COMPANY PROFILE

SWITCHGEAR MANUFACTURING DIVISION

Energy

Industry

Residential

Infrastructure

Ref. 6302K
CONTENTS

1.0 About Switchgear Manufacturing

2.0 Organization Chart

3.0 Quality Plan

4.0 Products

5.0 Sales and Marketing

6.0 Contact Us

7.0 Design

8.0 Materials

9.0 Manufacturing / Assembling

10.0 Factory Inspection and Testing

11.0 QHSE Inspection / After Sales

12.0 Installation, Testing and Commissioning

13.0 Technical Assistance

14.0 Warranty and Spare Parts Capability

15.0 Standards

16 0
16.0 F
Franchised
hi d Panel
P l Builder
B ild Certificate
C tifi t

17.0 QHSE Certificate

18.0 Type Test Certificate

19.0 Final Factory Inspection Certificate

20 0
20.0 Installation Testing and Commissioning Certificate
Installation,

21.0 Areas of Concern

22.0 Major Projects Executed

23.0 Some Major References

24.0 j Clients
Major

2 of 51

Ref. 6302K
1.0 ABOUT SWITCHGEAR MANUFACTURING DIVISION

Verger Delporte UAE Ltd has been operating in UAE since 1977 and have developed
extensive experience in the field of Low Voltage Switchgear. Our facility is located in
sharjah where we manufacture wide range of Low Voltage Switchgear products under
franchising
g agreement
g with Schneider Electric. The p
products are listed in the PRODUCTS
section of the website.

We adhere to the highest standards of corporate governance by establishing processes


and practices that promote and ensure integrity, compliance and accountability.

Verger Delporte UAE Ltd is committed to environment, health and safety excellence. We
believe in good corporate environmental citizenship in the communities in which we
operate and in providing a healthy and safe work place. We committed to complying with
all environmental, health and safety laws and regulations.

We supplied low voltage switchgear all over UAE for several projects for applications as
diverse as Power Stations, Oil and Gas, Utilities, School, Hospitals, Private Industries,
Airports, Shopping Centres and Commercial Buildings.

We have a state-of-the-art low voltage switchgear manufacturing facility in SHARJAH


spread over 20,000 square feet. The facility is equipped with sophisticated machines for
computer aided design and manufacturing, assembling and testing.

Our high-tech design office is fully capable of meeting client’s requirement while strictly
adhere to BS, IEC standards and Local Regulations. We are constantly updating and
improving our products through advances both in terms of quality and design, in line with
latest product standards and with the technical support from our franchiser.
franchiser We extend our
after sales service to the customer through well trained service team.

3 of 51

Ref. 6302K
1.0 ABOUT SWITCHGEAR MANUFACTURING DIVISION

Verger Delporte U.A.E. Ltd an ISO 9001, ISO 14001 and OHSAS 18001 certified company
and a franchised panel builder of Schneider Electric, in the services of Low Voltage Switch
Gear panel building, testing & commissioning and after sales activities over three decades
has committed to make everyy p
possible endeavor to follow up
p the development
p witnessed
by the Industry and to contribute effectively in supporting this progress.

We always exert efforts to adhere to the latest technology with the aim of enhancing our
competitive ability and meeting the goals set by ourselves in terms of quality, functionality
and safety.

We fully understand and exceed our customers’ needs, wants and preferences and
provide greater value to our customers than our competition.

Our team work and culture build on the company’s reputation and image internally and
externally while driving initiatives to ensure Verger Delporte remains as employer of
choice. We implement best-in-class operating practices and leverage company wide
opportunities and best practices.

With the experience, standard reached by us and our efficient team, we offer outstanding
services of high quality. We have strategies concentrating on all issues and difficulties and
establish in a manner that contribute in enhancing and supporting permanent cooperation
with our Customers satisfying their increasing needs.

4 of 51

Ref. 6302K
2.0 ORGANIZATION CHART

M.RAMAKRISHNA
MANAGER
SWITCHGEAR MANUFACTURING
DIVISION

K. KRISHNARAJ
ASSISTANT MANAGER
ABU DHABI & AL AIN

ARZA MADHUMURTHY
ASSISTANT MANAGER
DUBAI & NORTHERN EMIRATES

SALES
ABU DHABI & PRODUCTION
AL AIN

SALES
DUBAI & AFTER SALES
N.EMIRATES

TESTING AND
DESIGN
COMMISSIONING

MATERIALS QUALITY

5 of 51

Ref. 6302K
2.0 ORGANIZATION CHART

Verger delporte had established its own name in the field of low voltage switchgear as a
reliable manufacturer and has been build up customer confidence for services and after
sales support.

Assembling low voltage switchgear of all kinds under the franchise of Schneider Electric,
Electric
the division profits by the integrated process of panel building, stretching from the Design
(Electrical Calculation and Configuration Lay out) up to the Manufacture, Delivery and
After-Sales Service of finished products.

With a concern to stick closer to client's demand, the company have its branches in Dubai
& Northern Emirates and Abu-Dhabi (Asst. manager outpost) apart from its Sharjah head
office.

This division’s activities are shared out among 7 Sections, which are the Marketing /
Sales, Design, Materials, Production, Quality Control, Testing & Commissioning and After-
Sales Service.

6 of 51

Ref. 6302K
3.0 QUALITY PLAN

Internal organization in business key-processes to meet Project’s Quality requirements.

1. Offer / Contract review:

Prior to the acknowledgment


g of order,, under the responsibility
p y of SGD
Manager / Asst. Manager
¾ To check that VD offers meet client’s contractual requirements in all respects
¾ To make sure the agreed technical solution / scope of works remain within our
capacity.

2. Project
j programming:
p g g

Under the direction of SGD Manager / Asst. Manager, to plan adequately the tasks
and their related human and material/equipment resources as to meet project /
contract requirements.
¾ Design, Material selection, with optimal time margin for customers’ approval.
¾ Material procurement
p and execution.
¾ Final inspection, testing and commissioning.

3. Design and Materials:

Under the responsibility of Design Engineer and in control of SGD Manager/Asst.


Manager.

¾ To carry out the electrical design in terms of power / control diagrams followed by
general arrangements (taking heed of the environmental constraints as well as
electromechanical interfaces with the use and power generation) on software,
home-developed for our specific activities.

¾ The thoroughly reviewed and approved “design output” depends on initial control
of the “design input” (Specifications, technical guides from franchiser,
International & local standards, tailor- made software).

7 of 51

Ref. 6302K
3.0 QUALITY PLAN

4. Material Control: (Refer to GP6 – Purchasing and Material Control Procedure)

a). Selection – Under the responsibility of competent personnel:


To pick up from clients suggestions or / and VD list of approved suppliers
(Quality, Health, Safety and Environmental performance rated by senior responsible
and QHSE Manager) the right materials, complying with the specifications and
applicable quality standards.

b). Purchasing:
To place the corresponding comprehensive order, thoroughly reviewed and
approved by SGD Manager.

c). Incoming Goods Inspection:


Under the responsibility of Logistics Manager / Store Keeper to check material
compliance with the specified requirements, from optimally defined scrutiny.

Remarks: The major materials are 100% controlled by the franchiser or / and
approved supplier, with available certificates of conformity to IEC or BS standards.
5. Production: (Refer to HSIM 6301 & WI 3200 – 3209)

Under the responsibility of Production Supervisor:


From the Production file, to manufacture the panels in accordance with customer
requirements (drawings),
(drawings) Switchgear Assembly and Installation Guide (from our
franchiser), while auto-controlling the operations on the corresponding format.

6. Inspection & Testing:

Carried out by Quality Inspector or / and Assistant:


Before client’s factory acceptance test of completed panels, Quality Inspector, duly
authorized by SGD Manager, performs the corresponding Quality Control of the
panels, logging his results, recording his eventual comments and approval for the
panels delivery on the corresponding formats.

8 of 51

Ref. 6302K
3.0 QUALITY PLAN

7. Maintenance, Servicing & After Sales:

Under the responsibility of SGD Manager / Asst. Manager


¾ To carry out the required site intervention, after technical expertise of Quality
Inspector or /and Assistant.
¾ To provide spare parts and components for one-year period, with ten years
guaranteed availability of stock by our franchiser (Whenever available).

8. Project’s Documents control: (Refer to GP1 – General Documents


Control)
Under the shared responsibility of different sections head:
¾ To record, file, update, withdraw, and supersede the job-related documents,
when necessary, as per their relevance and importance with regard to quality
requirements.
¾ To make information easy to retrieve, using electronic (diskettes, hard-disks) or
paper
p p support,
pp , where applicable.
pp

Related Process: MP3 – Switchgear Division Management Process

With its Integrated Management System Documentation (IMSD), the company benefits
also from well-thought management processes and functional procedures, making our
organization, if not flawless, at least quick-responding to any challenging quality issues.
The personnel, whose competence and skills are under permanent watch (GP5 – Training
Procedure), can cope confidently with potential or actual anomalies (GP2 – Non-
conformity Procedure), or general issue handling, with (GP3 – Corrective and Preventive
actions Procedure).

Furthermore the whole practices related to business key-processes, which affect the
delivered quality,
quality are regularly audited to ensure that optimally defined proceeding,
proceeding
conform to ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 requirements (GP4
– Internal QHSE Audit Procedure).

Customer oriented QHSE policy, the driving force behind the major decisions and actions
of senior management has led the company to monitor its quality performance against
tough targets of business excellence (GP8 – Indexes and Indicators Procedure).
Procedure)

9 of 51

Ref. 6302K
4.0 PRODUCTS

The division proposes a wide selection of low


voltage switchgear, either derived from our
principals standard list or from other reputed
manufacturers, then locally customized under
strict control and acceptance of Schneider
Electric’s Quality Department or house
developed in accordance with the applicable
electrical standards and regulations.

