.5) d Between R-N circuit
a Conformity of the devices installed e Between Y-N circuit
b Conformity of accessories of the devices f Between B-N circuit
c Conformity of the metering instruments g Between R-E circuit
d Identification label of each devices h Between Y-E circuit
e Type, rating & breaking capacities i Between B-E circuit
5 Internal elect. circuits & connections (11.6) j Between N-E circuit
a Accessibility of devices & terminations 10 *Insulation test (after Dielectric Test) (11.9)
b Type, size and rating of cables a Between R-Y circuit
c Control and power cables crimping b Between Y-B circuit
d Type, rating & colour coding of bus bars c Between B-R circuit
e Installation of cables (trunking, supports) d Between R-N circuit
f Devices mounting are proper & satisfactory e Between Y-N circuit
6 Terminals for external conductors (11.7) f Between B-N circuit
a External cable termination facilities g Between R-E circuit
b Cabling and glanding spaces h Between Y-E circuit
c Adequate no. of metallic cable supports i Between B-E circuit
d Marking/identification of external conn. terminal j Between N-E circuit
7 Mechanical operations (11.8) 11 Electrical operational/functional test(11.10)
a Operation of withdrawable drawers a Elec. & mech. operational test for all devices
b Doors, locks & mech. locking systems b Operational test for protection & metering
c Withdrawable drawers mech. Interlocks c Elec. & mech. controls & safety interlocks
d Transport section, lifting & lifting points d Electrical & mechanical indications
e Interchangeability of drawable units(safety pin) e Functional test as per drawings / procedure
* Minimum acceptable insulation resistance value 1000 ohms / volt
This is to confirm that the Final Factory inspection of the referred …………………………………………….
……………………………………………………………………………………………………….…………………
was carried out in accordance to the IEC 61439-1/2 standards, approved factory inspection & testing
procedure and drawings.
The results of the inspection & testing were found satisfactory and the panel was found to be in compliance
to the standards, approved drawings and project requirements.
2 Clearance and creepage distances as per IEC 61439-1 standard sub-clause 11.3
6 Terminals for external conductors as per IEC 61439-1 standard sub-clause 11.7
Note: For details of inspection and results, refer to "Final Factory Inspection Report"
Client Consultant Contractor Tested by
………………………….. …………………………….. …………………………….. …………………………..
………………………….. …………………………….. …………………………….. …………………………..
20.0 INSTALLATION, TESTING AND COMMISSIONING CERTIFICATES
Considering the importance of testing and commissioning of low voltage switchboards, all
testing equipments and certificates are upgraded regularly. The testing and commissioning
certificates are:
30 of 51
Ref. 6302K
3124D
INSTALLATION INSPECTION REPORT
2 Switchboard Installation
a Switchboard assembly - No scratches or deformation, Free from dust and foreign objects
b Switchboard re-assembly-mechanical connections between cubicles & order of cubicles
Reference Documents Used are
c Busbar connections tightened to the required torque level at transport section joints
d Verification of protective earth conductor connections on metal component
e General tightening of all the busbar connections and component terminations
f General verification of creepage and clearances after all busbar connections are made
g Installation & connection of all components (if any), which were supplied separately
h Re-verification of circuit breakers rating and setting as per drawings
i Fully drawout all the withdrawable units and re-instate to service position
j All temporary openings are plugged and all gaskets are provided to maintain IP rating
k Labels, busbar protective shrouds, front plates, doors and cover panels are provided
l Mechanical interlocks, key locks and keys for devices and switchboard are provided
3 Cable Installation
a Cable trenches size and location are as per requirement and installation is satisfactory
b Cable tray type, size & accessories are as per requirement and installation is satisfactory
c Cable tray earth connection and earth continuity of cable trays
d Arrangement of cables in cable trays and trenches are satisfactory
e All cables are mechanically protected and tied to cable trays at regular intervals
f Power and ECC cable type and sizes are as per approved drawings and breaker ratings
g Control cables (where applicable) type, no. of cores, sizes & core identification as per approval
h Cable glanding, gland type and armoured cables earthing using earth tags
i Single core cables (if any) are glanded on non-magnetic gland plates
j Cable tags, tag description, circuit marking and coding of cables as per drawings
k Verify minimum bending radius of cables & securing cables inside switchboard
l Cable termination - Lug compatibility, material, contact area, crimping & connection hardware
m No excessive mechanical forces exerted on device connections
This is to confirm that the on-site installation inspection of the referred ………………………………
……………………………………………………………………………………………………….……..
was carried out in accordance to the IEC 61439-1 standard, IEEE (Latest edition), local regulations,
approved installation procedure and drawings.
