PROFORMA İNVOİCE

Date :17.04.2017

Proforma no:…..

BUYER : MUHAMMET AYAŞ

SUBJECT : AAC BLOCK ( THERMO STONE -AERETED AUTOCLAVE CONCRETE

FLAT BLOCK PRODUCTION LINE PURCHASE AND SALE

Detailed Equipment List for AAC Block Plant


with Total Daily Capacity 150 m3 SEMİ automatic Plant

1
MAIN TECHNICAL SPECIFICATIONS OF LINE

CAPACITY : In one line 150m3 / 24 hour

(45.000 m3 300 working day in a year)

Producible thickness :10x15x20cm

Producible breadth :30 cm

Producible height :60 cm –

STEAM –BOİLER- tunnel fuel type : FUEL OİL

THE ENERGY REQUIRED POWER

Total energy : approximate 600 kw

Voltage : 380-400 V

Frequency : 50 HZ

THE CONDITIONS OF WORKSHOP FOR PRODUCTION LINE

Height above sea level :0-100 meter

Temperature :from -5°C to +50°C

The temperature inside the building :from +10°C to +35°C

Moisture :max.%65 ,min.%40

Wind speed :max.100 km/h

2
LABOR FORCE : ( According to working 24 hour / 3 shift in a day)
Shift
No. Section name &position Shift Total
1 2 3
Raw material process section
1
Feeding worker 2 1 1 2
Batching pouring section
Batching worker 2 1 1
2
Pouring worker 2 1 1 6
Annoit 2 1 1
Resting section
3
Resting managing section 2 1 1 2
Cutting grouping section
Over-turn ,de-mould worker 2 1 1
4
Cutting worker 2 1 1 6
Grouping worker 2 1 1
Autoclave &curing section 3
5
Steam worker 3 1 1 1
Finished production section
Autoclave-out worker 2 1 1 2
6
Finished products carry
2 1 1 2
worker
Producing Auxiliary section
Machine maintenance 2 1 1 2
7
Electrician 2 1 1 2

Laboratorian 1 1 1 1
8 Boiler room 3 1 1 1 3
11 Total 31

3
WORKING TIME

Working days in a year : 300

Week in a year : 43

Working days per week : 6

RAW MATERIAL -To product 1m3 thermo stone (500-800 kg)

CEMENT:Portlant cement _pc 1-52.5 it should be minimum 12 PH ,cement alkali


measured by CaO,Na2O and K2O ,the amount of alkali (Na2O ve K2O) should be
minimum 75 ml,if the alkali is less should add caustic soda or lime, but if it over
should add PH or phosphoric acid.

AGREGA: ( the properties should be minimum SIO2 %90-95 _ maximum clay % 3-4
,moisture % 10 and between 0-2 mm)

Water : ph 6-7 ( hardness of drinking )

-Soluble salts 2000mg/1;max

-SO4-2 ions 600mg/1;max

-Cl-1 ions 350mg/1;max

-Other particulates 200mg/1;max

-THE GAZ GENERATING aluminum powder and paste

-CONCRETEN ADDITIVES (laboratory study and become clear in the trial production)

IT SHOULD BE IN REQUIRED FEATURE AND AMOUNT AND THE BUYER SHOULD OBEY
TO THESE IN THE TRIAL PRODUCTION.

4
THE PRODUCTS THAT ARE SUBJECT TO THE PROPOSAL

Below there are total 11 article

No SECTION & SYSTEM

1 Raw Materials Treatment Section

Batching & Pouring Section


2

3 Titling & Cutting Section

4 Grouping & Hardening Section

5 Out of Autoclave Section

Electricity and Control system


6

7 Ray and moulds troyler

Water Supply Pipe & Valves


8

Steam and Heat Equipment


9

10 Load Carriers for Production Line

11 Environmental Equipment

5
THE TOTAL VALUE OF MACHINERY AND EQUIPMENT

1.812.000 USD (one million eight hundred twelve thousand- usd )

PAYMENT INFORMATION:
BANK DETAILS : HALK BANKASI

NAME AND CITY OF BRANCH : GAZİEMİR_IZMIR

TL ACCOUNT NUMBER : 53000102

CODE OF SWIFT : TRHBTR2A

IBAN : TR80 0001 2009 7460 0053 000102

PAYMENT CONDITION: CAN BE DISCUSSED

PRODUCT DELIVERY TIME: IN 240 WORKING DAY FROM THE FIRST PAYMENT

(PARTLY OR AT ONE TIME ABOVE T.I.R IN THE CONTAINER, DELIVERY DATE )