Drawout Construction ¾ Main Distribution Boards


¾ Motor control Centres
(Fixed / Drawout)
¾ Intelligent Motor control Centres
(Fixed / Drawout)
¾ Sub-Main Distribution Boards
¾ Final Distribution Boards
¾ Automatic Power Factor Correction
Capacitor Panels
¾ Source Changeover System
Fixed Construction
(Manual / Automatic)
¾ Generator Control,
Load Management and
Synchronizing Panels
¾ Energy Meter Cabinets
¾ Feeder Pillars
¾ Lighting Control Panels
¾ Starter Panels

6000A Switchboard

10 of 51

Ref. 6302K
5.0 SALES & MARKETING

This department is strategically built-up to cover the complete UAE market.

¾ Abu Dhabi based post to cover Abu Dhabi and Al Ain

¾ Sharjah based post to cover Dubai and Northern Emirates


A team of people with good educational background and sound experience makes up the
mandatory condition to furnish proficiently these duties with customer satisfaction as
motive. The customers / clients are efficiently guided to communicate his practical
expectations. confidence in our products is built-up from the initial stages of discussions,
and the sales engineers are associated with the customers right from the sourcing of
enquiry to after sales service.
service

The techno-commercial offer is prepared as per the explicit requirement of client /


consultant while meeting the local regulations. Customized solutions from our range of
products will be provided to the customer within the guidelines of the principals.

A team of qualified and well experienced people render their services in estimation by
handling Qualitative and Quantitative major tendering works well with in the given target
dates.

11 of 51

Ref. 6302K
6.0 CONTACT US

Head Office - Sharjah M. RAMAKRISHNA


P.O. BOX 5629 Sharjah,
United Arab Emirates
Tel : +971 6 543 2436
Fax : +971 6 543 4139
Mobile: +971 50 631 40 57
E-mail : ramakrishna@verger-delporte.ae
Web. : www.verger-delporte.ae

Abu Dhabi and Al Ain K. KRISHNARAJ


P.O. BOX 47010, Abu Dhabi,
United Arab Emirates
Tel : +971 2 672 73 17
Fax : +971 2 672 96 99
Mobile: +971 50 797 15 56
E-mail : krishnaraj@verger-delporte.ae
Web. : www.verger-delporte.ae

Dubai and Northern Emirates ARZA MADHUMURTHY


P.O.
P O BOX 5629 Sharjah,
Sharjah
United Arab Emirates
Tel : +971 6 5432 436
Fax : +971 6 5434 139
Mobile: +971 50 4620 874
E-mail : madhu@verger-delporte.ae
Web. : www.verger-delporte.ae

With more than 250 dedicated employees at your service …

12 of 51

Ref. 6302K
7.0 DESIGN

The in-house design office structured with an engineering team of Design Engineers and
assisted by designers is capable to design the client’s requirements strictly according to
local regulations, I.E.C and other International / National Standards. It is equipped with all
records of technical documents provided by our principals and by other suppliers,
catalogues, manuals, product qualification & conformity certificates and complete latest
international standards for ready reference. Verger delporte office expertise in offering
solutions to clients in the electrical power distribution, programmable logic controls and
energy management system.

Total design system is accommodated with local computer network system and also linked
with external offices to extend highest service. Engineering drawings are prepared with
the latest AUTO CAD and EPLAN software. They are standardized with self developed
libraries according to the local regulations, system requirements and principals regulations.

13 of 51

Ref. 6302K
7.0 DESIGN

The marketing / sales, design office, materials control and production sections are all
equipped with the state of the art available technology and networked at all levels to
facilitate communication which helps us in effective time management.

A team of well experienced engineers assist the division in the use of customized
programs developed by verger Delporte based on our principal M/s Schneider electric
technical guides & Technical know how, International standards, National standards and
local regulations, besides standard office automation and latest operating systems.

Our programs act as a useful tool and helps us optimize the technical solution offered to
customers. From environmental and electrical constraints they help to bring-out the very
best definition of the panels in record time. They include (non limitative features)
calculation and design of power and control circuits, selection of components outlay of
external and internal configuration.

Materials and production planning are also done through the computerized network which
resulted in a better material management and inventory of the stocks available.

This total computerization of our process has given us the added bonus of increased
efficiency and output.

14 of 51

Ref. 6302K
8.0 MATERIALS

We stock more than 8000 different items worth of 20 Million UAE Dirhams. The material
section comprises of a well competent Material Co-ordinator and his assistants. The
entire material section is fully computerized, and connected to the common network so
that the management monitoring of the material procurement, allocation, safety stock and
order processes is easily carried out from computer work station.

The materials are selected based on our standard Design Manual, our principal
recommendation and also Client requirements and by adopting the International, National
standards and Local regulations. The Bill of Material is prepared based on the job
requirement, subsequently the purchase order also prepared and under the approval of
Division manager.

In order to ensure quality of materials received we have a special team for checking the
incoming goods. As per the standard procedure, the Non-Conformance is raised to the
supplier if any materials are found as faulty. The major materials are 100% approved by
the franchisee or are from an approved supplier with available certificates of conformity to
International, National standards and Local regulations.

15 of 51

Ref. 6302K
9.0 MANUFACTURING / ASSEMBLING

The Production premises is made up of two shop floor areas of 2000 sq. meters (each of
1000 sq. meter area). Besides a storage capacity of 900 sq. meter area with 8000
different items worth of 20 million UAE Dirhams.

The production team comprises of production incharge a supervisor and a group of team
leaders under whom a batch of trained and well experienced technicians put their
combined efforts to bring out the best in quality products of various L.V. switchgear panels
and control panels etc.. In all above three levels their work-in-progress is documented
through auto-control sheets.

The factory is well equipped with manual bending machines, hydraulic bending machines
for bus bar shaping, punching machines for drilling, shearing and bending machines, free
standing drilling machines for fabrication, besides miscellaneous equipments such as
drilling machines, saw cutters, heat gun for basic operations. this machinery and
equipments are carefully checked on monthly basis so as to ensure a consistency in the
performed operations (corrective and preventive actions are recorded).

Critical assembly tasks are subject to a thorough checking of the hand-equipment.


Crimping, cutting, stripping tools as well as torque wrenches are internally verified with
logged results for traceability purposes and certification is done by certified laboratories in
addition to internal calibration.

As a part of the weekly schedule, production, material, co-ordination and design people
meets to discuss the progress of jobs and planning for new ones.

Our workshop is equipped with latest tools & machines, upgraded time to time inline with
growing technology.

16 of 51

Ref. 6302K
10.0 FACTORY INSPECTION AND TESTING

At the end of the manufacturing process, an LV Switch Gear assembly must undergo
various individual inspections and tests at the factory, following an established programme.

The switchboard must comply with:

¾ The appropriate Standards


¾ The design files (Drawings, diagrams and specific requirements).
¾ Manufacturer’s Installation guide
¾ In–house standards
¾ Local regulations

Tests must be carried out in a clearly defined area and in compliance with applicable
regulations, by qualified personnel. Testing area must be cordoned-off using warning chain
or rope and warning sign.

Inspectors must be qualified personnel, must have attended and passed a special training
course. They must be qualified for working in the proximity of live parts.

The necessary tools should be correctly and periodically calibrated and maintained in good
working condition. Some of the necessary tools are:

¾ Control console (equipped with different control voltage source facilities)


¾ High voltage Test Kit
¾ Insulation Resistance Tester
¾ Primary Current Injection Test Kit
¾ Thermal Imager
¾ Power Quality Analyzer
¾ ACB / MCCB test kit (Secondary)
¾ ELCB / ELR Test Kit
¾ Low Resistance Test Kit.
¾ Digital Multi meter
¾ Torque wrench
¾ 3φ Variac

17 of 51

Ref. 6302K
10.0 FACTORY INSPECTION AND TESTING

Routine Tests intended to detect faults in materials and workmanship. Tests are carried out
on every new assembly after it has been assembled or on each transport unit. Hence
repetition of routine tests at the place of installation is not required.

Assemblies, which are assembled using standardized components outside the works of
the manufacturer and assemblies, by the exclusive use of parts and accessories specified
or supplied by the manufacturer for this purpose, shall be routine-tested by the firm which
is going to assemble

18 of 51

Ref. 6302K
11.0 QHSE INSPECTION / AFTER SALES

¾ The duties are carried out by proficient personnel, whose skills are regularly updated
by Schneider Electric’s quality and technical experts.

¾ It is made up of :

1) QHSE Manager
2) Quality Control Responsible.
3) Strictly selected quality conscious technicians from production.
4) Audit from Schneider Electric.
5) Audit from external parties (BV, Consultants, Clients, etc.)

¾ The quality inspection procedure ranges from correctness of the component ratings
up to compliance to the international, national standards & local regulations. Apart
from the above standard routine tests are carried out by quality personnel only. The
testing equipment provide for all low voltage testing needs. Functional tests are also
done.

¾ The test equipment are calibrated by certified laboratories while being thoroughly
checked internally, on regular intervals (Results logged and filed accordingly).

19 of 51

Ref. 6302K
12.0 INSTALLATION, TESTING AND COMMISSIONING

When contractually requested, the installation, testing and commissioning team carries-
out the tasks, under the strict supervision of their Engineers / Authorized personnel.

Considering the importance of Testing and Commissioning we upgrade all testing


equipments as per latest technology, and are also calibrating them by certified laboratories
while being thoroughly checked internally on regular intervals (Results are logged for
future reference).

We also undertake optional tests viz. Low Resistance test, Primary injection test,
Secondary injection test, etc. If required contractually.

Infrared Thermography is an ideal technique for inspecting electrical equipment for


defective components or connections. We have a team of well trained and certified
engineers to conduct these tests.