The results of the inspection were found satisfactory and the installation of panel was in compliance to
the standards, approved drawings and project requirements. The panel is approved for testing and
commissioning.
h Verification of additional holes in gland plates (This will reduce the IP rating)
i Control cables are crimped and terminated properly.
j The AC and DC supplies are distinguished by different colour code
k Compatibility between the cable cross section or lugs and the device tunnel or terminal
l Both internal and external Power & Control cables are identified as per the requirement
3 Conformity of Devices and Installation
a The installed switching devices are verified with As-built drawings
b The device accessories are verified as per the as-built drawings
c The devices are mounted as per the manufacturer's recommendation
d Ensure the smooth operation of all the devices.
e Switchboard is installed as per the Manufacturer's recommendation
f The front and rear clearances are maintained as per requirement
4 Precautions before testing
a All relevant safety messages, signs and warning labels are provided
b The panel is free from dust
c The panel is free from foreign objects like cables, wire off-cuts, hardware, tools etc.
d Ensure the insulation level of the panels
5 Protection of Persons
a The connections of protective conductors and connections between the cubicles
b Presence of earth braid in all movable parts of the enclosures
c Ensure the electrical continuity between the cubicles and doors.
d Partitions are as per form of constructions and rigidity of the bus bar shrouds
6 Energizing the switchboard
a Phase sequence of the main power supply
b Outgoing circuits are energized one by one and the operating sequence is verified
c Verification of electrical - mechanical interlocks, indication and measuring instruments etc.
Client Consultant Contractor Tested by
..…………………………. ..…………………………. ..…………………………. ...………………………….
..…………………………. ..…………………………. ..…………………………. ...………………………….
3145A
TESTING AND COMMISSIONING CERTIFICATE
This is to confirm that the on-site installation inspection of the referred ………………………………………….
……………………………………………………………………………………………………….…………………….
was carried out in accordance to the IEC 61439-1 standard, approved testing & commissioning
procedure and drawings.
The results of the tests were found satisfactory. Hence the switchboard was commissioned and put into service.
The functionality of the switchboard was found satisfactory as per project requirements.
6 Commissioning carried out and the switchboard was put into service.
Energy
Industry
Residential
Infrastructure