That do not exist on the date of signing the contract and pre-seen, beyond the control
of the seller, the seller contracts loaded with the emergence of partially or totally fulfill
the responsibilities it impossible to fulfill them on time or circumstances, force majeure
(natural disasters, war, terrorism, insurrection, revolt , provisions of the legislation
hand away, or strike, lockout, an important defect in the production and
communication facilities) will be considered.

If the force majeure occurs, sellers, must tell in written the buyer immediately. When
the force majeure is continue the seller became unable to perform so the seller is not
responsible.

THE TRANSPORT:The transport cost is responsibility of the buyer .(any tax, mortar
does not belong to seller)

TIME OF GUARANTEE AND THE SCOPE :THE INSTALLATION AND TRIAL


PRODUCTION ALL PRODUCTS -WHICH ARE MADE BY THE SELLER INVOICE AS OF
6
THE DATE TWO ( 2 ) YEARS GUARANTEE.( WEAR PARTS , ELECTRICAL PARTS , USE
ERRORS , EXCLUDING )

THE LOCATION AND SHAPE OF THE PRODUCT DELIVERY: From the seller
factory onto auto in container-dismantled

INSTALLATION AND SETUP THE GOOD : SELLER COMPANY DO THE MACHINE


ASSEMBLY (INSTALLATION TEAM VISA,TRAVEL EXPENSE, HOUSING ETC COSTS THE
BUYER COMPANY)

-CONSTRUCTION –ELECTRIC-WATER-ETC ACORDING TO THE PROJECT AND

INFRASTRUCTURE PREPARATION DO THE BUYER COMPANY, IN PLANT ELECTRICAL

WIRING AND INSTALLATION WORK DO THE BUYER, INSTALLATION TEAM GO AFTER

COMPLETING THE INFRASTRUCTURE.

- DURING INSTALLATION ALLTHE NECESSARY GADGETRY- CRANE-LIFT AUXILIARY

UNIT-TRANSLATER ETC. PROCEDURES SUPPLY BY THE BUYER

-OCCUPATIONAL HEALTH AND SAYFTY MEASURES IN THE WORKING AREA BUYER

PROVIDE.

-IN THE TRIAL STAGE THE MATERIAL IS USED AND THE LOSS OF THE PRODUCT
THAT CAN BE IS NOT RESPONSIBLE OF THE SELLER

-FOR GOOD THE DESIRED QUALITY,AND RUGGEDNESS NEEDED TO BE PREPARED


BY THE BUYER ,ATMOSPHERIC AREA AND TEMPERATURE

7
PROJECT : AAC LİNE - AFGANİSTAN

MONTHS
DATE ORDER 1-2 3-4 5-6 7-8 9-10
PROJECT (DESIGN AND ENGINEERING)

FACTORY LAYOUT

CONSTRUCTION PROJECT- ELECTRIC


PROJECT -BUILDING PROJECT (BELONG TO
CUSTOMER)
START OF CONSTRUCTION(BELONG TO
CUSTOMER)

EXCAVATIONS(BELONG TO CUSTOMER)
CONCRETE WORKS(BELONG TO
CUSTOMER)

CONSTRUCTION AREA INSTALLATION

THE BEGINNING OF THE MANUFACTURING

MANUFACTURING CONTINUATION

MANUFACTURING CONTINUATION

MANUFACTURING CONTINUATION

MANUFACTURİNG ENDİNG

FIELD FORWARDING

THE BEGINNING OF ASSEMBLY

INSTALLATION OF THE HEAT SYSTEM OF


THE TUNNEL

ALL OF THE MECHANICAL ASSEMBLIES

INSTALLATION OF ELECTRIC-AIR

SUPPLY OF RAW MATERIAL-END OF


ASSEMLY - COLD TESTS

FİNAL TESTİNG AND TRIAL PRODUCTION