20 of 51

Ref. 6302K
13.0 TECHNICAL ASSISTANCE

It consists of :

¾ External training from Schneider electric personnel in the organization to embrace a


general or specific view, as per the needs of the latest technology / products /
operational skills.
¾ Internal training in the form of seminars, workshops, hands-on courses on products,
software, shop floor practices, quality inspection.
¾ Expertise and technical support for outstanding job or product issues.
¾ On request from our clients we provide training on low voltage switchboards in both
classroom as well as on field.
field
¾ Our integral training course is for 3days and it covers, Sales, Design, Production,
Quality, and Ecodial software for load flow studies.

21 of 51

Ref. 6302K
14.0 WARRANTY & SPARES PARTS CAPABILITY

Our goods are guaranteed with a warranty period of 18 months from the date of delivery
or 12 months from the date of commissioning, which ever comes earlier against any defect
in construction or operation arising from faulty design, materials or workmanship.

We stock 8000 different items with a safety level of 2 to 3 months for moving items. This
enables us to provide a speedy service to our customers.

The stock level of every item is maintained by an ERP Integrated Solution, controlled and
maintained by thoroughly trained staff.

22 of 51

Ref. 6302K
15.0 STANDARDS

The division adapts to the reliable technology of manufacturer and it’s standards to provide
the state of the art design to the requirements of the Local Authorities and End users.

All our panel conform to latest IEC and BSEN standards with ASEFA / ASTA / KEMA or
DEKRA certifications.
certifications

All panel designed and assembled at verger delporte are totally type tested as specified
below.

¾ MDB / MCC certified for 100kA for 1sec. / 85kA for 1sec / 50kA for 3sec and
50kA for 1sec.
¾ SMDB’s certified for 50kA / 42kA / 35kA / 25kA for 1sec.
¾ DB’S and FDB’S certified for 25kA for 0.2sec / 17kA for 0.5sec.

Four routine tests are carried out at the premises, which evidences the company’s ability
to produce international / national standards locally.

Conformity to standards are as follows:

¾ Factory Built Assemblies – IEC 60439-1 / IEC 61439-1/2


¾ Resistance to Damp Heat – IEC 68-2-30
¾ Resistance to Salt Mist – IEC 68-2-11
¾ Internal Arc Confinement – AS 3439
¾ Earth Quakes – CBC (California Building Code)

23 of 51

Ref. 6302K
16.0 FRANCHISED PANEL BUILDER CERTIFICATES

Verger Delporte UAE Ltd is a Franchised Panel builder of Schneider Electric since 1977.
Under this franchising agreement we design, manufacture, test and supply LV
switchboards, upto 6300A we hold the certificate for prisma TT and Blokset system.

1. Certified as Franchised panel builder for Blokset system till 31St March 2013.

2. Certified as Franchised panel builder for Blokset system till 31St March 2012.

3. Certified as Franchised panel builder for Prisma TT and Blokset system till
31St March 2011.

4. Certified as Franchised panel builder for Prisma TT and Blokset system till
31st March 2010.

5. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2009

24 of 51

Ref. 6302K
16.0 FRANCHISED PANEL BUILDER CERTIFICATES

6. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31st March 2008

7. Certified as Franchised panel builder for Prisma plus and Blokset systems till
31 t M
31st March h 2007

8. Certified as Franchised panel builder for Prisma and Blokset systems till
31st March 2006

9. Certified as Franchised panel builder for Blokset system up to 6300A till


31st December 2004

10. Certified as Franchised panel builder for Prisma system up to 4000A till
31st December 2004 1

11. Certified as Franchised panel builder for Prisma Switchboard systems till 2002

12. Certified as Franchised panel builder for Prisma, Master block & TDI Motor Control
C
Centre systems in the year 1
15th January 199
1997

13. Certified as Franchised panel builder for MASTER BLOCK types MB100,
MB200 and MB400 systems in the year 1993

14. Certified as Franchised panel builder for low voltage switch gear assembling in the
year 1991

15. Franchising contract was made in 1977 for low voltage switch gear assembling

25 of 51

Ref. 6302K
17.0 QHSE CERTIFICATES

We always believe that Quality Excellence is inseparable from Health, Safety and
environment and it is for this reason we decided to have an Integrated Management
System (IMS – ISO 9001, ISO 140001 and OHSAS 18001). By having IMS, we are
continually proving our deepest concern not only in satisfying our customer’s needs but
also to protect the health and safety of our personnel, customers, any interested parties,
materials/equipments as well as the environment where we work and live.

With the continued dedication and commitment towards QHSE since 1995, we had been
certified in May 2012 for ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007.

1. ISO 9001:2008 for Quality


2. ISO 14001:2004 for Environment
3. OHSAS 18001:2007 for Health and Safety

26 of 51

Ref. 6302K
18.0 TYPE TEST CERTIFICATES

SL.
DESIGNATION CERTIFICATE No. CERTIFIED BY
No.
CAMGRO SYSTEM – 6000A
1 130a-11BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 4000A


2 129c-11BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 3200A


3 062-12BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 2500A


4 004a-11BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 1600A


5 003a-11BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 1000A


6 002a-11BT ASEFA
Main Distribution Board / MCC

CAMGRO SYSTEM - 630A


7 2147939.101 DEKRA
MDB / SMDB / MCC

CAMGRO SYSTEM - 250A


8 2147939.100 DEKRA
MDB / SMDB / MCC

Certificate of Internal Arcing


9 018a-08BT ASEFA
Type: BLOKSET type 132

CAMGRO S4 SYSTEM – 800A


10 2137902-105 DEKRA
SUB MAIN DISTRIBUTION BOARD

C G O S3 SYSTEM
CAMGRO S S – 630
630A
11 2137902-104 DEKRA
SUB MAIN DISTRIBUTION BOARD

CAMGRO S2 SYSTEM – 400A


12 2137902-103 DEKRA
SUB MAIN DISTRIBUTION BOARD

*copies available on request

27 of 51

Ref. 6302K
18.0 TYPE TEST CERTIFICATES

SL.No. DESIGNATION CERTIFICATE No. CERTIFIED BY

CAMGRO S1 SYSTEM – 250A


13 2137902-102 DEKRA
SUB MAIN DISTRIBUTION BOARD

CAMGRO F4 SYSTEM -250A


14 2145021.101 DEKRA
Final Distribution Board O/G-25kA

CAMGRO F3 SYSTEM -250A


15 2145021.100 DEKRA
Final Distribution Board O/G-15kA

CAMGRO F2 SYSTEM -250A 250A


16 2137902 101
2137902.101 DEKRA
Final Distribution Board O/G-10kA

CAMGRO F1 SYSTEM -125A


17 2137902.100 DEKRA
Split Type Final Distribution Board

4000A Main Distribution Board


18 18101 ASTA
Type:
yp Euroform Switchboard

2500A Main Distribution Board


19 18103 ASTA
Type: Euroform Switchboard

1600A Main Distribution Board


20 18105 ASTA
Type: Euroform Switchboard

1000A Main Distribution Board


21 18107 ASTA
Type: Euroform Switchboard

630A Main Distribution Board


22 2148038.100 DEKRA
Type: Euroform Switchboard

250A Main Distribution Board


23 2148038 101
2148038.101 DEKRA
Type: Euroform Switchboard

Certificate of Internal Arcing


24 17482 ASTA
Type: Euro form Switchboard

*copies available on request

28 of 51

Ref. 6302K
19.0 FINAL FACTORY INSPECTION CERTIFICATES

At the end of the manufacturing process, an LV Switchgear must undergo various


individual inspections and tests as per IEC 61439-1/2

A staff of extremely experienced and competent technicians carry out these testing
activities. They are qualified for working in proximity with live parts. The necessary tools
and equipment are correctly and periodically calibrated by certifying authority.

1. Final Factory Inspection Report - 3140


2. Final Factory Inspection Certificate - 3141

29 of 51

Ref. 6302K
3140A
FINAL FACTORY INSPECTION REPORT

Client : ………………………………………………………………… Date : ………………………………………


Consultant : ………………………………………………………….. Job No. : ……………………………........
Project : ………………………………………………………………. Drawing No. : ………………………........
Panel Title : ………………………………………………………….. Panel Sl.No. : ……………………..………

Inspection / Test carried out for Status Inspection / Test carried out for Status
1 Degree of protection of enclosure (11.2) 8 *Insulation test (before Dielectric Test)(11.9)
a Make, model, type & degree of protection a Between R-Y circuit
Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are

Routine tests are carried out in accordance with IEC 61439-1/2 standards sub-clause: 11. Reference documents used are
b Presence of gasket as per deg. of protection b Between Y-B circuit
2 Clearance and creepage distances (11.3) c Between B-R circuit
a Spacing of bus bars d Between R-N circuit
b Clearance & creepage distance e Between Y-N circuit
3 Protection against electric shock (11.4) f Between B-N circuit
a Protection of cables against sharp edges g Between R-E circuit
b Safety on normal operation & maintenance h Between Y-E circuit
c Presence of bus bar shrouds & its rigidity i Between B-E circuit
d Presence of door earthing j Between N-E circuit
switchboard drawings, factory inspection & testing procedure

switchboard drawings, factory inspection & testing procedure

e Partitions as per form of construction 9 Dielectric test (2.2 KV for 1 Second) (11.9)
f Effective continuity of the earthing circuit a Between R-Y circuit
Bolt & screws tightening of the protective b Between Y-B circuit
g
circuit connection c Between B-R circuit
4 Incorporation of built-in components (11.5) d Between R-N circuit
a Conformity of the devices installed e Between Y-N circuit
b Conformity of accessories of the devices f Between B-N circuit
c Conformity of the metering instruments g Between R-E circuit
d Identification label of each devices h Between Y-E circuit
e Type, rating & breaking capacities i Between B-E circuit
5 Internal elect. circuits & connections (11.6) j Between N-E circuit
a Accessibility of devices & terminations 10 *Insulation test (after Dielectric Test) (11.9)
b Type, size and rating of cables a Between R-Y circuit
c Control and power cables crimping b Between Y-B circuit
d Type, rating & colour coding of bus bars c Between B-R circuit
e Installation of cables (trunking, supports) d Between R-N circuit
f Devices mounting are proper & satisfactory e Between Y-N circuit
6 Terminals for external conductors (11.7) f Between B-N circuit
a External cable termination facilities g Between R-E circuit
b Cabling and glanding spaces h Between Y-E circuit
c Adequate no. of metallic cable supports i Between B-E circuit
d Marking/identification of external conn. terminal j Between N-E circuit
7 Mechanical operations (11.8) 11 Electrical operational/functional test(11.10)
a Operation of withdrawable drawers a Elec. & mech. operational test for all devices
b Doors, locks & mech. locking systems b Operational test for protection & metering
c Withdrawable drawers mech. Interlocks c Elec. & mech. controls & safety interlocks
d Transport section, lifting & lifting points d Electrical & mechanical indications
e Interchangeability of drawable units(safety pin) e Functional test as per drawings / procedure
* Minimum acceptable insulation resistance value 1000 ohms / volt

Client Consultant Contractor Tested by


..…………………………. ..…………………………. ..…………………………. ...………………………….
..…………………………. ..…………………………. ..…………………………. ...………………………….
3141A
FINAL FACTORY INSPECTION CERTIFICATE

Client : …………………………………………………………………... Date :…………………………………...