31 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
1 BURJUMAN CENTRE (L.L.C) DAR AL HANDSAH SHAIR AND PARTNERS THE NATIONAL CO. (KHARAFI NATIONAL) MDB,SMDB, MCC, DB, CAP.PANEL&METER CABINET
4 AL GHURAIR CENTRE NGC INTERNATIONAL AL GHURAIR CENTRE EXPANSION MDB,SMDB, MCC& FINAL DB
5 JUMEIRAH BEACH RESIDENCE DAR JUMEIRAH BEACH RESIDENCE MDBS,MCCS,SMDBS,DBS & CAP. PANELS
6 TABREED ELLERBE BECKET DISTRICT COOLING PLANT T2 & T3A MOTOR CONTROL CENTRE
7 TABREED ELLERBE BECKET DISTRICT COOLING PLANT T4 & 3B MOTOR CONTROL CENTRE
8 DUBAI CIVIL AVIATION KENNEDY & DONKIN DUBAI AIRPORT EXPANSION TD-196 MDB,MCC,SMDB & DB
10 DUBAI CIVIL AVIATION DAR AL-HANDASAH CENTRAL UTILITY COMPLEXES - 4 MDBS,MCCS,SMDBS & DB
11 DUBAI NATIONAL INVESTMENTS NORR GROUP CONSULTANTS METROPOLITAN BEACH - RESORT TOWERS MDB,MCC,SMDB,CAP.PANEL & DB
12 GULF IMPORT & EXPORT Co. GULF IMPORT & EXPORT Co. NFM - AGOM MCC PANELS
13 AL ROSTAMANI GROUP W.S. ATKINS 21st CENTURY TOWER, DUBAI LV PANEL,SMDB,DB & MCC
14 DUBAI INTERNET CITY SPP MEDIA CITY PHASE-III, DUBAI LV PANEL,SMDB,DB & MCC
15
5 JUMEIRAH BEACH
JU C RESIDENCE
S C HYDER CO
CONSULTING
SU G JJBR1- PODIUM
O U MDB,SMDBS,DBS,MCCS
,S S, S, CCS & CAP.BANK
C
16 P.W.D BELGIAN ARAB CONSULTANTS GENERAL HOSPITAL AL RAHBA MDB,SYN.PANEL,SMDB,CAP.PANEL & FINAL DB
18 DUBAI INTERNET CITY ARENCO DUBAI INTERNET PHASE III MDB,MCC,SMDB,DB & CAP.PANEL
32 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
19 DUBAI MEDIA CITY SCHUSTER, PECHTOLD AND PARTNERS DUBAI MEDIA CITY PHASE III MDB,MCC,SMDB,DB CAP. PANEL
25 MAJID AL FUTTAIM INVESTMENTS HALFORD ASSOCIATES SOUK AL NAKHEEL - SNOW DOME MDB,MCC,SMDB,CAP.PANEL & DB
26 ADCO ECG ENGINEERING BAB INFRASTRUCTURE & BAB 13 LV PANEL,SMDB,DB & MCC
27 EMMAR NORR GROUP EMMAR HEAD QUARTERS, DUBAI LV PANEL,SMDB,DB & MCC
28 AL GHURAIR GROUP LLC AL GURG CONSULTANTS DUBAI POLYFILM CO. EXPANSION MDBS,MCCS,SMDBS & DB
29 EMARAT ARENCO G+4 OFFICE COMPLEX PLOT. NO-155/DUBAI MDB,SMDB & FINAL DB
30 DUBAI INTERNET CITY AL TURATH ENGG. FALCON CABLE LANDING STATION P-109 LV PANEL,SMDBS,CAP.BANK,DBS & ISOLATOR PANEL
31 JEBEL ALI CONTAINAR GLASS FACTORY STONE & WEBSTER JEBEL ALI CONTAINAR GLASS FACTORY MAIN DISTRIBUTION BOARD
36 H.E.KHALIFA BIN AHMED AL OTAIBA SYR CONSULT FOUR POINT HOTEL BY SHERATON AT SHARJAH MDB,MCC,SMDB & FINAL DB
33 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
40 ADGAS IAN BANHAM & ASSOCIATES PROJECT-8003/DAS ISLAND MDB,MCC,SMDB & FINAL DB
42 ABUDHABI NATIONAL OIL CO. KHATIB & ALAMI NEW LPG FILLING PLANT-MUSSAFAH ANNOLAC,MDB,MCC & ATS
45 FIRST GULF BANK AL SALAAM FIRST GULF BANK HEAD QUARTERS MDB,SMDBS,DBS & MCCS
47 CIVIL AVIATION DUBAI INT'L BECHTEL INC. TD51 DUTY FREE WARE HOUSE MAIN DISTRIBUTION BOARD
