Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.1
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
DESIGN OF CORBEL
( For crane girder support on CWPH Columns along Grid- A & C )
Let l = 500 mm
Adopting 500 x 500mm Bearing Plate
Clear Cover = Cc = 50 mm
Dia of Rebar = f = 25 mm
The following loads are obtained as support reactions (with impact factor) from the Analysis and
Design of Crane girder. Refer Doc. no. PE-DC-314-653-C002.
file:///conversion/tmp/scratch/378948448.xls
BHEL - 1500 MW CCPP PRAGATI-III
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.2
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
CALCULATIONS :
Depth of Corbel = Fv / ( tc * B )
For Struct action in the Corbel, (av / d) ratio should be less than 0.6.
Ax2 + Bx + C = 0
x = (z/d)
A = 1
B = - 0.47/(0.47+0.062) = -0.884
C = 0.062/(0.47+0.062)*0.47^2 = 0.026
x = [ -B ± √(B2 - 4AC) ] / 2A
x = (z/d) = 0.854
Location of Compressive force from top compressive edge of the cross-section '0.45Xu' shall be
written as,
(d - z) = 0.45Xu
file:///conversion/tmp/scratch/378948448.xls
BHEL - 1500 MW CCPP PRAGATI-III
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.3
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
Ft = Fv ( av / z )
= 520.08 x ( 300 / 544.30 ) = 286.65 kN
Fv / 2 = 520.08 / 2 = 260.04 kN
file:///conversion/tmp/scratch/378948448.xls
BHEL - 1500 MW CCPP PRAGATI-III
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.4
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
Enhancement factor = 2 x d / av
for Shear Stress, f
= 2 x 637.50 / 300.0 = 4.25
t c1 = f x tc
= 4.25 x 0.54 = 2.29 N/mm2
= (0.87x500x226.19x637.5)/120 = 522.71 kN
file:///conversion/tmp/scratch/378948448.xls
BHEL - 1500 MW CCPP PRAGATI-III
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.5
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
HENCE SAFE
file:///conversion/tmp/scratch/378948448.xls
BHEL - 1500 MW CCPP PRAGATI-III
PE-DC-314-653-C001-PART-3
CW PUMP HOUSE - 3D ANALYSIS AND DESIGN
E.6
Part – 3 – Design of Columns, Isolated Footings, Tie Beams at EL (-) 4.500, Grade Beams , Corbel and RC Wall.
OUTPUT RESULTS :
(i) Materials
Concrete = M25
Steel = Fe 500
(ii) Dimensions :
Tension Reinforcement
Provide 4 - 12 mm
file:///conversion/tmp/scratch/378948448.xls