Consultant : …………………………………………………………..... Job No. :……………………………....
Project : ……………………………………………………………….... Drawing No. : ………………………....
Panel Title : …………………………………………………………..... Panel Sl.No. : ……………………..…..

This is to confirm that the Final Factory inspection of the referred …………………………………………….
……………………………………………………………………………………………………….…………………
was carried out in accordance to the IEC 61439-1/2 standards, approved factory inspection & testing
procedure and drawings.

The results of the inspection & testing were found satisfactory and the panel was found to be in compliance
to the standards, approved drawings and project requirements.

Inspection and Testing Programme

Routine tests as per IEC 61439-1/2 standards Verified

1 Degree of protection of enclosures as per IEC 61439-1 standard sub-clause 11.2

2 Clearance and creepage distances as per IEC 61439-1 standard sub-clause 11.3

3 Protection against electric shock and integrity of protective circuits as per


IEC 61439-1 standard sub-clause 11.4

4 Incorporation of built-in components as per IEC 61439-1 standard sub-clause 11.5

5 Internal electrical circuits and connections as per IEC 61439-1 standard


sub-clause 11.6

6 Terminals for external conductors as per IEC 61439-1 standard sub-clause 11.7

7 Mechanical operation as per IEC 61439-1/2 standards sub-clause 11.8

8 Dielectric properties as per IEC 61439-1 standard sub-clause 11.9

9 Wiring, operational performance and function as per IEC 61439-1 standard


sub-clause 11.10

Note: For details of inspection and results, refer to "Final Factory Inspection Report"
Client Consultant Contractor Tested by
………………………….. …………………………….. …………………………….. …………………………..
………………………….. …………………………….. …………………………….. …………………………..
20.0 INSTALLATION, TESTING AND COMMISSIONING CERTIFICATES

Considering the importance of testing and commissioning of low voltage switchboards, all
testing equipments and certificates are upgraded regularly. The testing and commissioning
certificates are:

1. Installation Inspection Report - 3124


2. Installation Inspection Certificate - 3125
3. Commissioning Report - 3144
4. Testing and Commissioning Certificate - 3145

30 of 51

Ref. 6302K
3124D
INSTALLATION INSPECTION REPORT

Client : ………………………………………………………………… Date : ...…………………………………….


Consultant : ………………………………………………………….. Job No. : ….………………………………
Project : ………………………………………………………………. Drawing No. : ……………………………

Panel Title :…………………………………………………………… Panel Sl.No. : ………………………………
Inspection carried out for Verified Comments
1 Switchboard layout
a Switchboard location is as per the approved drawings, requirements & local regulations 
b Minimum clearances around the panel is maintained as per local regulations 
c Operational & maintenance access to the switchboard are as per requirement 
d Door opening space & withdrawable unit access area are as per requirements 
e Clearance above and below panel are sufficient to permit smooth cable / bus raiser entry 
f Switchboard is located in clean, dry, safe and easily accessible place 
g Switchboard is fixed to floor / wall as per manufacturer's recommendation 
h Adequate & approved supports are provided for securing the switchboard to floor / wall 
i Switchboard location is away from the proximity of water, drainage and gas pipe 
j Switchboard location is free from hazardous item, material or equipment 
k Emergency lighting with sufficient illumination level is available 
l Fire alarm detectors are present for fire detections in close proximity 
Switch Board Drawings & Installation Procedure

2 Switchboard Installation
a Switchboard assembly - No scratches or deformation, Free from dust and foreign objects 
b Switchboard re-assembly-mechanical connections between cubicles & order of cubicles 
Reference Documents Used are

c Busbar connections tightened to the required torque level at transport section joints 
d Verification of protective earth conductor connections on metal component 
e General tightening of all the busbar connections and component terminations 
f General verification of creepage and clearances after all busbar connections are made 
g Installation & connection of all components (if any), which were supplied separately 
h Re-verification of circuit breakers rating and setting as per drawings 
i Fully drawout all the withdrawable units and re-instate to service position 
j All temporary openings are plugged and all gaskets are provided to maintain IP rating 
k Labels, busbar protective shrouds, front plates, doors and cover panels are provided 
l Mechanical interlocks, key locks and keys for devices and switchboard are provided 
3 Cable Installation
a Cable trenches size and location are as per requirement and installation is satisfactory 
b Cable tray type, size & accessories are as per requirement and installation is satisfactory 
c Cable tray earth connection and earth continuity of cable trays 
d Arrangement of cables in cable trays and trenches are satisfactory 
e All cables are mechanically protected and tied to cable trays at regular intervals 
f Power and ECC cable type and sizes are as per approved drawings and breaker ratings 
g Control cables (where applicable) type, no. of cores, sizes & core identification as per approval 
h Cable glanding, gland type and armoured cables earthing using earth tags 
i Single core cables (if any) are glanded on non-magnetic gland plates 
j Cable tags, tag description, circuit marking and coding of cables as per drawings 
k Verify minimum bending radius of cables & securing cables inside switchboard 
l Cable termination - Lug compatibility, material, contact area, crimping & connection hardware 
m No excessive mechanical forces exerted on device connections 

Client Consultant Contractor Tested by


..…………………………. ..…………………………. ..…………………………. ...………………………….
..…………………………. ..…………………………. ..…………………………. ...………………………….
3125A
INSTALLATION INSPECTION CERTIFICATE

Client :…………………………………………………………………… Date : …………………………………..


Consultant : ……………………………………………………………. Job No. : ………………………………
Project : .………………………………………………………………… Drawing No. : …………………………
Panel Title : …………………………………………………………….. Panel Sl.No. :………………………….

This is to confirm that the on-site installation inspection of the referred ………………………………
……………………………………………………………………………………………………….……..
was carried out in accordance to the IEC 61439-1 standard, IEEE (Latest edition), local regulations,
approved installation procedure and drawings.

The results of the inspection were found satisfactory and the installation of panel was in compliance to
the standards, approved drawings and project requirements. The panel is approved for testing and
commissioning.

Inspection and Testing Programme

Checks carried out as per approved inspection procedure Verified

1 General inspection of the switchboard after re-assembly at site including


inspection of busbar connections

2 Checking of protective measures of the electrical continuity of the protective


circuits including earthing and earth bonding.

3 Verification of breaker ratings and final adjusted setting.

4 Verification of cable sizes, terminations and tags of cables.

5 Verification of presence of protective shrouds.

Note: For details of inspection, refer to "Installation Inspection Report"


Client Consultant Contractor Tested by
………………………….. …………………………….. …………………………….. …………………………..
………………………….. …………………………….. …………………………….. …………………………..
3144A
COMMISSIONING REPORT

Client :…………………………………………………………………. Date :.. ...…………………………………...


Consultant :…………………………………………………………... Job No. :…
….……………………………....
Project :……………………………………………………………….. Drawing No. :……………………………
….
Panel Title : …………………………………………………………... Panel Sl.No. :……………………………….
Inspection carried out for Verified Comments
1 Documents and Tools verification
a As-built drawings are provided with in the panel and verified 
b Availability of different approved test procedures for testing. 
c Spare parts are provided as per the list 
d Factory final inspection reports are verified 
Reference Documents Used are As-built drawings, spare parts list, Factory Final Inspection test reports,

e The necessary testing equipments are checked for calibration 


2 Conformity of Electrical and Mechanical Connections
a Switchboard is fixed to floor / wall as per manufacturer's recommendation 
b Adequate & approved supports are provided for securing the switchboard to floor / wall 
c Cubicles are coupled with Gasket and recommended fish-plates 
d All the bus bar connections are tightened with appropriate torque pressure 
e Outgoing and incoming cables are glanded/terminated properly 
f Adequate supports are provided for incoming and outgoing cables 
g Verification of electrical clearance between bus bars and creepage distance of the supports 
Installation Instruction and Test Procedures.

h Verification of additional holes in gland plates (This will reduce the IP rating) 
i Control cables are crimped and terminated properly. 
j The AC and DC supplies are distinguished by different colour code 
k Compatibility between the cable cross section or lugs and the device tunnel or terminal 
l Both internal and external Power & Control cables are identified as per the requirement 
3 Conformity of Devices and Installation
a The installed switching devices are verified with As-built drawings 
b The device accessories are verified as per the as-built drawings 
c The devices are mounted as per the manufacturer's recommendation 
d Ensure the smooth operation of all the devices. 
e Switchboard is installed as per the Manufacturer's recommendation 
f The front and rear clearances are maintained as per requirement 
4 Precautions before testing
a All relevant safety messages, signs and warning labels are provided 
b The panel is free from dust 
c The panel is free from foreign objects like cables, wire off-cuts, hardware, tools etc. 
d Ensure the insulation level of the panels 
5 Protection of Persons
a The connections of protective conductors and connections between the cubicles 
b Presence of earth braid in all movable parts of the enclosures 
c Ensure the electrical continuity between the cubicles and doors. 
d Partitions are as per form of constructions and rigidity of the bus bar shrouds 
6 Energizing the switchboard
a Phase sequence of the main power supply 
b Outgoing circuits are energized one by one and the operating sequence is verified 
c Verification of electrical - mechanical interlocks, indication and measuring instruments etc. 
Client Consultant Contractor Tested by
..…………………………. ..…………………………. ..…………………………. ...………………………….
..…………………………. ..…………………………. ..…………………………. ...………………………….
3145A
TESTING AND COMMISSIONING CERTIFICATE

Client : …………………………………………………………………... Date :…………………………………...