48 BURJUMAN CENTRE L.L.C DAR-AL-HANDASAH BURJUMAN CENTER EXPANSION DUBAI SMDBS, DBS,MCP & METER CABINET
49 P.W.D W. S. ATKINS & PARTNERS OVERSEAS GUARD ADMINISTRATION BUILDING AL AIN MDB,ATS PANEL,SMDB,FINAL DB & CAP. PANELS
51 DUBAI MUNICIPALITY ITAL CONSULT CUSTOMS HEAD QUARTERS & DOC MDB,SMDB & FINAL DB
52 WOMEN'S ASSOCIATES IAN BANHAM ASSOCIATES WOMEN'S ASSOSIATION BUILDING MDB,SMDB & FINAL DB
53 DUBAI INTERNET CITY (TECOM) AL TURATH MAIN TELEPORT AT JABEL ALI, DUBAI LV PANEL, SMDB, DB, & MCC
34 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
55 MAJID AL FUTTAIM RENAULT & PARTNERS AJMAN RETAIL DEV. - CONTINENT FIT OUT MDB,SMDB,DB & SYN. PANEL
57 SHEIKH SULTAN SURROR AL DHAHERI AL SUWEIDI ENGG CONSULTANTS SHEIKH BUILDING MDB,SMDBS,DBS & MCCS
58 EAST COST CO. INTERNAL ENGG. CENTER 50 VILLAS PROJECTS AT RAS AL KHAIMA MDB,SMDB & FINAL DB
59 DUBAI INTERNET CITY AL TURATH ENGG. CONSULTANT POP-JUMAIRAH ISLAND MDB,SMDB,CAP.PANEL & DB
60 DUBAI INTERNET CITY AL TURATH ENGG. CONSULTANT MAIN TELEPORT STATION AT JABEL ALI, DUBAI MDB,SMDB,CAP.PANEL & DB
61 ABU DHABI MUNICIPALITY FEDERIC R. HARRIS INC. MINA ZAYED FREE ZONE STREET LIGHTING CONT.PANEL
62 H H SHEIKH MANSOOR
H.H INTEGRATED DESIGN BUREAU COMMERCIAL BUILDING MDB SMDBS & DB
MDB,SMDBS
63 RULERS REPRESENTATIVE IN EASTERN REGION KEO INTERNATIONAL CONSULTANTS DIWAN BUILDING MDB,SMDBS,CAP.PANEL & DB
65 ZADCO SUIDAN & ASSOCIATES ZIRKU FACILITIES NEW CONT. CAMP MDB,SMDB & FINAL DB
66 EMIRATES OF ABU DHABI WORK DEPT. TECHNICAL STUDIES BUREAU AL RAHA BEACH RESORT, ABU DHABI SMDB,DB & CONTROL PANELS
68 P.W.D BELGIAN ARAB CONSULTANT BUREAU SGENERAL HOSPITAL AL RAHBA MDB & AC PANELS
69 ARCOI QATAR INC. PARSONS TECHNIP ARCO AL RAYYAN OIL DEVELOPMENT, QATAR MDB,SMDB & FINAL DB
71 INTERNATIONAL CAPITAL TRADING BIONA CONSULTING ENGG DEVELOPMENT OF FLATS C1 - C6 MOTOR CONTROL CENTRE
72 P.W.D. AL AIN T.K.B. CONSULTANT COMB. SCHOOL - AL HAYER MDB,SMDB & FINAL DB
35 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
75 W.E.D D. BALFOUR & SONS MARFA HILL TOP PUMPING STATION MOTOR CONTROL CENTRE
78 RAS AL KHAIMAH CEMENT Co. LAFARGE 3100 TPD CEMENT PLANT CONTROL PANELS
79 W.E.D. ABU DHABI TEBODIN CONSULTANT PUMPING FAC. FOR SEA PALACE MOTOR CONTROL CENTRE
80 SEREX INTL CONSULTANT SEREX INTL CONSULTANT WARE HOUSE FOR ADIA AT MUSSAFAH ATS CAP PANEL SMDB LVP DB & MCCB
ATS,CAP.PANEL,SMDB,LVP,DB
81 M.P.W. & H. - DUBAI EHA CONSULTING CENTER. HIGHER SECONDARY SCHOOLS MDB,SMDB & FINAL DB
82 AMANA STEEL MOT MAC DONALD TUFTED CARPET FACTORY AT MUSSAFAH LV,CAP.PANEL,SMDP & DB
83 KASSIM ISMAIL AHMED MOHAMMED SPACE CONSULT G+10 COMM. PLOT - 416 MDB,SMDB & DB