Consultant : …………………………………………………………..... Job No. :……………………………....
Project : ……………………………………………………………….... Drawing No. : ………………………....
Panel Title : …………………………………………………………..... Panel Sl.No. : ……………………..…..

This is to confirm that the on-site installation inspection of the referred ………………………………………….
……………………………………………………………………………………………………….…………………….
was carried out in accordance to the IEC 61439-1 standard, approved testing & commissioning
procedure and drawings.

The results of the tests were found satisfactory. Hence the switchboard was commissioned and put into service.
The functionality of the switchboard was found satisfactory as per project requirements.

Inspection and Testing Programme

Checks carried out as per approved test procedure Verified

1 Insulation resistance test.

2 Auto and manual functions and safety interlocks.

3 Metering functions (where applicable).

4 Earth leakage and other protection relays (where applicable).

5 Any other specific test as per requirement.

6 Commissioning carried out and the switchboard was put into service.

Note: For details of inspection, refer to "Testing and Commissioning Report"


Client Consultant Contractor Tested by
………………………….. …………………………….. …………………………….. …………………………..
………………………….. …………………………….. …………………………….. …………………………..
21.0 AREAS OF CONCERN

Energy

Industry

Residential

Infrastructure

31 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL. No. CLIENT CONSULTANT PROJECT PRODUCT

1 BURJUMAN CENTRE (L.L.C) DAR AL HANDSAH SHAIR AND PARTNERS THE NATIONAL CO. (KHARAFI NATIONAL) MDB,SMDB, MCC, DB, CAP.PANEL&METER CABINET

2 EMIRATES ADPI EMIRATES NEW ENGINEERING CENTRE MDB,SMDB,MCC,CAP.PANEL & DB

3 GASCO ARENCO BUHASA ACCOMMODATION COMPLEX MDB,SMDB, MCC & DB

4 AL GHURAIR CENTRE NGC INTERNATIONAL AL GHURAIR CENTRE EXPANSION MDB,SMDB, MCC& FINAL DB

5 JUMEIRAH BEACH RESIDENCE DAR JUMEIRAH BEACH RESIDENCE MDBS,MCCS,SMDBS,DBS & CAP. PANELS

6 TABREED ELLERBE BECKET DISTRICT COOLING PLANT T2 & T3A MOTOR CONTROL CENTRE

7 TABREED ELLERBE BECKET DISTRICT COOLING PLANT T4 & 3B MOTOR CONTROL CENTRE

8 DUBAI CIVIL AVIATION KENNEDY & DONKIN DUBAI AIRPORT EXPANSION TD-196 MDB,MCC,SMDB & DB

9 GASCO S.C.T.P ASAB ACCOMMODATION COMPLEX MCC,MDB,SMDB & DB

10 DUBAI CIVIL AVIATION DAR AL-HANDASAH CENTRAL UTILITY COMPLEXES - 4 MDBS,MCCS,SMDBS & DB

11 DUBAI NATIONAL INVESTMENTS NORR GROUP CONSULTANTS METROPOLITAN BEACH - RESORT TOWERS MDB,MCC,SMDB,CAP.PANEL & DB

12 GULF IMPORT & EXPORT Co. GULF IMPORT & EXPORT Co. NFM - AGOM MCC PANELS

13 AL ROSTAMANI GROUP W.S. ATKINS 21st CENTURY TOWER, DUBAI LV PANEL,SMDB,DB & MCC

14 DUBAI INTERNET CITY SPP MEDIA CITY PHASE-III, DUBAI LV PANEL,SMDB,DB & MCC

15
5 JUMEIRAH BEACH
JU C RESIDENCE
S C HYDER CO
CONSULTING
SU G JJBR1- PODIUM
O U MDB,SMDBS,DBS,MCCS
,S S, S, CCS & CAP.BANK
C

16 P.W.D BELGIAN ARAB CONSULTANTS GENERAL HOSPITAL AL RAHBA MDB,SYN.PANEL,SMDB,CAP.PANEL & FINAL DB

17 MAJID AL FUTTAIM INVESTMENT WSP SOUK AL NAKHEEL MDBS,MCCS,CAPACITOR & DB

18 DUBAI INTERNET CITY ARENCO DUBAI INTERNET PHASE III MDB,MCC,SMDB,DB & CAP.PANEL

32 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL. No. CLIENT CONSULTANT PROJECT PRODUCT

19 DUBAI MEDIA CITY SCHUSTER, PECHTOLD AND PARTNERS DUBAI MEDIA CITY PHASE III MDB,MCC,SMDB,DB CAP. PANEL

20 EMMAR ROBERTS PARTNERS RESIDENCES AT BURJ DUBAI MDBS, SMDBS, MCCS, DB

21 TABREED TABREED AL- AIN AIR COLLEGE LV MCC,MDB & MCC

EMIRATES OF ABU DHABI GENERAL MDB,SMDB,CAP.PANEL,FEEDER PILLAR,


22 W. S. ATKINS & PARTNERS OVERSEAS ABU DHABI INDUSTRIAL CITY
INDUSTRY CORPORATION FINAL DB & CONTROL PANELS

23 EMMAR PROPERTIES NORR GROUP CONSULTANTS MARINA TOWER MSB,MCC,SMDB & DB

CHAMERA HYDROELECTRIC PROJECT,


24 NATIONAL HYDRO ELECTRIC POWER CORPORATION Ltd. SNC LAVALIN INC. MDB, SMDB & FINAL DB
STAGE-II HIMACHAL PRADESH

25 MAJID AL FUTTAIM INVESTMENTS HALFORD ASSOCIATES SOUK AL NAKHEEL - SNOW DOME MDB,MCC,SMDB,CAP.PANEL & DB

26 ADCO ECG ENGINEERING BAB INFRASTRUCTURE & BAB 13 LV PANEL,SMDB,DB & MCC

27 EMMAR NORR GROUP EMMAR HEAD QUARTERS, DUBAI LV PANEL,SMDB,DB & MCC

28 AL GHURAIR GROUP LLC AL GURG CONSULTANTS DUBAI POLYFILM CO. EXPANSION MDBS,MCCS,SMDBS & DB

29 EMARAT ARENCO G+4 OFFICE COMPLEX PLOT. NO-155/DUBAI MDB,SMDB & FINAL DB

30 DUBAI INTERNET CITY AL TURATH ENGG. FALCON CABLE LANDING STATION P-109 LV PANEL,SMDBS,CAP.BANK,DBS & ISOLATOR PANEL

31 JEBEL ALI CONTAINAR GLASS FACTORY STONE & WEBSTER JEBEL ALI CONTAINAR GLASS FACTORY MAIN DISTRIBUTION BOARD

GULF LIBRARY MANUSCRIPTS & MDB,SMDB,CAP.PANEL,FINAL DB &


32 EMIRATES OF ABU DHABI WORK DEPARTMENT AL BURJ. ENGG. CONSULTANTS
STUDIES CENTRE CONTROL PANELS
EMIRATES OF ABU DHABI GENERAL MDB,SMDB,CAP.PANEL,FINAL DB &
33 W S.
W. S ATKINS & PARTNERS OVERSEAS ABU DHABI INDUSTRIAL CITY (CONTRACT-2A)
(CONTRACT 2A)
INDUSTRY
S CO
CORPORATION
O O CO
CONTROL
O PANELS S
COOLING PLANTS FOR AL TOWAISA
34 TABREED SHANKLAND COX Ltd. MCC,ATS & DB
MILITARY BASE

35 M.P.W.H H D P OVERSEAS KALBA HOSPITAL, SHARJAH LV PANEL,SMDB,DB & MCC

36 H.E.KHALIFA BIN AHMED AL OTAIBA SYR CONSULT FOUR POINT HOTEL BY SHERATON AT SHARJAH MDB,MCC,SMDB & FINAL DB

33 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL. No. CLIENT CONSULTANT PROJECT PRODUCT

37 W.E.D. EWBANK PREECE MIRFA POWER & DISALINATION DISTRIBUTION BOARDS

L.T. SW,BD,SYN.PANEL,SOFT STARTER PNL,


38 WED - ALAIN CANSULT 100 WELLS & TELEMETRY SYSTEM IN SHUWAIB
WELL HEAD CONTROL PANELS

39 NATIONAL PROJECTS EREX CONSULTANT AL REEF COMPOUND MDB,SMDB & CAP.PANEL

40 ADGAS IAN BANHAM & ASSOCIATES PROJECT-8003/DAS ISLAND MDB,MCC,SMDB & FINAL DB

41 TABREED TABREED TABREED COOLING PLANT-3B EXTENSION MOTOR CONTROL CENTRE

42 ABUDHABI NATIONAL OIL CO. KHATIB & ALAMI NEW LPG FILLING PLANT-MUSSAFAH ANNOLAC,MDB,MCC & ATS

43 TABREED TABREED TABREED PHONIX PHASE-1 MOTOR CONTROL CENTRE

44 CUMMINS DIESEL CUMMINS DIESEL IRAQ PROJECTS MAIN DISTRIBUTION BOARD

45 FIRST GULF BANK AL SALAAM FIRST GULF BANK HEAD QUARTERS MDB,SMDBS,DBS & MCCS

46 DEFENCE DEFENCE MW - 1590 MDB, SMDB & DB

47 CIVIL AVIATION DUBAI INT'L BECHTEL INC. TD51 DUTY FREE WARE HOUSE MAIN DISTRIBUTION BOARD

48 BURJUMAN CENTRE L.L.C DAR-AL-HANDASAH BURJUMAN CENTER EXPANSION DUBAI SMDBS, DBS,MCP & METER CABINET

49 P.W.D W. S. ATKINS & PARTNERS OVERSEAS GUARD ADMINISTRATION BUILDING AL AIN MDB,ATS PANEL,SMDB,FINAL DB & CAP. PANELS

50 R.A.K. CERAMICS R.A.K. CERAMICS MODERN CERAMICS-9 MDBS,CAP.BANK & SMDBS

51 DUBAI MUNICIPALITY ITAL CONSULT CUSTOMS HEAD QUARTERS & DOC MDB,SMDB & FINAL DB

52 WOMEN'S ASSOCIATES IAN BANHAM ASSOCIATES WOMEN'S ASSOSIATION BUILDING MDB,SMDB & FINAL DB

53 DUBAI INTERNET CITY (TECOM) AL TURATH MAIN TELEPORT AT JABEL ALI, DUBAI LV PANEL, SMDB, DB, & MCC

UNITED ARAB EMIRATES MINISTRY OF


54 GIBB MIDDLE EAST COMPREHENSIVE TECH. SCHOOL AT RAK MDB,SMDB,DB & CAP.PANELS
PUBLIC WORKS & HOUSING

34 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

55 MAJID AL FUTTAIM RENAULT & PARTNERS AJMAN RETAIL DEV. - CONTINENT FIT OUT MDB,SMDB,DB & SYN. PANEL

DUBAI AIRPORT CARGO VILLAGE EXPANSION


56 DUBAI CIVIL AVIATION DAR AL HANDSAH MDB, MCC& DB
EMIRATES SKY CARGO CENTRE

57 SHEIKH SULTAN SURROR AL DHAHERI AL SUWEIDI ENGG CONSULTANTS SHEIKH BUILDING MDB,SMDBS,DBS & MCCS

58 EAST COST CO. INTERNAL ENGG. CENTER 50 VILLAS PROJECTS AT RAS AL KHAIMA MDB,SMDB & FINAL DB

59 DUBAI INTERNET CITY AL TURATH ENGG. CONSULTANT POP-JUMAIRAH ISLAND MDB,SMDB,CAP.PANEL & DB

60 DUBAI INTERNET CITY AL TURATH ENGG. CONSULTANT MAIN TELEPORT STATION AT JABEL ALI, DUBAI MDB,SMDB,CAP.PANEL & DB

61 ABU DHABI MUNICIPALITY FEDERIC R. HARRIS INC. MINA ZAYED FREE ZONE STREET LIGHTING CONT.PANEL

62 H H SHEIKH MANSOOR
H.H INTEGRATED DESIGN BUREAU COMMERCIAL BUILDING MDB SMDBS & DB
MDB,SMDBS

63 RULERS REPRESENTATIVE IN EASTERN REGION KEO INTERNATIONAL CONSULTANTS DIWAN BUILDING MDB,SMDBS,CAP.PANEL & DB

64 HYATT REGENCY SERVEU HYATT REGENCY CHILLER PANEL,VFD PANEL

65 ZADCO SUIDAN & ASSOCIATES ZIRKU FACILITIES NEW CONT. CAMP MDB,SMDB & FINAL DB

66 EMIRATES OF ABU DHABI WORK DEPT. TECHNICAL STUDIES BUREAU AL RAHA BEACH RESORT, ABU DHABI SMDB,DB & CONTROL PANELS

PUMPS, GENERATOR & 11KV OVERHEAD


67 ABU DHABI MUNCIPALITY ARABIAN ENGINEERING CENTRE MDB & SYNCHRONISING PANEL
LINES IN BEDAA GHANEM AREA.

68 P.W.D BELGIAN ARAB CONSULTANT BUREAU SGENERAL HOSPITAL AL RAHBA MDB & AC PANELS

69 ARCOI QATAR INC. PARSONS TECHNIP ARCO AL RAYYAN OIL DEVELOPMENT, QATAR MDB,SMDB & FINAL DB

GOVERNMENT OF ABU DHABI GENERAL ADDITION, ALTERNATION,MAINTENANCE


70 EHA CONSULTING ENGINEERS MDB & CAPACITOR BANKS
AUTHORITY FOR HEALTH CARE WORKS FOR TAWAM HOSPITAL AL AIN

71 INTERNATIONAL CAPITAL TRADING BIONA CONSULTING ENGG DEVELOPMENT OF FLATS C1 - C6 MOTOR CONTROL CENTRE

72 P.W.D. AL AIN T.K.B. CONSULTANT COMB. SCHOOL - AL HAYER MDB,SMDB & FINAL DB

35 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

73 GASCO S.C.T.P BAB ACCOMMODATION COMPLEX MCC,MDB,SMDB & DB

74 QATAR TELECOMMUNICATION QATAR TELECOMMUNICATION IDC BUILDING- QATAR MDB,MCCS & DB

75 W.E.D D. BALFOUR & SONS MARFA HILL TOP PUMPING STATION MOTOR CONTROL CENTRE

76 ADNOC FOD ADNOC FOD LOBP / GREASE PLANT L.V.PANEL BOARDS

EXTENSION OF EXISTING PRIVATE SUITS AT


77 PWD MAKHLOUF MDB,SMDB & FINAL DB
AL MAFRAQ HOSPITAL

78 RAS AL KHAIMAH CEMENT Co. LAFARGE 3100 TPD CEMENT PLANT CONTROL PANELS

79 W.E.D. ABU DHABI TEBODIN CONSULTANT PUMPING FAC. FOR SEA PALACE MOTOR CONTROL CENTRE

80 SEREX INTL CONSULTANT SEREX INTL CONSULTANT WARE HOUSE FOR ADIA AT MUSSAFAH ATS CAP PANEL SMDB LVP DB & MCCB
ATS,CAP.PANEL,SMDB,LVP,DB

81 M.P.W. & H. - DUBAI EHA CONSULTING CENTER. HIGHER SECONDARY SCHOOLS MDB,SMDB & FINAL DB

82 AMANA STEEL MOT MAC DONALD TUFTED CARPET FACTORY AT MUSSAFAH LV,CAP.PANEL,SMDP & DB

83 KASSIM ISMAIL AHMED MOHAMMED SPACE CONSULT G+10 COMM. PLOT - 416 MDB,SMDB & DB

84 PWD E. KRAUT CONSULTANT GERMANY 10MG WATER RESERVOIR & PUMPING STATION CONTROL PANEL,CAP.PANEL & DB

85 ABU DHABI WATER & ELECTRICITY AUTHORITY ESB INTERNATIONAL NEW 132/11KV SUBSTATION AC MDB,SDB & LDB

86 TAWAM HOSPITAL PAC INTERNATIONAL AL TAWAM HOSPITAL MDB,SMDB &FINAL DB

87 AL KHASANA INSURANCE AGG AL KHASNA INSURANCE BLDG, ABU DHABI MDB,MCC,SMDB & FINAL DB

88 AL GAITH HOLDING NATIONAL ENGINEERING BUREAU DALMA & YASSAT TOWER, DUBAI MDB,SMDB & DB

BURJ DUBAI OLD TOWN RESIDENTIAL ACB, MSB, SMDB, CAP.BANK PANEL, METER CABINET, DB &
89 EMAAR HYDER CONSULTING
AT PHASE-3 CONTROL PANELS

90 JUMEIRAH BEACH RESIDENCE IAN BANHAM JUMEIRAH BEACH RESIDENCE -6 MDB, SMDB, MCC, CAP.BANK PANEL & DB

36 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

91 DUBAI FESTIVAL CITY HYDER CONSULTING DUBAI FESTIVAL CITY MDB, SMDB, MCC, CAP.BANK PANEL & DB

92 ZAYED UNIVERSITY SHANKLAND COX Ltd ZAYED UNIVERSITY MDB, SMDB, MCC, CAP.BANK PANEL & DB

93 EMAAR HYDER CONSULTING BURJ DUBAI PHASE -3 MDB, SMDB, MCC, CAP.BANK PANEL & DB

94 Mr. MOHAMMAED ABDALLAH AL GERGAWI IAN BANHAM AL SOUFOUTH MIXED USE DEVELOPMENT DUBAI MDB, SMDB, MCC, CAP.BANK PANEL & DB

95 EMAAR HYDER CONSULTING BURJ DUBAI PHASE -3 MDB, SMDB, MCC, CAP.BANK PANEL & DB

96 Mr. HUMAID AHAMED BIN DRAI CCD PARK PALACE MDB, SMDB, MCC, CAP.BANK PANEL & DB

97 EMAAR HYDER CONSULTING DUBAI MARINA-7W7X- DUBAI MDB, SMDB, MCC, CAP.BANK PANEL & DB

98 EMAAR NOOR GROUP BURJ VIEWS PLOT NO 85 ACB MCC,


ACB, MCC SSB,
SSB CAP.BANK
CAP BANK PANEL & DB

G+9 STOREYED LUXUARY BEACH RESORT AL MINA


99 DUBAI INTERNATIONAL MARINE CLUB ARCH GROUP MDB, SMDB, MCP, CAP.BANK PANEL & DB
SEYAHI DUBAI
DIST. COOLING PLANT AT UNIVERSITY LOCATED AT
100 TABREED SNC LAVALIN GULF CONTRACTORS MCC, VFD PANELS AND CAP.BANK PANEL
KHALIA CITY
COLD STORAFGE AT CENTRAL FRUIT AND VEG.
101 DUBAI MUNICIPALITY AL TURATH ENGG CONSULTANTS L.V.PANEL, MDB, SMDB, CAP.BANK PANEL & DB
MARKET

102 ABU DHABI GAS INDUSTRIES SNAMPPROGETTI GASCO RUWAIS 3rd NGL TRAIN MCC

UNITED TEXTILE FACTORY ON PLOT NO 45.