84 PWD E. KRAUT CONSULTANT GERMANY 10MG WATER RESERVOIR & PUMPING STATION CONTROL PANEL,CAP.PANEL & DB
85 ABU DHABI WATER & ELECTRICITY AUTHORITY ESB INTERNATIONAL NEW 132/11KV SUBSTATION AC MDB,SDB & LDB
87 AL KHASANA INSURANCE AGG AL KHASNA INSURANCE BLDG, ABU DHABI MDB,MCC,SMDB & FINAL DB
88 AL GAITH HOLDING NATIONAL ENGINEERING BUREAU DALMA & YASSAT TOWER, DUBAI MDB,SMDB & DB
BURJ DUBAI OLD TOWN RESIDENTIAL ACB, MSB, SMDB, CAP.BANK PANEL, METER CABINET, DB &
89 EMAAR HYDER CONSULTING
AT PHASE-3 CONTROL PANELS
90 JUMEIRAH BEACH RESIDENCE IAN BANHAM JUMEIRAH BEACH RESIDENCE -6 MDB, SMDB, MCC, CAP.BANK PANEL & DB
36 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
91 DUBAI FESTIVAL CITY HYDER CONSULTING DUBAI FESTIVAL CITY MDB, SMDB, MCC, CAP.BANK PANEL & DB
92 ZAYED UNIVERSITY SHANKLAND COX Ltd ZAYED UNIVERSITY MDB, SMDB, MCC, CAP.BANK PANEL & DB
93 EMAAR HYDER CONSULTING BURJ DUBAI PHASE -3 MDB, SMDB, MCC, CAP.BANK PANEL & DB
94 Mr. MOHAMMAED ABDALLAH AL GERGAWI IAN BANHAM AL SOUFOUTH MIXED USE DEVELOPMENT DUBAI MDB, SMDB, MCC, CAP.BANK PANEL & DB
95 EMAAR HYDER CONSULTING BURJ DUBAI PHASE -3 MDB, SMDB, MCC, CAP.BANK PANEL & DB
96 Mr. HUMAID AHAMED BIN DRAI CCD PARK PALACE MDB, SMDB, MCC, CAP.BANK PANEL & DB
97 EMAAR HYDER CONSULTING DUBAI MARINA-7W7X- DUBAI MDB, SMDB, MCC, CAP.BANK PANEL & DB
102 ABU DHABI GAS INDUSTRIES SNAMPPROGETTI GASCO RUWAIS 3rd NGL TRAIN MCC
104 GULF PHARMACEUTICAL INDUSTRIES GULF PHARMACEUTICAL INDUSTRIES JULPHAR GULR PHARMACEUTICAL INDUSTRIES MDB
37 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
109 SAEED HUMAID MATAR AL TAYER IAM BANHAM AL TAYER TOWER – AL BARSHA MDB, SMDB, CAP.BANK PANEL & DB
110 ABDULLA HASSAN AL RUSTAMANI IAM BANHAM AL ROSTAMANI TOWERS MDB, SMDB, CAP.BANK PANEL & DB
111 DEPARTMENT OF CIVIL AVIATION ADPI / DAR AL HANDSAH JXB1/DB/220 CARGO TERMINAL BUILDING MDB, SMDB, MCC, CAP.BANK PANEL & DB
112 DUBAI SPORTS CITY SINCLARIKNIGHT MERS (SKM) CRICKET STADIUM-S3 MDB, SMDB, CAP.BANK PANEL & DB
113 KLEINDIENST & PARTNERS HALCROW EUROPEAN BUSINESS CENTRE MDB, SMDB, CAP.BANK PANEL, CHILLER PANELS & DB
114 KHARAFI NATIONAL CO KHARAFI NATIONAL CO LABOUR CAMP. DUBAI MDB, SMDB, SYNCHRONISING PANEL
117 ENGINEERS OFFICE ENGINEERS OFFICE EVENT ARENA @ AL MARMOOM, DUBAI MDB, SMDB, CAP.BANK PANEL & DB
118 JIWIN INVESTMENTS LACASA G+2 LABOUR ACCOMODATION MDB, SMDB, CAP.BANK PANEL & DB
120 ABU DHABI GAS INDUSTRIES SNAM PPROGETTI GASCO RUWAIS 3rd NGL TRAIN MCC
122 H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN IAN BANHAM & ASSOCIATES AL KAMAL TOWER MCC & CAP.BANK PANEL
H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN & COMPLEX OF 18 VILLAS FOR H.H. SHKA.