103 UNITED TEXTILE FACTORY CONCEPT CONSULTING ENGINEERING MDB, SMDB, CAP.BANK PANEL & DB
FUJAIRAH

104 GULF PHARMACEUTICAL INDUSTRIES GULF PHARMACEUTICAL INDUSTRIES JULPHAR GULR PHARMACEUTICAL INDUSTRIES MDB

MDB, SMDB, ATS, CAP.BANK PANEL, DB & ISOLATOR


105 FIRST GULF IAM BANHAM COMM. RESI BLDG, AL NADHA
PANELS
DUBAI INTRTNATIONAL AIRPORT EXPANRION
106 DUBAI CIVIL AVIATION DAR AL HANDSAH CONTROL PANELS
(PHASE-2)
RAS LAFFAN LIQUIFFIED NATURAL
107 RAS LAFFAN LIQUIFFIED NATURAL GAS CO. Ltd. GASCO RUWAIS 3rd NLG TRAIN CONROL PANELS
GAS CO. Ltd.
AL FUTTAIM MOTOR PARTS DISTRIBUTION CENTER
108 AL FUTTAIN REALESTATE KLING CONSULT MDB, SMDB, CAP.BANK PANEL & DB
@ DIP

37 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

109 SAEED HUMAID MATAR AL TAYER IAM BANHAM AL TAYER TOWER – AL BARSHA MDB, SMDB, CAP.BANK PANEL & DB

110 ABDULLA HASSAN AL RUSTAMANI IAM BANHAM AL ROSTAMANI TOWERS MDB, SMDB, CAP.BANK PANEL & DB

111 DEPARTMENT OF CIVIL AVIATION ADPI / DAR AL HANDSAH JXB1/DB/220 CARGO TERMINAL BUILDING MDB, SMDB, MCC, CAP.BANK PANEL & DB

112 DUBAI SPORTS CITY SINCLARIKNIGHT MERS (SKM) CRICKET STADIUM-S3 MDB, SMDB, CAP.BANK PANEL & DB

113 KLEINDIENST & PARTNERS HALCROW EUROPEAN BUSINESS CENTRE MDB, SMDB, CAP.BANK PANEL, CHILLER PANELS & DB

114 KHARAFI NATIONAL CO KHARAFI NATIONAL CO LABOUR CAMP. DUBAI MDB, SMDB, SYNCHRONISING PANEL

TRANSPOET AND RESCUE DEPARTMENT COMPLEX


115 DUBAI POLICE FORCE ARIF & BINTOAK L.V. PANEL , SMDB, DB & FEEDER PILLER
FOR DUBAI POLICE FORCE

116 OMNIYAT SPEC ONE @ BUSINESS BAY L V PANELS , SMDB


L.V. SMDB, MCC,
MCC CAP.BANK
CAP BANK PANEL & DB

117 ENGINEERS OFFICE ENGINEERS OFFICE EVENT ARENA @ AL MARMOOM, DUBAI MDB, SMDB, CAP.BANK PANEL & DB

118 JIWIN INVESTMENTS LACASA G+2 LABOUR ACCOMODATION MDB, SMDB, CAP.BANK PANEL & DB

DEVELOPMENT OF FLATS C1/Z-9 SHK. MOHD BIN


119 LINK INVESTMENTS BAINONA MDB, CAP.BANK PANEL & DB
ZAYED CITY AXD

120 ABU DHABI GAS INDUSTRIES SNAM PPROGETTI GASCO RUWAIS 3rd NGL TRAIN MCC

ETHIHAD INTERIM TERMINAL


121 EMITATES OF ABU DHABI WS ATKINS & PARTNER OVERSEAS MDB, SMDB, MCC, CAP.BANK PANEL & DB
CONSTRUCTION, AXD

122 H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN IAN BANHAM & ASSOCIATES AL KAMAL TOWER MCC & CAP.BANK PANEL

H.H. SHEIKH HAMDAN BIN ZAYED AL NAHYAN & COMPLEX OF 18 VILLAS FOR H.H. SHKA.
123 DEWAN MDB, SMDB, CAP.BANK PANEL & DB
LINK INVESTMENT MOZA BINT HAMDAN AL NAHYAN
MISCELLANEOUS BUILSDINGS AT
124 DEPARTMENT OF THE PRESIDENTS AFFAIRS ABU DHABI AL SALAAM MDB, SMDB, CAP.BANK PANEL & DB
ABU AL ARYAD ISLAND
HIGHER CORPORATION FOR SPECIALIZED ECONOMIC ABU DHABI BUSINESS HUB, PHASE-1 OFFICE
125 AL RAMAHI ENGG. MDB, SMDB & DB
ZONES INDUSTRIAL CITY OF AXD COMPLEX

126 ABU DHABI NATONAL HOTEL AL SALAAM SPECTRUM GLASS FACTORY-AXD MDB, SMDB, ATS, & CAP.BANK PANEL

38 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

PRIMARY HEALTH CARE CENTER AT AL MUWAIJI-


MUWAIJI AL
127 GENERAL AUTHORITY FOR HEALTH SERVICES HDP (OVERSEAS) Ltd. MDB, SMDB, CAP.BANK PANEL & DB
AIN

128 H.H. SHEIKH TAHNOON BIN MOHAMED AL NAHYAN AL SALAAM AL AIN ROTANA HOTEL EXTENTION PHASE-1 MDB, SMDB, CAP.BANK PANEL & DB

129 MUBADALA DEVELOPMENT COX GROUP UAE UNIVERSITY NEW CAMPUS MDB, SMDB, MCC, CAP.BANK PANEL & DB

130 SHARJAH MUNCIPALITY HALLCROW DIBBA AL HISN SEWARAGE NETWORK PHASE-1 MDB, MCC & MCP

131 GOVT. OF DUBAI AIRPORT FREE ZONE AUTHORITY M. ENGINEERING. INC CENTRAL CHILLING PLANT MODIFICATION MDB, MCC, CAP.BANK PANEL & DB

132 TAMEER ADAN SAFFARINI PRINCESS TOWER (DXB) MDB, SMDB, CAP.BANK PANEL & DB

133 MAF SHOPPING MALLS WSP MIDDLE EAST MIRDIF CITY CENTRE MDB, SMDB, CAP.BANK PANEL & DB

134 ALDAR (MASSEERA) HALCROW YAS ISLAND DEVELOPMENT MDB

EMIRATES INTERGRATED TELECOMMUNICATIONS TECOM INVESTMENT FZ-L.L.C, SPORTS CITY


135 AL TURATH ENGINEERING MDB, SMDB, ATS, CAP.BANK PANEL & DB
COMPANY PJSC (DU) VICTORY HEIGHTS & VILLA AL WARQAA
PRIMARY HEALTH CARE CENTER IN
136 GENERAL AUTHORITY FOR HEALTH SERVICES GENERAL HEALTH AUTHORITY MDB, SMDB, CAP.BANK PANEL & DB
MADINAT ZAYED – ABU DHABI
BEACON EDUCATION SCHOOLS AT
137 BEACON EDUCATION W.S. ATKINS MDB, SMDB, CAP.BANK PANEL & DB
AL RAHA GARDENS (AXD)

138 OMAR AL MANA (QATAR) ARCHITECTURAL CONSULTING GROUP AL MANA VILLAS M.V. PANEL, SMDB, CONTROL PANEL & ATS PANEL

139 AL FUTTAIM REAL ESTATE N.E. AZZAM & PARTNERS INTERCON HOTEL STAFF MDB, SMDB, MCC, CAP.BANK PANEL & DB

140 DUBAI PROPERTIES KHATIB & ALAMI BAY SQUARE AT BUSINESS BAY MDB, SMDB & DB

141 NAKHEEL DYNAMIC ENGINEERING CONSULTANT 613 VILLAS @ JUMEIRA VILLAGE MDB,, SMDB,, METER CABINET,, CAP.BANK PANEL & DB

TAMMER CONSULTING ENGINEERING &


142 EMIRATES MEDIA ASSOCIATION UNITED PRINTING AND PUBLISHING MDB, SMDB, ACB PANEL, CAP.BANK PANEL & DB
MANAGEMENT
CLARKEBOND MIDDLE EAST
143 ALDAR LABOUR VILLAGE @ AL AIN MDB, SMDB, CAP.BANK PANEL & DB
ENGINEERING AND MANAGAMENT
TABREED COOLING PLANT RB-04 (017721),
144 TABREED TABREED MCC, CAP.BANK PANEL & CONTROL PANEL
AL RAHA BEACH, AXD

39 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

TABREED COOLING PLANT RB


RB-02
02 (017721)
(017721),
145 TABREED TABREED MCC, CAP.BANK PANEL & CONTROL PANEL
AL RAHA BEACH, AXD
TABREED COOLING PLANT T-07, P-7301
146 TABREED TABREED L.V. MCC & CAP.BANK PANEL
ZAYED MILITARY CITY,( AXD)
TABREED COOLING PLANT T-08, P-7301
147 TABREED TABREED L.V. MCC & CAP.BANK PANEL
ZAYED MILITARY CITY,( AXD)

148 DEPARTMENT OF THE PRESIDENTS AFFAIRS DEWAN ARCHITECTS & ENGINEERINGS AL RAWDHA PALACE CAPACITOR BANK PANELS

GOVERNMENT OF DUBAI ROADS & TRANSPORT


149 ATKINS DUBAI METRO-RASHIDIYA DEPOT MDB & MCC
AUTHORITY
UAE ARMED FORCES DIRECTORATE OF MILTARY
150 MW/SOC/CFD/SC/208/247 LV PANES & CAP. PANELS
WORKERS (DMW)