123 DEWAN MDB, SMDB, CAP.BANK PANEL & DB
LINK INVESTMENT MOZA BINT HAMDAN AL NAHYAN
MISCELLANEOUS BUILSDINGS AT
124 DEPARTMENT OF THE PRESIDENTS AFFAIRS ABU DHABI AL SALAAM MDB, SMDB, CAP.BANK PANEL & DB
ABU AL ARYAD ISLAND
HIGHER CORPORATION FOR SPECIALIZED ECONOMIC ABU DHABI BUSINESS HUB, PHASE-1 OFFICE
125 AL RAMAHI ENGG. MDB, SMDB & DB
ZONES INDUSTRIAL CITY OF AXD COMPLEX
126 ABU DHABI NATONAL HOTEL AL SALAAM SPECTRUM GLASS FACTORY-AXD MDB, SMDB, ATS, & CAP.BANK PANEL
38 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
128 H.H. SHEIKH TAHNOON BIN MOHAMED AL NAHYAN AL SALAAM AL AIN ROTANA HOTEL EXTENTION PHASE-1 MDB, SMDB, CAP.BANK PANEL & DB
129 MUBADALA DEVELOPMENT COX GROUP UAE UNIVERSITY NEW CAMPUS MDB, SMDB, MCC, CAP.BANK PANEL & DB
130 SHARJAH MUNCIPALITY HALLCROW DIBBA AL HISN SEWARAGE NETWORK PHASE-1 MDB, MCC & MCP
131 GOVT. OF DUBAI AIRPORT FREE ZONE AUTHORITY M. ENGINEERING. INC CENTRAL CHILLING PLANT MODIFICATION MDB, MCC, CAP.BANK PANEL & DB
132 TAMEER ADAN SAFFARINI PRINCESS TOWER (DXB) MDB, SMDB, CAP.BANK PANEL & DB
133 MAF SHOPPING MALLS WSP MIDDLE EAST MIRDIF CITY CENTRE MDB, SMDB, CAP.BANK PANEL & DB
138 OMAR AL MANA (QATAR) ARCHITECTURAL CONSULTING GROUP AL MANA VILLAS M.V. PANEL, SMDB, CONTROL PANEL & ATS PANEL
139 AL FUTTAIM REAL ESTATE N.E. AZZAM & PARTNERS INTERCON HOTEL STAFF MDB, SMDB, MCC, CAP.BANK PANEL & DB
140 DUBAI PROPERTIES KHATIB & ALAMI BAY SQUARE AT BUSINESS BAY MDB, SMDB & DB
141 NAKHEEL DYNAMIC ENGINEERING CONSULTANT 613 VILLAS @ JUMEIRA VILLAGE MDB,, SMDB,, METER CABINET,, CAP.BANK PANEL & DB
39 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
148 DEPARTMENT OF THE PRESIDENTS AFFAIRS DEWAN ARCHITECTS & ENGINEERINGS AL RAWDHA PALACE CAPACITOR BANK PANELS
151 PACIFIC CONTROLS ORBIT ENGINEERING CONSULTANTS CLOUD COMPUTING CENTER MDB,SMDB,MCC,CAP.PANEL & DB
155 SHETH ESTATE (INTERNATIONAL) Ltd. WS ATKINS & PARTNERS OVERSEAS IRIS BAY PLOT NO.BB.A.02.005 MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
157 Mr. ABDULAH HAMAD OBAID AL SHAMSI AL NAHDA ENG. CONSULTANT PROPOSED (G+4P+20) BLDG MDB,SMDB,CAP.PANEL & DB
160 INTERNATIONAL CAPITAL TRADING RAFIK EL - KHOURY & PARTNERS AL-RAHA BEACH HOTEL EXTENSION ABUDHABI UAE. MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
161 GIFFIN TRAFFIKS LLC FIRAS ENGINEERING CONSULTANT FACTORY MDB,SMDB,CAP.PANEL & DB
EMIRATES LAND GROUP POST BOX-26536, ABUDHABI SHINING TOWERS AL KHALDIA COMPLEX PLOT-
162 RAMBOLL MCC & CONTROL PANELS
UAE. C9,SECTOR-W9.
40 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
163 ADNOC RUWAIS HOUSING COMPLEX EXPANSION - PHASE III CAP. BANK PANELS
164 CROWN PAPER MILL LTD. CONSULTING ENGINEERING GROUP CROWN PAPER MILL FACTORY MDB's
171 DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI PRIVATE VILLA AT LA MISERE SEYCHELLES MDB,SMDB,MCC,CAP.PANEL & DB
172 DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI PRIVATE VILLA AT BARBARON SEYCHELLES MDB,SMDB,MCC,CAP.PANEL & DB
41 of 51
Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED
42 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
CLEVELAND CLINIC
43 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
44 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
45 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
46 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
47 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
BURJ VIEWS
48 of 51
Ref. 6302K
23.0 SOME MAJOR REFERENCES
49 of 51
Ref. 6302K
24.0 MAJOR CLIENTS
50 of 51
Ref. 6302K
24.0 MAJOR CLIENTS
51 of 51
Ref. 6302K