151 PACIFIC CONTROLS ORBIT ENGINEERING CONSULTANTS CLOUD COMPUTING CENTER MDB,SMDB,MCC,CAP.PANEL & DB

M/S. ARKIPLAN CONSULTING ARCHITECTS


S B+G+12 FLOOR PARKING BUILDING
152 H H SHAIKH RASHID BIN KHALIFA AL MAKTOUM
H.H MDB SMDB MCC CAP PANEL & DB
MDB,SMDB,MCC,CAP.PANEL
& ENGINEERS LATIFA TOWER
GOVERNMENT OF DUBAI ROADS & TRANSPORT PROJECT DM-001 DUBAI METRO PROJECT - GREEN
153 ATKINS MDB,SMDB & DB
AUTHORITY LINE
GOVERNMENT OF DUBAI ROADS & TRANSPORT
154 ATKINS DUBAI METRO(DM-001)-RASHIDIYA DEPOT MCC
AUTHORITY

155 SHETH ESTATE (INTERNATIONAL) Ltd. WS ATKINS & PARTNERS OVERSEAS IRIS BAY PLOT NO.BB.A.02.005 MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB

156 JULPHAR JULPHAR - J10 LV. PANEL

157 Mr. ABDULAH HAMAD OBAID AL SHAMSI AL NAHDA ENG. CONSULTANT PROPOSED (G+4P+20) BLDG MDB,SMDB,CAP.PANEL & DB

DIBBA AL HISN FOUL MAIN LIFTING PUMP STATION


158 SHARJAH MUNICIPALITY M/S.HALCROW MDB,MCC & CAP.PANEL
TANKER DISCHARGE FACILITY
ABUDHABI INVESTMENT COUNCIL NEW
159 ABUDHABI INVESTMENT COUNCIL ARUP MDB & ACB PANELS
HEADQUARTERS

160 INTERNATIONAL CAPITAL TRADING RAFIK EL - KHOURY & PARTNERS AL-RAHA BEACH HOTEL EXTENSION ABUDHABI UAE. MDB,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB

161 GIFFIN TRAFFIKS LLC FIRAS ENGINEERING CONSULTANT FACTORY MDB,SMDB,CAP.PANEL & DB

EMIRATES LAND GROUP POST BOX-26536, ABUDHABI SHINING TOWERS AL KHALDIA COMPLEX PLOT-
162 RAMBOLL MCC & CONTROL PANELS
UAE. C9,SECTOR-W9.

40 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

163 ADNOC RUWAIS HOUSING COMPLEX EXPANSION - PHASE III CAP. BANK PANELS

164 CROWN PAPER MILL LTD. CONSULTING ENGINEERING GROUP CROWN PAPER MILL FACTORY MDB's

ABUDHABI INVESTMENT COUNCIL NEW


165 ABUDHABI INVESTMENT COUNCIL ARUP MDB's, ACB PANEL,GENSET PANEL & ATS PANEL
HEADQUARTERS

166 MUBADALA AECOM CLEVELAND CLINIC - ABU DHABI MDB,SMDB,MCC,CAP.PANEL & DB

KHARAFI NATIONAL OIL AND GAS EQUIPMENT


167 KHARAFI NATIONAL CO.(L.L.C.) IAN BANHAM AND ASSOCIATES MDB,SMDB & DB
FABRICATION PJSC
SHINING TOWERS OF ABUDHABI AL KHALDIA
168 EMIRATES LAND GROUP RAMBOLL MDB,ACB PANELS,ATS,SMDB,CAP.PANEL & DB
COMPLEX
H.E. SHEAIKH AHMED BIN SAIF BIN MOHAMMAD AL ACG - ARCHITECTURAL CONSULTING MDB,ATS, SMDB, MCC, CAP.PANELS, CONTROL PANELS &
169 NOVOTEL & IBIS HOTEL, MUSSAFAH, ABU DHABI
NAHYAN GROUP DB
YAS ISLAND DEVELOPMENT SOUTHERN TUNNEL
170 ALDAR HALCROW INTERNATIONAL PARTNERSHIP
P MDB's
CROSSING

171 DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI PRIVATE VILLA AT LA MISERE SEYCHELLES MDB,SMDB,MCC,CAP.PANEL & DB

172 DEPARTMENT OF THE PRESIDENTS AFFAIRS, ABU DHABI PRIVATE VILLA AT BARBARON SEYCHELLES MDB,SMDB,MCC,CAP.PANEL & DB

TABREED COOLING PLANT SHAMS ISLAND (017906) -


173 TABREED TABREED LV.MCC & MCC's
SM01,ABUDHABI,U.A.E
YAHSAT SGS PROJECT SITE-A AL FALAH SWEIHAN MDB,SMDB,CAP.PANEL & DB
174 YAHSAT(UNITED ARAB EMIRATES) ALTURATH ENGINEERING CONSULTANTS
ROAD,ABUDHABI
MDB,SMDB,MCC,CAP.PANEL & DB
175 ABU DHABI POLICE GHQ POLICE PROJECTS COMMITTEE ARCH.& PLANNING GROUP (APG) EXEMPLARY SCHOOL FOR POLICE AL AIN

AL AIN LABOUR VILLAGE ATSEEH AL LAHAMA - AL MDB,SMDB,CAP.PANEL & DB


176 AL DAR ARCHITECTURE & PLANNING GROUP
AIN
YAHSAT SGS PROJECT SITE-B AL AIN MILITARY MDB,SMDB,CAP.PANEL & DB
177 YAHSAT(UNITED ARAB EMIRATES) ALTURATH ENGINEERING CONSULTANTS
CAMP AL AIN
CAMP,
AL GHURAIR CITY EXPANSION (PHASE-
178 AL GHURAIR CITY ARIF & BINTOAK MDB,ATS,SMDB,MCC,CAP.PANELS,CONTROL PANELS & DB
II),DUBAI,U.A.E.
WATANI RESIDENTIAL DEVELOPMENT, PHASE 1A-
179 SOROUH REAL ESTATE PJSC M/S.EWAN SMDB's & DB's
ABUDHABI,UAE
M/s. BURO HAPPOLD CONSULTING
180 THE LAND MARK TOWER - ABU DHABI PDB,SDB,MCC,CAP.PANEL & DB
ENGINEERS

41 of 51

Ref. 6302K
22.0 MAJOR PROJECTS EXECUTED

SL.No. CLIENT CONSULTANT PROJECT PRODUCT

H E AL SHAIKH RASHID BIN KHALIFA BIN SAEED AL


H.E.AL LATIFA TOWER,
TOWER RESIDENTIAL/COMMERCIAL
181 ARKIPLAN LV.PANELS, ACB PANELS, CAP. PANELS,MCC, SMDB'S & DB
MAKTOUM (B+G+M+41+2 MECH. FLOORS)

42 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

CLEVELAND CLINIC

YAHSAT SATTILITE STATION

43 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

AL MAKTOUM INTERNATIONAL AIRPORT

CLOUD DATA CENTRE

44 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

DUBAI FESTIVAL CITY

MIRDIF CITY CENTRE

45 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

ABU DHABI UNIVERSITY

BAVARIA DALMA TOWER BAVARIA YASSAT TOWER

46 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

BURJ DUBAI – OLD TOWN

ETIHAD TRAINING COMPLEX

47 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

DUBAI MARINA TOWERS – X1, X2 DUBAI MARINA TOWERS – W1, W2


AND X3 AND W3

BURJ VIEWS

48 of 51

Ref. 6302K
23.0 SOME MAJOR REFERENCES

EMIRATES ENGINEERING CENTER

EMIRATES FLIGHT HANGAR

49 of 51

Ref. 6302K
24.0 MAJOR CLIENTS

¾ Abu Dhabi Oil Refining Company (TAKREER)


¾ Abu Dhabi National Oil Company For Distribution (ADNOC FOD)
¾ Abu Dhabi Drilling Chemicals & Products Limited (ADDCAP)
¾ Abu Dhabi Gas Liquefaction & Co.
Co Ltd (ADGAS)
¾ Abu Dhabi Marine Operating Company (ADMA OPCO)
¾ Abu Dhabi National Oil Company (ADNOC)
¾ AD Water and Electricity Authority - Village & Islands Department &Street Lighting
Department
¾ Abu Dhabi Municipality - Irrigation and Street Lighting Departments
¾ Abu Dhabi Company for Onshore Oil Operations (ADCO)
¾ Abu Dhabi Gas Industries Limited (GASCO)
¾ Ajman Fisheries
¾ Beach Hotel, Abu Dhabi
¾ Department of Civil Aviation
Aviation, Abu Dhabi International Airport
¾ Dubai Ports Authority
¾ Dubai Police Force
¾ Dubai Electricity and Water Authority (DEWA)
¾ Dubai Municipality (DM)
¾ Department of Civil Aviation (DCA)
¾ Department of Social Services and Commercial Buildings
¾ EPPCO and ENOC
¾ EMARAT
¾ Emirates Telecommunications Corporation (ETISALAT)
¾ Ministry of Public Works and Housing (MPWH)
¾ Ministry of Interior
¾ Ministry of Information & Culture, Emirates Broadcasting Corporation
¾ National Petroleum Construction Company

50 of 51

Ref. 6302K
24.0 MAJOR CLIENTS

¾ Public Works Department, Abu Dhabi, Beda Zayed & Al Ain


¾ Ras Al Khaimah Cement Plant
¾ Sharjah Electricity and Water Authority (SEWA)
¾ Sharjah Municipality
¾ Sharjah Oil Refinery
¾ Town Planning Department, Abu Dhabi
¾ UAE Armed Forces G.H.Q.
¾ Zakum Development Company (ZADCO)
¾ Dubai Internet City (TECOM)
¾ Sharjah Police
¾ EMAAR
¾ Al Ghurair Group

51 of 51